MINISTRY OF EDUCATION, MALAYSIA


VOCATIONAL COLLEGE STANDARD CURRICULUM
COURSE INFORMATION

DOOR AND WINDOW FRAMES INSTALLATION

COURSE NAME

CODE NAME

WTP 201

LEVEL

1 SEMESTER 2

CREDIT UNIT

2.0 credit/hrs

CONTACT HOUR

FACE TO FACE

: 4.0 HOURS/WEEK

NON FACE TO FACE

COURSE TYPE

VOCATIONAL

PREREQUISITE

CORE REQUISITE

1
Last Edited

10 13 Nov 2013

Course Page

1/8

Document Page

December Edition

2013

COURSE OUTCOMES:
At the end of the module , the students should be able to:1.

select frames and fix fasteners on frames

2.

fix Frame on the Wall

3.

construct Door and window opening on brick wall

4.

erect formwork for Lintel

5.

place lintel over frames

COURSE DESCRIPTION
This course is designed for students to be able to fix the frame in a correct position. As part of it, they are able to understand the materials and
methods in selecting frames, plus fixing fasteners on frames using proper technique in constructing the frame on the wall. In following the right
technique and procedures, students will also be able to erect lintel over frames. In addition, the module allows awareness among the students
to select, use the workplace tools and equipment safely. Also ensure the student maintain the cleanliness of work area, equipment and avoid
workplace hazards.

CONTENT AND LEARNING STANDARDS


2
Last Edited

10 13 Nov 2013

Course Page

2/8

Document Page

December Edition

PROGRAM

CONSTRUCTION TECHNOLOGY

COURSE NAME

DOOR AND WINDOW FRAMES INSTALLATION

CODE NAME

WTP 201

CONTENT STANDARD
1. SELECT FRAMES AND
FIX FASTENERS ON
FRAMES

LEARNING STANDARD

2013

PERFORMANCE CRITERIA

1.1 Identify frames

1.1.1. Confirm frames according to the working drawing.

1.2 Prepare undercoats for the frames

1.2.1

1.3 Recognize the fastener for the frame

1.3.1 Confirm fastener as specified in the work


requirement.
1.3.2 Install fasteners on frames according to the work
specification.

Apply undercoats to the frames properly as to


comply with the work requirement.

CONTENT AND LEARNING STANDARDS


3
Last Edited

10 13 Nov 2013

Course Page

3/8

Document Page

December Edition

PROGRAMME

CONSTRUCTION TECHNOLOGY

COURSE NAME

DOOR AND WINDOW FRAMES INSTALLATION

CODE NAME

WTP 201

CONTENT STANDARD
2

FIX FRAMES ON THE WALL.

LEARNING STANDARD

2013

PERFORMANCE CRITERIA

2.1 Identify the working site.

2.1.1

Prepare the location according to the


working drawing.

2. 2 Identify frames.

2.2.1

Select frames as required by Working


drawing.
Transport frames to the work site according to
the job specification.

2.2.2
2.3 Set up frame.

2.3.1

Carry out frame to the required proposed


structure according to the job procedure.

2.4 Measure the height and level of


frames.

2.4.1

Confirm the height and level of frames


according to the working drawing.

2.5 Support the frame.

2.5.1

Install brace to support the frame and


adjust their alignment properly as required by
the work specification.
4

Last Edited

10 13 Nov 2013

Course Page

4/8

Document Page

December Edition

2013

CONTENT AND LEARNING STANDARDS

PROGRAMME

CONSTRUCTION TECHNOLOGY

COURSE NAME

DOOR AND WINDOW FRAMES INSTALLATION

CODE NAME

WTP 201

CONTENT STANDARD
3. CONSTRUCT DOOR AND
WINDOW OPENING ON
BRICK WALL

LEARNING STANDARD

PERFORMANCE CRITERIA
4.1.1

Define wall opening according to standard


requirement

4.2Specify the position of wall opening

4.2.1

Mark the position of door and window by proper


method according to drawing plan.

4.3 Set up wall with opening up to the


lintel level

4.3.1

Set up wall with opening up to the lintel level


by proper procedures using appropriate tools
and equipment

4.4 Erect frame into position

4.4.1

Install and fix frame into position according to the


Procedures.
Fix and install frame to wall with fasteners using
proper procedures and tools according to
standard procedures

4.1 Recognise wall opening

4.4.2

4.5 Install lintel over opening

4.5.1
4.5.2

Select method of constructing lintel according to


drawing plan.
Place different lintel in position according to
Standard procedures
5

Last Edited

10 13 Nov 2013

Course Page

5/8

Document Page

December Edition

2013

CONTENT AND LEARNING STANDARDS

PROGRAMME

CONSTRUCTION TECHNOLOGY

COURSE NAME

DOOR AND WINDOW FRAMES INSTALLATION

CODE NAME

WTP 201

CONTENT STANDARD

4. ERECT FORMWORK
FOR LINTEL

LEARNING STANDARD
3.1 Identify the work area surface.
3.2 Prepare formwork parts.

PERFORMANCE CRITERIA
3.1.1

Make up work area surface according to the working


drawing.

3.2.1

Select formwork parts for lintel to comply with the work


specification.
Fabricate formwork parts for lintel according to the work
specification.
Apply oil to the inner side of formwork surface as required by
the work specification.

3.2.2
3.2.3
3.3 Set up formwork for lintel
3.3.1

Carry out formwork construction for lintel using proper


procedures and techniques in accordance with work
specification
.
6

Last Edited

10 13 Nov 2013

Course Page

6/8

Document Page

December Edition

3.4 Strip off, clean and stack lintel


formwork.

3.5 Clean the work area from debris.

3.3.2
3.3.3
3.4.1
3.4.2

3.5.1

2013

Perform the work of alignment and straightness of lintel


with proper techniques.
Ensure the water tightness between gaps.
Dismantle formwork for lintel using proper procedures and
and stack techniques.
Clean formwork for proper storage as required by the work
site procedures.
Carry out cleaning of waste at the site after completion of
work.

7
Last Edited

10 13 Nov 2013

Course Page

7/8

Document Page

December Edition

2013

CONTENT AND LEARNING STANDARDS


PROGRAMME

CONSTRUCTION TECHNOLOGY

COURSE NAME

DOOR AND WINDOW FRAMES INSTALLATION

CODE NAME

WTP 201

CONTENT STANDARD
5.

PLACE LINTEL OVER


FRAMES

LEARNING STANDARD

PERFORMANCE CRITERIA

4.1 Identify the working site.

4.1.1 Select correct location according to the


working drawing.

4.2 Prepare pre-cast lintels.

4.2.1 Select reinforcement concrete bars according


to the working drawing.
4.2.2 Pour concrete mortar into the formwork
according to the work specification.
4.2.3 Carry out pre-cast lintels according
to work requirement.
4.2.4 Transport pre-cast lintel to work site according
to the standard of procedure.

4.3 Prepare platform and scaffolding to


place lintels on frame.

4.3.1 Erect platform and scaffolding according


to the job requirement

4.4 Fix lintel over the frames

4.4.1 Carry out lintel placement over frames


according to the specification.
8

Last Edited

10 13 Nov 2013

Course Page

8/8

Document Page

December Edition

2013

9
Last Edited

10 13 Nov 2013

Course Page

9/8

Document Page

You might also like