HOUSING &

DEVELOPMENT
BOARD

STANDARD SCHEDULE OF RATES

FOR

DEMOLITION WORKS

(JUL 2009)

Published by Housing and Development Board, Republic of Singapore.


No part of this document may be reproduced or copied in any form
or by any means without the prior permission of the publisher.

HOUSING & DEVELOPMENT BOARD


STANDARD SCHEDULE OF RATES
FOR
DEMOLITION WORKS (JUL 2009)

CONTENTS

S/N

DESCRIPTION

PAGE

GENERAL PREAMBLES

i - iii

PARTICULAR PREAMBLES TO VARIOUS TRADES

iv - x

EXCAVATION

CONCRETE WORK

1-3

CARPENTRY

FLOOR FINISHES

WALL FINISHES

NON-STRUCTURAL STEEL WORK

PAINTING AND DECORATING

10

SITEWORK/MISCELLANEOUS

6-7

11

DAYWORK

7-9

Page i

GENERAL PREAMBLES
Introduction
1.1

The clauses in the General Preambles shall apply to all work items contained
in the Standard Schedule of Rates.

1.2

The Particular Preambles to each Trade shall be read in conjunction with the
respective Trade in the Standard Schedule of Rates.

1.3

All Rates include the allowances for complying with the General and Particular
Preambles.

All rates contained in the Schedule of Rates are fixed basic rates (in
Singapore Currency) and no amendment whatsoever shall be made to such
Rates. The tenderers shall be deemed to have closely studied all Rates
contained herein and duly noted their implications.

All rates contained in this Standard Schedule of Rates are exclusive of any
Goods and Services Tax. Any such Goods and Services Tax shall be borne
by the Employer as and when the same becomes due and payable.

All work, materials and goods described in these Schedule of Rates shall be
of the respective kinds described in the Contract and in accordance with the
instructions of the Superintending Officer or the Superintending Officer's
Representative.

Headings to groups of items shall be read as part of the descriptions of the


items to which the headings apply.

Where brand/trade names are given in the descriptions, they are solely
intended for fixing the rates of the items. The products and materials to be
used in the contract shall be governed by the Specifications, Drawings and
other documents forming the contract (and not this Schedule of Rates).
Description of Works and Inclusions

Unless specifically stated otherwise, the following shall be deemed to be


included in the description of the item of work:
(a)

Labour and all costs in connection therewith including the labour in


fabricating, assembling, setting, fitting and fixing of materials and goods
in position.

Page ii
GENERAL PREAMBLES
Description of Works and Inclusions (Contd)
(b)

Materials and goods including materials required for lapping, jointing and
the like and all costs in connection therewith such as delivery, unloading,
storing, returning of packings, handling, hoisting and lowering.

(c)

Preparing surfaces to receive work.

(d)

Protecting materials and work.

(e)

Waste of materials.

(f)

All cutting and waste.

(g)

Use of Construction Equipment, tools, vehicles and all costs in


connection therewith.

(h)

Cleaning up on completion and making good all work disturbed.

(i)

General requirements set out in the Specifications, Drawings and other


documents forming the Contract.

(j)

Establishment charges, overhead, profit.

Unless otherwise stated, all work shall be measured net as fixed in its place.

Unless otherwise stated, pipes are described by their internal diameters.

10

Where minimum deductions of voids are dealt with in this document they shall
refer only to openings or voids which are within the boundaries of measured
area. Openings or voids which are at the boundaries of measured area shall
always be the subject of deductions irrespective of size.
Billing of Quantities

11.1

Where the unit of measurement is the linear metre, square metre and cubic
metre, quantities shall be billed to the nearest whole unit. Fractions of the unit
less than half shall be disregarded and all other fractions shall be regarded as
a whole unit.

Page iii
GENERAL PREAMBLES
Billing of Quantities (Cont'd)
11.2

Where the unit of measurement is the kilogramme, quantities shall be billed


to the nearest whole unit. Fractions of a unit less than half shall be
disregarded and all other fractions shall be regarded as a whole unit. Where
the unit of billing is the tonne or litre, quantities shall be billed to the nearest
two places of decimals.

11.3

Where the unit of measurement is the hour, fractions of the unit shall be
billed to the nearest next half hour.

11.4

Where the application of clauses 11.1 and 11.2 would cause an entire item
to be eliminated, such item shall be billed to the nearest two places of
decimals.

12

Unless otherwise stated, the term "as specified" means as specified in any
of the documents forming part of the Contract.

13

The following abbreviations are used for the units:


m
m2
m3
no.
kg
hr

Linear metre
Square metre
Cubic metre
Number
Kilogram
Hour

Page iv
PARTICULAR PREAMBLES TO VARIOUS TRADES

1.0

1.1

1.2

EXCAVATION
Definition of Ground
Ordinary ground includes spoil or rubbish of every description, rubbish tip
material etc, sand gravel, decomposed granite, red or white earth, loamy or
gravelly clay, gravelly laterite, mud, bog or any other formation of pick and
shovel and at any depth.
Description
The description of each item of excavation shall be deemed to include
excavating around foundation, piles and confined areas, getting out, removing
of bakau piles, trimming, levelling and compacting bottoms of excavations,
keeping sides plumb and planking and strutting.

Measurement
1.3.1 The measurement of all excavations and subsequent disposal shall be those
before excavating. The increases in bulk and any extra excavation required
for earthwork support, planking and strutting and formwork for concrete shall
be deemed to be included in the Rates.
1.3.2 No allowance for working space shall be made in the measurement of all
excavation unless the method of construction requires workmen to operate
from the outside of the structure. In such cases, a working space of 600mm
shall be measured from the external face of the structure.
1.3.3 Filling shall be measured as equal to the void to be filled. Any thickness
stated shall be deemed to be after compacting.

1.4

Rate
Rates for each item shall be held to include for keeping all excavation free
from water and site dry by pumping or bailing if required and providing any
temporary drains required.

Page

2.0 CONCRETE WORK

2.1

2.2

2.3

Rate
Rates for each item of concrete shall be held to include the following:
(a)

Forming, cutting grooves, chases, mortices, holes and making good any
other sundry items of a like nature.

(b)

Extra labour for laying to falls, or cambers and preparing surfaces to


receive screeds or pavings also to be included.

(c)

All tests on concrete, cement and aggregate etc as required and


compliance with the strengths as specified.

(d)

Tamping and/or vibrating to give thorough compaction; working between


and around reinforcements.

(e)

Laying on any type of sub-base; preparing and leaving surfaces to


receive screeds or paving.

Deduction
No deduction shall be made in the measurement of concrete work for:
(a)

Voids of 0.05 cubic metre or less.

(b)

Volume of the reinforcement and steelwork.

(c)

Openings in walls, floor, roof slabs and the like of 0.10 square metre or
less.

Reinforcement

Description
2.3.1 The description of each item of reinforcement shall be deemed to include:

2.4

(a)

Allowances in the weight of reinforcement for rolling margins.

(b)

All cleaning, cutting, bending, fabricating, placing, typing and the


provision of all necessary distance blocks, tying wires, spacers or chairs,
temporary fixings and supports.

Fabric Reinforcement

Rate
2.4.1 Rates for each item of fabric reinforcement shall be held to include for extra
material at laps, tying wires and all bending, cutting and notching around
obstruction. Only the net area covered shall be measured and no deduction
shall be made for opening less than 1.00 square metre.

Page vi
2.0 CONCRETE WORK (Contd)
2.5

Formwork

Description
2.5.1 The description of each item of formwork shall be deemed to include:
(a)

All necessary boardings, supports, erecting, framing, cutting,


perforations for pipes, angles, cleaning, wetting and treatment with
mould oil, mould liquid or limewhite and the like.

(b)

All splayed edges, notchings, allowance for overlaps and passings at


angles, battens, strutting, bolting, wedging, easing, striking and removal.

Measurement
2.5.2 Formwork shall be measured to the surface of work sloping more than 15
degree from the horizontal.
Deduction
2.5.3 No deduction shall be made in measurement of formwork for:
(a)

Openings less than 1 square metre

(b)

Intersection of main and secondary beams

(c)

Intersection of beams and stanchion casing or columns

2.6

Unless otherwise stated, Rates for concrete, reinforcement and formwork


shall be applicable to all work irrespective of locality, positions, shapes
and height.

2.7

Precast Work

Description
2.7.1 The description of each item of precast work shall be deemed to include
concrete, reinforcement, formwork including the formation and filling of
pockets, holes, chases and recesses for anchors, bolts and the like, grouting,
pointing of joints, surface finishes, delivery, unloading, hoisting, erecting,
fixing including all necessary temporary erection gear, bracing and working
platforms.
2.8

Surface Water Channels

Rate
2.8.1 Rates for each item of surface water channels shall be held to include for all
angles, intersections, ends, outlets and extra labour and material for forming
grooves or rebates to sides.

Page vii
3.0

3.1

CARPENTRY
Description
The description of each item of carpentry work shall be deemed to include all
cutting, notching, boring, sinking, pelleting, fitting, trimming, mitring, halving,
morticing, tenoning, dovetailing, scarfing, wedging and all ends, splayed
edges, short lengths and temporary supports and any other sundry of a like
nature and also all labour in forming, drilling for bolts and fixing in position
complete with nails, screws or adhesives.

3.2

Nominal sizes are stated for wrot timber and an allowance of 2.5mm is
permitted for each wrot face.

4.0

FLOOR FINISHES

4.1

4.2

4.3

4.4

4.5

Description
The description of each item of floor finishes shall be deemed to include all
temporary rules, temporary grounds, temporary screeds and the like, cutting
holes, notching and the like, all normal bedding and pointing materials,
providing all necessary samples, cleaning down and making good around
pipes, sanitary fixtures and the like, work in narrow widths and small
quantities in areas interrupted by seatings, channels and the like, all internal
angles, quirks, grooves, throats, drips, coves and rounded external angles not
exceeding 25mm radius, angles, stops, intersections, fair ends junctions,
wreathed corners and the like on cornices, mouldings, enrichments, coves,
skirtings, gutters, channels, strings, kerbs and similar or other sundry items of
a like nature.
The description of each item of floor finishes shall be deemed to include
protecting surfaces from the weather or building operations.

Rate
Rates for each item of skirtings, risers, moulded edges, channels and the like
shall be held to include for all short lengths, formed, cut and purpose made
angles, junctions, end, necessary UPVC trimming pieces, etc and making
good and any other sundry item of a like nature.

Deduction
No deduction shall be made for openings of 0.50 square metre or less.

Measurement
Where an item is described as Add to (or deduct from).. for each 5mm
thickness over (or under) .. , the difference for any thickness less than
5mm shall be paid/deducted based on 5mm thick.

Page viii
5.0

5.1

5.2

5.3

5.4

WALL FINISHES
Rate
Rates for each item shall be deemed to include all temporary rules, temporary
grounds, temporary screeds and the like, cramps, dowels, ties, special metal
supporting brackets and the like, cutting holes, notching and the like,
masking, labour to internal angles other than coved angles, making good
around pipes, sanitary fixtures and the like, work in narrow widths and small
quantities, joints between different types of work, joints between new and old
work, internal angles, fair edges, rounded or chamfered edges or angles,
quirks, grooves, V-joints, groin points and other intersections of curved
surfaces, rounded coves and external angles not exceeding 25mm radius,
mitres, stops and the like on cornices, mouldings, architraves, coves,
skirtings, gutters, strings and all making good and any other sundry items of a
like nature.
Rates for each item shall also be deemed to include protecting surfaces from
the weather or building operations.

Deduction
No deduction shall be made for openings of 0.50 square metre or less.

Measurement
In the measurement of plastering, no deduction shall be made for casings for
pipes under 300mm wide or angles which are finished in a different material if
these do not exceed 100mm girth.

5.5

Within the building shall mean surfaces within the internal of buildings/flats,
corridors, staircases and the like which normally do not entail scaffolding or
mechanical cradles to carry out the works.

5.6

External face of building shall mean surfaces such as gable end walls,
front/back external walls and any other surfaces which are constantly
exposed to weather and/or which normally require the use of scaffolding or
mechanical cradles to carry out the works.

5.7

Work shall be deemed to be executed when scaffolding has been provided


during the course of construction. Should scaffolding be required separately
just to execute the work, it would be paid as an extra item.

Page ix
6.0

NON-STRUCTURAL STEEL WORK

6.1

Description
The description of each item of steel work shall be deemed to include:

6.2

(a)

Allowance for rolling margins and the weight of welding materials.

(b)

Shop and site fabrication including drilling, cutting (including holes and
openings for other trades), notching, splicing, riveting, bolting, machining
ends and bearings, delivery, unloading, landing, hoisting, erecting, fitting
and fixing in position.

(c)

Provision of all necessary Construction Equipment, temporary bracing


supports and the like required for erection, providing samples and tests
required by the specification, the inspection of welds including the use of
any special radio-graphic techniques.

(d)

Nuts and any type of washer which may be required.

(e)

Preparation of shop drawings.

Deduction
No deduction shall be made for drillings, holes, notchings, splay cuts and the
like.

6.3

Measurement
Weights stated shall be net theoretical weights.

7.0

PAINTING AND DECORATING

7.1

Rate
Rates for each item of painting shall be held to include for all necessary
preparation of surfaces including cleaning off, sandpapering woodwork,
wirebrushing metal and leaving all surfaces free from dust, rust, grease and
oil before painting, narrow widths, etc.

7.2

All items in this section shall be deemed to included for multi-coloured works.

7.3

Deduction
No deduction shall be made for openings of 0.50 m2 or less.

7.4

Work shall be deemed to be executed when scaffolding has been provided


during the course of construction. Should scaffolding be required separately
just to execute the work, it would be paid as an extra item.

Page x
8.0

8.1

SITEWORK/MISCELLANEOUS
Definition of Approved Soil Mixture
Approved Soil Mixture shall be 3 parts of topsoil with 1 part of soil conditioner
and 1 kg per m3 of compound fertilizer NPK (15:15:6.4) or 4:2:1 subsoil,
unwashed sand and soil conditioner with 1 kg per m3 of granular fertilizer NPK
(15:15:6.4).

8.2

Measurement
The measurement of girths of the trees shall be at a height of 1.0 metre above
ground.

8.3

Rates
The rate for cutting down trees shall be deemed to include for grubbing up
roots and filling of voids after removal of tree roots.

9.0

DAYWORK

9.1

Rate
The rates shall be applicable to all work executed on a daywork basis
including shifting of office equipment and furniture, supply of transportation as
directed etc. During the continuance of such work, the Contractor shall keep
proper records of the names, occupations and working hours of all workmen
employed for such work and the quantities and descriptions of all materials
and construction equipments employed. Such records, receipts or vouchers
must be verified by the Superintending Officer or Superintending Officer's
Representative before payment can be effected. Provided always that if the
Superintending Officer's Representative shall consider that for any reason the
keeping of such records, receipts and vouchers by the Contractor as required
was impracticable, he shall nevertheless be entitled to authorise payment for
such work either as daywork (being satisfied as to the time employed and
Construction Equipments and materials used on such work) or at such value
thereof as he shall consider fair and reasonable.
Daywork's Schedule of Rates for LABOUR and CONSTRUCTION
EQUIPMENT shall be based on the Schedule of Rates PLUS 15%
Establishment Charge and Profit.
For computation of `STAR' rate using Daywork's Schedule of Rates, it shall
include the respective Schedule of Rates items PLUS 15% Establishment
Charge and Profit.

STANDARD SCHEDULE OF RATES FOR DEMOLITION WORKS (JUL 2009)


S/No

Description

Unit

Rate

Code

EXCAVATION
* Excavation oversite commencing from ground level in ordinary
ground, including forming of surfaces and removal of surplus
excavated materials within site for the following average overall
depth:- *(DM001 - DM003)
001

Not exceeding 150mm deep.

m2

$1.50

DM001

002

Exceeding 150mm but not exceeding 300mm deep.

m2

$2.80

DM002

003

Exceeding 300mm deep.

m3

$8.70

DM003

004

Excavation in Embankment commencing from reduced level in


ordinary ground including forming of surfaces and removal of
surplus excavated materials within site.

m3

$10.10

DM004

005

Cart away excavated materials off site and deposit at the


Contractor's own dumping ground.

m3

$7.90

DM005

006

Dry approved earth filling obtained from outside source and fill in
layers of 300mm thick; including labour for spreading, trimming
and consolidating to form earth mounds or to form levels outside
buildings and / or under floor slabs, etc. as specified.

m3

$13.60

DM006

007

Select excavated material obtained within the site and used as


filling to make up level including consolidation.

m3

$11.40

DM007

008

Hardcore in beds, comprising of clean broken bricks/concrete,


deposit, spread, levelled, mechanically consolidated and
including 25mm thick sand or quarry dust blinding/topping.

m3

$19.50

DM010

009

Supply quarry waste, spread, level and consolidate.

m3

$54.10

DM011

CONCRETE WORK

010

Mass Concrete (1:3:6)

m3

$135.30

DM012

011

Reinforced concrete (Grade 20) with 20mm to 30mm granite


mechanically mixed, including working around rod or fabric
reinforcement (Formwork and reinforcement measured
separately).

m3

$145.90

DM013

ID:DEMO2009JUL

Page 1 of 9

STANDARD SCHEDULE OF RATES FOR DEMOLITION WORKS (JUL 2009)


S/No
012

Description
Reinforced concrete (Grade 25) with 20mm to 30mm granite
mechanically mixed, including working around rod or fabric
reinforcement (Formwork and reinforcement measured
separately).

Unit

Rate

Code

m3

$147.80

DM014

* PRECAST CONCRETE in heelstones, sills, lintols, slabs etc,


including moulds, hoisting and fixing in position, With
Reinforcement :- *(DM015 - DM016)
013

Precast Concrete Grade 20

m3

$464.90

DM015

014

Precast Concrete Grade 25

m3

$472.00

DM016

* PRECAST CONCRETE in heelstones, sills, lintols, slabs etc,


including moulds, hoisting and fixing in position, Without
Reinforcement :- *(DM017 - DM018)
015

Precast Concrete Grade 20

m3

$245.60

DM017

016

Precast Concrete Grade 25

m3

$252.90

DM018

* Concrete in small quantities not exceeding 0.15 m including all


necessary formwork :- *(DM019 - DM021)
017

Concrete (Grade 20)

m3

$329.10

DM019

018

Concrete (Grade 25)

m3

$332.00

DM020

019

Concrete (Grade 30)

m3

$334.90

DM021

020

Mild / Deformed High Tensile Steel Rod Reinforcement,


fabricated and laid in foundations, beds, suspended slabs, walls,
columns, beams, staircases etc., including labour for forming
stirrups, links etc. irrespective of size.

kg

$1.60

DM022

* WELDED STEEL FABRIC REINFORCEMENT well lapped and


tied at joints (measured nett) :- *(DM023 - DM027)
021

A5

m2

$3.70

DM023

022

A6

m2

$4.40

DM024

023

A7

m2

$5.60

DM025

024

A8

m2

$7.10

DM026

ID:DEMO2009JUL

Page 2 of 9

STANDARD SCHEDULE OF RATES FOR DEMOLITION WORKS (JUL 2009)


S/No
025

Description
B6

Unit

Rate

Code

m2

$7.10

DM027

Formwork
026

Timber formwork to surfaces of concrete columns, walls,


suspended slabs, stairs, canopies, beams, lintols etc.

m2

$19.70

DM028

027

Timber formwork to surfaces of concrete foundations, column


stumps, ground beams, ground floor slabs, etc.

m2

$12.70

DM029

028

225mm wide (internal) reinforced concrete (Grade 25) surface


drain not exceeding 300mm deep (average) to invert constructed
with 75mm thick sides, 100mm thick bottom reinforced with a
layer of BRC B6 weldmesh. All exposed sides, bottom and arises
rendered smooth in cement and sand mortar (1 : 3) including all
necessary excavation, hardcore, sand blinding and formwork,
laid to fall as directed.

$44.10

DM030

029

Add to Item DM030 for the increase in stages of 150mm deep.

$15.20

DM031

030

225mm wide (internal) reinforced concrete (Grade 25) surface


drain not exceeding 400mm deep (average) to invert constructed
with 100mm thick sides and bottom reinforced with a layer of
BRC B6 weldmesh. All exposed sides, bottom and arises
rendered smooth in cement and sand mortar (1 : 3) including all
necessary excavation, formwork and lean concrete laid to fall as
directed.

$85.10

DM032

031

Add to Item DM032 for the increase in stages of 100mm deep.

$16.20

DM033

032

EXTRA OVER 225 mm wide reinforced concrete drain for


PRECAST CONCRETE INVERT.

$3.30

DM036

033

Breaking up existing reinforced concrete structures including


removal of debris off the site.

m3

$109.40

DM039

034

Breaking up existing mass concrete structures including removal


of debris off the site.

m3

$85.70

DM040

035

Forming of 25mm wide x 100mm deep bituminous expansion


joint in concrete floors including formwork and bituminous seal.

$9.20

DM041

036

Take out precast concrete paving or revetment slabs and stack


up for re-use.

m2

$5.20

DM042

ID:DEMO2009JUL

Page 3 of 9

STANDARD SCHEDULE OF RATES FOR DEMOLITION WORKS (JUL 2009)


S/No
037

Description
Select from stack and lay precast concrete paving or revetment
slabs including the provision of 50mm bed of quarry waste or
sand.

Unit

Rate

Code

m2

$5.10

DM043

m3

$1,160.50

DM044

CARPENTRY

038

Sawn kapoh, balau or keruing in construction members, plates,


scantlings, railings, deckings, hoardings, rafters, etc cut to the
forms and sizes required.
FLOOR FINISHES

039

Hack existing concrete surface to form keys and wash clean to


receive finishing.

m2

$1.60

DM045

040

20mm thick prepacked screed to floor trowelled to a smooth


finish.

m2

$7.00

DM046

041

Add to (or deduct from) Item DM046 for each 5mm thickness
over (or under) 20mm.

m2

$1.40

DM047

* 20mm thick prepacked screed to skirting, treads, risers, curbs


and return etc. and trowelled to a smooth finish including curved
and rounded angles :- * (DM048 - DM049)
042

Not exceeding 150mm girth / height

$3.70

DM048

043

Exceeding 150mm but not exceeding 300mm girth /height.

$5.80

DM049

044

Add to (or deduct from) Item DM048 for each 5mm thickness
over (or under) 20mm.

$0.70

DM050

045

Add to (or deduct from) Item DM049 for each 5mm thickness
over (or under) 20mm.

$1.20

DM051

m2

$2.40

DM052

WALL FINISHES

046

Hack existing concrete surface to form keys and wash and clean
to receive finishes.

ID:DEMO2009JUL

Page 4 of 9

STANDARD SCHEDULE OF RATES FOR DEMOLITION WORKS (JUL 2009)


S/No

Description

Unit

Rate

Code

047

18mm thk plastering with approved PREPACKED MORTAR MIX


to RC surfaces, brickwalls and blockwalls etc, applied from within
the building as specified.

m2

$15.50

DM124

048

18mm thk plastering with approved PREPACKED MORTAR MIX


to RC surfaces, brickwalls and blockwalls etc, applied from the
external face of the building as specified.

m2

$17.80

DM125

kg

$3.70

DM057

NON-STRUCTURAL STEELWORK

049

Mild steel flats, angles, tees, channels, rivets and bolts, etc. of
any size fabricated and fixed including welding or bolting, and
painting with one coat of primer (for non-structural steel work
only).
PAINTING AND DECORATING

050

Brush or wash down and apply one coat of approved acrylic


emulsion paint (with 20% water dilution).

m2

$1.00

DM058

051

Brush or wash down and apply one priming coat (with 20% water
dilution) and two upper coats (without water dilution) of approved
acrylic emulsion paint on concrete or plastered surfaces.

m2

$2.60

DM059

052

Brush or wash down and apply one priming coat (with 20% water
dilution) and one upper coat (without water dilution) of approved
acrylic emulsion paint on concrete or plastered surfaces.

m2

$1.80

DM060

053

Brush or wash down and apply one coat of water based sealer on
concrete or plastered surfaces.

m2

$1.10

DM061

054

Prepare and apply one under coat and one finishing coat of
approved synthetic enamel paint on steel and ironwork.

m2

$3.20

DM062

055

Prepare and apply one under coat and one finishing coat of
approved synthetic enamel paint on grilles or railing etc (rate
inclusive of painting on both faces).

m2

$3.70

DM063

056

Prepare and apply two coats of approved synthetic enamel paint


to pipes not exceeding 75mm diameter.

$0.80

DM064

057

Prepare and apply two coats of approved synthetic enamel paint


to pipes exceeding 75mm but not exceeding 150mm diameter.

$1.60

DM065

058

Prepare and apply two coats of approved synthetic enamel paint


to pipes exceeding 150mm but not exceeding 300mm diameter.

$3.20

DM066

ID:DEMO2009JUL

Page 5 of 9

STANDARD SCHEDULE OF RATES FOR DEMOLITION WORKS (JUL 2009)


S/No

Description

Unit

Rate

Code

059

Stop, knot with spirit knotting varnish, prime with one coat wood
primer and paint two coats of approved synthetic enamel paint on
new woodwork.

m2

$5.30

DM067

060

Painting plain surfaces of woodwork and metalwork including


sand papering with one undercoat and one finishing coat of
synthetic enamel paint.

m2

$3.00

DM068

061

Prepare and apply two coats of wood preservative on woodwork.

m2

$1.60

DM069

SITEWORK / MISCELLANEOUS

062

Close turfing to slope embankment exceeding 15 degrees


including supply of a layer of 125mm thick approved good quality
top soil as specified and well watering and tending to ensure
growth of turfs.

m2

$10.50

DM070

063

Close turfing to flat and slope level with surface not exceeding 15
degrees including supply of a layer of 125mm thick approved
good quality top soil as specified and well watering and tending to
ensure growth of turfs.

m2

$10.10

DM071

064

Supply and lay 100mm diameter perforated UPVC sub-soil pipe


with open end butt joints

$7.60

DM072

065

Supply and lay 150mm diameter perforated UPVC sub-soil pipe


with open end butt joints

$11.20

DM073

* Cut down trees with girth measured at a point 1.0m above the
ground, grub up roots and clear away from site :- *(DM115 DM123)
066

Not exceeding 0.5m girth.

no

$161.90

DM115

067

Exceeding 0.5m but not exceeding 1.0m girth.

no

$194.20

DM116

068

Exceeding 1.0m but not exceeding 1.5m girth.

no

$252.30

DM117

069

Exceeding 1.5m but not exceeding 2.0m girth.

no

$377.10

DM118

070

Exceeding 2.0m but not exceeding 2.5m girth.

no

$472.90

DM119

071

Exceeding 2.5m but not exceeding 3.0m girth.

no

$615.30

DM120

072

Exceeding 3.0m but not exceeding 4.0m girth.

no

$754.30

DM121

ID:DEMO2009JUL

Page 6 of 9

STANDARD SCHEDULE OF RATES FOR DEMOLITION WORKS (JUL 2009)


S/No

Description

Unit

Rate

Code

073

Exceeding 4.0m but not exceeding 5.0m girth.

no

$947.90

DM122

074

Exceeding 5.0m but not exceeding 6.0m girth.

no

$1,122.00

DM123

075

Grass cutting at aeration slabs including weeding, sweep and


remove cut grass off site. (includings area occupied by aeration
slabs but exclude concrete lining)

m2

$0.20

DM126

076

Grass cutting including weeding on level ground or slope


embarkments, sweep and remove cut grass off site and
trimming edges at drain kerbs and roadsides, etc.

m2

$0.10

DM127

077

Precast concrete composite drain channels as specified true to


line and level as shown in Drawing (Excavation, sand bed and
bakau roller measured separately)
For 300mm (Type C7) channel

$24.20

DM128

078

Precast concrete kerb including jointing in cement mortar to


details as shown in Drawing For 125mm x 280mm (with 20mm
diameter mild steel Bar) kerb

$14.00

DM129

DAYWORK
* Rates for the following items do not include establishment
charges & profits :- *(DM075 - DM108)
079

Labourer.

hr

$4.70

DM075

080

Steel Bender and Fixer.

hr

$7.20

DM076

081

Carpenter.

hr

$7.40

DM077

082

Welder.

hr

$7.60

DM078

083

Fitter.

hr

$7.00

DM079

084

Watchman.

hr

$4.60

DM080

085

Concretor.

hr

$6.90

DM081

086

Crane Driver.

hr

$12.60

DM082

087

Drainlayer.

hr

$6.70

DM083

088

Excavator.

hr

$7.00

DM084

ID:DEMO2009JUL

Page 7 of 9

STANDARD SCHEDULE OF RATES FOR DEMOLITION WORKS (JUL 2009)


S/No

Description

Unit

Rate

Code

089

Mechanic.

hr

$7.00

DM085

090

Lorry Driver.

hr

$8.50

DM086

091

Construction Equipment Operator.

hr

$13.50

DM087

092

Motor lorry (pick-up) not more than 2.5 tonne size including fuel
and driver.

hr

$15.30

DM088

093

Motor lorry 2.5 to 3 tonne size including fuel and driver.

hr

$27.00

DM089

094

Motor lorry or Tipper 5.5 to 7 tonne size including fuel and driver.

hr

$32.40

DM090

095

Motor lorry or Tipper 10 tonne size including fuel and driver.

hr

$51.40

DM091

096

Diesel Dumper not exceeding 0.75 m capacity including fuel and


driver.

hr

$25.20

DM092

097

Diamond cutter including fuel and driver.

hr

$29.90

DM093

098

Wheel or crawler shovel or excavator loader with back hoe


bucket not exceeding 0.4 m or 1.30 m loader buckets capacity
including fuel and driver, eg Kobe 904, JCB.

hr

$70.10

DM094

099

Mini-backhoe excavator (not exceeding 0.2 m) including fuel and


driver eg. Airman HS205.

hr

$29.70

DM095

100

Crawler excavator with back hoe or dragline 0.85 m bucket


including fuel and driver, eg. Kobe 907.

hr

$80.60

DM096

101

Kobe 904 with breaker including fuel and driver.

hr

$107.70

DM097

102

Kobe 907 with breaker including fuel and driver.

hr

$144.40

DM098

103

Motor crane 3 tonne lifting capacity including fuel and driver.

hr

$35.00

DM099

104

Motor crane 5 tonne lifting capacity including fuel and driver.

hr

$43.30

DM100

105

Motor crane 8 to13 tonne lifting capacity including fuel and driver.

hr

$73.90

DM101

106

Kato crane (Kato KR20H) including fuel and driver.

hr

$106.00

DM102

107

Crawler mounted crane 25 tonne lifting capacity including fuel


and driver

hr

$85.30

DM103

108

Diesel powered field welder with minimum capacity 300 amp.

hr

$13.20

DM104

ID:DEMO2009JUL

Page 8 of 9

STANDARD SCHEDULE OF RATES FOR DEMOLITION WORKS (JUL 2009)


S/No

Description

Unit

Rate

Code

109

Mechanical rammer with impact force not exceeding 4000 kg per


blow.

hr

$14.80

DM105

110

Mechanical lawn mover with blade not exceeding 500mm and


engine power not exceeding 150cc.

hr

$2.50

DM107

111

Air Compressor with air-delivery capacity not less than 4.5 m per
minute, pneumatic tools, fuel and tool sharpening (no labour).

hr

$22.70

DM108

112

Oxy-acytelene cutter including welder.

hr

$41.20

DM106

ID:DEMO2009JUL

Page 9 of 9