2.1 Overview of Train Operation
Train operation of the Pink Line is designed to
efficiently serve the travel demand based on
alignment, station location, monorail system and
travel demand analysis and forecast. The operation
plan analysis considers various important operation
factors such as train capacity, speed, frequency and
headway that can ensure operation efficiency and
service standard. The train operation can be
described in this chapter.

2.2 Data and Parameters


In comparison to the train operation plan in the
previous feasibility study, key operation data and
parameters were revised in accordance with latest
revisions including the following changes.
Number of station increases to 30 stations.
Travel demand forecast is updated.
Additional train operation betweenPK7-PK25
JMS/TLT/RE5501/P1988/RE091 The feasibility study review, preliminarydesign plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai-Min Buri.

Supporting Design Review Documents


Chapter 2 Train Operation Plan and Service System

2-2

is introduced.
Station name and number are as follows:
PK01
PK02
PK03
PK04
PK05
PK06
PK07
PK08
PK09

Nonthaburi Civic
Center
KhaeRai
Sanambin Nam
Samakkhi
Royal
Irrigation
Department
Pak Kret
Liang Mueang Pak
Kret
ChaengWatthanaPak Kret 28
Muang
Thong
Thani

PK10 Sri Rat


PK11 Muang Thong 1
PK12 Government
Complex
Commemorating
His Majesty
PK13 TOT
PK14 Lak Si
RajabhatPhranakh
PK15
on

PK16
PK17
PK18
PK19
PK20
PK21
PK22
PK23
PK24

WongwianLak Si
Ramindra 3
LatPlaKhao
Ramindra 31
Maiyalap
Watcharaphon
Ramindra40
Khu Bon
Ramindra83

PK26
PK27

East Outer Ring


Road
NopparatRajatha
nee
Bang Chan

PK28
PK29

Setthabutbamph
en
Min Buri Market

PK25

PK30

Min Buri

The key parameters and operation data for


system operation are summarized inTable2.2-1, with
comparison to previous data in the feasibility study.
JMS/TLT/RE5501/P1988/RE091 The feasibility study review, preliminarydesign plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai-Min Buri.

Supporting Design Review Documents


Chapter 2 Train Operation Plan and Service System

2-3

Table 2.2-1Key Operation Data and Parameters


(Monorail)
Item
Operatio
n length
Maximu
m
gradient
Minimum
Facili
radius
ties
Number
of
stations
Average
station
distance
Oper Maximu
ation m speed
meth Dwell
od/
time
Oper at
ation intermed
spee iate
d
stations
Turn
back
time
at both
ends
Running
time
Commer
cial

Data and Parameters


This
Feasibility
Report
Study

Notes
Route
length
34.5km

33.84km

33.84km

6.0%

6.0%

On the
Line

Main

70m

70m

On the
Line

Main

30

24

Approx.
1.2km

Approx.
1.5km

80km/h

80km/h

On the
Line

20-50sec.
(Depends
on
ridership)

30sec.

Because some
stations have
very
big
ridership.

Approx.
5min.

Approx.
5min.

57:00
(PK01PK30)
34:20
(PK07PK25)
35.6km/h
(PK01-

59:00
(PK01PK24)

Increased by 6

Main

Including dwell
time

35.2km/h
(PK01-

JMS/TLT/RE5501/P1988/RE091 The feasibility study review, preliminarydesign plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai-Min Buri.

Supporting Design Review Documents


Chapter 2 Train Operation Plan and Service System

Data and Parameters


Item
Notes
This
Feasibility
Report
Study
PK30)
34.3km/h
speed
PK24)
(PK07PK25)
PHPDT
Fare:
(Betwee 20Baht flat
n PK16- 14,978 (in
PK17/
2017)
Westbou
35,666 (in
8,242 (in
nd train)
2046)
Increased
Rider
2016)
40-63%
Fare:
ship
21,911 (in
2046)
Distance
2046)
based
10,928 (in
2017)
30,560 (in
2046)
Train
4-car (in
4-car (in
Oper Train
initial
initial
ation composit
stage)
stage)
Plan ion
6-car (in
6-car (in
final stage) final stage)
Daily
service
5:00-24:00 5:00-24:00
hour
Train
Fare:
15/4.0min. Increased
operatio 20Baht flat
(in 2016) 14-33%
n
18/3.3min. 21/2.9min. 2046)
frequenc
(in 2017)
(in 2046)
y/headw
28/2.1min.
ay
(in 2046)
in peak Fare:
hour
Distance
based
14/4.3min.
(in 2017)
24/2.5min.

2-4

by
(in

by
(in

JMS/TLT/RE5501/P1988/RE091 The feasibility study review, preliminarydesign plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai-Min Buri.

Supporting Design Review Documents


Chapter 2 Train Operation Plan and Service System

Data and Parameters


Item
This
Feasibility
Report
Study
(in 2046)
Fare:
20Baht flat
33sets/132
cars (in
2017)
52sets/312
cars (in
Total
36sets/144
2046)
number
cars (in
of train2016)
Fare:
sets/cars
50sets/300
Distance
(spare
cars (in
based
included)
2046)
27sets/108
cars (in
2017)
45sets/270
cars (in
2046)

2-5

Notes

Fare:
20Baht
flat (in 2046)
Increased
by
2sets/12cars
Fare: Distance
based
(in
2046)
Decreased by
5sets/30cars
*Due
to
installation of
limited
section(PK07PK25)
operation

Track Layout
Due to high demand in the section PK7-PK25,
in addition to main line operation from PK1-PK30,
another train operation for section between PK7-PK25
shall be planned. For this purpose, track layout
should be arranged as shown in Figure 2.2-1 for the
purpose of turn-back at PK7 and PK25.Main depot
shall be provided at the east end of the line (at
PK30).In addition, twocrossovers shall be set at PK15
and PK20 for the maintenance, emergency and
degraded operation.
JMS/TLT/RE5501/P1988/RE091 The feasibility study review, preliminarydesign plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai-Min Buri.

Supporting Design Review Documents


Chapter 2 Train Operation Plan and Service System

2-6

Figure 2.2-1 Outline of Track Layout