2-1
Chapter
Train Operation Plan and Service
System
2.1 Overview of Train Operation
Train operation of the Pink Line is designed to
efficiently serve the travel demand based on
alignment, station location, monorail system and
travel demand analysis and forecast. The operation
plan analysis considers various important operation
factors such as train capacity, speed, frequency and
headway that can ensure operation efficiency and
service standard. The train operation can be
described in this chapter.
modification,
and preparation of tender documents for Pink Line Project. Khae Rai-Min Buri.
2-2
is introduced.
Station name and number are as follows:
PK01
PK02
PK03
PK04
PK05
PK06
PK07
PK08
PK09
Nonthaburi Civic
Center
KhaeRai
Sanambin Nam
Samakkhi
Royal
Irrigation
Department
Pak Kret
Liang Mueang Pak
Kret
ChaengWatthanaPak Kret 28
Muang
Thong
Thani
PK16
PK17
PK18
PK19
PK20
PK21
PK22
PK23
PK24
WongwianLak Si
Ramindra 3
LatPlaKhao
Ramindra 31
Maiyalap
Watcharaphon
Ramindra40
Khu Bon
Ramindra83
PK26
PK27
PK28
PK29
Setthabutbamph
en
Min Buri Market
PK25
PK30
Min Buri
modification,
and preparation of tender documents for Pink Line Project. Khae Rai-Min Buri.
2-3
Notes
Route
length
34.5km
33.84km
33.84km
6.0%
6.0%
On the
Line
Main
70m
70m
On the
Line
Main
30
24
Approx.
1.2km
Approx.
1.5km
80km/h
80km/h
On the
Line
20-50sec.
(Depends
on
ridership)
30sec.
Because some
stations have
very
big
ridership.
Approx.
5min.
Approx.
5min.
57:00
(PK01PK30)
34:20
(PK07PK25)
35.6km/h
(PK01-
59:00
(PK01PK24)
Increased by 6
Main
Including dwell
time
35.2km/h
(PK01-
modification,
and preparation of tender documents for Pink Line Project. Khae Rai-Min Buri.
2-4
by
(in
by
(in
modification,
and preparation of tender documents for Pink Line Project. Khae Rai-Min Buri.
2-5
Notes
Fare:
20Baht
flat (in 2046)
Increased
by
2sets/12cars
Fare: Distance
based
(in
2046)
Decreased by
5sets/30cars
*Due
to
installation of
limited
section(PK07PK25)
operation
Track Layout
Due to high demand in the section PK7-PK25,
in addition to main line operation from PK1-PK30,
another train operation for section between PK7-PK25
shall be planned. For this purpose, track layout
should be arranged as shown in Figure 2.2-1 for the
purpose of turn-back at PK7 and PK25.Main depot
shall be provided at the east end of the line (at
PK30).In addition, twocrossovers shall be set at PK15
and PK20 for the maintenance, emergency and
degraded operation.
JMS/TLT/RE5501/P1988/RE091 The feasibility study review, preliminarydesign plan
modification,
and preparation of tender documents for Pink Line Project. Khae Rai-Min Buri.
2-6
modification,
and preparation of tender documents for Pink Line Project. Khae Rai-Min Buri.