PROJECT
OVERVIEW
PROJECT SCOPE
Design and construction of a new 2.82-mile, four-lane limited access
highway
Construction of multiple new bridges and local connectors
A reconfigured Commercial Vehicle Inspection Station (CVIS) for NSN
Relocation of NSN Gate 6 (entry control point)
WILL BE DESIGNED TO
ALLEVIATE LOCAL
TRAFFIC CONGESTION,
REDIRECT HEAVY TRUCK
TRAFFIC FROM NORFOLK
CITY STREETS, AND
PROVIDE IMPROVED
ACCESS FOR THE
ESTIMATED 80,000
VEHICLES ENTERING
Relocation of NSNs Patrol Road
Construction of a new access road to the Virginia Port Authoritys North
Gate Terminal
PROJECT BENEFITS
The extension of I-564 will help streamline Hampton Roads transportation
network, resulting in direct freight access and increased cargo efficiencies at
NIT and the Port of Virginia.
Significant relief from Norfolks Hampton Boulevard which currently serves
NIT, coupled with more fluid and direct commuter access to NSN, will help
improve safety and security for a region known for its vital military presence.
The I-564 Intermodal Connector will serve as a critical link to the future
Patriots Crossing, a significant transportation project designed to improve
congestion at the I-64 Hampton Roads Bridge-Tunnel.
PROJECT SCHEDULE
Start of Construction: Summer 2015
PROJECT IMPACTS
Construction will be scheduled primarily during travel periods when traffic
volumes are lower to reduce impact to motorists.
Roadway lanes on I-564 will be open during peak travel times with restricted
lane closures during off-peak hours.
Project work will be suspended during significant government holidays.
STAYING INFORMED
To learn of lane closures and alternate routes prior to traveling in a work
zone area, motorists are encouraged to use the following resources:
Visit www.I564intermodal.com, 511virginia.org, or virginiaroads.org
Call 511 or download Virginias free 511 mobile app
Call the Traffic Information Line at 757-361-3016
I-564 Intermodal
Connector
Community Outreach
Watch for interstate variable message signs
Listen to Highway Advisory Radio (HAR) 1680 AM
TEAM IS DEDICATED TO
KEEPING THE PUBLIC FULLY
Slow down
Stay alert
Minimize distractions
INFORMED THROUGHOUT
ALL PHASES OF THE PROJECT.
PARDON OUR DUST PROGRESS
MEETINGS, I-564INTERMODAL.
COM, ELECTRONIC
COMMUNICATIONS, AND
CONTINUAL DISSEMINATION
OF PROJECT INFORMATION
TO THE MEDIA WILL BE
PERFORMED CONSISTENTLY
FROM THE PROJECTS
INCEPTION TO COMPLETION.
I-564 INTERMODAL
CONNECTOR PROJECT
Hampton Blvd
Naval
Station
Norfolk
564
Chambers Field
NAS Norfolk
Public Connector
Fleet Recreation
Park
Ramp C
Gate 6
Ramp A
Ramp D
Exisiting Railroad
Ramp B
Port of Virginia
Hampton Blvd
Sewells
Point Golf
Course
337
Exisiting Railroad
Virginia Beach
Joint Forces
Staff College
Elizabeth
River
564
Terminal Blvd
Terminal Blvd
406
Hampton Blvd
165
Hampton Blvd
CONTACT INFORMATION
Cherry Hill Construction, Inc., A Tutor Perini Company
5360 Robin Hood Road, Suite 201, Norfolk, Virginia 23513 | 757-447-9100