You are on page 1of 45

ROOFING

Input 1 if you use G.I. Sheet as Top Roof or Leaved it Blank if not ? :
Input 1 if you use Roof Tiles or Leaved it Blank if not ? :
Input 1 if you use Asphalt Shingles or Leaved it Blank if not ? :

ROOFING using Corr. G.I.


Did you use corr. G.I. sheet? Input 1 if True & Leave it blank if False ? :
Roofing Area ? :
Eff. Area of Single G.I. Corrugated Sheet for Top Roof ? :
Total Length of Ridge ? :
Effective Length of Single Ridge Roll ? :
Total Length of Valley ? :
Effective Length of Single Valley Roll ? :
Total Length of Flashing ? :
Effective Length of Single Flashing Sheet ? :
Total Length of Fascia Board ? :
Effective Length of Single Fascia Board ? :
Total Length of Gutter ? :
Effective Length of Single Gutter :

1.00
-

1.00
180.00
2.00
25.00
2.10
8.00
2.10
2.10
60.00
2.10
34.00
2.25

Corrugated Sheet Roofing :


G.I. Corr. Sheet for Top Roof:
Ridge Roll :

Valley Roll :
Flashing Sheet :
Fascia Board :
Tekscrew ;
G.I. Gutter :
Silicon Sealant :

ROOFING using Contrex Roof Tiles


Roofing Area ? :
Down End Length ? :
Ridge Length ? :
Left End Barge Length? :
Right Hand Barge Length? :
Effective Length of Single Down End Tiles ? :
Effective Length of Single Ridge Tiles ? :
Effective length of Single Left Hand Barge ? :
Effective length of Single Rigth Hand Barge ? :
Valley Gutter Length ? :
Effective Length of Single Valley Gutter ? :
Total Flashing Length ? :
Effective Length of Single Flashing Sheet ? :
Total Length of Fascia Board ? :
Effective Length of Single Fascia Board ? :
Effective G.I. Roofing Sheet for Undersheeting ? :
Spacing of Vertical Battens ? :
Spacing of Horizontal Batten ? :
Eff. Area of Single Flat Tiles ? :
Eff. Area of Single Down End ? :
Eff. Area of Single Rigth Hand Barge ? :
Eff. Area of Single Left Hand Barge ? :

12.00
6.00
2.40
2.40
0.30
0.29
0.28
0.30
2.35
4.80
2.35
12.00
2.35
2.50
0.60
0.50
0.09
0.09
0.09
0.09

Roof Tiles Roofing :


Flat Tiles :
Down End :
Right Hand Barge :
Left hand Barge :
Ridge Tiles :
G.I. Corr. Roofing Sheet :
Metal Battens :
Valley Roll :
Flashing Sheet :
Fascia Board :
Fascia Screw :
Ripper Screw:
Tekscrew ;
Battens Screw :

Roofing Area ? :
Area of Asphalt Filler ? :
Effective Area of Single Asphalt Shingles ? :

60.00
60.00
0.40

Asphalt Shingles Roofing:


Asphalt Shingles:
Asphalt Filler:
Marine Plywood:
CWN #1:
Tekscrew :

ROOFING using Asphalt Shingles

PARTITION
Input 1 if you use Ficem Board or leave it Blank if not ? :
Input 1 if you use Gypsum Board or Leave it Blank if not ? :
Ficem Board Wall Area ? :
Gypsum Board Wall Area ? :
Spacing of Vertical Metal Studs ? :
Spacing of Horizontal Metal Studs ? ;

Ficem Board :
Gypsum Board :
Metal Stud :
Blind Rivet :
Flat Head Screw :

CEILING
Input 1 if you use Ficem Board or leave it Blank if not ? :
Input 1 if you use Gypsum Board or Leave it Blank if not ? :
Interior Ficem Board Ceiling Area ? :
Exterior Ficem Board Ceiling Area ? :
Interior Gypsum Board Ceiling Area ? :
Exterior Gypsum Board Ceiling Area ? :
Spacing of Carrying Channel ? :

1.00
127.00

Ficem Board :
Gypsum Board :
Carrying Channel :
Furring Channel :

1.20

Hunger :

Spacing of Furring Channel ? :

0.60

Flat Head Screw :


Vents :

1.00
8.00
0.90

Handrails :
Metal Railing :
Expansion Bolt :

No. of Vents ? :

STAIRS & RAILINGS


Input 1 if Have Metal Railings or Leave It Blank if not ? :
Length of Metal Railings ? :
Height of Railings ? :

CABINETS & CLOSETS


No. of Cabinet ? :
No. of Closets ? :

Cabinet :
Closets :
Expantion Bolt :

Total Length of Base Board ? :


Total Length of Cornices ? :

Base Board :
Cornice :
Wood Glue :

BASEBOARD & CORNICES :

DOORS & WINDOWS :


No. of Panel Doors :
No. of Flush Doors :
Total Window Area :

ELECTRICAL ROUGH-INS
Circuit Breaker 20A (2 Poles)
Circuit Breaker 30A
Circuit Breaker 40A
Circuit Breaker 100A
Panel Board 12 Branches 100A
15mm Polyflex
20mm Polyflex
IMC Pipe 25mm x 10mm
THW 8.0 mm.sq.
L.B. Conduit #1
Porcelain Split Knobs
G.I. Bushing #1
65mm C Clamp
Electrical Tape (big)
Utility Box (2x2x4)
Cut Out Box (4x4)
ELECTRICAL FINISHING
One Way Gang Switch (100 watts)
One Way Two Gang Switch (100 Watts)
One Gang Three Way Switch (100 Watts)
Two Gang C.O. - (200 Watts)
Two Gang C.O. W.P. - (200 Watts)
One Gang C.O. Ref - (800 Watts)
One Gang C.O. Range (800 Watts)
One Gang C.O. - ACU (1.5 Hp)
Porcelain Socket 2x2
PLUMBING ROUGH-INS
PVC Pipe 3/4 x10
PVC Elbow 3/4

1.00
6.00
17.00

8.00
2.00
1.00
1.00

34.00
7.00
10.00
2.00
1.00
14.00
1.00
1.00
1.00
15.00
40.00
24.00

Panel Door :
Flush Door :
Door Jambs :
Hinges :
Lockset (main Door) :
Lockset Ordinary :
Window Frames :
Window Glass :

PVC. Tee 3/4


PVC Coupling 3/4
PVC Solvent Cement
Tefpon Tape
G.I. Nipple 3/4x6
G.I. Coupling 3/4 x 1/2
GI. End Cap 1/2
PVC Pipe 50mm
PVC Pipe 100mm
PVC 1/4 Bend #2
PVC Tee 4x2
PVC Wye 4x2
PVC P-Trap#2
PVC C.O. w/ Adopter #4
PVC Solvent Cement
PLUMBING FINISHING
3/4 H & Brass Faucet
Water Closet
Lavatory w/ Fittings
Floor Drain 4x4
N.P. Faucet 1/2x6
Tel. Shower Head w/ Valve
Kitchen Sink
Tissue Holder
Soap Holder
Towei Bar
Curtain Rod 3/4 x 1.25
SEPTIC TANK

10.00
3.00
4.00
2.00
2.00
2.00
38.25
26.33
8.00
6.00
2.00
4.00
2.00
3.00
2.00
2.00
3.00
2.00
2.00
2.00
2.00
2.00
2.00
Input 1 if you use CHB 4" or Leaved it Blank if not ? :
Input 1 if you use CHB 6" or Leaved it Blank if not ? :
Length of Excavation ? :
Width of Excavation ? :
Height of Excavation ? :
Total Linear Meter of Perimeter Wall Including Internal Partition ? :
Height of Wall ? :
Thickness of Slab on Fill ? :
Thickiness of Suspended Slab ? :
Input 1 if you use 10mm dia. Bars or Leaved it Blank if not ? :
Input 1 if you use 12mm dia. Bars or Leaved it Blank if not ? :
Spacing of Bars on Slab on Fill ? ;
Spacing of Bars on Suspended Slab ? :
Spacing of Wall Vertical Bars ? :
Spacing of Wall Horizontal Bars ? :

1.00

Interior Wall ? :
Exterior Wall ? :
Interior Ceiling ? :
Exterior Ceiling ? :
Other Considerable Interior Area ? :
Other Considerable Exterior Area ? :

237.00

Interior Wall ? :
Interior Ceiling ? :
Exterior Ceiling ? :
Input 1 if you use Oil Wood Stain for Stairs or Leave it Blank if not ? :
Input 1 if you use Flat Wall Enamel for Stairs or Leave it Blank if not ? :
Total Wooden Stairs Area ? :
Input 1 if you use Oil Wood Stain for Railings or Leave it Blank if not ? :
Input 1 if you use Flat Wall Enamel for Railing or Leave it Blank if not ? :
Total Wooden Railing Area ? :
Input 1 if you use Oil Wood Stain for Cabinet & Closets or Leave it Blank if not ? :
Input 1 if you use Flat Wall Enamel for Cabinets & Clostes or Leave it Blank if not ? :
Total Cabinets & Closets Area ? :

80.00
42.00
-

2.50
1.20
1.50
8.60
1.50
0.10
0.10
1.00
0.50
0.30
0.60
0.60

Floor Area :
CHB Area :
No. of CHB 4" :
No. of CHB 6" :
No. of 10mm dia. RSB :
No. of 12mm dia. RSB :
Cement For Plastering :
Sand for Plastering :
Cement For Mortar & Filler CHB#4:
Sand for Mortar & Filler CHB#4 :
Cement For Mortar & Filler CHB#6:
Sand for Mortar & Filler CHB#6 :
Cement For Concreting works :
Sand for Concreting works :
Gravel for Concreting works :
Tie Wires :
Volume of Excavation :
Volume of Concrete :
Formworks :

PAINTING OF CONCRETE

Concrete Neutralizer :
Flat Latex for Primer :
Acritex Cast :
Flat Latex for Int. 2nd & 3rd coat :
Semi Gloss Latex for Ext. 2nd & 3rd coat :
Sanding Paper #180 :

PAINTING OF WOOD
Flat Wall Enamel :
Glazing Putty :
Quick Dry Enamel :
Paint Thinner :
Wood Bleach :
Oil Wood Stain :
Sanding Sealer :
Flat Laquer :
Sanding Paper #100 :

Input 1 if you use Oil Wood Stain for Doors & Windows or Leave it Blank if not ? :
Input 1 if you use Flat Wall Enamel for Doors & Windows or Leave it Blank if not ? :
Doors & Windows ? :
Input 1 if you use Oil Wood Stain for Other Considerable or Leave it Blank if not ? :
Input 1 if you use Flat Wall Enamel for Other Considerable or Leave it Blank if not ? :
Plus Other Considerable Area ? :

PAINTING OF METAL
Total Area of Steel Surfaces ? :

40.00

Red Oxide Primer :


Quick Dry Enamel :
Sanding Paper :
Paint Thinner :

90.00
11.90

3.81
28.57
900.00
15.11
-

#DIV/0!
#DIV/0!
-

44.10
116.42
232.83
63.50

881.94
-

8.00
77.47
13.00

1.00
6.00
7.00
21.00
1.00
6.00
17.00
17.00

3.00
12.90
161.25
12.59
2.97
0.25
6.77
0.56
4.50
0.30
0.60
2.45
4.50
0.60
3.00

7.90
7.90
15.80
15.80
39.50

4.88
4.07
9.76
1.46
-

1.33
1.33
6.67
0.40

BILL OF MATERIALS
PROJECT TITLE

PERIMETER FENCE

Location : ENGR. ROMEL BUCAYU RESIDENCE


ITEM
CODE

ITEM OF WORKS

I. CONCRETING WORKS
11. Columns

DESCRIPTION

QTY.

UNIT

UNIT COST

AMOUNT

*
CEMENT
SAND
GRAVEL
RBS #16
RBS #10
Plywood
Good Lumber
CWN No. 1
CWN No. 3
Tie Wire guage 16

16.00
1.00
2.00
17.00
24.00
8.00
100.00
1.00
1.00
2.00

bags
cu.m.
cu.m.
pcs.
pcs.
pcs.
bd.ft.
kgs.
kgs.
kgs.

200.00
400.00
500.00
250.00
180.00
400.00
40.00
70.00
70.00
80.00

CEMENT
SAND
GRAVEL
RBS #16
RBS #10
Tie Wire guage 16

16.00
1.00
2.00
16.00
20.00
6.00

bags
cu.m.
cu.m.
pcs.
pcs.
kgs.

200.00
400.00
500.00
250.00
180.00
80.00

12. Beams

II. MASONRY WORKS


21. CHB Laying

*
RSB No. 10
Tie wire gauge 16
Cement
Sand
CHB No 4

23.00
2.00
21.00
1.75
500.00

3,200.00
400.00
1,000.00
4,250.00
4,320.00
3,200.00
4,000.00
70.00
70.00
160.00
3,200.00
400.00
1,000.00
4,000.00
3,600.00
480.00
-

pcs.
kgs.
bags
cu.m.
pcs.

180.00
80.00
200.00
400.00
8.00

4,140.00
160.00
4,200.00
700.00
4,000.00

12.00 bags
1.00 cu.m.

200.00
400.00

2,400.00
400.00

33,350.00

16,000.00

22. Plastering
Cement
Sand
III. STEEL WORKS
31. Steel Grille

21,000.00
Steel Grille

15.00 sq.m.

1,000.00

15,000.00

Steel Gate

6.00 sq.m.

1,000.00

6,000.00

32. Steel Gate


IV. PAINTING WORKS
41. Concrete

4,740.00
Concrete Neutralizer
Flat Latex for Primer
Acritex Cast
Semi Gloss Latex
Sanding Paper #180

1.00
2.00
4.00
4.00
10.00

gal.
gal.
gal.
gal.
pcs.

50.00
330.00
380.00
360.00
20.00

50.00
660.00
1,520.00
1,440.00
200.00

Red Oxide Primer


Quick Dry Enamel
Sanding Paper #180
Paint Thinner

1.00
2.00
6.00
1.00

gal.
gal.
pcs.
gal.

190.00
250.00
20.00
60.00

190.00
500.00
120.00
60.00

42. Steel

Prepared by:
Engr. Bobby Lupango
Civil Engr.
PTR #: 0084358

MATERIAL COST:

70,350.00

LABOR COST:

21,105.00

TOTAL PROJECT COST:

91,455.00

BILL OF MATERIALS
House Model

: VICENZA
Floor Area :
90.00 sq.m.
Location : Gardens of Maia Alta

ITEM
CODE

ITEM OF WORKS

DESCRIPTION

QTY.

UNIT

10. EARTHWORKS
11. Staking Lay-Out
Coco Lumber
Good Lumber
CWN No. 1
CWN No. 2
CWN No. 3
Nylon String

243.00
0.90
0.90
50.60

bd.ft.
bd.ft.
kgs.
kgs.
kgs.
ln.m.

12. Excavation
13. Gravel Bedding
14. Soil Poisoning
15. Backfilling
20. CONCRETING WORKS
21. Foundation

22. Columns

23. Beams

24. Suspended Slab

25. Slab on Fill

26. Service Entrance

27. Stairs

30. MASONRY WORKS


31. Batter Board

32. CHB Laying

33. Plastering

34. Concrete Molding


35. Tile Works

36. Floor Toppings

37. Other Finishing works

IV. THERMAL & MOISTURE PROTECTION


1. Roof Framing

2. Water Proofing

*
Gravel G1
*
Soil Treatment Chem.
*
Excess/barrow
*
*
RSB No. 10
RSB No. 12
RSB No. 16
Tie wire gauge 16
Cement
Sand
Gravel G1
*
Lumber
Form ply
CWN No. 1
CWN No. 2
CWN No. 3
RSB No. 10
RSB No. 12
RSB No. 16
Tie wire gauge 16
Cement
Sand
Gravel G1
*
Lumber
Form ply
CWN No. 1
CWN No. 2
CWN No. 3
RSB No. 10
RSB No. 12
RSB No. 16
Tie wire gauge 16
Cement
Sand
Gravel 3/4
*
Lumber
Form ply
CWN No. 1
CWN No. 2
CWN No. 3
RSB No. 10
RSB No. 12
RSB No. 16
Tie wire gauge 16
Cement
Sand
Gravel 3/4
Steel Deck
*
RSB No. 10
RSB No. 12
Tie wire gauge 16
Cement
Sand
Gravel G1
*
RSB No. 10
RSB No. 12
Tie wire gauge 16
Cement
Sand
Gravel G1
*
Lumber
Form ply
CWN No. 1
CWN No. 2
CWN No. 3
RSB No. 10
RSB No. 12
RSB No. 16
Tie wire gauge 16
Cement
Sand
Gravel 3/4
*
*
Good Lumber
Concrete Nail
*
RSB No. 10
Tie wire gauge 16
Cement
Sand
CHB No 6
CHB No 4
*
Cement
Sand
*
Concrete Molding
*
4"x4" tiles
8"x8" tiles
12" x 12" tiles
16" x 16" tiles
12"x12" Vinyl Tiles
Tile Adhesive :
Tile Grout :
Tile Trim :
Rugby :
*
Cement
Sand
*
Cement
Sand
Pebble Wash-Out
Bricks
Rabbles

*
*
2x4 C-Purlins :
2x6 C-Rafters :
Welding Rod :
Steel Plate :
Anchor Bolt :
Sag Rod :
*

6.00 cu.m.
1.20 li.
6.00 cu.m.

58.25
25.38
63.45
4.23
10.20

pcs
pcs
pcs
kgs.
bags
cu.m.
cu.m.

66.91
11.10
1.11
1.34
1.67
27.00
20.00
5.63
16.88
0.94
1.88

bd.ft.
pcs.
kgs.
kgs.
kgs.
pcs
pcs
pcs
kgs.
bags
cu.m.
cu.m.

56.94
11.47
1.15
5.69
5.69
26.00
20.67
5.58
16.74
0.93
1.86

bd.ft.
pcs.
kgs.
kgs.
kgs.
pcs
pcs
pcs
kgs.
bags
cu.m.
cu.m.

#DIV/0!
#DIV/0!
#DIV/0!
-

bd.ft.
pcs.
kgs.
kgs.
kgs.
pcs
pcs
pcs
kgs.
bags
cu.m.
cu.m.
sq.m.

16.81
16.80
50.40
2.80
11.20

pcs
pcs
kgs.
bags
cu.m.
cu.m.

pcs
pcs
kgs.
bags
cu.m.
cu.m.

bd.ft.
pcs.
kgs.
kgs.
kgs.
pcs
pcs
pcs
kgs.
bags
cu.m.
cu.m.

bd.ft.
kgs.

61.66
5.50
91.91
7.66
875.00
500.00

pcs.
kgs.
bags
cu.m.
pcs.
pcs.

52.22 bags
4.36 cu.m.
200.00
700.00
1,333.33
450.00
30.00
-

li.m.
pcs.
pcs.
pcs.
pcs.
pcs.
kgs.
kgs.
pcs.
li.

4.032 bags
0.448 cu.m.
40.58
0.42
0.48
3,466.67
-

41.90
14.24
32.00
10.00
20.00
16.00

bags
cu.m.
cu.m.
pcs.
pcs.

pcs.
pcs.
kgs.
pcs.
pcs.
pcs.

UNIT COST

AMOUNT

V. CARPENTRY WORKS
1. Partition Wall

2. Ceiling

3. Stair & Railing

4. Cabinets & Closets

5. Base Board & Cornices

G.I. Corr. Sheet for Top Roof:


Ridge Roll :
Valley Roll :
Flashing Sheet :
Fascia Board :
Tekscrew ;
G.I. Gutter :
Silicon Sealant :
*
Flat Tiles :
Down End :
Right Hand Barge :
Left hand Barge :
Ridge Tiles :
G.I. Corr. Roofing Sheet :
Metal Battens :
Valley Roll :
Flashing Sheet :
Fascia Board :
Fascia Screw :
Ripper Screw:
Tekscrew ;
Battens Screw :
*
Asphalt Shingles:
Asphalt Filler:
Marine Plywood:
CWN #1:
Tekscrew :
*
*
Ficem Board
Gypsum Board
Metal Stud
Blind Rivet
Flat Head Screw
*
Ficem Board
Gypsum Board
Carrying Channel
Furring Channel
Hunger
Flat Head Screw
*
Handrails
Metal Railing
Expansion Bolt
*
Cabinets
Closets
Expansion Bolt
*
Baseboard
Cornices
Wood Glue

90.00
11.90
3.81
28.57
900.00
15.11
-

pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.

pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.

pcs.
sq.m
pcs.
kgs.
pcs.

#DIV/0!
#DIV/0!
-

pcs.
pcs.
pcs.
pcs.
pcs.

44.10
116.42
232.83
63.50
881.94

pcs.
pcs.
pcs.
pcs.
pcs.
pcs.

8.00 ln.m.
77.47 sq.m.
13.00 pcs.
-

set
set
pcs.

pcs.
pcs.
li.

VI. DOORS & WINDOWS


1. Doors
Panel Door
Flush Door
Door Jambs
Hinges
Lockset (main Door)
Lockset Ordinary

1.00
6.00
7.00
21.00
1.00
6.00

set
set
set
set
set
set

Window Frames
Window Glass

17.00 sq.m.
17.00 sq.m.

Circuit Breaker 20A (2 Poles)


Circuit Breaker 30A
Circuit Breaker 40A
Circuit Breaker 100A
Panel Board 12 Branches 100A
15mm Polyflex
20mm Polyflex
IMC Pipe 25mm x 10mm
THW 8.0 mm.sq.
L.B. Conduit #1
Porcelain Split Knobs
G.I. Bushing #1
65mm C Clamp
Electrical Tape (big)
Utility Box (2x2x4)
Cut Out Box (4x4)

8.00
2.00
1.00
1.00
34.00
7.00

sets
sets
sets
sets
sets
rolls
rolls
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.

One Way Gang Switch (100 watts)


One Way Two Gang Switch (100 Watts)
One Gang Three Way Switch (100 Watts)
Two Gang C.O. - (200 Watts)
Two Gang C.O. W.P. - (200 Watts)
One Gang C.O. Ref - (800 Watts)
One Gang C.O. Range (800 Watts)
One Gang C.O. - ACU (1.5 Hp)
Porcelain Socket 2x2

10.00
2.00
1.00
14.00
1.00
1.00
1.00
15.00

pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs

PVC Pipe 3/4 x10


PVC Elbow 3/4
PVC. Tee 3/4
PVC Coupling 3/4
PVC Solvent Cement
Tefpon Tape
G.I. Nipple 3/4x6
G.I. Coupling 3/4 x 1/2
GI. End Cap 1/2
PVC Pipe 50mm
PVC Pipe 100mm
PVC 1/4 Bend #2
PVC Tee 4x2
PVC Wye 4x2
PVC P-Trap#2
PVC C.O. w/ Adopter #4
PVC Solvent Cement
Elbow PVC

40.00
24.00
10.00
3.00
4.00
2.00
2.00
2.00
38.25
26.33
8.00
6.00
2.00
4.00
2.00
15.00

pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.

3.00
2.00
2.00
3.00
2.00
2.00
2.00
2.00
2.00
2.00

pcs.
sets
sets
pcs.
pcs.
sets
sets
sets
sets
pcs.
pcs.

7.90
7.90
15.80
15.80
39.50

gal.
gal.
gal.
gal.
gal.
pcs.

Flat Wall Enamel


Glazing Putty
Quick Dry Enamel
Paint Thinner
Wood Bleach
Oil Wood Stain
Sanding Sealer
Flat Laquer
Sanding Paper #100

4.88
4.07
9.76
1.46
-

gal.
gal.
gal.
gal.
gal.
gal.
gal.
gal.
pcs.

Red Oxide Primer


Quick Dry Enamel
Sanding Paper #180
Paint Thinner

1.33
1.33
6.67
0.40

gal.
gal.
pcs.
gal.

2. Windows

VII. ELECTRICAL WORKS


1. Electrical Rough-ins

2. Electrical Finishing

VIII. PLUMBING WORKS


1. Plumbing Rough-ins

2. Plumbing Finishing
3/4 H & Brass Faucet
Water Closet
Lavatory w/ Fittings
Floor Drain 4x4
N.P. Faucet 1/2x6
Tel. Shower Head w/ Valve
Kitchen Sink
Tissue Holder
Soap Holder
Towei Bar
Curtain Rod 3/4 x 1.25
IX. PAINTING
1. Concrete
Concrete Neutralizer
Flat Latex for Primer
Acritex Cast
Flat Latex for Int. 2nd & 3rd coat
Semi Gloss Latex for Ext. 2nd & 3rd coat
Sanding Paper #180
2. Wood

3. Metal

BILL OF MATERIALS
PROJECT TITLE

: Residential
Floor Area :
127.00 sq.m.
Location : Cauayan, Isabela

ITEM
CODE

ITEM OF WORKS

DESCRIPTION

UNIT

Building

UNIT COST

AMOUNT

I. EARTHWORKS
11. Staking Lay-Out

12. Gravel Bedding


13. Soil Poisoning
14. Backfilling
II. CONCRETING WORKS
21. Foundation

22. Columns

23. Beams

24. Slab on Fill

III. MASONRY WORKS


31. CHB Laying

32. Plastering

33. Floor Toppings

34. Tile Works

35. Other Finishing works

IV. THERMAL & MOISTURE PROTECTION


41. Roof Framing

10,720.00
Good Lumber
CWN No. 2
CWN No. 3
Nylon String
*
Gravel G1
*
Soil Treatment Chem.
*
Excess/barrow
*
*
RSB No. 12
Tie wire gauge 16
Cement
Sand
Gravel G1
*
Lumber
Form ply
CWN No. 1
CWN No. 2
CWN No. 3
RSB No. 10
RSB No. 16
Tie wire gauge 16
Cement
Sand
Gravel G1
*
Lumber
Form ply
CWN No. 1
CWN No. 2
CWN No. 3
RSB No. 10
RSB No. 16
Tie wire gauge 16
Cement
Sand
Gravel 3/4
*
RSB No. 10
Tie wire gauge 16
Cement
Sand
Gravel G1
*
*
RSB No. 10
Tie wire gauge 16
Cement
Sand
CHB No 6
CHB No 4
*
Cement
Sand
*
Cement
Sand
*
4"x4" tiles
8"x8" tiles
12" x 12" tiles
Tile Adhesive :
Tile Grout :
Tile Trim :
*
Cement
Sand
Bricks
*
*
2x4 C-Purlins :
L40x40x6mm
L30x30x6mm
Welding Rod :

160.00
1.00
1.00
40.00
5.00
1.00
64.00
46.00
20.00
48.00
4.00
8.00
96.00
16.00
2.00
2.00
2.00
38.00
29.00
8.00
24.00
1.00
3.00
112.00
20.00
2.00
4.00
4.00
46.00
40.00
8.00
28.00
2.00
3.00
56.00
8.00
64.00
4.00
11.00
118.00
10.00
174.00
14.00
1,600.00
1,040.00
36.00
3.00
28.00
3.00
160.00
560.00
1,068.00
360.00
24.00
4.00
32.00
2,776.00
24.00
48.00
24.00
26.00

bd.ft.
kgs.
kgs.
ln.m.

30.00
30.00
30.00
1.00

cu.m.

400.00

li.

300.00

cu.m.

55.00

pcs
kgs.
bags
cu.m.
cu.m.

150.00
35.00
150.00
300.00
400.00

bd.ft.
pcs.
kgs.
kgs.
kgs.
pcs
pcs
kgs.
bags
cu.m.
cu.m.

30.00
250.00
25.00
30.00
30.00
100.00
250.00
35.00
150.00
300.00
400.00

bd.ft.
pcs.
kgs.
kgs.
kgs.
pcs
pcs
kgs.
bags
cu.m.
cu.m.

30.00
250.00
25.00
30.00
30.00
100.00
250.00
35.00
150.00
300.00
450.00

pcs
kgs.
bags
cu.m.
cu.m.

100.00
25.00
150.00
300.00
400.00

pcs.
kgs.
bags
cu.m.
pcs.
pcs.

100.00
35.00
150.00
300.00
7.00
5.00

bags
cu.m.

150.00
300.00

bags
cu.m.

150.00
280.00

pcs.
pcs.
pcs.
kgs.
kgs.
pcs.

10.00
25.00
45.00
10.00
26.00
105.00

bags
cu.m.
pcs.

150.00
300.00
4.00

pcs.
pcs.
pcs.
kgs.

160.00
350.00
280.00
25.00

4,800.00
30.00
30.00
40.00
2,000.00
300.00
3,520.00
6,900.00
700.00
7,200.00
1,200.00
3,200.00
2,880.00
4,000.00
50.00
60.00
60.00
3,800.00
7,250.00
280.00
3,600.00
300.00
1,200.00
3,360.00
5,000.00
50.00
120.00
120.00
4,600.00
10,000.00
280.00
4,200.00
600.00
1,350.00
5,600.00
200.00
9,600.00
1,200.00
4,400.00
11,800.00
350.00
26,100.00
4,200.00
11,200.00
5,200.00
5,400.00
900.00
4,200.00
840.00
1,600.00
14,000.00
48,060.00
3,600.00
624.00
420.00
4,800.00
11,104.00
3,840.00
16,800.00
6,720.00
650.00

93,360.00

154,398.00

53,805.00

42. Water Proofing

V. CARPENTRY WORKS
51. Ceiling

52. Stair & Railing

Steel Plate :
Anchor Bolt :
Sag Rod :
*
G.I. Corr. Sheet for Top Roof:
Ridge Roll :
Valley Roll :
Fascia Board :
Tekscrew ;
G.I. Gutter :
Silicon Sealant :
*
*
Ficem Board
Carrying Channel
Furring Channel
Hunger
Flat Head Screw
*
Handrails
Metal Railing
Expansion Bolt

VI. DOORS & WINDOWS


61. Doors
Panel Door
Flush Door
Door Jambs
Hinges
Lockset (main Door)
Lockset Ordinary
62. Windows
Window Frames
Window Glass
VII. ELECTRICAL WORKS
VIII. PLUMBING WORKS
1. Plumbing Rough-ins
PVC Pipe 1" x10
PVC Elbow 1"
PVC Elbow Reducer 1"x3/4"
PVC. Tee 1"
PVC. Tee Reducer 1"x3/4"
PVC Coupling 1"
PVC Pipe 3/4 x10
PVC Elbow 3/4
PVC. Tee 3/4
PVC Solvent Cement
PVC Pipe 50mm
PVC Pipe 100mm
PVC Elbow #4
PVC Elbow #2
PVC Tee 4x2
PVC Tee 4x4
PVC P-Trap#2
PVC C.O. w/ Adopter #4
2. Plumbing Finishing
3/4 H & Brass Faucet
Water Closet
Lavatory Closet
Lavatory w/ Fittings
Floor Drain 4x4
Tel. Shower Head w/ Valve
Kitchen Sink
Tissue Holder
Soap Holder
Towei Bar
Curtain Rod 3/4 x 1.25
Bathtub
IX. PAINTING
1. Concrete
Concrete Neutralizer
Flat Latex for Primer
Acritex Cast
Flat Latex for Int. 2nd & 3rd coat
Semi Gloss Latex for Ext. 2nd & 3rd coat
Sanding Paper #180

8.00
16.00
13.00
72.00
10.00
3.00
23.00
720.00
12.00
1.00
35.00
93.00
186.00
51.00
640.00
6.00
62.00
10.00
1.00
5.00
6.00
17.00
1.00
5.00
14.00
14.00
7.00
4.00
2.00
1.00
6.00
8.00
4.00
7.00
2.00
4.00
6.00
7.00
1.00
2.00
2.00
2.00
6.00
2.00
6.00
2.00
2.00
3.00
2.00
2.00
1.00
2.00
2.00
2.00
2.00
1.00
5.00
8.00
16.00
10.00
6.00
40.00

pcs.
pcs.
pcs.

30.00
80.00
60.00

pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.

260.00
130.00
120.00
64.00
1.00
69.00
95.00

pcs.
pcs.
pcs.
pcs.
pcs.

210.00
80.00
60.00
15.00
2.00

ln.m.
sq.m.
pcs.

300.00
200.00
40.00

set
set
set
set
set
set
sq.m.
sq.m.

3,000.00
1,000.00
500.00
35.00
280.00
150.00
800.00
90.00

pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.

150.00
10.00
10.00
15.00
15.00
10.00
120.00
10.00
15.00
50.00
180.00
200.00
20.00
15.00
20.00
20.00
100.00
100.00

pcs.
sets
sets
sets
pcs.
sets
sets
sets
sets
pcs.
pcs.
pcs.

80.00
5,000.00
2,000.00
500.00
50.00
500.00
5,000.00
500.00
500.00
1,500.00
1,000.00
15,000.00

gal.
gal.
gal.
gal.
gal.
pcs.

50.00
330.00
380.00
330.00
360.00
20.00

10.00
8.00
15.00
0.50

gal.
gal.
gal.
gal.

320.00
300.00
300.00
80.00

1.00
2.00
6.00
1.00

gal.
gal.
pcs.
gal.

190.00
250.00
20.00
60.00

2. Wood
Flat Wall Enamel
Glazing Putty
Quick Dry Enamel
Paint Thinner
3. Metal
Red Oxide Primer
Quick Dry Enamel
Sanding Paper #180
Paint Thinner

240.00
1,280.00
780.00
18,720.00
1,300.00
360.00
1,472.00
720.00
828.00
95.00
7,350.00
7,440.00
11,160.00
765.00
1,280.00
1,800.00
12,400.00
400.00
3,000.00
5,000.00
3,000.00
595.00
280.00
750.00
11,200.00
1,260.00
1,050.00
40.00
20.00
15.00
90.00
80.00
480.00
70.00
30.00
200.00
1,080.00
1,400.00
20.00
30.00
40.00
40.00
600.00
200.00
480.00
10,000.00
4,000.00
1,500.00
100.00
1,000.00
5,000.00
1,000.00
1,000.00
3,000.00
2,000.00
15,000.00
250.00
2,640.00
6,080.00
3,300.00
2,160.00
800.00
3,200.00
2,400.00
4,500.00
40.00
190.00
500.00
120.00
60.00

42,595.00

25,085.00

30,000.00
49,565.00

26,240.00

MATERIAL COST:

485,768.00

LABOR COST:

145,730.40

TOTAL PROJECT COST:

631,498.40

BILL OF MATERIALS
PROJECT TITLE

: Residential
Floor Area :
127.00 sq.m.
Location : Cauayan, Isabela

ITEM
CODE

ITEM OF WORKS

DESCRIPTION

UNIT

Building

UNIT COST

AMOUNT

I. EARTHWORKS
11. Staking Lay-Out

12. Gravel Bedding


13. Soil Poisoning
14. Backfilling
II. CONCRETING WORKS
21. Foundation

22. Columns

23. Beams

24. Slab on Fill

III. MASONRY WORKS


31. CHB Laying

32. Plastering

33. Floor Toppings

34. Tile Works

35. Other Finishing works

IV. THERMAL & MOISTURE PROTECTION


41. Roof Framing

15,700.00
Good Lumber
CWN No. 2
CWN No. 3
Nylon String
*
Gravel G1
*
Soil Treatment Chem.
*
Excess/barrow
*
*
RSB No. 12
Tie wire gauge 16
Cement
Sand
Gravel G1
*
Lumber
Form ply
CWN No. 1
CWN No. 2
CWN No. 3
RSB No. 10
RSB No. 16
Tie wire gauge 16
Cement
Sand
Gravel G1
*
Lumber
Form ply
CWN No. 1
CWN No. 2
CWN No. 3
RSB No. 10
RSB No. 16
Tie wire gauge 16
Cement
Sand
Gravel 3/4
*
RSB No. 10
Tie wire gauge 16
Cement
Sand
Gravel G1
*
*
RSB No. 10
Tie wire gauge 16
Cement
Sand
CHB No 6
CHB No 4
*
Cement
Sand
*
Cement
Sand
*
4"x4" tiles
8"x8" tiles
12" x 12" tiles
Tile Adhesive :
Tile Grout :
Tile Trim :
*
Cement
Sand
Bricks
*
*
2x4 C-Purlins :
L40x40x6mm
L30x30x6mm
Welding Rod :

240.00
1.00
1.00
60.00
7.00
1.00
96.00
70.00
30.00
72.00
5.00
13.00
144.00
24.00
2.00
3.00
4.00
58.00
43.00
12.00
36.00
2.00
4.00
168.00
30.00
3.00
6.00
6.00
68.00
60.00
12.00
42.00
2.00
5.00
84.00
12.00
96.00
5.00
17.00
178.00
16.00
260.00
22.00
2,400.00
1,560.00
54.00
5.00
42.00
5.00
240.00
840.00
1,602.00
540.00
36.00
6.00
49.00
1.00
4,164.00
36.00
72.00
36.00
38.00

bd.ft.
kgs.
kgs.
ln.m.

30.00
30.00
30.00
1.00

cu.m.

400.00

li.

300.00

cu.m.

55.00

pcs
kgs.
bags
cu.m.
cu.m.

150.00
35.00
150.00
300.00
400.00

bd.ft.
pcs.
kgs.
kgs.
kgs.
pcs
pcs
kgs.
bags
cu.m.
cu.m.

30.00
250.00
25.00
30.00
30.00
100.00
250.00
35.00
150.00
300.00
400.00

bd.ft.
pcs.
kgs.
kgs.
kgs.
pcs
pcs
kgs.
bags
cu.m.
cu.m.

30.00
250.00
25.00
30.00
30.00
100.00
250.00
35.00
150.00
300.00
450.00

pcs
kgs.
bags
cu.m.
cu.m.

100.00
25.00
150.00
300.00
400.00

pcs.
kgs.
bags
cu.m.
pcs.
pcs.

100.00
35.00
150.00
300.00
7.00
5.00

bags
cu.m.

150.00
300.00

bags
cu.m.

150.00
280.00

pcs.
pcs.
pcs.
kgs.
kgs.
pcs.

10.00
25.00
45.00
10.00
26.00
105.00

bags
cu.m.
pcs.

150.00
300.00
4.00

pcs.
pcs.
pcs.
kgs.

160.00
350.00
280.00
25.00

7,200.00
30.00
30.00
60.00
2,800.00
300.00
5,280.00
10,500.00
1,050.00
10,800.00
1,500.00
5,200.00
4,320.00
6,000.00
50.00
90.00
120.00
5,800.00
10,750.00
420.00
5,400.00
600.00
1,600.00
5,040.00
7,500.00
75.00
180.00
180.00
6,800.00
15,000.00
420.00
6,300.00
600.00
2,250.00
8,400.00
300.00
14,400.00
1,500.00
6,800.00
17,800.00
560.00
39,000.00
6,600.00
16,800.00
7,800.00
8,100.00
1,500.00
6,300.00
1,400.00
2,400.00
21,000.00
72,090.00
5,400.00
936.00
630.00
7,350.00
300.00
16,656.00
5,760.00
25,200.00
10,080.00
950.00

139,945.00

232,622.00

80,503.00

42. Water Proofing

V. CARPENTRY WORKS
51. Ceiling

52. Stair & Railing

Steel Plate :
Anchor Bolt :
Sag Rod :
*
G.I. Corr. Sheet for Top Roof:
Ridge Roll :
Valley Roll :
Fascia Board :
Tekscrew ;
G.I. Gutter :
Silicon Sealant :
*
*
Ficem Board
Carrying Channel
Furring Channel
Hunger
Flat Head Screw
*
Handrails
Metal Railing
Expansion Bolt

VI. DOORS & WINDOWS


61. Doors
Panel Door
Flush Door
Door Jambs
Hinges
Lockset (main Door)
Lockset Ordinary
62. Windows
Window Frames
Window Glass
VII. ELECTRICAL WORKS
VIII. PLUMBING WORKS
1. Plumbing Rough-ins
PVC Pipe 1" x10
PVC Elbow 1"
PVC Elbow Reducer 1"x3/4"
PVC. Tee 1"
PVC. Tee Reducer 1"x3/4"
PVC Coupling 1"
PVC Pipe 3/4 x10
PVC Elbow 3/4
PVC. Tee 3/4
PVC Solvent Cement
PVC Pipe 50mm
PVC Pipe 100mm
PVC Elbow #4
PVC Elbow #2
PVC Tee 4x2
PVC Tee 4x4
PVC P-Trap#2
PVC C.O. w/ Adopter #4
2. Plumbing Finishing
3/4 H & Brass Faucet
Water Closet
Lavatory Closet
Lavatory w/ Fittings
Floor Drain 4x4
Tel. Shower Head w/ Valve
Kitchen Sink
Tissue Holder
Soap Holder
Towei Bar
Curtain Rod 3/4 x 1.25
Bathtub
IX. PAINTING
1. Concrete
Concrete Neutralizer
Flat Latex for Primer
Acritex Cast
Flat Latex for Int. 2nd & 3rd coat
Semi Gloss Latex for Ext. 2nd & 3rd coat
Sanding Paper #180
2. Wood
Flat Wall Enamel
Glazing Putty
Quick Dry Enamel
Paint Thinner
3. Metal
Red Oxide Primer
Quick Dry Enamel
Sanding Paper #180
Paint Thinner

12.00
24.00
19.00
108.00
14.00
5.00
34.00
1,080.00
18.00
1.00
53.00
140.00
279.00
76.00
960.00
10.00
93.00
16.00
1.00
7.00
8.00
25.00
1.00
7.00
20.00
20.00
11.00
6.00
2.00
1.00
10.00
12.00
6.00
11.00
2.00
6.00
10.00
11.00
1.00
4.00
2.00
4.00
8.00
2.00
8.00
2.00
2.00
5.00
2.00
2.00
1.00
2.00
2.00
2.00
2.00
1.00
6.00
10.00
19.00
12.00
7.00
48.00
12.00
10.00
18.00
1.00
1.00
2.00
7.00
1.00

pcs.
pcs.
pcs.

30.00
80.00
60.00

pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.

260.00
130.00
120.00
64.00
1.00
69.00
95.00

pcs.
pcs.
pcs.
pcs.
pcs.

210.00
80.00
60.00
15.00
2.00

ln.m.
sq.m.
pcs.

300.00
200.00
40.00

set
set
set
set
set
set
sq.m.
sq.m.

10,000.00
1,500.00
500.00
35.00
280.00
150.00
1,000.00
105.00

pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.

200.00
10.00
10.00
15.00
15.00
10.00
120.00
10.00
15.00
50.00
220.00
250.00
20.00
15.00
20.00
20.00
100.00
100.00

pcs.
sets
sets
sets
pcs.
sets
sets
sets
sets
pcs.
pcs.
pcs.

80.00
5,000.00
2,000.00
500.00
50.00
500.00
5,000.00
500.00
500.00
1,500.00
1,000.00
20,000.00

gal.
gal.
gal.
gal.
gal.
pcs.

50.00
350.00
400.00
350.00
380.00
20.00

gal.
gal.
gal.
gal.

400.00
350.00
350.00
80.00

gal.
gal.
pcs.
gal.

190.00
250.00
20.00
60.00

360.00
1,920.00
1,140.00
28,080.00
1,820.00
600.00
2,176.00
1,080.00
1,242.00
95.00
11,130.00
11,200.00
16,740.00
1,140.00
1,920.00
3,000.00
18,600.00
640.00
10,000.00
10,500.00
4,000.00
875.00
280.00
1,050.00
20,000.00
2,100.00
2,200.00
60.00
20.00
15.00
150.00
120.00
720.00
110.00
30.00
300.00
2,200.00
2,750.00
20.00
60.00
40.00
80.00
800.00
200.00
640.00
10,000.00
4,000.00
2,500.00
100.00
1,000.00
5,000.00
1,000.00
1,000.00
3,000.00
2,000.00
20,000.00
300.00
3,500.00
7,600.00
4,200.00
2,660.00
960.00
4,800.00
3,500.00
6,300.00
80.00
190.00
500.00
140.00
60.00

64,370.00

48,805.00

50,000.00
60,115.00

34,790.00

MATERIAL COST:

726,850.00

LABOR COST:

254,397.50

TOTAL PROJECT COST:

981,247.50

10. Site Preparation/Restoration

Matl
Code

Materials
1. Coco Lumber
4. Good Lumber
2.1 CWN No. 1
2.2 CWN No. 2
2.3 CWN No. 3
3. Nylon String
4. Soil treatment chem.
5. Excess/barrow
6. Gravel G1

TOTAL :

Unit
bd.ft.
bd.ft.
kgs.
kgs.
kgs.
ln.m.
li.
cu.m.
cu.m.

Unit
Price

QTY.

9.00
25.00
25.00
30.00
30.00
1.00
300.00
50.00
350.00

243.00
0.90
0.90
50.60
1.20
0.40
6.00

TOTAL
AMOUNT
6,075.00
27.00
27.00
50.60
360.00
20.00
2,100.00

8,659.60

11
Staking/Layout
factor
qty.
1.00
1.00
243.00
1.00
1.00
0.90
1.00
0.90
1.00
50.60

11
Staking/Layout
amount
6,075.00
27.00
27.00
50.60
-

6,179.60

factor

12
Excavation
qty.
amount
-

13
Gravel Bedding
factor
qty.
amount
1.00
6.00
2,100.00

2,100.00

14
Soil Poisoning
factor
qty.

1.00

1.20

14
Soil Poisoning
amount
360.00
-

15
Backfilling
factor
qty.
amount
1.00
0.40
20.00
-

360.00

20.00

factor

16
Demolition
qty.
amount
-

17
Lot Levelling
factor
qty.
amount
-

20. Concreting Works

Matl
Code

Materials
1. Lumber
2. Form ply
3.1 CWN No. 1
3.2 CWN No. 2
3.3 CWN No. 3
4.1 RSB No. 10
4.2 RSB No. 12
4.3 RSB No. 16
5. Tie wire gauge 16
6. Cement
7. Sand
8.1 Gravel G1
8.1 Gravel 3/4
9. Steel Deck

TOTAL :

Unit
bd.ft.
pcs.
kgs.
kgs.
kgs.
pcs
pcs
pcs
kgs.
bags
cu.m.
cu.m.
cu.m.
sq.m.

Unit
Price
8.00
120.00
25.00
30.00
30.00
42.00
65.00
110.00
35.00
125.00
280.00
350.00
450.00
200.00

QTY.

TOTAL
AMOUNT

123.85
22.57
2.26
7.03
7.37
#DIV/0!
#DIV/0!
#DIV/0!
53.39
147.47
8.90
23.28
1.86
-

990.82
2,708.60
56.43
210.97
221.01
#DIV/0!
#DIV/0!
#DIV/0!
1,868.48
18,433.13
2,491.30
8,146.25
837.00
#DIV/0!

21
Foundation
factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

21
Foundation
qty.
amount

58.25
0
25.38
63.45
4.23
10.20

3,786.25
888.30
7,931.25
1,184.40
3,570.00
-

17,360.20

factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

22
Column
qty.
66.91
11.10
1.11
1.34
1.67
27
20.00
5.63
16.88
0.94
1.88

amount
535.30
1,332.10
27.75
40.15
50.18
1,134.00
2,200.00
196.88
2,109.38
262.50
656.25
-

8,544.48

factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

23
Beams
qty.
56.94
11.47
1.15
5.69
5.69
26.00
20.67
5.58
16.74
0.93
1.86

24
Suspended Sla
amount
455.53
1,376.50
28.68
170.82
170.82
1,092.00
2,273.33
195.30
2,092.50
260.40
837.00

8,952.88

factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

24
Suspended Slab
qty.
amount
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

25
Slab on Fill
qty.
amount

16.81
16.80
50.40
2.80
11.20

1,092.36
588.00
6,300.00
784.00
3,920.00
-

12,684.36

26
Service Entrance
factor
qty.
amount
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

26
Stairs
qty.
-

amount
-

30. Masonry Works

Matl
Code

Materials
1. Good Lumber
2. Form ply
3.1 Concrete Nail
3.2 CWN No. 2
3.3 CWN No. 3
4.1 RSB No. 10
4.2 RSB No. 12
4.3 RSB No. 16
5. Tie wire gauge 16
6. Cement
7. Sand
8. Gravel 3/4
9.1 CHB No 6
9.2 CHB No 4
10.1 4"x4" tiles
10.2 8"x8" tiles
10.3 12" x 12" tiles
10.4 16" x 16" tiles
11. 12"x12" Vinyl Tiles
12. Concrete Molding
13.Tile Adhesive :
14. Tile Grout :
15. Tile Trim :
16. Rugby :
17. Pebble Wash-Out
17. Bricks
18. Rabbles

TOTAL :

Unit
cu.m.
sq.m.
kgs.
kgs.
kgs.
kgs.
kgs.
kgs.
kgs.
bags
cu.m.
cu.m.
pcs
pcs
pcs
pcs
pcs
pcs
pcs
ln.m.
kgs.
kgs.
pcs.
li.
cu.m.
pcs.
pcs.

Unit
Price
20.00
120.00
25.00
30.00
30.00
42.00
65.00
110.00
30.00
125.00
250.00
450.00
6.50
4.50
9.00
20.00
31.00
45.00
8.00
175.00
50.00
26.00
105.00
34.00
600.00
2.50
3.00

QTY.

TOTAL
AMOUNT

61.66
5.50
184.71
12.44
875.00
500.00
200.00
700.00
1,333.33
450.00
30.00
0.48
3,466.67
-

2,589.77
165.00
23,088.67
3,109.15
5,687.50
2,250.00
1,800.00
14,000.00
41,333.33
22,500.00
780.00
285.00
8,666.67
-

126,255.08

31
Batterboards
factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

31
Batterboards
qty.
amount
-

factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

32
CHB Laying
qty.

61.66

5.50
91.91
7.66
875.00
500.00

amount
2,589.77
165.00
11,488.75
1,914.15
5,687.50
2,250.00
-

24,095.17

factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

33
Plastering
qty.

52.22
4.36

sq.m.

33
Plastering
amount
6,528.00
1,091.00
-

7,619.00

factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

34
Conc. Mouldings
qty.
amount

factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

35
Tileworks
qty.

200.00
700.00
1,333.33
450.00
30.00
-

35
Tileworks
amount
1,800.00
14,000.00
41,333.33
22,500.00
780.00
-

80,413.33

factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

36
Floor Accents
qty.

amount
-

37
Other Finishing Works
factor
qty.
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
40.58
1.00
0.42
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.48
1.00 3,466.67
1.00
-

37
Other Finishing Works
amount
5,071.92
104.00
285.00
8,666.67
-

14,127.58

factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

37
Floor Toppings
qty.
amount

4.032
0.448

504.00
112.00
-

616.00

40. Thermal & Moisture Protection

Matl
Code

Unit

Unit
Price

2x4 C-Purlins :
2x6 C-Rafters :
Welding Rod :
Steel Plate :
Anchor Bolt :
Sag Rod :

pcs.
pcs.
kgs.
pcs.
pcs.
pcs.

125.00
250.00
25.00
30.00
80.00
60.00

41.90
14.24
32.00
10.00
20.00
16.00

5,238.10
3,560.59
800.00
300.00
1,600.00
960.00

G.I. Corr. Sheet for Top Roof:


Ridge Roll :
Valley Roll :
Flashing Sheet :
Fascia Board :
Tekscrew ;
G.I. Gutter :
Silicon Sealant :

pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.

150.00
130.00
120.00
90.00
64.00
1.00
69.00
95.00

90.00
11.90
3.81
28.57
900.00
15.11
-

13,500.00
1,547.62
457.14
1,828.57
900.00
1,042.67
-

Flat Tiles :
Down End :
Right Hand Barge :
Left hand Barge :
Ridge Tiles :
G.I. Corr. Roofing Sheet :
Metal Battens :
Valley Roll :
Flashing Sheet :
Fascia Board :
Fascia Screw :
Ripper Screw:
Tekscrew ;
Battens Screw :

pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.

20.00
35.00
35.00
35.00
25.00
120.00
60.00
45.00
45.00
120.00
1.00
1.50
0.50
0.75

pcs.
sq.m
pcs.
kgs.
pcs.

150.00
70.00
130.00
30.00
1.00

Materials

Asphalt Shingles:
Asphalt Filler:
Marine Plywood:
CWN #1:
Tekscrew :

TOTAL
AMOUNT

QTY.

TOTAL

31,734.69

factor
1.00
1.00
1.00
1.00
1.00
1.00

41
Roof Framing
qty.
amount
41.90
14.24
32.00
10.00
20.00
16.00

factor

5,238.10
3,560.59
800.00
300.00
1,600.00
960.00

42
Water Proofing
qty.
amount

1.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

90.00
11.90
3.81
28.57
900.00
15.11
-

13,500.00
1,547.62
457.14
1,828.57
900.00
1,042.67
-

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00
1.00

12,458.69

19,276.00

50 Carpentry Works

Matl
Code

Materials

Unit

Unit
Price

TOTAL
AMOUNT

QTY.

Ficem Board
Gypsum Board
Metal Stud
Blind Rivet
Flat Head Screw

pcs.
pcs.
pcs.
pcs.
pcs.

190.00
260.00
140.00
2.00
1.50

#DIV/0!
#DIV/0!
-

#DIV/0!
#DIV/0!
-

factor
1.00
1.00
1.00
1.00
1.00

Ficem Board
Gypsum Board
Carrying Channel
Furring Channel
Hunger
Flat Head Screw

pcs.
pcs.
pcs.
pcs.
pcs.
pcs.

190.00
260.00
80.00
60.00
15.00
6.00

44.10
116.42
232.83
63.50
881.94

8,378.47
9,313.33
13,970.00
952.50
5,291.67

1.00
1.00
1.00
1.00
1.00
1.00

300.00
200.00
40.00

8.00
77.47
13.00

2,400.00
15,494.40
520.00

1.00
1.00
1.00

Handrails
Metal Railing
Expansion Bolt

ln.m.
sq.m.
pcs.

Vents

pcs.

240.00

1.00

Baseboard
Cornices
Wood Glue

pcs.
pcs.
li.

125.00
110.00
35.00

1.00
1.00
1.00

2,000.00
2,500.00
40.00

1.00
1.00
1.00

Cabinets
Closets
Expansion Bolt

TOTAL :

set
set
pcs.

#DIV/0!

51
Partition Wall
qty.
#DIV/0!
#DIV/0!
-

51
Partition Wall
amount

52
Interior Ceilimg
qty.

factor

#DIV/0!
#DIV/0!
-

1.00
1.00
1.00
1.00
1.00

amount

52
Exterior Ceiling
factor
qty.
amount
###
###
###
###
###
-

1.00
1.00
1.00
1.00
1.00
1.00

###
###
###
###
###
###

###
###
###

1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00

###
###
###

1.00
1.00
1.00

###
###
###

#DIV/0!

###

44.10
116.42
232.83
63.50
881.94

8,378.47
9,313.33
13,970.00
952.50
5,291.67
-

37,905.97

53
Stairs & Railing
factor
qty.
amount
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

8.00
77.47
13.00

2,400.00
15,494.40
520.00

54
Cabinets & Closets
factor
qty.
amount
1.00
1.00
1.00
1.00
1.00
-

55
Baserboard & Cornices
factor
qty.
amount
1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00

1.00
1.00
1.00

###

1.00

1.00

1.00
1.00
1.00

1.00
1.00
1.00

1.00
1.00
1.00

1.00
1.00
1.00

1.00
1.00
1.00

1.00
1.00
1.00

18,414.40

60. Doors & Windows

Matl
Code

Materials
Panel Door
Flush Door
Door Jambs
Hinges
Lockset (main Door)
Lockset Ordinary
Window Frames
Window Glass

TOTAL :

Unit
set
set
set
set
set
set
sq.m.
sq.m.

Unit
Price
2,500.00
1,800.00
500.00
35.00
280.00
150.00
175.00
105.00

QTY.
1.00
6.00
7.00
21.00
1.00
6.00
17.00
17.00

TOTAL
AMOUNT
2,500.00
10,800.00
3,500.00
735.00
280.00
900.00
2,975.00
1,785.00
21,690.00

factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

61
Windows
qty.
1.00
6.00
7.00
21.00
1.00
6.00

61
Windows
amount
2,500.00
10,800.00
3,500.00
735.00
280.00
900.00
18,715.00

factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

62
Doors
qty.

17.00
17.00

amount
2,975.00
1,785.00
2,975.00

70. Electrical Works

Matl
Code

Materials
1. Circuit Breaker 20A (2 Poles)
2. Circuit Breaker 30A
3. Circuit Breaker 40A
4. Circuit Breaker 100A
5. Panel Board 12 Branches 100A
6. 15mm Polyflex
7. 20mm Polyflex
8. IMC Pipe 25mm x 10mm
9. THW 8.0 mm.sq.
10. L.B. Conduit #1
11. Porcelain Split Knobs
12. G.I. Bushing #1
13. 65mm C Clamp
14. Electrical Tape (big)
15. Utility Box (2x2x4)
16. Cut Out Box (4x4)
17. One Way Gang Switch (100 watts)
18. One Way Two Gang Switch (100 Watts)
19. One Gang Three Way Switch (100 Watts)
20. Two Gang C.O. - (200 Watts)
21. Two Gang C.O. W.P. - (200 Watts)
22. One Gang C.O. Ref - (800 Watts)
23. One Gang C.O. Range (800 Watts)
24. One Gang C.O. - ACU (1.5 Hp)
25. Porcelain Socket 2x2

TOTAL :

Unit

Unit
Price

QTY

TOTAL
AMOUNT
-

factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

71
Rough-ins
qty.
amount
-

factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

72
Finishing
qty.

amount
-

80 Pumbing Works

Matl
Code

Materials

Unit

Unit
Price

QTY.

TOTAL
AMOUNT

81
Water Lines
factor

1. PVC Pipe 3/4 x10


2. PVC Elbow 3/4
3. PVC. Tee 3/4
4. PVC Coupling 3/4
5. PVC Solvent Cement
6. Tefpon Tape
7. G.I. Nipple 3/4x6
8. G.I. Coupling 3/4 x 1/2
9. GI. End Cap 1/2
10. PVC Pipe 50mm
11. PVC Pipe 100mm
12. PVC 1/4 Bend #2
13. PVC Tee 4x2
14. PVC Wye 4x2
15. PVC P-Trap#2
16. PVC C.O. w/ Adopter #4
17. PVC Solvent Cement
18. 3/4 H & Brass Faucet
19. Water Closet
20. Lavatory w/ Fittings
21. Floor Drain 4x4
22. N.P. Faucet 1/2x6
23. Tel. Shower Head w/ Valve
24. Kitchen Sink
25. Tissue Holder
26. Soap Holder
27. Towei Bar
28. Curtain Rod 3/4 x 1.25

81
Water Lines
qty.
amount
-

82
Sanitary Lines
factor
qty.
amount
-

81
Plumbing Fixtures
factor
qty.
amount
-

81
Septic Tank
factor
qty.

81
Septic Tank
amount
-

90 Painting Works

Matl
Code

Total

Materials

Unit

Unit
Price

QTY

Total
AMOUNT

Concrete Neutralizer
Flat Latex for Primer
Acritex Cast
Flat Latex for Int. 2nd & 3rd coat
Semi Gloss Latex for Ext. 2nd & 3rd coat
Sanding Paper #180

gal.
gal.
gal.
gal.
gal.
pcs.

50.00
300.00
350.00
300.00
320.00
20.00

7.90
7.90
15.80
15.80
39.50

395.00
2,370.00
5,530.00
4,740.00
790.00

Flat Wall Enamel


Glazing Putty
Quick Dry Enamel
Paint Thinner
Wood Bleach
Oil Wood Stain
Sanding Sealer
Flat Laquer
Sanding Paper #100

gal.
gal.
gal.
gal.
gal.
gal.
gal.
gal.
pcs.

290.00
270.00
250.00
80.00
150.00
280.00
230.00
90.00
25.00

4.88
4.07
9.76
1.46
-

1,415.20
1,098.00
2,440.00
117.12
-

Red Oxide Primer


Quick Dry Enamel
Sanding Paper #180
Paint Thinner

gal.
gal.
pcs.
gal.

190.00
250.00
20.00
60.00

1.33
1.33
6.67
0.40

253.33
333.33
133.33
24.00

19,639.32

91.00
factor
1.00
1.00
1.00
1.00
1.00
1.00

Concrete
qty.
7.90
7.90
15.80
15.80
39.50

amount

92.00
factor

395.00
2,370.00
5,530.00
4,740.00
790.00

1.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00

13,825.00

Wood
qty.

amount

factor
-

4.88
4.07
9.76
1.46
-

93.00

1,415.20
1,098.00
2,440.00
117.12
-

5,070.32

Metal
qty.

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

1.33
1.33
6.67
0.40

93.00
Metal
amount
253.33
333.33
133.33
24.00

744.00

Compatibility Report for ESTIMATES Garage.xls


Run on 8/21/2011 8:51
The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when you save this workbook in
an earlier file format.
Minor loss of fidelity
Some formulas in this workbook are linked to other workbooks that are
closed. When these formulas are recalculated in earlier versions of Excel
without opening the linked workbooks, characters beyond the 255-character
limit cannot be returned.

# of occurrences
2

'Decrease'!E4
'Increase'!E4

You might also like