PROCESS SITE VISIT REPORT

3.1 ETIM PRODUCTION FACILITY


Site survey activity for Etim (LP) platform involved process operating data
gathering, equipment capacity and rating verification. Preliminary tie-in points
consideration and a line by line verification of P&IDs.
Process Operating Data Gathering
Average operating conditions and flow rates of the major process equipment
were retrieved from the plant record and archive system. This information is
presented in Appendix C1.1
Equipment Operation and Reliability
Process equipment operational reliability was discussed with the operation
personnel on site. Site discussion notes with regards to the operational
integrity and reliability of the major equipments is presented in Appendix D1.1
Equipment Capacity and Rating Verification
Process equipments capacity and rating were verified and marked on the
P&IDs. Data gathered included following equipment;
Production Separator
Test Separator
Liquid Knock out Drum
Potable Water Storage Tanks
Fuel Gas Scrubber
Diesel Storage Tank
Fire Water Pumps
MOL Pumps
Metering System
Condensate Pumps
Sump Tank and Pumps
Pig Traps
Instrument Air Compressors
The data marked on the P&ID is shown in the site visit Red-line P&IDs (not
attached in this report).
Preliminary Tie-In Point Consideration
Required tie-in points for piping greater than 2 were considered on system by
system basis. This is reported in section 4.1 below. Tie-in points for 2 and
below were considered to be from equipment nozzle to equipment nozzle
where applicable since all 2 piping and below will be replaced. 2 and below
tie-in consideration is not reported in this document but will be documented in
the tie-in register to be delivered latter.
As Built P&IDs.

A line by line verification of the various P&IDs was done to ensure as built
quality of the P&IDs. The site markup was used to generate the RED-line
P&IDs (not submitted with this report).
3.2 INIM PRODUCTION FACILITY
The site survey activity for Inim (IP) platform involved process operating data
gathering, equipment capacity and rating verification, preliminary tie-in points
consideration and a line by line verification of P&IDs.
Process Operating Data Gathering
Average operating conditions and flow rates of the major process equipment
were retrieved from the plant record and archive system. This information is
presented in Appendix C1.2
Equipment Operation and Reliability
Process equipment operational reliability was discussed with the operation
personnel on site. Site discussion notes with regards to the operational
integrity and reliability of the major equipments is presented in Appendix D1.2
Equipment Capacity and Rating Verification
Process equipments capacity and rating were verified and marked on the
P&IDs. Data gathered included following equipment;
Production Separator
Test Separator
Liquid Knock out Drum
Potable Water Storage Tanks
Fuel Gas Scrubber
Diesel Storage Tank
Fire Water Pumps
MOL Pumps
Metering System
Condensate Pumps
Sump Tank and Pumps
Pig Traps
Instrument Gas System
The data marked on the P&ID is shown in the site visit Red-line P&IDs (not
attached in this report).
Preliminary Tie-In Point Consideration
Required tie-in points for piping greater than 2 were considered on system by
system basis. This is reported in section 4.1 below. Tie-in points for 2 and
below were considered to be from equipment nozzle to equipment nozzle
where applicable since all 2 piping and below will be replaced. 2 and below
tie-in consideration is not reported in this document but will be documented in
the tie-in register to be delivered later.
As Built P&IDs.

A line by line verification of the various P&IDs was done to ensure as built
quality of the P&IDs. The site markup was used to generate the RED-line
P&IDs (not submitted with this report).
3.3 UTUE PRODUCTION FACILITY
The site survey activity for Utue (KP) platform involved process operating data
gathering equipment capacity and rating verification preliminary tie-in points
consideration and a line by line verification of P&IDs.
Process Operating Data Gathering
Average operating conditions and flow rates of the major process equipment
were retrieved from the plant record and archive system. The operating
condition and flow rates were obtained when only Utue wellheads were
producing and when both Utue and Iyak SE wellheads were producing. This
information is presented in Appendix C1.3
Equipment Operation and Reliability
Process equipment operational reliability was discussed with the operation
personnel on site. Site discussion notes with regards to the operational
integrity and reliability of the major equipments is presented in Appendix D1
Equipment Capacity and Rating Verification
Process equipments capacity and rating were verified and marked on the
P&IDs. Data gathered included following equipment;
Production Separator
Liquid Knock out Drum
Potable Water Storage Tanks
Fuel Gas Scrubber
Diesel Storage Tank
Fire Water Pumps
MOL Pumps
Metering System
Condensate Pumps
Sump Tank and Pumps
Pig Traps
Instrument Air Compressors
Inergen System
The data marked on the P&ID is shown in the site visit Red-line P&IDs (not
attached in this report).
Preliminary Tie-In Point Consideration
Required tie-in points for piping greater than 2 were considered on system by
system basis. This is reported in section 4.1 below. Tie-in points for 2 and
below were considered to be from equipment nozzle to equipment nozzle
where applicable since all 2 piping and below will be replaced. 2 and below
tie-in consideration is not reported in this document but will be documented in
the tie-in register to be delivered latter.

As Built P&IDs.
A line by line verification of the various P&IDs was done to ensure as built
quality of the P&IDs. The site markup was used to generate the RED-line
P&IDs (not submitted with this report).
4.1.1 ETIM PRODUCTION FACILITY RECOMMENDATIONS
LP-PR-001: Receiver and Inlet Manifold.

Consider installing SDV on line P-002-12-120-AGA-3 upstream the


barred tee.

Consider converting existing SDV (MV1) to gear operated manual


valve.

Consider installing SDV on line P-001-14-120-AGA-3.

Consider installing SDV on line P-003-8-120-AGA-3.

Consider re-route PSV-1 outlet from pressure drain to flare system

Specify preliminary tie-in points for the new SDVs and PSV re-routing.
LP-PR-002: Production Separator

Consider Installing an SDV on line GN-004-8-STD-ACA-3 (Separator


Gas outlet)

Consider reworking separator piping.

Specify preliminary tie-in points for the new SDV and piping rework.
LP-PR-003: Test Separator

Consider installing an SDV on line P-007-8-120-AGA-3 (Test Separator


Gas outlet).

Consider installing an SDV on line P-024-8-120-AGA-3 (Test Separator


Liquid outlet).

Consider re-routing test separator gas outlet from inlet manifold to gas
export system.

Consider reworking Test Separator piping.

Specify preliminary tie-in points for the new fittings and piping rework.
LP-PR-004: Main Oil Line Pumps

Nil.
LP-PR-005: Metering system & Launcher

Consider demolishing line EC-006-2-80-AAA-3, all flow after the


meters should go through subsea pipeline to Inim

Specify tie-in points for appropriate piping rework.


LP-PR-006: Liquid Knock Out Drum & Flare

Consider demolishing liquid KO drum PSVs in line with new philosophy


of using it as flare scrubber.

Consider reworking Liquid KOD piping in line with new philosophy

Consider reworking the drawing into flare header drawing, flare


scrubber drawing and flare tip drawing.
Specify tie-in points as required

LP-PR-007: Sump Tank

Consider replacing both sump tank pumps.

Consider re-routing EC-002-6-40-AAA-3 to closed drain system.

Specify tie-in point as appropriate.


LP-PR-158: Condensate System

Consider replacing both condensate pumps.

Specify tie-in point as appropriate.


LP-PR-009: Pressure (Closed) Drain System

Consider reviewing closed drain collection system, specifying tie-in


points where necessary.
LP-PR-010: Open Drain System

Consider reviewing open drain collection system, specifying tie-in


points where necessary.
LP-PR-011: Fuel Gas System

Consider revamping the separator piping and bridles.

Consider demolishing supply of gas to instrument air system (Line GI001-4-40-AAA-3)


LP-PR-012: Instrument Air System.

Consider replacing the old instrument air compressor LP-KM-101B with


one of equivalent capacity to the recently replaced compressor LP-KM101A.

Consider evaluating existing instrument air equipment capacities.

Consider revamping or replacing existing instrument air dryers.


LP-PR-013: Fire Water System

Consider revamping / changing entire fire water system.


LP-PR-014: Salt Water System

Consider demolishing existing salt water system, which may not be


required in the new scheme.
LP-PR-015: Fresh (Potable) Water System

Consider reviewing potable water storage capacity and distribution to


cover proposed new facility

Consider providing wash water system from the potable water system.

Review the in and out flow direction of pump LP-G-11.


LP-PR-016: Diesel System

Consider reviewing diesel storage capacity and distribution to cover


proposed new facilities.

General Comments

Consider revamping / replacing all vessels bridles / instrumentation


connection

Most piping has been de-rated; consider changing / revamping all


piping so that life span can be extended for another 25 years.

4.1.2 INIM PRODUCTION FACILITY RECOMMENDATIONS


IP-PR-151: Pig Receivers.

Consider installing SDV on line P-1003-12-120-AGA-3 upstream the


barred tee.

Consider re-routing PSV-12 outlet from pressure drain to flare system.

Consider routing PSV-13 outlet to flare system

Consider revamping the pig traps (IP-M-12 & IP-M-13) piping to


conform with master specification.

Specify preliminary tie-in points for the new SDVs and PSV re-routing.
IP-PR-152: Production Separator

Consider Installing an SDV on line GN-3001-12-STD-ACA-3


(Separator Gas outlet)

Specify preliminary tie-in points for the new SDV and piping rework.
IP-PR-153: Test Separator

Consider installing an SDV on line GN-3003-6-40-ACA-3 (Test


Separator Gas outlet).

Consider installing an SDV on line P-2010-4-40-ACA-3 (Test Separator


Liquid outlet).

Consider reworking Test Separator piping as appropriate.

Specify preliminary tie-in points for the new fittings and piping rework.
IP-PR-154: Production Separator (IP-D-11)

Consider Installing an SDV on line P-1011-16-120-AGA-3 upstream


pipeline barred tee.

Consider Installing an SDV on line GN-3005-12-STD-ACA-3 (IP-D-11A


Separator Gas outlet)

Specify preliminary tie-in points for the new SDVs and piping rework.
IP-PR-155: Main Oil Line Pumps

Nil.
IP-PR-156: Metering & Launcher

Consider Installing an SDV on line P-2004-14-80-AFA-3

Consider re-routing PSV-14 outlet from pressure drain to flare system.


Specified tie-in points for appropriate piping rework.

IP-PR-157: Liquid Knock Out Drum & Launcher to Asabo

Consider demolishing liquid KO drum PSVs in line with new philosophy


of using it as flare scrubber.

Consider reworking Liquid KOD piping in line with new philosophy

Consider reworking the drawing into flare header drawing, flare


scrubber drawing, flare tip drawing, Asabo pig launcher and Edop pig
launcher drawings.

Consider reworking piping as appropriate.

Specify tie-in points as required


IP-PR-158: Condensate System

Consider replacing both condensate pumps.

Specify tie-in point as appropriate.


IP-PR-159: Fuel Gas System

Consider revamping the separator piping and bridles.

Consider demolishing gas supply to instrument air system (Line GU5503-1160-AAA-3)

Specify tie-in point as appropriate.


IP-PR-160: Instrument Gas System.

Consider decommissioning instrument gas system.

Consider providing instrument air system.


IP-PR-301: Fire Water System

Consider revamping / changing entire fire water system.


IP-PR-302: Fresh (Potable) Water System

Consider reviewing potable water storage capacity and distribution to


cover proposed new facility

Consider providing wash water system with the potable water system.
IP-PR-303: Sump Tank

Consider replacing the electrically driven sump tank pump (IP-G-7).

Consider re-routing EC-7001-4-40-AAA-3 to close drain system.

Specify tie-in point as appropriate.


IP-PR-304: Pressure (Closed) Drain System

Consider reviewing closed drain collection system, specifying tie-in


points where necessary.
IP-PR-305: Open Drain System

Consider reviewing open drain collection system, specifying tie-in


points where necessary.

IP-PR-306: Diesel System

Consider reviewing diesel storage capacity and distribution to cover


proposed new facilities.
General Comments

Consider revamping / Replacing all vessels bridles / instrumentation


connection

Most piping has been de-rated; consider changing / revamping all


piping so that life span can be extended for another 25 years.

4.1.3 UTUE PRODUCTION FACILITY RECOMMENDATIONS


KP-PR-151: Inlet Manifold And Receiver.

Consider installing SDV and check valve on P-1001-14-120-AGA3


before the manifold.

Consider re-routing PSV-1 flare outlet from pressure drain to flare


system.

Consider Installing SDV on P-1002-12-AGA-3 before the barred tee.

Specify preliminary tie-in points for the two new SDV and check valve.
KP-PR-152: Production Separator

Consider installing an SDV on line GN-3001-12-STD-ACA.

Consider replacing instrument bridles.

Specify preliminary tie-in points for the new SDV .

Consider verifying Gas outlet and Liquid outlet line sizes.


KP-PR-153: Main Oil Line

Consider Installing a check valve on line P-2011-8-40-ACA-3 down


stream pump KP-G-A3 discharge.
KP-PR-154: Metering System & Launcher

Consider Installing an SDV on line P-2015-16-XS-ACA-3.

Specified tie-in points for new SDV.


KP-PR-155: Liquid Knock out Drum & Flare

Consider demolishing liquid KO drum PSVs in line with new philosophy


of using it as flare scrubber.

Consider reworking Liquid KOD piping in line with new philosophy.

Consider dividing the P&ID into Flare header drawing, Flare scrubber
drawing, Flare tip drawing, Asabo pig launcher and Edop pig launcher
drawings.

Consider reworking piping as appropriate.

Specify tie-in points as required.

KP-PR-156: Gas Launcher to Ubit Platform

Consider Installing PSV on KP-D-101.

Consider relocating pig signal indicator from pipeline to upstream the


barred tee.

Specify preliminary tie-in point for new PSV.


KP-PR-157: Condensate System

Consider automating condensate pumps operation.


KP-PR-301: Instrument &Plant Air Compression and Drying

Consider replacing both instrument air compressors with higher


capacity compressors.

Consider evaluating existing instrument air equipment capacities.


KP-PR-302: Instrument /Utility Air Distribution.

Consider demolishing fuel gas supply lines as back-up instrument air


supply.

Consider reviewing instrument /utility distribution to cover all users e.g.


trash compactor & condensate pumps.
KP-PR-303: Sump Tank

Consider replacing both sump tank pumps.

Consider re-routing EC-7001-6-40-AAA-3 to close drain system.


KP-PR-304: Pressure (Closed Drain) System

Consider reviewing closed drain collection system, specifying tie-in


points where necessary.
KP-PR-305: Open Drain System

Consider reviewing open drain collection system, specifying tie-in


points where necessary.
KP-PR-306: Diesel System And Crane

Consider reviewing diesel storage capacity and distribution to cover


proposed new facilities.

Consider providing pump for diesel distribution.


KP-PR-307: Salt Water System

Consider demolishing salt water system, as system may not be


required in the new scheme.
KP-PR-308: Fresh Water System (Potable Water System)

Consider reviewing potable water storage capacity and distribution to


cover proposed new facility.

Consider providing wash water system with supply from the potable
water system.

KP-PR-309: Fire Water System

Consider revamping / changing entire fire water P&ID


KP-PR-310: Halon System

Consider replacing Generator room halon system with carbon dioxide


based system.
KP-PR-158: Fuel Gas System

Consider revamping the separator piping and bridles.

Consider demolishing supply of gas to instrument air system.


General Comments

Consider revamping all vessels bridles / instrumentation connection

Most piping has been de-rated. consider changing / revamping all


piping so that life span can be extended for another 25 years

Consider repairing Trash Compactor.

6.1.1 Etim Production Facility Follow up List


S/No Description
1.
Need to confirm Trash compactor Electrical
consumption rating
2.
Need to know the status of existing liquid KOD
3.
Need to know the status of existing out of service
Prover Loop
4.
Need to know the type of fire fighting facility to be
provided in the Generator room and Switch gear room.
5.
Need a comprehensive list of Etim utility air users
6.
Need to know MPN plan for replacement of the existing
old instrument air compressor that was not replaced
7.
Need to know if existing sump tank would be replaced.

Remarks

6.1.2 Inim Production Facility Follow up List


S/No Description
1.
Need to know the status of existing liquid KOD
2.
Need to know the type of fire fighting facility to be
provided in the Generator room and Switch gear room.
3.
Need comprehensive list of Inim utility air users
4.
Need to know if existing sump tank would be replaced.
6.1.3 Utue Production Facility Follow up List
S/No
Description
1
Need to confirm Trash compactor instrument air
consumption rating
2
Need to know the status of existing liquid KOD

Remarks

Remarks

3
4
5
6
7

7.0

Need to know Condensate Pumps instrument air


consumption rate
Need a comprehensive list of Utue Platform utility air
users
Need to know if existing sump tank would be replaced.
Need to know existing diesel transfer pump rating
Need to know MPN plan for replacement of the existing
old instrument air compressor.

LESSONS LEARNED
1.0
Site visit impacted positively on the engineers understanding and
appreciation of process equipment facilities.
2.0

Site visit logistic impacted negatively on site visit activities time


keeping.

3.0

Multi-disciplinary team site visit impacted positively on the ease and


completeness of site information gathering.

SECTION D1
SITE VISIT MEETING NOTES
FACILITY:

ETIM PRODUCTION FACILITY

OPERATION PERSONNEL:

E.C, ORODO
X.A. THOMPSON
K. ANIMASHAUN
The process personnel requested information from MPN personnel as per operations
listed below;
Production Separator
The level control on the production separator is currently a concern. The operations
personnel revealed that the separator has not been de-sand for some time. Recently
a de-sanding request has been raised by the Etim operation team.The sight
glasses are blocked. The bridle piping is badly corroded and any attempt to clean the
sight-glass in order to restore it to function may lead to breaking the piping.
Test Separator
This equipment is operated intermittently as required. Operational issues are not
documented, however, the sight-glass is not functional and piping is badly corroded.
Any attempt to clean it may lead to damaging the sight-glasses.
Condensate Pumps
The pumps are aged and operators confirm that a replacement request have been
placed to change both pumps. The gear of one of the pumps is bad and no spares in
the store to restore it back to service. Very urgent attention is required.
Instrument Air System
One of the instrument air compressors has just been replaced and the capacity is
358 SCFM. The second old compressor with operating capacity of 225 SCFM is bad
and there is need for replacement. The instrument air system after-cooler attached to
this compressor is out of service. Also, the instrument air dryers are out of service
and is currently by-passed. There is need to urgently re-instate it to functional.
However no major upset is reported since by-passing the instrument air dryer and
because of this the supply is adequate.
The current instrument air supply scheme shows fuel gas as back-up supply to the
instrument gas system. But the operators confirm that fuel gas was old design. Since
the instrument air was installed, fuel gas has not been used as back-up.
There are no documented utility air users on ETIM production platform. However
utility air station is available.
Gas To Edop Platform
There is currently no flow of gas from Etim platform to Edop platform. This is due to
rupture of the gas line. For the past three years, gas has not been sent to Edop
platform. Gas supply to Edop platform may resume when the pipeline is repaired.
Diesel System Supply

Diesel supply to crane, emergency generator and fire water pumps is manual. The
supply scheme installed over thirty years ago is not functional.
Fire Water System
The fire water system is currently not pressurized. However, the pumps are
functional and activated on fire detection. The entire fire water piping has greatly
deteriorated. Fire water divert valves must be closed manually to concentrate supply
to the required locations.
Fuel Gas System
This is functional without pre-heater and super heater in place. There is also a backup line to instrument air. Since instrument air system was installed, gas has not been
in used as back-up and there is no plan for this, hence there should be proper
isolation.
Meter Prover
The existing Meter prover is out of service. The current flow Meters can not be
proved. There is need to overhaul the prover.
MOL Pumps
All the three pumps are functional. However, the isolation valves of one pump is
leaking, hence pump can not be taken out for maintenance.
Generators
Three gas engines exist at Etim production platform. One of these is out of service,
the second generators cylinders are said to be in bad condition and the remaining
one is not at peak performance. Anytime the generator with the bad cylinder is
running, it shuts-in whenever a little surge is encountered. The third generator is
functioning well and reliable. With the current improved production at Etim platform
there is only one generator that can be relied upon to support production.
Potable Water System
Potable water is supplied via boat. Current capacity can last six people for a week.
Sump Tank
Biocide is occasionally injected to the sump tank. The flow of biocide is by gravity
from the main deck. One of the sump pumps is out of service and the other one is
not reliable. There is a need to change both pumps.
Halon System
Already the switch gear room has been changed to carbon dioxide based, while
generator room is not changed and out of service.
Salt Water System
Salt water pump is not functional. This was previously used to pressurized fire water
system and supply living quarters toilet WC.
Liquid Knock Out Drum
No operational issues as regards flow and control.

Diesel Storage
Supply is by boat and its flows by gravity to the various users.

SECTION D1
SITE VISIT MEETING NOTES
FACILITY:

INIM PRODUCTION FACILITY

OPERATION PERSONNEL:

Engnr. Ashiru

The process personnel requested information from MPN personnel as per operations
listed below.
Production Separators:
The operations personnel noted that the separators were de-sanded about 2-3 years
ago. Only the Enang production separator is currently in use. The separator is
operational with little or no carry over.
Generally the bridle piping is badly corroded and the sight glasses are not
functioning well. With the extent of corrosion in the bridles, any attempt to clean the
sight glasses may lead to damaging them. There are no major operational issues in
terms of level control of the production separator.
Test Separators:
The test separator is usually operated intermittently, however the bridles are badly
corroded and need to be restored to their original functionality. Recently the Inim A
test line was changed after the line ruptured.
Condensate Pumps:
The condensate pumps are old and obsolete without serviceable parts. One of the
pumps is out of service with the belt and parts entirely bad. The second may run with
difficulty and has leaking piping. A request to change the condensate pumps has
been out for more than three years.
Instrument Gas System:
There is no instrument air system at Inim; instrument gas is used for all
instrumentation activities at Inim. There is need to provide instrument air system for
the facility.
Utility Gas Users:
The utility gas user currently identified at Inim is the Inim sump tank. Adequate utility
gas stations are provided on the platform.
Fire Water System:
The Fire water pumps are all weak and need replacement. One of the diesels driven
fire water pump is currently tagged as out of operation and needs urgent attention to
reinstate it. The fire water system is not pressurized and the piping has corroded
heavily. The electric driven pump is available for use.
Fuel Gas System/Generators:
There are no operational issues with the fuel gas system.The gas engine driven
generators are old and not very reliable. With the current drilling activities around
Enang field, an increase in the electrical load is expected at Inim platform. The

current generators are de-rated to give a combine out put of about 400kw and may
not handle the expected increase in electrical load. The operation personnel prefer
gas turbine generators (3 x 50 %).
MOL Pumps:
One production train (Enang Separator) is currently in use. All Enang train pumps
are in place, however two pumps from the Inim train have been taken out for service.
Pumps suction lines are badly corroded and may need replacement.
Potable Water:
Potable water is supplied by boat to the platform. The frequency of supply depends
on usage.
Sump Tank
Biocide is occasionally injected to the sump tank to enable the oil to flow freely as it
is being pumped out. Biocide flow is by gravity from the main deck. There is need to
change the electrically driven pump.
Salt Water System:
The Pump is out of service. It was previously used to pressurized the fire water
system and provide water to the living quarters WC system.
Liquid Knock Out Drum:
The operators have no idea as regard various internals installed. Currently the Inim
flare is out of service with produced gas sent to Edop platform for flaring. The current
export gas does not flow through the liquid K.O drum. However any time gas is sent
to Asabo, the gas flow through the liquid K.O drum.
Diesel Storage:
Diesel is supplied by boat to the facility. Frequency of supply depends on the extent
of usage.
General Commment:
Instrumentation is obsolete and should be up graded. Major process lines have been
de-rated, and urgently need to be revamped so that lines may be restored to their
original integrity and pressure rating.

SECTION D1
SITE VISIT MEETING NOTES
FACILITY:

UTUE PRODUCTION FACILITY

OPERATION PERSONNEL:

James Esentia
James Umoreh
Chinedu Aboaja
George Itok

The process personnel requested information from MPN personnel regarding the
facility operation integrity.
Gas to Ubit PP
There is currently no flow of gas from Utue platform to Ubit platform. The last time
gas was sent from Utue platform to Ubit platform was on 06-06-1999.
Crane
The existing crane doesnt have a pedestal. Diesel supply to the crane is done via
flexible hose connection from a pipe on the diesel system to the crane day tank
using an electrically driven pump.
Hydraulic oil supply to the crane is via a flexible hose connection from the hydraulic
drum to the crane day tank using an air driven pump.
Potable Water Supply
Potable water is supply by boat to the platform on a weekly basis. The potable water
is operational. 10 tonnes of water is normally received each week.
Fuel Gas System
The existing fuel gas system is operational and does not require pre-heating or
superheating to satisfy the engine specification requirement.
Production Separator
A general maintenance and shutdown of separator was done in 2004 and sand was
removed from the separator. After that, the separator level control stopped giving
problems.
Liquid Knock Out Drum
During the general maintenance and shutdown the demister in the vessel was
discovered to have collapsed and it was removed. Presently the vessel has no
demister.
Instrument Air
The existing instrument air system supplied air at a pressure of 60 psig. Existing
instrument air supply is not adequate. Instrument air system capacity could not be
obtained.
MOL Pumps

The pumps are adequate for current production. One of the pumps was out of
service.
Condensate Pumps
Recently the two condensate pumps have been changed with the same rating as the
previous pumps. The pumps are pneumatic and are manually operated, however
pressure switches are installed. When ever a pump is put into operation, it tends to
overload the instrument air system. Usually an operator stands on location for the
period of usage.
Trash (Waste) Compactor
The Trash Compactor is air driven and for the duration of the site visit it was not in
used; hence its impact on the air supply system could not be ascertained.
Crane Oil Hydraulic Supply Pumps.
The Crane hydraulic oil pumps are air driven, but the consumption is low: hence they
do not overload the instrument air supply when in operation.
Fire Water System
Generally, fire water piping and fitting are badly corroded. The Jockey pump is not
operational. (Formally the salt water pump was used as the jockey pump). There are
two existing fire water pumps: one, diesel driven and one, electrically driven.
Chemical Injection
Currently there is no chemical injection facility on Utue production platform. However,
biocide is injected periodically to the sump tank. This is done using a manual kit.
Salt Water System
This system is out of service. Previously it was used to provide water to the living
quarters toilet WC system and to keep fire water main ring pressurized (as the fire
water jockey pump).
Meter Prover Loop
The team could not identify any loop used as meter prover.
Inergen System
Currently the switchgear room inergen system has been changed from Halon based
system to carbon dioxide based. The generator room inergen system was still based
on Halon system and is out of service.
Diesel Supply System
Diesel is supply by boat to the facility. The existing diesel storage facility is adequate.
Frequency of supply is dependent on usage.