You are on page 1of 1

FLAGS

Open Hole CPI

Poor Perm
Pay
Sand
Perfs

2900

2850

2800

2750

2700

2650

2550
2550

2600

2500

Vshale gr (%)
V shale sp
Vshale ND

0.8
0.6
0.4
0.2

PAY SUMMARY - COMPLETE SECTION


Total Net Pay (ft)
23
Total HPV (ft)
3.122
Average Porosity (%)
27.18
Average Sw (%)
50.05
Total Reservoir (ft)
172

Production History

0.0

bvw
bvhcmov
bvhcirr

NOTES:
Perfs in 4-99. First cut 94 bopd.

5%

0.04 bvw
0.1

Dolomite

3
-0.05

0.05

0.1

0.15

0.2

0.25

0.3

0.35

0
0.01

0.4

N phie decimal

0.11

0.21

Pickett Plot

Neutron Density Sand X plot


0.55

0.5

0.5

2900

2850

2800

2750

2700

2650

2600

2450

2900

2850

2800

2750

2700

2650

2600

2550

2500

RLLM

0
0.1
0.2

2,550

2,600

2,650

2,700

2,750

2,800

2,850

2,900

2550

2600

2650

2700

2750

2800

2850

2900

3
2
1

0.5

0.2

0.25

0.3

Nphie %lst

0.3

2,500

100

0.15

2500

10

Rt

0.1

2,450

0.05

2450

0.1

2,400

20% Vshl

0.01

3.5

1.5

40% Vshl

0.05

-70

2400

0.1

-60

2.5

60% Vshl

Central (2)

-50

2,350

80% Vshl

-40

2350

Shale Point

0.2

-30

2,300

0.25

0.15

Lower (3)

2450

GR (api)
GR corrected
GR Res
sp mv

-20

2300

0.3

-10

phie 30%
phie 25%
phie 20%
phie 15%
phie 10%

0.35

Hole Gauge 8.5" bit

Phie Density sand

Corrected Porosity (decimal)

0.4

Upper (1)

2400

0.45

0.1

2350

0.31

porosity

150

2.9

GR api

2.8

0.4

0.2

SP

10%

0.6

15%

Sandstone
Limestone

N phie corr

NPHIE

0.06 bvw

2.45

0.3

Nphie (dec)

2300

2.6

0.12 bvw

0.005 bvw

Rhob(g/cc)

2.25

20%

1000 md

2.05

2.5

0.08 bvw

0.02 bvw

1.85

0.4
25%

1.65

30%

2.4

Sw

Rho b g/cc

2.3

0.1 bvw

100

0.5

2.65

100 md

2.2

2.7

0.2 0.4 0.6 0.8

Central (2)

Central (2)

0.5

10 md

2900

Upper (1)
1 md

2900

Upper (10

2.1

0.1md

0.6

2300

Lower (1)

2850

Lower (3)

0.01 bvw
2

2850

BVW and estimated K plot


0.7

2800

CNL / FDC X plot

1.9

0.7

2800

0.6

2750

Shale Area

0.5

2750

0.4

2700

0.7

2700

0.65

2650

0.6

2650

0.55

GR Induction too
difference to??
Neutron

0.55
0.5

2600

1.75

2600

Upper (1)

Sandstone

2550

Lower (3)

2.25

2550

Central (2)

0.65

2500

Anhydrite

2500

2.75

2450

0.75

Upper (1)

RLLD

Lower (3)

2450

Dolomite

Dolomite

Central (2)

3.25

2350

0.85

3.75

RLLD (ohm-m)
Rmsfl
Rwa (ohm)
R LL8
Rw
#

RMSFL

Sandstone

RWA

Limestone

2400

2ary Porosity

4.25

GR

0.95

RHOB

Limestone

2400

Gas

Anhydrite
4.75

2350

M - N Lithology X plot
1.05

5.25

2300

Oct-97

Pe vs N Lithology Xplot

Pe Photoelectric Factor

2400

2300
Aug-97

Jun-97

100

Apr-97

10

Feb-97

Dec-96

Sw Ratio

50

Oct-96

Sw Archie
Sxo

0.1

Rho b g/cc all Lst scale

10

Restivity ohm - m

Oil
Water
Gas
WI
PSI

100

Sw decimal

1000

La Salina B 17 Well Mugrosa Formation CPI

rate bbls/mo, mcf/mo

10000

2350

100000

1.0

2500

0.1
0.35
0.55

PAY SUMMARY - Zone 2 Central


Total Net Pay (ft)
12
Total HPV (ft)
1.566953823
Average Porosity (%)
25.82
Average Sw (%)
49.43
Total Reservoir (ft)
19

2450

CUTOFFS
Porosity cutoff for pay calculation(decimal)
Vshale cutoff for plots and pay calculation (decimal)
Sw cutoff for pay calculation (decimal)

2400

1.9
60
90
0.45
1
2.66
2.3
1.5
0.6
0.6
2380
2425

2350

FORMATION PARAMETERS
m (for a=1, n=2) zone
1.9
m (for a=1, n=2) Zone 2
SP Clean
-65
GR Clean
SP Shale
-30
GR Shale
Nphie shale (decimal)
Rho mud filt (g/cc) Fresh=1, Salt = 1.1
Rho Zone 1 & 3
2.66
Rho Zone 2
Mud wt
9.5
Rho shale (g/cc)
R shale (ohm m) shale resistivity (not always adjacent bed)
Rw (ohm m) at formation temp top section
Rw (ohm m) at formation temp base section
Base Zone 1, Top Zone 2 ft
Base Zone 2, Top Zone 3

2300

o
t
l
l
s

V shale

Gas or Oil (enter G or O)


Tert (unconsolidated) or older (consolidated) enter T or O
Vshale use GR(G), (always if gas), or lesser ND or GR (L)
Sandstone Laminated or Dispersed clay? (enter L or D)
CPI use clean (C) or shaley (S) calculations

hpv
Vma-sst
Vshale

Interpretation
0.4
0.6
0.8

FLAGS

2300
2900
5808
138
1.22
86
100
1.06
550
Cities Service 12/78
Schlumberger

Top section (ft)


Base section (ft)
TD (ft) TVD md
Temp (F)
Rmf (ohm)
Temp for Rmf (F)
Formation temp
Rmf at formation temp
RKB (ft)
Operator/Date
Contractor
Location

0.2

La Salina B 17 Mugrosa Formation

Pore
volume
0.1
0.2
0.3

WELL

WELL DATA

0.35

Phie Neu Sand

0.4

0.45

0.5

0.55

-0.5

You might also like