You are on page 1of 22

TCE CONSULTING ENGINEERS LIMITED

SHEET i OF i

30421007-3CL00016-P0A

125V DC STATION BATEERY AND BATTERY CHARGER


SIZING REPORT

SAUDI ELECTRICITY COMPANY


EASTERN OPERATING AREA
Dammam, Saudi Arabia
GENERATION EXPANSION OF ARAR POWER PLANT
(CONTRACT NO : 30421007/00)

DESIGN BASIS
FOR
125V DC STATION BATTERY & BATTERY CHARGER SIZING

DOCUMENT NO : 30421007-3CL-00016-P0A
OCTOBER 2004

ENGINEERING CONSULTANT
TCE CONSULTING ENGINEERS LIMITED
73/1, ST.MARK'S ROAD
BANGALORE 560001
INDIA

CONTRACTOR:
AL-TOUKHI COMPANY FOR INDUSTRY & TRADING
P.O.BOX 497, RIYADH 11411, KINGDOM OF SAUDI ARABIA
TEL.00966-1-14633660 : FAX.00966-1-4631150

P0A
26.10.2004

MP

SR

REV NO. DATE

PREPARED BY

CHECKED BY

278172441.xls
SECTION :cover sheeet

CLEARED BY

APPROVED BY

SHEET 1 OF 22

REV NO. DATE

278172441.xls
SECTION :cover sheeet

PREPARED BY

CHECKED BY

CLEARED BY

APPROVED BY

SHEET 2 OF 22

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)

CALCULATION DOCUMENT

DOCUMENT NO. 30421007-3CL-00016-P0A.

SIZING CALCULATION FOR STATION 125V DC SYSTEM

CONTENTS

SECTION

DESCRIPTION

1.0

PURPOSE

2.0

STANDARDS & REFERENCES

3.0

SIZING CRITERIA

4.0

BATTERY LOAD CYCLE.

5.0

CONSIDERATIONS

6.0

DETERMINATION OF NO. OF CELLS

7.0

CORRECTION FACTOR S FOR BATTERY SIZING

8.0

DUTY CYCLE( LOAD PROFILE)

9.0

BATTERY AND CHARGER SIZING CALCULATIONS.

10.0

DC LOAD ESTIMATION

11.0

CONCLUSION

278172441.xls
SECTION :Index

SHEET 3 OF 22

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)

278172441.xls
SECTION :Index

SHEET 4 OF 22

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)
CALCULATION DOCUMENT

DOCUMENT NO. 30421007-3CL-00016-P0A

1.0 PURPOSE:
The purpose of this calculation is to determine the sizes of the 125V DC battery and battery charger for
the Station DC System of GTG#7 and GTG#8 of ARAR Central Power Station.
2.0 STANDARDS & REFERENCES
2.1

SCECO Engineering Standard SES-P-103.02 - Revision 3 Storage Battery Selection and Capacity
determination

2.2

SCECO Engineering Standard SES-P-103.03 - Revision 3 Battery Charger sizing.

2.3

IEEE-485 - IEEE Recommended Practice for Sizing of Large Lead Acid Storage Batteries for Generating
stations and Sub Stations.

2.4

Key One Line Diagram for Arar Plant Drawing No:KA-667481, Rev-P0D SHEET 1 OF 1

3.0 SIZING CRITERIA


3.1

The battery has been sized to meet the Station DC loads, namely the switchgear control supplies and the
Lighting load in the event of black out, for a period twelve (12) hours.The DC Loads pertaining to Gas
turbine and Generator Auxiliaries are not considered as part of these calculation.since these loads would
be catered to unit DC system.

3.2

The Type of battery selected is Vented Type Lead Acid Battery as per cl no 3.03-19(a), page 40 of 336 of
PTS-1022

3.3

The tripping/closing coil/spring charging motor loads for MV breakers are based on Schneider Electric
switchgear catalogues.

3.4

The End cell voltage is considered as 1.75V as per SES-P-103.02.

3.5

Design marigin factor of 1.1 has been considered as per cl.no.4.4.2 of SES-P-103.02

3.6

Ageing factor of 1.25 has been considered as per cl.no. 4.4.3 of SES-P-103.02

3.7

The Battery room temperature is considered as 25 deg C and the temperature correction factor of 1.19
based on inside room temperature of 10 Deg C in case of power failure is considered as per cl.no 2.2 of
SES-P-103.02. Page 17 of 35

3.8

Capacity correction factors and Temperature correction factors are based on SCECO engineering
standard SES-P-103.02.

278172441.xls
SECTION :Writeup

SHEET 5 OF 22

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)
CALCULATION DOCUMENT
4.0
4.0.1

DOCUMENT NO. 30421007-3CL-00016-P0A.

BATTERY LOAD CYCLE


Prior to blackout the following plant configurations are considered:
As a worst case, Incomer & Feeder Breakers of 4.16kV Switchgear, Unit LV Switchgear and Station LV
Switchgear are considered as closed. On loss of power in the plant, all the above referred circuit
breakers will trip.This load is considered as 1 minute load at starting of duty cycle.

4.0.2

On return of normal power supply, simutaneous closing of one incomer & one outgoing feeder, tripping
of one breaker if fault persists, starting of one spring charging motor and running of one spring charging
motor are considered as per c.l.no.2.3(b) of SES-P-103.02. page no 18 of 35. This load is considered
as 1 minute load prior to end of duty cycle.

4.0.3

Starting current of spring charging motor is taken as 5 times the normal current as per cl.no 2.4 SES-P103.02.

4.0.4

Continuous loads corresponding to remote control/annunciation panels, OLTC panels of Generator


Transformer, LV Aux Transformers,indications on switchgear for a period of 12 hours.

4.0.5

DC Emergency lighting load for 3 hours which will be switched on within 3 hours of power failure in
accordance with cl.no. 2.6 of SES-P-103.03

5.0
5.1.1

CONSIDERATIONS
Maximum of 2000Watts of lighting loads has been considered.

5.1.2

The following type of indication lamps and transducers have been condsidered for the MV breakers
(a) Indication Lamps for
(b) Transducers for
i) Breaker -ON
i) Voltage(V) Transducer
ii) R phase -ON
ii) Ammeter(A) Transducer
iii)Y phase -ON
iii) Watt (W) Transducer
iv) B phase -ON
iv) Power Factor(PF) Transducer
v) Trip circuit healthy -ON
v) VAR Transducer

5.1.3

The following type of Indication Lamps & Annunciation have been condsidered for Remote control/
annunciation Panel.
(a) Indication Lamps for
(b) Annunciations for
i) Breaker -ON
i) Transformer Winding Temperature high
ii) R phase -ON
ii) Transformer Winding Temperature very high.
iii)Y phase -ON
iii)Transformer oil temperarue high
iv) B phase -ON
iv) Transformer oil temperature very high
v) Trip circuit healthy -ON
v) Buchholz relay for transformer and OLTC
vi) Pressure relief valve
vii) DC supply supervision relay
viii) Trip circuit supervision relay
ix) O/C & E/F protection
x) REF protection
xi) Differntial protection
xii) Overall Differntial protection
xiii) Lockout relay
xiv) Under Voltage Relay
xv) AC trip coil healthy

278172441.xls
SECTION :Notes for Sizing

SHEET 6 OF 22

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)
xvi) Motor Protection Relay

278172441.xls
SECTION :Notes for Sizing

SHEET 7 OF 22

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)
CALCULATION DOCUMENT

6.0

DOCUMENT NO.30421007-3CL-00016-P0A

DETERMINATION OF NUMBER OF CELLS


Nominal cell voltage

2 volts

Nominal battery voltage

125 volts

as per cl.no 2.0 of SES-P-103.02

Float voltage

2.2 volts

as per cl.no 2.0 of SES-P-103.02

End cell voltage

1.75 volts

Minimum permitted Voltage

101.5 volts

as per cl.no 2.0 of SES-P-103.02

Maximum Permitted Voltage

136.3 volts

as per cl.no 2.0 of SES-P-103.02

as per cl.no 4.1.2(d) of SES-P-103.02

Number of cells required considering the minimum system voltage and end cell voltage =
101.5/1.75

58.00

..(i)

Number of cells required considering the maximum system voltage and float voltage =
136.3/2.2

61.95

..(ii)

Number of cells chosen is lower of the above 2 values =

58.00

Maximum system voltage considering 58cells and float voltage of 2.2 volts is 58 * 2.2
=
<

127.6
136.3

volts
volts

Hence the maximum voltage developed during float charging is less than the maximum permissible
system voltage.
Hence, selection of 58 cells is justified.
7.0

CORRECTION FACTORS FOR BATTERY SIZING


For arriving at the battery Amp-Hr. capacity the following correction factors have been considered:
a) Temperature derating factor, Tt (as per SES-P-103.02)
b) Capacity Factor (KT) as per SES-P-103.02

278172441.xls
SECTION :Cell Number

SHEET 8 OF 22

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)
CALCULATION DOCUMENT
8.0

DOCUMENT NO30421007-3CL-00016-P0A

D U TY CYC LE ( D C LOAD PR O F I LE )

L
O
A
D

A5=134

I
N
A1=42
A
M
P
S

A5
A3=41

A1
A2=25

A4=25
A4

A3

A2
0

180

360

719

720

MINUTES
SKETCH (Not to Scale)

NOTE:
Refer CL.No: 10.0: DC Load Estimation for calculation of load currents A1 to A5

278172441.xls
SECTION :DUTY CYCLE

SHEET 9 OF 22

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)

278172441.xls
SECTION :DUTY CYCLE

SHEET 10 OF 22

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)
DOCUMENT NO30421007-3CL-00016-P0A

CALCULATION DOCUMENT
9.0

BATTERY & CHARGER SIZING CALCULATION


End Cell Voltage
1.75 volts
Minimum Site Temperature : (-5) Deg. Cent.
Battery Room Temp - 25 deg C
1

Period

Load

3
Change in Load

Battery Nominal Voltage: 125 V


Total Duration: 720 Min.
Load in Amps A1=
42A
A4=
25A
5

Duration Of
Period

Time End of Section

Nominal cell voltage = 2.0volts per cell


A2=
A5=
6

25A
134A
7

Capacity
Temperatur
Factor at t
e Derating
Min. rate ( KT) Factor for t
Min.( Tt)

A3=

41A
8
Reqd. Section Size)

Pos. Values
Section 1: First Period Only - if A2 is greater than A1, go to Section 2
1 A1=
A1=42
A1-0=42
M1=1

t=M1=1

0.7700
Section 1

1.19
Total

(3)*(6)*(7) = Rated Amp.


Hrs.

Neg. Values
38.48
38.48 AH

Section 2: First Two Periods Only- If A3 is greater than A2, go to Section 3


1 A1=

A1=42

A1-0=42

M1= 1

t= M1 + M2 =180

3.7000

1.19

2 A2=

A2=25

A2-A1= - 17

M2 = 179

t= M2 = 179

3.6800

1.19

Section 2

Sub. Total
Total

184.93

-74.45
184.93
-74.45
110.48 AH

Section 3 : First Three Periods Only - if A4 is greater than A3, go to Section 4


1 A1=

A1=42

A1-0=42

M1 = 1

t= M1 + M2 + M3 = 360

6.2900

1.19

2 A2=

A2=25

A2-A1= -17

M2=179

t=M2 + M3 = 359

6.2700

1.19

3 A3=

A3=41

A3-A2= 16

M3=180

t = M3 = 180

3.7000

1.19

Section 3

278172441.xls
SECTION :Battery&ChargerSizing

314.37

-126.84

70.45

Sub. Total

384.82

Total

257.98 AH

-126.84

SHEET 11 OF 22

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)
DOCUMENT NO30421007-3CL-00016-P0A

CALCULATION DOCUMENT
Section 4 : First Four Periods Only - if A5 is greater than A4, go to Section 5
1 A1=

A1=42

A1-0=42

M1 = 1

t= M1 + M2 + M3+M4 = 719

10.7400

1.19

2 A2=

A2=25

A2-A1= -17

M2=179

t=M2 + M3+M4 = 718

10.7200

1.19

3 A3=

A3=41

A3-A2= 16

M3=180

t = M3+M4 = 539

7.7100

1.19

4 A4=

A4=25

A4-A3= -16

M4=359

t = M4 = 359

6.2700

1.19

Section 4

536.79

-216.87

146.80

-119.38

Sub. Total

683.58

Total

347.34 AH

-336.25

Section 5 : First Five Periods Only - if A6 is greater than A5, go to Section 6


1 A1=

A1=42

A1-0=42

M1 = 1

t= M1 + M2 + M3 + M4+M5=
720

10.7600

1.19

2 A2=

A2=25

A2-A1= -17

M2=179

t= M2 + M3 + M4+M5= 719

10.7400

1.19

3 A3=

A3=41

A3-A2= 16

M3=180

t= M3 + M4+M5= 540

7.7300

1.19

3 A4=

A4=25

A4-A3= -16

M4=359

t= M4+M5= 360

6.2900

1.19

3 A5=

A5=134

A5-A4= 109

M5=1

t = M5 = 1

0.7700

1.19

Section 5
Uncorrected Cell Size = Maximum Section Size
Design Margin =
Aging Factor =
Cell Size =

(Uncorrected Cell Size) * (Design Margin) * (Aging Factor)

Cell Size selected is

278172441.xls
SECTION :Battery&ChargerSizing

537.78

-217.27

147.18

-119.76
122.78

Sub. Total

807.75

Total
470.72
10%
1.25

470.72 AH

647.24

650

-337.03

AH

AH

SHEET 12 OF 22

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)
DOCUMENT NO30421007-3CL-00016-P0A

CALCULATION DOCUMENT

Battery Charger rating


BIF X AHR
Battery charger rating =

SF X L +

RT

Where,
SF

= Service Factor

1.1

= continuous DC load

27

BIF

= Battery Inefficiency Factor

as per cl.no 2.0 of SES-P-103.03 of page 3 of 6


Amps

1.1

AHR =

Ampere Hours removed from the battery

470.72

AH

RT

Recharging time

16

Hrs

With design margin of 10%, the charger rating comes to

Selected Battery Charger


rating

278172441.xls
SECTION :Battery&ChargerSizing

as per cl.no 2.0 of SES-P-103.03

62.06

Amps

68.27

Amps

70

as per cl.no 4.3 of SES-P-103.02

Amps

SHEET 13 OF 22

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)

CALCULATION DOCUMENT
10.0 DC LOAD ESTIMATION

SL.
No.

Load Description

DOCUMENT NO30421007-3CL-00016-P0A

A1
A2
Type Unit
Qty 0-1 minute 1-180 minute
of
Load
load
load
Load (Watts)
(watts)
(watts)

A3
A4
A5
180-360
360-719
719-720
minute load minute load minute
(watts)
(watts)
load(watts)

Continuous Remarks
Load on
Charger
(watts)

A.
1

4.16kV Switchgear
Indication lamps

1.2

35

42

42

42

42

42

42

Protective Relays

50

350

350

350

350

350

350

Auxiliary relays

3.3

35

115.5

115.5

115.5

115.5

115.5

115.5

Transducers

1.5

35

52.5

52.5

52.5

52.5

52.5

52.5

5
6

Multifunction Meter
Tripping coil

C
M

6
50

7
16

42
800

42
0

42
0

42
0

42
100

42
0

Closing coil

50

200

One. incomer and one feeder


breaker will be closed on return of
normal power from each bus section

Spring Charging Motor staring

300

3000

One no. breaker spring will be


charged on closing of breaker and
the starting current is taken 5 times
the normal current from each bus
section.

Spring Charging Motor running

300

600

One no of spring charge motor on


running from each bus section.

1402.00

602.00

602.00

602.00

4502.00

602.00

Sub Total Load : (D) in Watts


B.
1

480V Station Switchgear


Indication lamps

1.2

65

78

78

78

78

78

78

Protective Relays

50

13

650

650

650

650

650

650

278172441.xls
SECTION :DC LOAD ESTIMATION

Indication lamps considered for


1) Breaker- ON , 2) 'R'
Phase-ON,
3) 'Y' Phase-ON,
4) 'B' Phase ON,
5)Trip Circuit
Healthy-ON
Unit Loads for Protective Relays are
assumed values.
5 nos Auxiliary Relays are
considered for each breaker
Transducers are considered for VX,
AX, WX, PFX,VARX
8 nos of Breakers trip on loss of
normal power(one Buscoupler not
considered) and One no breaker will
be tripped on normal power return
from each bus section.

Indication lamps considered for


1) Breaker- ON , 2) 'R'
Phase-ON,
3) 'Y' Phase-ON,
4) 'B' Phase ON,
5)Trip Circuit
Healthy-ON
Unit Loads for Protective Relays are
assumed values.

SHEET 14 OF 22

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)

CALCULATION DOCUMENT
10.0 DC LOAD ESTIMATION

SL.
No.

Load Description

DOCUMENT NO30421007-3CL-00016-P0A

A1
A2
Type Unit
Qty 0-1 minute 1-180 minute
of
Load
load
load
Load (Watts)
(watts)
(watts)

A3
A4
A5
180-360
360-719
719-720
minute load minute load minute
(watts)
(watts)
load(watts)

Continuous Remarks
Load on
Charger
(watts)
5 nos Auxiliary Relays are
considered for each breaker
Transducers are considered for VX,
AX, WX, PFX,VARX

Auxiliary relays

1.3

65

84.5

84.5

84.5

84.5

84.5

84.5

Transducers

1.5

65

97.5

97.5

97.5

97.5

97.5

97.5

5
6

Multifunction Meter
Tripping coil

C
M

6
50

13
12

78
600

78
0

78
0

78
0

78
100

78
0

Closing coil

50

200

One. incomer breaker and one


outgoing breaker will be closed on
return of normal power from each
bus section.

Spring Charging Motor starting

300

3000

One no. breaker spring will be


charged on closing of breaker and
the starting current is taken 5 times
the normal current from each bus
section.

Spring Charging Motor running

300

600

One no of spring charge motor on


running from each bus section

1588

988

988

988

4888

988

Sub Total Load : (E) in Watts


C.
1

480V Unit Switchgear-1


Indication lamps

1.2

15

18

18

18

18

18

18

Protective Relays

50

150

150

150

150

150

150

Auxiliary relays

1.3

15

19.5

19.5

19.5

19.5

19.5

19.5

Transducers

1.5

15

22.5

22.5

22.5

22.5

22.5

22.5

5
6

Multifunction Meter
Tripping coil

C
M

6
50

3
4

18
200

18
0

18
0

18
0

18
50

18
0

278172441.xls
SECTION :DC LOAD ESTIMATION

12 nos of Breakers trip on loss of


normal power and one no of breaker
will be tripped on restoration period
from each bus section

Indication lamps considered for


1) Breaker- ON , 2) 'R'
Phase-ON,
3) 'Y' Phase-ON,
4) 'B' Phase ON,
5)Trip Circuit
Healthy-ON
Unit Loads for Protective Relays are
assumed values.
5 nos Auxiliary Relays are
considered for each breaker
Transducers are considered for VX,
AX, WX, PFX,VARX
4 nos of Breakers trip on loss of
normal power and one breaker will
be tripped on restoration period

SHEET 15 OF 22

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)

CALCULATION DOCUMENT
10.0 DC LOAD ESTIMATION

SL.
No.

Load Description

DOCUMENT NO30421007-3CL-00016-P0A

A1
A2
Type Unit
Qty 0-1 minute 1-180 minute
of
Load
load
load
Load (Watts)
(watts)
(watts)

A3
A4
A5
180-360
360-719
719-720
minute load minute load minute
(watts)
(watts)
load(watts)

Continuous Remarks
Load on
Charger
(watts)

Closing coil

50

100

One. Incomer and one feeder


breaker will be closed on return of
normal power

Spring Charging Motor starting

300

1500

One no. breaker spring will be


charged on closing of breaker and
the starting current is taken as 5
times the normal current.

Spring Charging Motor running

300

300

One no of spring charge motor on


running

428

228

228

228

2178

228

Sub Total Load : (F) in Watts


D.
1

480V Unit Switchgear-2


Indication lamps

1.2

15

18

18

18

18

18

18

Protective Relays

50

150

150

150

150

150

150

Auxiliary relays

1.3

15

19.5

19.5

19.5

19.5

19.5

19.5

Transducers

1.5

15

22.5

22.5

22.5

22.5

22.5

22.5

5
6

Multifunction Meter
Tripping coil

C
M

6
50

3
4

18
200

18
0

18
0

18
0

18
50

18
0

Closing coil

50

100

One. Incomer and one feeder


breaker will be closed on return of
normal power

Spring Charging Motor starting

300

1500

One no. breaker spring will be


charged on closing of breaker and
the starting current is taken as 5
times the normal current.

Spring Charging Motor running

300

300

One no of spring charge motor on


running

428

228

228

228

2178

228

Sub Total Load : (G) in Watts


E.

Indication lamps considered for


1) Breaker- ON , 2) 'R'
Phase-ON,
3) 'Y' Phase-ON,
4) 'B' Phase ON,
5)Trip Circuit
Healthy-ON
Unit Loads for Protective Relays are
assumed values.
5 nos Auxiliary Relays are
considered for each breaker
Transducers are considered for VX,
AX, WX, PFX,VARX
4 nos of Breakers trip on loss of
normal power and one breaker will
be tripped on restoration period

480V Unit Switchgear(future)

278172441.xls
SECTION :DC LOAD ESTIMATION

SHEET 16 OF 22

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)

CALCULATION DOCUMENT
10.0 DC LOAD ESTIMATION

SL.
No.

Load Description

DOCUMENT NO30421007-3CL-00016-P0A

A1
A2
Type Unit
Qty 0-1 minute 1-180 minute
of
Load
load
load
Load (Watts)
(watts)
(watts)

A3
A4
A5
180-360
360-719
719-720
minute load minute load minute
(watts)
(watts)
load(watts)

Continuous Remarks
Load on
Charger
(watts)

Indication lamps

1.2

15

18

18

18

18

18

18

Protective Relays

50

150

150

150

150

150

150

Auxiliary relays

1.3

15

19.5

19.5

19.5

19.5

19.5

19.5

Transducers

1.5

15

22.5

22.5

22.5

22.5

22.5

22.5

5
6

Multifunction Meter
Tripping coil

C
M

6
50

3
4

18
200

18
0

18
0

18
0

18
50

18
0

Closing coil

50

100

278172441.xls
SECTION :DC LOAD ESTIMATION

Indication lamps considered for


1) Breaker- ON , 2) 'R'
Phase-ON,
3) 'Y' Phase-ON,
4) 'B' Phase ON,
5)Trip Circuit
Healthy-ON
Unit Loads for Protective Relays are
assumed values.
5 nos Auxiliary Relays are
considered for each breaker
Transducers are considered for VX,
AX, WX, PFX,VARX
4 nos of Breakers trip on loss of
normal power and one breaker will
be tripped on restoration period
One. Incomer and one feeder
breaker will be closed on return of
normal power

SHEET 17 OF 22

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)

CALCULATION DOCUMENT
10.0 DC LOAD ESTIMATION

SL.
No.

Load Description

DOCUMENT NO30421007-3CL-00016-P0A

A1
A2
Type Unit
Qty 0-1 minute 1-180 minute
of
Load
load
load
Load (Watts)
(watts)
(watts)

A3
A4
A5
180-360
360-719
719-720
minute load minute load minute
(watts)
(watts)
load(watts)

Continuous Remarks
Load on
Charger
(watts)

Spring Charging Motor starting

300

1500

One no. breaker spring will be


charged on closing of breaker and
the starting current is taken as 5
times the normal current.

Spring Charging Motor running

300

300

One no of spring charge motor on


running

428

228

228

228

2178

228

Sub Total Load : (H) in Watts


F.
1

Relay Panel for Generator Transformer of


GTG#7
Transformer Relay Panel

70

70

70

70

70

70

70

50

50
120

0
70

0
70

0
70

0
70

0
70

70

70

70

70

70

70

70

50

50
120

0
70

0
70

0
70

0
70

0
70

70

70

70

70

70

70

70

50

50
120

0
70

0
70

0
70

0
70

0
70

60

60

60

60

60

60

60

60

60

60

60

60

60

Sub Total Load : (I) in Watts

G.
1

Relay Panel for Generator Transformer of


GTG#8
Transformer Relay Panel

Sub Total Load : (J) in Watts

H.
1

Relay Panel for Generator Transformer of


future GTG
Transformer Relay Panel

Sub Total Load : (K) in Watts


I.

OLTC Remote Tap Changer Panel for


Genrator Transformer of GTG#7

Transformer OLTC Panel

Sub Total Load : (L) in Watts

278172441.xls
SECTION :DC LOAD ESTIMATION

Refer SES-P-103.02 page 20 of 35


for Relay panel unit loads

Refer SES-P-103.02 page 20 of 35


for Relay panel unit loads

Refer SES-P-103.02 page 20 of 35


for Relay panel unit loads

Refer SES-P-103.02 page 20 of 35


for OLTC panel unit loads

SHEET 18 OF 22

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)

CALCULATION DOCUMENT
10.0 DC LOAD ESTIMATION

SL.
No.

Load Description

J.

OLTC Remote Tap Changer Panel for


Genrator Transformer of GTG#8

Transformer OLTC Panel

DOCUMENT NO30421007-3CL-00016-P0A

A1
A2
Type Unit
Qty 0-1 minute 1-180 minute
of
Load
load
load
Load (Watts)
(watts)
(watts)

60

Sub Total Load : (M.) in Watts


K

OLTC Remote Tap Changer Panel for


Genrator Transformer of future GTG

Transformer OLTC Panel

60

Sub Total Load : (N.) in Watts


L

OLTC Remote Tap Changer Panel for


Station LV Aux Transformer-1

Transformer OLTC Panel

60

Sub Total Load : (O) in Watts


M

OLTC Remote Tap Changer Panel for


Station LV Aux Transformer-2

Transformer OLTC Panel

Sub Total Load : (P) in Watts

278172441.xls
SECTION :DC LOAD ESTIMATION

60

A3
A4
A5
180-360
360-719
719-720
minute load minute load minute
(watts)
(watts)
load(watts)

Continuous Remarks
Load on
Charger
(watts)

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

60

Refer SES-P-103.02 page 20 of 35


for OLTC panel unit loads

Refer SES-P-103.02 page 20 of 35


for OLTC panel unit loads

Refer SES-P-103.02 page 20 of 35


for OLTC panel unit loads

Refer SES-P-103.02 page 20 of 35


for OLTC panel unit loads

SHEET 19 OF 22

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)

CALCULATION DOCUMENT
10.0 DC LOAD ESTIMATION

SL.
No.

Load Description

DOCUMENT NO30421007-3CL-00016-P0A

A1
A2
Type Unit
Qty 0-1 minute 1-180 minute
of
Load
load
load
Load (Watts)
(watts)
(watts)

A3
A4
A5
180-360
360-719
719-720
minute load minute load minute
(watts)
(watts)
load(watts)

Continuous Remarks
Load on
Charger
(watts)

Remote Control & Annunciation PANEL


for 4.16kV SWGR

Remote Control

1.2

15

18

18

18

18

18

18

Annunciation

1.2

48

57.6

57.6

57.6

57.6

57.6

57.6

75.6

75.6

75.6

75.6

75.6

75.6

Sub Total Load : (Q) in Watts


O

Remote Control & Annunciation PANEL


for 480V Station SWGR

Remote Control Indication lamps

1.2

15

18

18

18

18

18

18

Annunciation

1.2

48

57.6

57.6

57.6

57.6

57.6

57.6

75.6

75.6

75.6

75.6

75.6

75.6

Sub Total Load : (R) in Watts

Remote Control & Annunciation PANEL


for 480V Unit SWGR-1

Remote Control Indication lamps

1.2

15

18

18

18

18

18

18

Annunciation

1.2

48

57.6

57.6

57.6

57.6

57.6

57.6

75.6

75.6

75.6

75.6

75.6

75.6

Sub Total Load : (S) in Watts

278172441.xls
SECTION :DC LOAD ESTIMATION

Indication lamps considered for


1) Breaker- ON , 2) 'R'
Phase-ON,
3) 'Y' Phase-ON,
4) 'B' Phase ON,
5)Trip Circuit
Healthy-ON
Refer Cl.no. 5.1.3

Indication lamps considered for


1) Breaker- ON , 2) 'R'
Phase-ON,
3) 'Y' Phase-ON,
4) 'B' Phase ON,
5)Trip Circuit
Healthy-ON
Refer Cl.no. 5.1.3

Indication lamps considered for


1) Breaker- ON , 2) 'R'
Phase-ON,
3) 'Y' Phase-ON,
4) 'B' Phase ON,
5)Trip Circuit
Healthy-ON
Refer Cl.no. 5.1.3

SHEET 20 OF 22

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)

CALCULATION DOCUMENT
10.0 DC LOAD ESTIMATION

SL.
No.

Load Description

DOCUMENT NO30421007-3CL-00016-P0A

A1
A2
Type Unit
Qty 0-1 minute 1-180 minute
of
Load
load
load
Load (Watts)
(watts)
(watts)

A3
A4
A5
180-360
360-719
719-720
minute load minute load minute
(watts)
(watts)
load(watts)

Continuous Remarks
Load on
Charger
(watts)

Remote Control & Annunciation PANEL


for 480V Unit SWGR-2

Remote Control Indication lamps

1.2

15

18

18

18

18

18

18

Annunciation

1.2

48

57.6

57.6

57.6

57.6

57.6

57.6

75.6

75.6

75.6

75.6

75.6

75.6

Sub Total Load : (T) in Watts


R

Remote Control & Annunciation PANEL


for 480V Unit SWGR future

Remote Control Indication lamps

1.2

15

18

18

18

18

18

18

Annunciation

1.2

48

57.6

57.6

57.6

57.6

57.6

57.6

75.6

75.6

75.6

75.6

75.6

75.6

0
0.00

0
0.00

2000.00
2000.00

0.00
0.00

0
0

0.00
0.00

5312.00

3162.00

5162.00

3162.00

16812.00

3162.00

42

25

41

25

134

25

Sub Total Load : (U) in Watts


S

DC Lighting
Sub Total Load : (V) in Watts

TOTAL LOAD IN WATTS


TOTAL LOAD IN AMPS

278172441.xls
SECTION :DC LOAD ESTIMATION

Lot

Indication lamps considered for


1) Breaker- ON , 2) 'R'
Phase-ON,
3) 'Y' Phase-ON,
4) 'B' Phase ON,
5)Trip Circuit
Healthy-ON
Refer Cl.no. 5.1.3

Indication lamps considered for


1) Breaker- ON , 2) 'R'
Phase-ON,
3) 'Y' Phase-ON,
4) 'B' Phase ON,
5)Trip Circuit
Healthy-ON
Refer Cl.no. 5.1.3

SHEET 21 OF 22

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)
CALCULATION DOCUMENT

DOCUMENT NO. 30421007-3CL-00016-P0A.

11.0 CONCLUSION
(a) Recommended minimum battery size for the station DC system of GTG#7 and GTG # 8 including one
future GTG of ARAR Power station is 650AH on 12 hours duration basis.
(b) A battery charger of 70 Amps rating shall be provided.