Professional Documents
Culture Documents
The values are Displayed in Blue color are the Input values
118
Load Case
Bending Moment at Support
Bending Moment at Mid Span
Max Shear Force at support, Vu
Max Shear Force at mid span, Vu
=
=
=
=
=
101
299
299
857
810
=
=
757 KN.m
757 KN.m
KN.m
KN.m
KN
KN
2 Section Geometry
0.0035
0.45 fck
3/7xu
Asc
xu
0.42 xu
0.002
4/7xu
c=0.36 fck b xu
Ast
Es
T
b
0.87fy/Es+0.002
Strain diagram
Stress diagram
3 Design Datas
1. Length of Beam
2. Width of Support
3. Depth of beam, D
=
=
=
8 m
230 mm
1000 mm
4. Width of Beam, B
300 mm
25 N/mm2
415 N/mm2
=
=
=
where
Mu = bending moment at the cross-section
Mt =
Tu(1+D/b/1.7)
Mt
30 mm
20 mm
8 mm
= Mu + Mt
= 757000000((1 + (1000/300)/1.7)
= 1929.61 KN.m
1929.61>299
Provide additional tensile
reinforcement for torsion at support
At mid Span
Me1
2228.6 KN.m
As per Clause
41.4.2.1,
IS:456:2000
= Mu + Mt
where
Mu = bending moment at the cross-section
Mt =
Tu(1+D/b/1.7)
Mt
= 757000000((1 + (1000/300)/1.7)
= 1929.61 KN.m
1929.61>299
Provide additional tensile
reinforcement for torsion at mid
span
Me1
5 Effective depth required
Overall Depth, Dprovided
Effective depth provided, dprovided
2228.6 KN.m
=
1000 mm
= (D-CC-1/2 of bar)
= (1000-30-1/2 x 20)
960 mm
Mu.lim
xu.max/d
Mu.lim
=
=
d,reqd
= (Mu.lim/Qb)1/2
0.48
3.45 bd2
(IS:456:2000,
Annex G, clause
G.1.1.c)
1467.4 mm
1467.39 > 960
Revise the depth or Provide
doubly rein. beam
Mu.lim
953.86 KN.m
Mu>Mu.lim
Doubly
Mu/bd2
pt
Ast
0 mm2
Ast.min
589.88 mm2
Ast
589.88 mm2
0 Nos
No of bars
b) At mid span
=
Mu/bd2
Ast
0 mm2
Ast.min
589.88 mm2
Ast
589.88 mm2
0 Nos
pt
No of bars
= Ast1+Ast2
Mu.lim/bd2
pt
= (953856000)/(300x960x960)
=
3.45
1.188
= Mu-Mu.lim/0.87fy(d-d')
=
3837.7 mm2
Ast =
7259.1 mm2
No of bars
24 Nos
= 0.87 fy
d'
40 mm
fsc
361.05 N/mm2
3960.3 mm2
No of bars =
13 Nos
Asc
= (953856000)/(300x960x960)
pt
Ast
3.45
1.19
= 3421.44 mm2
As2
= Mu-Mu.lim/0.87fy(d-d')
=
3837.7 mm2
Ast =
7259.1 mm2
24 Nos
No of bars
= 0.87 fy
d'
40 mm
fsc
361.05 N/mm2
3960.3 mm2
No of bars =
13 Nos
Asc
= Vu +1.6(Tu/b)
= 857+(1.6x757/300)
=
861.04 KN
= Vu +1.6(Tu/b)
= 810+(1.6x757/300)
814.04 KN
Ve/bd
= 861040/(300x960)
=
pt =
2.976 N/mm2
2.5205
= 0.87fck/6.89pt
=
Allowable shear stress at support, tc
7.9567
0.429 N/mm2
2.976>0.429
Provide shear reinforcement
tc.max =
4.15
N/mm2
2.976<4.15
O.K
Minimum reinforcement
Asv/sv b = 0.4/0.87fy
sv =
0 mm
Shear reinforcement
47 mm
min spacing
300 mm
Vus = Vu-tc bd
=
sv =
spacing
733.45 KN
47 mm
Ve/bd
= 814040/(300x960)
=
pt =
2.827 N/mm2
1.3751
= 0.87fck/6.89pt
=
Allowable shear stress at mid span, tc
4.3408
0.549 N/mm2
2.827>0.549
Provide shear reinforcement
tc.max =
4.15
N/mm2
2.827<4.15
O.K
Minimum reinforcement
Asv/sv b = 0.4/0.87fy
sv =
0 mm
Shear reinforcement
Vus = Vu-tc bd
= 655.93 KN
sv =
53 mm
Longitudinal reinforcement
Beam Dimensions
B, mm
D, mm
Reinforcement, Area
Beam type
At support
At mid span
top
Top
Bottom
Bottom
spacing
53 mm
min spacing
300 mm
300
1000
Doubly
Bar dia
25
20
16
25
25
20
15
7359.4
628
Nos
602.88 2453.1
8
47
mm
mm No of Stirrups Legged
Spacing
53
mm
mm No of Stirrups Legged
=
8.33
= B.V x M.F
= 100Ast/bd
fs
=
2.52
= 0.58x fyx(Ast required/Ast provided)
fs
Modification Factor
l/d, Max
712.27 N/mm2
0.4
=
= 0.4 X 26
=
10.4
10.4>8.33
O.K