Professional Documents
Culture Documents
Project
Owner
Contractor
PROCEDURE FOR
FABRICATION AND ERECTION OF STATION STRUCTRAL
WORKS
INDCON-PJPL-STN-MECH-PNP-01
00
07.11.07
Rev.
No
Date
Submitted for
approval
description
Ajit
Amit
Prepared Checked
by
by
GSB
Approved
by
Approved by
IOCL
INDEX
Sr.No.
Description
Page No.
Purpose
03
References
03
Fabrication
03
Erection
04
Tolerance Limits
04
05
Documentation
05 08
PURPOSE: This specification covers Fabrication and erection of structure steel work
consisting of Columns, beam, brackets, grating, pumping units piping, vessels,
valves and other location as per drawing.
2.0
REFERENCES: -
2.1.
: IS 226
: IS 2062
: IS 1367 Gr. B
d. Welding electrodes
: IS 814, IS 815
e. Washer
: IS 226
3.0
FABRICATION: -
3.1
3.2
Ensure that all approved Fabrication drawing shall be referred to. The
connection shall be bolted or welded as specified in the drawing.
3.3
Fabrication tolerance shall be so set that misalignment of plate at any weld shall
be not exceed of the plate thickness or 1.5 mm whichever is less. Maximum
deviation from a straight line shall not exceed 3 mm in any 3 meter.
3.4
Qualification test for welder and approval of the electrodes shall be carried out
as per IS-823. Platform and ladder shall be shape assembled in the largest unit
suitable for handling, transportation and erection.
ERECTION:-
4.1.
Erection shall be carried out in accordance with IS: 800 Section VI and shall be
permitted only after the relevant foundation or other structure over which the
steel work will be erected is ready for erection.
4.2.
4.3.
Maximum tolerance for line and level of the steel work shall be 3 mm for any
part of structure. The structure shall not be out of plumb by more then 3.5 mm on
each 10 meter section of height and not more then 7 mm per 30 meter length.
5.0
TOLERANCE LIMITS
5.1.
FOR FABRICATION:
5.2.
FOR ERECTION:
6.0
All utilities shall be identified and protected so that they do not foul with the
execution work.
All employees shall follow the employee occupational health & safety rules.
DOCUMENTATION
Inspection Test Plan
: INDCON-PJPL-STN-MECH-PNP-01
Inspection Report
: INDCON-PJPL-STN-MECH-FM-01A
INDCON-PJPL-STN-MECH-FM-01B
Note:
In case of conflict between the requirements of this procedure and that of the
above referred specifications the requirements of the latter shall govern, until and
unless specific intention is meant.
Contractor: Indcon
Project
Revision : 00
Sr.
No.
Activity Description
Date:
Checked By
Frequency of
Insp./ Testing
INDCON
IOCL
Doc. To be
submitted by
Indcon
At the Beginning
AP
INDCON-PJPL-STNMECH-PNP-01
WPS/PQR
At the Beginning
AP
INDCON-PJPL-STNMECH-WPS-13
At the Time of
Material Receipt
Manufacturers Test
Certificates
Fabrication work
Random
RM
INDCON-PJPL-STNMECH-FM-01A
Every Joint
RM
INDCON-PJPL-STNMECH-FM-01A/B
Erection wok
Random
RM
INDCON-PJPL-STNMECH-FM-01B
Safety
Throughout
INDCON-PJPL-STNMECH-FM-01A/B
Legend:
P : Perform ,
R : Review Documents,
AP : Approval ,
RM : Random
W : Witness
Name:
Name:
Sign:
Sign:
Date:
Date:
INSPECTION REPORT
FOR
FABRICATION AND ERECTION OF STATION STRUCTRAL WORKS
Procedure No: INDCON-PJPL-STN-MECH-PNP-01
Client
Contractor: Indcon
Project
Revision : 00
SL.
NO.
MARK NO.
ITEM NO.
ITEM
DESCRIPTION
Date:
SIZE
QTY
FABRICATION
OK
REMARK
Legend:
BW - BUTT WELD
SW - SOCKET WELD
BR - BRANCH WELD
FW Fillet Weld
Contractor: Indcon
Project
Revision : 00
SL.
NO.
MARK NO.
ITEM NO.
ERECTION
WELD OK
SIZE
QTY
WEIGHT IN KGS
REMARK
Legend:
BW - BUTT WELD
SW - SOCKET WELD
BR - BRANCH WELD
FW Fillet Weld