Background
The committee proposed: Three types of fish farms using less water, and
simultaneously an increased degree of recirculation of the water volume.
These farms were also intended to be established with standardized water
treatment plants.
Results of the Fish Farm
Committee’s recommendations
The model fish farm project was described and started in 2004 - 2005 with
participation of 8 Danish trout farms. The fish farmers have received 30 %
of the building cost as funding from the Danish government and EU.
A project dealing with the environmental impact was formed by the National
Environmental Institute, Danish Institute for Fisheries Research and the
Organization Danish Aquaculture with 100 % funding from the Danish
Government and EU.
This project is presently being implemented, and the final report from the project
is expected at the end of 2007.
Participants in model Fish farm project
8 Danish trout farms are participating in the project and these have been rebuilt
to so-called model fish farms. All of the participating farms have been rebuilt to
“model 3 farms”.
The production at the rebuilt farms has been initiated accordingly during 2004
and 2005.
During the project period the allowed amount of feed is increased by 100 %.
After the project period of 2 years, a new maximum allowed amount of feed,
based on the removal rate of Nitrogen, Phosphor and BOD on each farm, will
be decided by the environmental authorities.
Three types of model fish farms
Anvendte farver/signaturer:
Skellinie, matr.nr.
Bygninger
Grøft, ca. 0,5 m dyb
bundbredde, ca. 5 m Damme og kanaler med opdræt
Nedgravede rør
Vandløb og fødekanaler
V
an
an
Stemmeværker
df
df
or
or
s
Rist
sy
yn
in
ni n
gf
Adgangsvej
gf
S l od
ra
te m em
ra
Vandets strømningsretning
bo
d
ræ
m å l:
r in
ev K
g
æ ot
rk e 2
In
,
d lø
bs
3 ,6
ka
na
1m
l
DN
N
Sl
am
be
A
Vejle Å
Bu
nd
Matr.nr. 4 t
fæ
ld
Jordvold
sb
a
ss
Grøft Betonplade
ri
nd
Slamtank
nd
ø 10 meter
Matr.nr. 2 e
Luftrør Vejle Å Matr.nr. 1 a
A
vsp: 21,69 m
r.n
Ilttank
at
Stem
M
agu ne
l ntel
dam
Pla Pa l øb
nte r ør fo r om gs bassi n
ver e
vsp: 21,79 m
lagu avede g af bun df ælni n
am
ne N edg r n
Le
ved r e snin
ere d
bsg røft
Le v
Pla n O mlø
tel ag
un e
Adgangsvej Ozonanlæg
8
rin g Pla 7 borin g
g bo nte la gu 6 fra væld og
ld o ne 5 Till øb
væ Slambeholder 4
fra 3
b 2
T il l ø
Sættefiskanlæg
40
70
100
70
70
20
50
Hydraulic capacity up
Inlet Outlet to 700 l/s
280
2 10
50
50
•Cost effective
•Low maintenance