http://dankuchma.com/stm/STM/examples/Corbel/Corbel.htm

Strut-and-Tie Resource W eb Site


Home

Strut-and-Tie Method (STM)

Worked Design Examples

Single Corbel

Single Corbel

Site Map

Design per ACI 318-02 Appendix A, SI Unit

Deep Beam (1) | Deep Beam (2) | Dapped-Beam End | Single Corbel | Double Corbel

A single corbel projecting from a 350 mm 350 mm column is to be designed to support

precast beam reaction forces at 100 mm from the face of the column. The factored vertical
load to be carried is 250 kN. A horizontal force of 50 kN is assumed to develop to account for
creep and shrinkage deformations.
Summary of
ACI 318-02 Appendix A
View Print-Friendly
Version of this Page
View PDF Version
of this Page

The concrete strength is 35 MPa (normal density), and the yield strength of reinforcement is
taken as 420 MPa.
Determine the Bearing Plate Dimensions:
Choose a 300 mm

150 mm 13 mm bearing pad. The bearing plate area is

and the bearing stress is


is less than the bearing stress limit, i.e.

Since this
the

bearing size is adequate.


Choose the Corbel Dimensions:
Choose an overall corbel depth at column face of 450 mm. The ACI Code requires that the
depth at the outside of the bearing area is at least one-half of the depth at the column face.
Therefore, select a depth of 225 mm at the free end of the corbel. Figure 1 summarizes the
selected dimensions for the corbel.

Figure 1
(Click here to view a larger image)
Determine the Strut-and-Tie Model:
The vertical load is assumed to be located 25 mm toward the edge of the corbel from the
center of bearing plate to allow for load eccentricities and erection tolerances. Thus, the
position of vertical load is 25 + 100 = 125 mm from the face of column.
The geometry of the assumed truss is given in Figure 2. The center of tie CB is assumed to be

2/12/2012 12:07 PM

Strut-and-Tie Resources Web Site - Worked Design Examples: Sing...

2 of 4

http://dankuchma.com/stm/STM/examples/Corbel/Corbel.htm

located 50 mm from the top of the corbel. Thus, d = 450 50 = 400 mm. The horizontal tie DA
is assumed to lie on the horizontal line passing through the sloping end of the corbel.
The location of strut DD centerline is found by calculating the strut width a. The required
compressive force in strut DD, NDD, can be found by taking moments about Node A as
follows:

As the stress on the nodal zone at D is to be limited to


we have
Solving these two equations gives

and

This fixes the geometry of the truss and means that member CD has a horizontal projection of
10 + 125 + 79/2 = 175 mm while member BC has a horizontal projection of 300 - 79/2 = 260
mm.

Figure 2
(Click here to view a larger image)
Determine the Required Truss Forces by Statics:
The required forces in the other important members of the truss are given in the following
table. Note that positive indicates tension, negative compression.
Member
Force (kN)

CD
-273

CB
+159

BD
-292

BA
+245

DA
+50

DD'
-495

Design the Ties:


The area of reinforcement required for tie CB is

Choose 4 No. 13 mm bars,


As shown in the above table, tie BA has a larger tension than tie CB. However, this tie force
should be resisted by column longitudinal reinforcement. Therefore, continue the 4 No. 13 mm
bars down the column just to have a sufficient development length.

2/12/2012 12:07 PM

Strut-and-Tie Resources Web Site - Worked Design Examples: Sing...

3 of 4

http://dankuchma.com/stm/STM/examples/Corbel/Corbel.htm

The area of reinforcement required for tie DA is


Choose 2 No. 10 mm additional column ties at location DA,
Design the Nodal Zones and Check the Anchorages:
The width a of nodal zone D was chosen to satisfy the stress limits on the nodal zone.
To anchor tie CB, the horizontal loop is used. The detail is shown in Figure 4. To satisfy the
nodal zone stress limit, the tie reinforcement must engage an effective depth of concrete at
least equal to:

This limit is easily satisfied since the nodal zone available is 100 mm.

The required anchorage length for tie AA is


Since this is
less than the available length, i.e. 50 + 150 (25 + 10) = 165 mm, the anchorage length is
adequate.
Check the Struts:
The struts will be checked by computing the strut widths and checked whether they will fit in
the space available.
The stresses in the diagonal struts CD and BD is limited to
Hence, the required widths for struts
CD and BD are
and
respectively.
Choose 50 mm width for both struts CD and BD. The required width for strut DD is equal to
a, i.e. 79 mm.
As shown in Figure 3, all the strut widths fit into the outline of the corbel region. Thus, this
solution is accepted. Figure 3 also shows a summary of the stress demand for each strut and its
corresponding stress limit (in brackets).

Figure 3
(Click here to view a larger image)
Calculate the Minimum Reinforcement Required for Crack Control:
According Appendix A, the minimum reinforcement provided must satisfy
to be able to take
as 0.75 for the diagonal struts, and the minimum
spacing for the vertical reinforcement is the smallest of 300 mm or d/2.

2/12/2012 12:07 PM

Strut-and-Tie Resources Web Site - Worked Design Examples: Sing...

4 of 4

http://dankuchma.com/stm/STM/examples/Corbel/Corbel.htm

In addition, the code requires closed stirrups or ties parallel to the reinforcement required for
tie CB to be uniformly distributed with 2/3 of the effective depth adjacent to tie CB, i.e. 2/3
(400) = 267 mm; use 275 mm. The area of these ties must exceed
, where
is
the area of reinforcement resisting the tensile force
Hence, the minimum area required is

Try 3 No. 10 mm closed stirrups with average spacing of 275/3 = 92 mm.

Since this amount of reinforcement satisfies both requirements, provide 3 No. 10 closed
stirrups distributed over a depth of 275 mm from tie CB with a concrete cover of 25 mm.
Summary of the Design:
The reinforcement details for the corbel designed using the strut-and-tie model according to
Appendix A are shown in Figure 4.

Figure 4
(Click here to view a larger image)
Deep Beam (1) | Deep Beam (2) | Dapped-Beam End | Single Corbel | Double Corbel
Site Map | Contact Us | Copyright Info

Back to Top

Home | In the News | Strut-and-Tie Method | CAST Design Tool


NSF CAREER Award Project | Other Educational Resources
Q & A | Related Links
This page was created and is maintained by Tjen Tjhin
University of Illinois at Urbana-Champaign
Last update: June 01, 2002