Training contents
HERVE
BARON
http://www.editionstechnip.com/en/catalogue-detail/1111/oil-gas-engineering-guide-the.html
CD
Training slides (~1000 nos)
Great for your tablets!
HERVE
BARON
My pedagogy
All matters are explained by means of example. Thats the best way
to learn!
Training Agenda
Day 1
HERVE
BARON
Training Agenda
Day 2
HERVE
BARON
Management of changes
2014 Herv Baron
Training Agenda
Day 3
HERVE
BARON
Training Agenda
Day 1
HERVE
BARON
HERVE
BARON
gate
gate
FEL-2
BASIC Engineering/Conceptual
FEL-3
FEED
Content: Technical
assessment, milestone
schedule, estimated cost
range
Deliverables: Functional
requirements, economic
evaluation
By: Company
By: Contractor
By: Contractor
FEL-1
Business Planning Phase
Basic Engineering/FEED
HERVE
BARON
Client
Documents
submitted to
client
Process Design
Package (PDP)
Approval/
Comments
Engineering
Vendors / SubContractors
Inquiries
???
Quotations
HERVE
BARON
Process design
PFDs
P&IDs
H&M balance
Piping
Instrumentation
Process
data sheet
Equipment specification
Layout
Civil
Electrical
Rotating
Pressure vessels
Fired equipment
Heat exchangers
Packages etc.
Vendor
drawings
Training Agenda
Day 1
HERVE
BARON
HERVE
BARON
Specifications
HERVE
BARON
Safety concept
Design philosophy for cathodic protection
Specification for pipe supports design
HERVE
BARON
Training Agenda
Day 1
HERVE
BARON
HERVE
BARON
PROCESS
Design basis and criteria
Process Simulations, Process Flow Diagrams, HMB, equipment list
Process description
Equipment sizing
P&IDs
Piping specification and sizing
Instrument process specification
Process and Emergency shutdown
Flare study
Operating manual
HERVE
BARON
Design margins
Design Pressure and Temperature criteria
Equipment sizing criteria
Line sizing criteria
Control valve sizing criteria
HERVE
BARON
PROCESS
Design basis and criteria
Process Simulations, Process Flow Diagrams, HMB, equipment list
Process description
Equipment sizing
P&IDs
Piping specification and sizing
Instrument process specification
Process and Emergency shutdown
Flare study
Operating manual
Process simulations
HERVE
BARON
Input
- Feed composition and
conditions
Simulator settings
- Flow scheme
- Thermodynamic model
- Equipment performance
Output
- Stream flows and
composition
- Equipment duty
HERVE
BARON
HERVE
BARON
Depicts the various Equipment within a Process (or Utility) Unit and their sequence
HERVE
BARON
Vessel size
HERVE
BARON
HERVE
BARON
During operation:
Reference drawing for operator, work permit, plant modifications etc.
At design stage:
Defines the design basis for Piping & Instrumentation disciplines
Serves to show and agree the operating and maintenance features between
Engineer and Owner or between Engineer and Vendor
Serves to show the interface with equipment/package vendors
Perform HAZOP review
HERVE
BARON
Normal operation
Redundancy for critical instruments / safety switches
Shutdown
Check valves
Start-up
Pressurization
warm-up / purge lines
Maintenance
Equipment isolation & bypass: valves, spectacle/blind
Nitrogen injection, vent
Drains
Control and ON/OFF valves isolation
Instrument isolation
HERVE
BARON
Various
P&ID
representation
Details
HERVE
BARON
Vendor drawings
P&ID
Review
IFR
HAZOP
IFD
Piping MTO
& 1st PO
Piping MTO
& Top-ups
Piping MTO
& RFQ
IFC
HERVE
BARON
Quiz
Which revision of P&IDs has the following purpose/contents?
Purpose
Collect Client comments
Perform PID review
Perform HAZOP
Perform Piping MTO for 1st Piping purchase
Freeze Control system I/O list
Issue Piping ISOs
Contents
Comments from all disciplines
IFR
IFD
IFC
IFR
IFD
IFC
HERVE
BARON
Training Agenda
Day 1
HERVE
BARON
HERVE
BARON
Look at the PDS and MDS in your exercise book. What additional
information is contained in the MDS? What does Mechanical
design entail?
HERVE
BARON
Equipment / Mechanical
What is a package ?
What is, for Engineering, the purpose
to order as a package ?
What is usually ordered as a package ?
Which is the responsible discipline ?
Which document is produced to specify
a package ? By whom ?
HERVE
BARON
Test
HERVE
BARON
Duty
spec
MDS
Particular
General
Specification Specification
MR
Pressure Vessel
Rotating equipment
Reactor
Heat Exchanger Shell &
Tube
Heat Exchanger Other type
Package
Fired heater
Training Agenda
Day 1
HERVE
BARON
HAZOP
hands-on exercise
HERVE
BARON
HERVE
BARON
0,998
0,070
Delayed
Ignition
Explosion/
Flash-fire
Consequence Event
0,002
7,779E-03
1,520E-05
1,11E-01
Release/yr
0,949
Dispersion
9,827E-02
0,120
Explosion
1,774E-05
0,880
Flash fire
1,301E-04
Dispersion
5,133E-03
0,930
0,028
0,051
0,972
Yes
5%
Frequency (event/year)
Jet fire ESD & FF
7,779E-03
Probability of delayed ignition (2.8%)Jet
takes
into
account
fire no ESD & FF
1,520E-05
equipment explosion protection (Ex) Explosion
1,774E-05
Flash Fire
1,301E-04
Dispersion
1,034E-01
No
B04a/b/c/d
Frequency (ev/y)
Training Agenda
Day 1
HERVE
BARON
HERVE
BARON
Overturning
axis
Input
Loads: dead, operating,
test, live, wind, seismic,
Soil data: bearing
capacity, angle of
friction, unit weight,
boyancy
Dimensions to test
Stability check
for sliding and
overturning
Bearing
pressure check
De-stabilizing
moment
Stabilizing
moment
Calculation
HERVE
BARON
HERVE
BARON
Pipe-rack design
Training Agenda
Day 1
HERVE
BARON
Layout/principles
HERVE
BARON
PREVAILING WIND
4
2
HERVE
BARON
HERVE
BARON
Piping installation
HERVE
BARON
Line diagram
HERVE
BARON
HERVE
BARON
Plot
Plan
Piping
line
diagram
Piping
studies
& layout
Piping 3D
modelling
Piping
isometric
drawing
Stress
OK?
Piping
isometric
drawing IFC
By whom?
For which lines?
HERVE
BARON
PFD
Plot
Plan
Process
eqt list
Piping
line
diagram
Piping
studies &
layout
Stress
OK?
Piping
isometric
drawing
IFC
?
IFD
P&IDs
IFC
P&IDs
Piping
isometric
drawing
?
IFR
P&IDs
Piping 3D
modelling
HERVE
BARON
Quiz
HAZOP
Training Agenda
Day 1
HERVE
BARON
HERVE
BARON
Case of Package
controlled by Central
Process Control
System
Training Agenda
Day 1
HERVE
BARON
HERVE
BARON
HERVE
BARON
Electrical Engineering
HERVE
BARON
Training Agenda
Day 2
HERVE
BARON
Training Agenda
Day 2
HERVE
BARON
Management of changes
2014 Herv Baron
HERVE
BARON
1.
CONTRACTOR identifies, in the course of the design, that the capacity of one
utility unit foreseen in the DESIGN PACKAGE is not enough. A unit with
increased capacity is required.
A document part of the exclusions listed in the Endorsement Certificate
specifies that Sea Water used for cooling should be discharged no more with no
more than 10C temperature increase. COMPANY now asks for 3C. This
required CTR to put additional cooling facilities.
2.
61
Training Agenda
Day 2
HERVE
BARON
Management of changes
2014 Herv Baron
HERVE
BARON
Discipline
Paris (%)
India (%)
Process/HSE Design
Equipment
Electrical
Civil
Piping
Instrumentation
HERVE
BARON
Training Agenda
Day 2
HERVE
BARON
Management of changes
2014 Herv Baron
HERVE
BARON
Training Agenda
Day 2
HERVE
BARON
Management of changes
2014 Herv Baron
HERVE
BARON
Training Agenda
Day 2
HERVE
BARON
Origin of changes
HERVE
BARON
New
New
New
valves instruments accesses
HAZID
HAZOP
QRA
P&ID
review
3D
model
review
SIL
review
Training Agenda
Day 3
HERVE
BARON
HERVE
BARON
HERVE
BARON
Training Agenda
Day 3
HERVE
BARON
HERVE
BARON
Safety Engineering
Training Agenda
Day 3
HERVE
BARON
HERVE
BARON
HERVE
BARON
HERVE
BARON
Please guess
???? manhours
HERVE
BARON
Your instructor:
Herv Baron, Project Manager
Professional experience/positions held
Field Engineering Manager (4 years) for EPC Off-shore (FPSO) 1bln USD Project
Contract Manager (3 years) for 700mln USD and 1bln USD EPC
Training experience
HERVE
BARON
http://www.ifptraining.com/course/engineering-management-5219.html