Hydroelectric power plant is a large structure comprises heavy structural mechanics itself. The whole plant is analysed as
Superstructure and Substructure. In this paper, preliminary dimensions of a high head and capacity power plant are computed as
per IS 12800, and from the computed dimensions structural modelling and design of super structure is carried out in Staad.Pro as
per IS 4247(Part I). An attempt is made to make calculations of dimensioning as per the codal provisions and design of
components of super structure using the software. Loadings and combinations are given as per the referenced IS codes including
Earthquake Static and Earth loads (for underground structures). The objective of the paper is to demonstrate procedure of fixing
dimensions and design of structure in Staad.Pro.
Keywords: Preliminary Dimensions, Superstructure, Underground Structure, Earthquake Loads
________________________________________________________________________________________________________
I. INTRODUCTION
Hydroelectric power plant consist super structure made of Heavy beams and columns with Steel roofing and Substructure with
massive concrete, in totality of almost around 50 to 60 m height. The first and essential part of any construction is the
dimensioning of components of power plant derived from the dimensions of functional components of it. Here hydroelectric
plant consist large equipments/Components mainly:
1) Heavy E.O.T.
2) Generator with stator and rotor
3) Turbine
4) Scroll case
5) Draft tube
IS 4247 is providing detailed guidelines of preliminary dimensioning of Power plant.
1) Roof
2) Roof supports
3) Gantry columns
4) Gantry girder
5) Beam or braces
6) Floors and
II. GROSS WATER HEAD, NET HEAD AND CAPACITY OF POWER PLANT
A. Gross Head:
It is a difference of head water level (u/s) and tail water level (d/s) when no water is flowing.
B. Net Head:
The head available for doing work on the turbine, that is, the difference between the total heads at inlet and outlet of turbine.
175
Dimensioning & Design of High head Underground Hydroelectric Power Plant Superstructure
(IJSTE/ Volume 1 / Issue 11 / 028)
C. Capacity:
The capacity of a power plant is capacity of the total number of generators installed in a power plant. It depends on variation in
head, discharge, speed and efficiency for a turbine and speed, power factor and temperature rise in a generator.
Where Hs =10 m
Hv=0.4 m
H- 120 m
=0.12 from fig 3 IS 12800(part 1): corresponding a specific speed of 191 r.p.m
With a further margin of 0.5 meters the center linr of the distributor should be set 4.8+0.5=5.3 meters below minimum tailrace
level
C. Step 3: Size of Runner:
Discharge diameter
=4.7 meters
Where
H=115 m
n = 191 r.p.m
ku=0.705 From fig 6 corresponding to a specific speed 191r.p.m
D. Step 4: Dimension of Spiral Case:
As the gross head above the turbine is more than 30 m metallic, spiral casing should be used .The main dimensions of the spiral
casing as determined in accordance with fig 8,9, and 10.
176
Dimensioning & Design of High head Underground Hydroelectric Power Plant Superstructure
(IJSTE/ Volume 1 / Issue 11 / 028)
A=1.13 X 4.7=5.32 m
B=1.40 X 4.7=5.21 m
C=1.50 X 4.7=5.58 m
D=1.67 X 4.7=7.88 m
E=1.27 X 4.7=5.99 m
F=1.65 X 4.7=7.88 m
G=1.40 X 4.7=6.63 m
H=1.22 X .7=5.78 m
=197 cumecs
Where
P= 200000 Kw
H=115 m
= 0.9
Fig. 1:
177
Dimensioning & Design of High head Underground Hydroelectric Power Plant Superstructure
(IJSTE/ Volume 1 / Issue 11 / 028)
=2.97 m
Where
Suspended type of construction k=0.85
Dt =12.2 m
G. Step 7: Overall Dimension of Power Station:
Outer diameter of generator = inside diameter of generator + 2 x wall thick
=14+0.6+0.6=15.2 m
Width of Right side =7.6+2(from IS 12800-1993)=9.6m
Width of left side = 7.6+2+2=11.6 m
Total width of power station =11.6+9.6=21.2m
Length of erection bay=9.6+9.6=19.2m
Length of power station=6x 19.2+19.2+6=140.4 m
Height of machine at power station=H1+hj+Lt+k=12.92+2.97+4+6=25 .89m
21.2m
9.6m
4m
26m
90 N/m2
12
178
Dimensioning & Design of High head Underground Hydroelectric Power Plant Superstructure
(IJSTE/ Volume 1 / Issue 11 / 028)
Crane capacity
200KN
179
Dimensioning & Design of High head Underground Hydroelectric Power Plant Superstructure
(IJSTE/ Volume 1 / Issue 11 / 028)
21.2 m
9.6 m
200KN
40KN
1.2 KN
3.5KN
300N/m
250 MPa
Fig. 3:
Fig. 4:
Taking moment @ c
RD 21.2=240 1.2+9.43 21.2 10.6
RD=113.5 KN
Rc =Total load RD
=(240+9.43 21.2)-113.5
= 325.78 KN
At the each end of crane girder there are two wheels
Load on each wheel =
=162.89 KN
180
Dimensioning & Design of High head Underground Hydroelectric Power Plant Superstructure
(IJSTE/ Volume 1 / Issue 11 / 028)
Fig. 5:
Fig. 7:
181
Dimensioning & Design of High head Underground Hydroelectric Power Plant Superstructure
(IJSTE/ Volume 1 / Issue 11 / 028)
Table 2
Beam No 13 Reinforcement Details
Horizontal Vertical Horizontal
Moment
Node
L/C
Fx kN
Fy kN
Fz kN
Mx kNm
My kNm
Mz kNm
Max Fx
506
6 EARTH PRESSURE
453.724
-12.254
-0.015
0.013
0.214
-691.68
Min Fx
632
6 EARTH PRESSURE
-380.496
-72.077
-5.143
Max Fy
508
4 1.5DL+1.5L.L
-120.342
2810.544
-2.336
-5.061
-0.228
223.21
Min Fy
13
7 EQZ
1.362
-196.259
-20.764
-104.433
-15.636
-3.023
Max Fz
44
16 1.5DL-1.5EQZ
-8.44
2373.202
141.865
436.606
2.216
153.521
Min Fz
539
14 1.5DL+1.5EQZ
-8.452
2373.235
-141.865
-436.605
-2.204
153.646
Max Mx
572
12 1.2DL+1.2LL-1.2EQZ
-8.135
1219.005
68.306
871.067
9.669
320.168
Min Mx
11
10 1.2DL+1.2LL+1.2EQZ
-8.105
1218.984
-68.306
-871.067
-9.706
319.898
Max My
11
6 EARTH PRESSURE
250.018
-12.5
0.746
-0.005
273.034
-680.465
Min My
572
6 EARTH PRESSURE
250.016
-12.5
-0.747
0.005
-273.038
-680.454
Max Mz
308
9 1.2DL+1.2LL+1.2EQX
-127.512
2222.534
-0.081
-0.222
0.161
2172.917
Min Mz
275
19 0.9DL-1.5EQX
139.272
1393.542
0.052
0.132
0.216
-1889.73
Fig. 8:
Fig. 9:
182
Dimensioning & Design of High head Underground Hydroelectric Power Plant Superstructure
(IJSTE/ Volume 1 / Issue 11 / 028)
Table 3
Column No 12 Reinforcement Details
V. DISCUSSION
From the paper following can be discussed:
Analysis and design 1200Mw capacity hydroelectric power plant super structure was carried out using Staad.Pro
Dimensions of Plant are computed based on IS 12800(part 1) :1993
Base Shear due to EQ static loading is almost 3371 kN.
The modeling of super structure is carried out with guidelines of IS 4247 (part 1)-1998
REFERENCES