CIVIL ENGIINEERING
MATERIALS
Works of concrete preparation at site:1) Batching method of concrete : volume method and
weighing method.
2) Mixing method of concrete : manually and using
machinery.
Using the measuring box and the conventional method, which has
long been used to work at construction site.
This method can not be used for work that requires accuracy
concrete.
Volume of cement is calculated based on the volume of one bag /
weight of cement and sand as well as for coarse aggregate
b) Weigh method
Mixing by hand.
Cant to used of efection for the high workabability.
Mixing for are small quantity mixture.
b) Machinery.
1) Types T drum are lean
concrete.
When mixing are finish the concrete will be throut.
The shape of machine is cone and spin in one direction.
The angle of casting is 40 to 60 .
b) Chute
c) Pump
horizontal direction.
Have two type is plunger pump and press pump.
Used on difficult to utilize lorry and transport machine.
d) Crane
Have two types:
1) Mobile crane.
2) Tower crane.
1) Mobile crane
2) Tower crane
materials.
For structure concrete wall and column must be placing in layer
thickness 450mm.
Concrete must be compact before the next layer.
Avoid for cold joint.
Covered with sacks wet, plastic, wood dust, sand and other wet
materials.
Materials that may damage the color of concrete can not be
used.
Slump test
Purpose :
Apparatus :
Procedure :
Prepare materials for the concrete mix according to the mix ratio as
directed.
Clean of the surface of the cone, then lay on flat base plate.
Include the concrete mix into the cone of 3 layers and each layer
Cube test
Objective :
Apparatus :
Concrete.
Cube consistometer machine.
Procedure :
simultaneously.
Vibration is continued till the conical shape of the concrete