CAMARINES SUR III ELECTRIC COOPERATIVE, INC.

(CASURECO III)
San Isidro, Iriga City
July 27, 2007
For

: General Manager

Thru

: COMED Manager

From

: Operation/Maintenance Supervisor

Subject
: ACCOMPLISHMENT REPORT (PREVENTIVE
MAINTENANCE)
15 MVA SUBSTATION, STA. CRUZ, IRIGA CITY &
5 MVA SUBSTATION, FABRICA, BULA

Hereunder is the accomplishment report of Prime Electrix, Inc. for the Preventive
Maintenance at 15 MVA Substation, Sta. Cruz, Iriga City & 5 MVA Substation, Fabrica,
Bula, Camarines Sur, to wit:
SCOPE OF WORK:
15 MVA SUBSTATION, STA. CRUZ, IRIGA CITY:
Testing of transformer oil before and after filtering (Die Electric Strength Test).
Testing of 2 units Power Transformer
1 10 MVA Substation
1 5 MVA Substation
Megger Test
TTR Test
Filtering of transformer oil.
Cleaning of primary and secondary bushing of 2 units Power Transformer.
Retightening of all terminal logs.
69 KV Line
Feeder 1, 2, 3 & 4
Cleaning of SF6 bushing and lightning arrester.
Cleaning of cubicles and retightening of bush bar joint.
Repair and calibrate over current relays
69 KV panel board
Feeder 1, 2, 3 & 4 = 16 units
Filtering of 5 MVA Power Transformer (Takaoka)
Replacement of transformer oil of Oil Circuit Breaker (OCR) Inoque Brand
Feeder 2 (2 drums).
Cleaning of contacts of OCR
Lubricate and calibrate mechanisms
Retightening of terminal logs
Calibrate of Over Current Relay 4 units
B.) 5 MVA SUBSTATION, FABRICA, BULA
(April 21-22, 2007)
Testing of transformer oil before and after filtering.
Megger Test
TTR Test
Filtering of transformer oil.
Retightening of all terminal logs
Calibrate over current relay and cleaning of contacts 6 units over current relay
Replacement of transformer oil of 2 units Oil Circuit Recloser (OCR)

(2 drums transformer oil/Recloser)


6. Cleaning of contacts of OCR
7. Retightening of OCR logs.
8. Cleaning of secondary bushing/retightening of terminal logs of power transformer.
C. NOT WITHIN THE CONTRACT:
1. Testing of transformer oil 12 drums xfmer oil tested (new).

Prepared by:
ROGELIO M. BANZAGALES
Noted by:
CLARO M. TURIANO
COMED Manager

CAMARINES SUR III ELECTRIC COOPERATIVE, INC.


(CASURECO III)
San Isidro, Iriga City
August 19, 2009

For

: OIC-General Manager

Thru

: OIC-COMED Manager

From

: Operation/Maintenance Supervisor

Subject

: ACCOMPLISHMENT REPORT (PREVENTIVE MAINTENANCE)


15 MVA SUBSTATION, STA. CRUZ, IRIGA CITY &
5 MVA SUBSTATION, FABRICA, BULA

Hereunder is the accomplishment report of Prime Electrix, Inc. for the


Preventive Maintenance at 15 MVA Substation, Sta. Cruz, Iriga City & 5 MVA
Substation, Fabrica, Bula, Camarines Sur, to wit:
15 MVA SUBSTATION, STA. CRUZ, IRIGA CITY:

Power Transformer (10 MVA) New Korea Brand


Sta. Cruz Substation, Sta. Cruz, Iriga City

A.) Conduct testing of power transformer windings before and after filtering
1. Transformer turn ratio test
2. Insulation resistance test
3. Winding resistance test
4. Oil dielectric test
5. Polarization index test
6. Check-up of Becholts Relay of 10 MVA power transformer
7. Filtering of transformer oil with heater
8. Put additional transformer oil (1 drum added)
B.) Repair and replaced of Pneumatic Valve Assembly
1. Repair of air charging motor compressor
2. Replacement of improvement gasket due to air leakage
3. Calibration of over current relay from Feeder I to IV
4. Testing of VCB tripping and closing (tripping of over current
relay) from Feeder 1 to IV.
5. Cleaning of post insulator and bush bar

Power Transformer (5 MVA) Takaoka Brand

Sta. Cruz Substation, Sta. Cruz, Iriga City


1. Conduct power transformer testing of winding before and after filtering.
2. Insulation resistance test
3. Winding resistance test
4. Oil dielectric test
5. Repair of float valve of conservator tank
6. Repair of oil gauge
7. Filtering of transformer oil
8. Put additional transformer oil (1 drum added)

Reconditioning of one (1) unit 15KV Oil Circuit Breaker


1. Cleaning of contact
2. Calibration of over current relay (Feeder II)
3. Replacement of OCB transformer oil
4. Testing of OCB closing and tripping/through over current relay
5.

5 MVA Power Transformers, Portico, Bula, Cam. Sur


1.
2.
3.
4.
5.
6.
7.

Conduct testing of power transformer windings before and after


Insulation Resistance test
Winding resistance test
Oil dielectric strength test
Polarization index test
Filtering of transformer oil with heater
Cleaning of bushing and terminal lugs.

Oil Circuit Breaker (OCB)


1. Replacement of transformer oil, 2-15 KV units, OCB, Feeder V & VI.
2. Cleaning of contacts, feeder V & VI.
3. Calibration of over current relay of feeder V & VI
4. Check-up of electronic panel board & control panel.
NOT WITHIN THE CONTRACT
1. Testing of dielectric strength test of new purchase oil (5 drums oil tested)
2. Replacement of Silica Gel of two (2) Power transformers.

ROGELIO M. BANZAGALES
Noted by:

PRUDENCIO C. ALBALATE
OIC - COMED Manager

CAMARINES SUR III ELECTRIC COOPERATIVE, INC.


(CASURECO III)
San Isidro, Iriga City
January 12, 2009
For

: General Manager

Thru

: COMED Manager

From

: Operation/Maintenance Supervisor

Subject

: ACCOMPLISHMENT REPORT FOR THE SERVICING


OF SF6 GAS CIRCUIT BREAKER AT 10 MVA SUBSTATION,
STA. CRUZ, IRIGA CITY

Hereunder is the accomplishment report of Prime Electrix, Inc. for the servicing
of 69KV Control, SF6 Gas Circuit Breaker, Auxillary Control and Switchgear Metal Clad
of 10 MVA Substation, Sta. Cruz, Iriga City last December 11, 2008, to wit:
SCOPE OF WORK:
1. Check-up/testing of SF6 Circuit Breaker wiring from 69KV control to SF6 Breaker.
2. Check-up/testing and re-wiring of SF6 Breaker grounding up to 69KV control panel.
3. Check-up/testing of Current transformer (CT) ratio and setting.
4. Check-up/testing the Vacuum Circuit Breaker (VCB) Bus bar secondary side if it is
fitted.
5. Check-up/testing of distribution transformer at the auxillary control connection and
primary bushing and cut-outs.
6. Check-up/testing of bus bar of the 13.2KV and Current/Potential transformer.
7. Check-up/testing of post insulator and cleaning of bus bar and insulator.
8. Re-repair wiring of distribution transformer connections in the primary side.
9. check-up/testing the grounding of power transformer and feeder groundings.
10. After completing all the testing, then energization.
11. Monitor the current of the main feeder whether it is in tolerance in balancing per
phase.
For your information.

ROGELIO M. BANZAGALES
Noted by:
CLARO M. TURIANO
COMED Manager