Date: 22-03-2014
Letter No. OPGC/BOP/0196/20-03-2014
Ref. No. OPGCL/PPD-EN-PE/00469
Reference: BGR Letter Ref. No. GID/0208-T/00355 dated 31-01-2014
Subject: Comments on: GENERAL NOTES AND DETAILS - CABLING
Comment Resolution Sheet: 1
SL.
No.
OPGCL / DCPL
Comments
Date: 16-01-2014
BGR Replies /
Resolution
Date: 22-03-2014
OPGCL / DCPL
Response
Date: 02-04-2014
1.
2.
Cable tray cover (Flat Revised as per contract spec. Noted and closed.
type), Not accepted. drawing
Provide as per contract
spec. drawing
SL.
No.
3.
4.
OPGCL / DCPL
Comments
Date: 16-01-2014
For tray earthing, Each
cable tray shall be
interconnected by using
50x6 mm GI Earth flat or
GI Flexible at regular
interval of every 10 M
Where more than one
tray is used and earth
conductor from cable
trays shall connect to
main earth grid at every
10 M
BGR Replies /
Resolution
Date: 22-03-2014
As per MOM dated 2301-2014, this point was
kept open and it was
decided to provide the
tray earthing based on
the IE rules. Since tray
earthing detail is not
specified in IE rules and
IS, we agree to provide
each section of other
cable
trays
interconnection
by
using 50x6 mm GI
Earth flat or GI Flexible
at regular interval of
every 10 M
OPGCL / DCPL
Response
Date: 02-04-2014
However
runway
earthing conductor shall
be connected to the
main earth grid at
interval of every 50 M
only based on the
standard
practice
followed in all projects
-
Page 2 of 5
SL.
No.
5.
6.
OPGCL / DCPL
Comments
Date: 16-01-2014
provided
as
per
contract.
BGR Replies /
Resolution
Date: 22-03-2014
Not accepted. Power Revised as per the contract Noted and closed.
cables shall be on top specification
trays
and
control
&instrumentation
on
bottom trays and be
stacked in descending
order
with
higher
voltage on top in line
with
contract
specification. The same
philosophy has also
been adopted for Main
plant area.
In
Standard
Industrial
LT Power and control LT power and control cables practice LT Power and
cables shall run in shall run in separate tray only, control cables shall run in
separate trays
However In some case LT separate trays.
power and control (few cables)
Point modified in the
may run in the same tray with
Please modify as revised document
150mm gap or separator shall However in a very space
be provided.
constraint area LT power
and control (few cables)
may run in the same tray
with
150mm
gap
or
separator
as
an
OPGCL / DCPL
Response
Date: 02-04-2014
Page 3 of 5
SL.
No.
OPGCL / DCPL
Comments
Date: 16-01-2014
BGR Replies /
Resolution
Date: 22-03-2014
OPGCL / DCPL
Response
Date: 02-04-2014
7.
8.
Page 4 of 5
SL.
No.
OPGCL / DCPL
Comments
Date: 16-01-2014
BGR Replies /
Resolution
Date: 22-03-2014
OPGCL / DCPL
Response
Date: 02-04-2014
Page 5 of 5