You are on page 1of 5

ODISHA POWER GENERATION CORPORATION LIMITED

BANHARPALI, JHARSUGUDA ODISHA 768234 INDIA


IB THERMAL POWER STATION 2 660 MW UNITS 3 & 4

Date: 22-03-2014
Letter No. OPGC/BOP/0196/20-03-2014
Ref. No. OPGCL/PPD-EN-PE/00469
Reference: BGR Letter Ref. No. GID/0208-T/00355 dated 31-01-2014
Subject: Comments on: GENERAL NOTES AND DETAILS - CABLING
Comment Resolution Sheet: 1
SL.
No.

OPGCL / DCPL
Comments
Date: 16-01-2014

BGR Replies / Resolution


Date: 31-01-2014

BGR Replies /
Resolution
Date: 22-03-2014

OPGCL / DCPL Response


Date: 20-03-2014

OPGCL / DCPL
Response
Date: 02-04-2014

Document / Drawing Number: GID-208-EL-BBA-SA-2042 _R2

1.

Cable tray Support shall


be coated with zinc rich
paint

Revised & Incorporated

Noted and closed.

2.

Cable tray cover (Flat Revised as per contract spec. Noted and closed.
type), Not accepted. drawing
Provide as per contract
spec. drawing

DEVELOPMENT CONSULTANTS PRIVATE LIMITED


DEVELOPMENT CONSULTANTS HOUSE
BLOCK-DG/4, SECTOR-II, SALT LAKE, KOLKATA 700 091
Page 1 of 5

Comments Resolution Sheet: Continued.

SL.
No.
3.

4.

OPGCL / DCPL
Comments
Date: 16-01-2014
For tray earthing, Each
cable tray shall be
interconnected by using
50x6 mm GI Earth flat or
GI Flexible at regular
interval of every 10 M
Where more than one
tray is used and earth
conductor from cable
trays shall connect to
main earth grid at every
10 M

BGR Replies / Resolution


Date: 31-01-2014
Standard Industrial practice is
to interconnect each cable tray
by 50x6 mm G.I Earth flat at
regular interval of every 25 M,
where more than one tray is
used and the earth conductor
from cable trays is to be
connected to main earth grid at
every 50 M. Which would meet
the requirement. Please convey
your acceptance.

For underground road Revised & Incorporated


crossing of railways,
road etc. Hume pipe
enclosed in RCC to be

OPGCL / DCPL Response


Date: 20-03-2014
The point was as discussed
in
meeting
dated
23.01.2014
at
BGR
Chennai and was decided
as:
a. Each section of
other cable trays
shall
be
interconnected by
using 50x6 mm GI
Earth flat or GI
Flexible at regular
interval of every 10
M. No section of
cable shall be left
unearthed.
b. Also
runway
earthing conductor
shall be connected
to the main earth
grid at every 30 M.
Please
incorporate
accordingly.

Noted and closed.

BGR Replies /
Resolution
Date: 22-03-2014
As per MOM dated 2301-2014, this point was
kept open and it was
decided to provide the
tray earthing based on
the IE rules. Since tray
earthing detail is not
specified in IE rules and
IS, we agree to provide
each section of other
cable
trays
interconnection
by
using 50x6 mm GI
Earth flat or GI Flexible
at regular interval of
every 10 M

OPGCL / DCPL
Response
Date: 02-04-2014

Noted and closed.

However
runway
earthing conductor shall
be connected to the
main earth grid at
interval of every 50 M
only based on the
standard
practice
followed in all projects
-

Page 2 of 5

Comments Resolution Sheet: Continued.

SL.
No.

5.

6.

OPGCL / DCPL
Comments
Date: 16-01-2014
provided
as
per
contract.

BGR Replies / Resolution


Date: 31-01-2014

OPGCL / DCPL Response


Date: 20-03-2014

BGR Replies /
Resolution
Date: 22-03-2014

Not accepted. Power Revised as per the contract Noted and closed.
cables shall be on top specification
trays
and
control
&instrumentation
on
bottom trays and be
stacked in descending
order
with
higher
voltage on top in line
with
contract
specification. The same
philosophy has also
been adopted for Main
plant area.
In
Standard
Industrial
LT Power and control LT power and control cables practice LT Power and
cables shall run in shall run in separate tray only, control cables shall run in
separate trays
However In some case LT separate trays.
power and control (few cables)
Point modified in the
may run in the same tray with
Please modify as revised document
150mm gap or separator shall However in a very space
be provided.
constraint area LT power
and control (few cables)
may run in the same tray
with
150mm
gap
or
separator
as
an

OPGCL / DCPL
Response
Date: 02-04-2014

Noted and closed

Page 3 of 5

Comments Resolution Sheet: Continued.

SL.
No.

OPGCL / DCPL
Comments
Date: 16-01-2014

BGR Replies / Resolution


Date: 31-01-2014

BGR Replies /
Resolution
Date: 22-03-2014

OPGCL / DCPL Response


Date: 20-03-2014

OPGCL / DCPL
Response
Date: 02-04-2014

exceptional and rare case.

7.

Not accepted, All the Revised


instrumentation cables
shall run in separate
tray

Noted and closed.

8.

In plant area, No. of


cables less than or
equal to 3, the cables
shall
be
clamped
suitably & fixed with Noted
saddles on structure at
interval not exceeding
300mm for cable up to
25mm dia. & 500mm for
cables
larger
than
25mm dia.
Point Included
150mm or 300mm cable
tray may be used in
such case. If in some
place erection of cable
tray is not physically
possible, this procedure
may be used locally
subjected to Approval

Please modify as Where Point modified in the


erection of cable tray is not revised document
physically possible and ,
no. of cables less than or
equal to 3, the cables may
be clamped suitably & fixed
with saddles on structure at
interval
not
exceeding
300mm for cable up to
25mm dia. & 500mm for
cables larger than 25mm
dia.

Noted and closed.

Page 4 of 5

Comments Resolution Sheet: Continued.

SL.
No.

OPGCL / DCPL
Comments
Date: 16-01-2014

BGR Replies / Resolution


Date: 31-01-2014

OPGCL / DCPL Response


Date: 20-03-2014

BGR Replies /
Resolution
Date: 22-03-2014

OPGCL / DCPL
Response
Date: 02-04-2014

In case cables need to


be taken on wall or
structures then PVC/GI
conduits shall used
suitably & fixed with
saddles.