ZXMP S385

SDH Based Multi-Service Node Equipment

Engineering Document

Contract No.

__________________

Project Name __________________


User __________________

ZTE CORPORATION

ZXMP S385 SDH Based Multi-Service Node Equipment Acceptance Test Record

ZXMP S385
SDH Based Multi-Service Node Equipment
Engineering Document

Document Version
Product Version

20060627-R1.0
V1.0V1.1V2.0V2.1

Copyright ZTE Corporation


All rights reserved.
No part of this documentation may be excerpted, reproduced, translated, annotated or
duplicated, in any form or by any means without the prior written permission of ZTE
Corporation.

ZTE CORPORATION
ZTE Plaza, Keji Road South, Hi-Tech Industrial Park, Nanshan District, Shenzhen, P.R.China
Postcode: 518057
Technical Support Website: http://support.zte.com.cn
Customer Support Center:
Tel: (+86755) 26771900

800-9830-9830

Fax: (+86755) 26770801


Email: support@zte.com.cn
*

*
S.N.: gczl20060027

ZXMP S385 SDH Based Multi-Service Node Equipment Acceptance Test Record

ZXMP S385
SDH Based Multi-Service Node Equipment

Acceptance Test Record

Contract No.

__________________

Project Name

__________________

User

__________________

Date of Acceptance __________________

ZTE CORPORATION

ZXMP S385 SDH Based Multi-Service Node Equipment Acceptance Test Record

1. Project Acceptance Organization


User

Project Name

Date of

Date of

Commencement

Completion
Person in charge:

Users

Participants:

Personnel

Person in charge:

ZTEs

Participants:

Personnel

Person in charge:

Project
supervisors

Participants:

Personnel

Person in charge:

Constructor s

Participants:

Personnel

Remark

-1-

ZXMP S385 SDH Based Multi-Service Node Equipment Acceptance Test Record

2. Test Record of Basis System Functions


Description

1-1-1-A

Primary power voltage

-57 V ~ -43 V

Pass Fail

1-1-2-A

The voltage between the working


ground and protective ground

Less than 1V

Pass Fail

1-2-1-A

Testing the plug-in box of the fan

Pass Fail

1-3-1-A

Alarm indicator

Pass Fail

1-3-2-A

Alarm buzzer

Pass Fail

1-4-1-A

LOS protection switching

Pass Fail

1-4-2-A

AIS protection switching

Pass Fail

1-4-3-A

1:N protection switching

Pass Fail

Changeover between two external


timing sources
Changeover between external
timing source and line timing
source

Pass Fail

1-5-3-A

Clock alarm

Pass Fail

1-6-1-A

Endpoint call

Pass Fail

1-6-2-A

Group call

Pass Fail

1-6-3-A

Call break-in

Pass Fail

1-6-4-A

Voice quality and volume

Pass Fail

1-7-1-A

15-minute errored seconds

Pass Fail

1-7-2-A

24-hour errored seconds

Pass Fail

1-5-1-A
1-5-2-A

Criteria

Test
Result

Test No.

Conclusion

Pass Fail

-1-

Remark

ZXMP S385 SDH Based Multi-Service Node Equipment Acceptance Test Record

3. Test Record of NE-Level Management Functions


Test No.

Description
Connection

Test Result

between

Conclusion

the

the

and

Pass Fail

commands

and

Pass Fail

2-1-3-A

Closing /accessing the EMS

Pass Fail

2-2-1-A

Preventing illegal login

Pass Fail

2-2-2-A

User operation authority

Pass Fail

2-3-1-A

Reporting alarm messages

Pass Fail

2-3-2-A

Recording alarm messages

Pass Fail

2-3-3-A

Setting alarm mask

Pass Fail

2-3-4-A

Setting alarm severity

Pass Fail

2-1-1-A

EMS

terminal

equipment
2-1-2-A

2-3-5-A

2-4-1-A

2-5-1-A
2-5-2-A
2-5-3-A

Sending

receiving data

Querying

current

and

Pass Fail

historical alarms

Sampling

Pass
Fail

performance

parameters

Graphical

network

Pass Fail

Establishing and canceling

Pass Fail

configuration
service channels
Protection

switching

Pass Fail

parameter settings

2-6-1-A

Inserting loopback

Pass Fail

2-6-2-A

Data backup and recovery

Pass Fail

-1-

Remark

ZXMP S385 SDH Based Multi-Service Node Equipment Acceptance Test Record

4. Test Records of Service Card Indices


The optical interface of _______________ at _________________ site
Test No.
3-1-1-A
3-2-1-A

Description
Transmitting

Test Result
optical

Conclusion
Pass Fail

power
Pass Fail

Receiving optical power

Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail

-1-

Remark

ZXMP S385 SDH Based Multi-Service Node Equipment Acceptance Test Record

5. Acceptance Conclusion

Users
representative

Signed by:

Date:

Signed by:

Date:

Signed by:

Date:

Signed by:

Date:

ZTEs
representative

Project
supervisors
representative

Constructor s
representative

-1-

ZXMP S385
SDH Based Multi-Service Node Equipment

Installation Acceptance Report

Contract No.

___________

Project Name

___________

Installation Site

___________

Acceptance Date ___________

ZTE CORPORATION
-1-

ZXMP S385 SDH Based Multi-Service Node Equipment Installation Acceptance Report

1.1 Introduction
This Installation Acceptance Report is compiled in accordance with the relevant
standards of the Ministry of Information Industry and on the basis of the actual
situation with the Unitrans ZXMP S385. It is to be used in the hardware installation
acceptance of the Unitrans ZXMP S385.

ZXMP S385 SDH Based Multi-Service Node Equipment Installation Acceptance Report

1.2 Arrangement for Project Acceptance


User company

Project Name

Start Date

Finish Date
Person in charge:

User

personnel

Participants:

arrangement

Person in charge:
ZTE

personnel

Participants:

arrangement

Person in charge:
Project

Participants:

supervisor
arrangement

Construction
contractor

Person in charge:
Participants:

personnel
arrangement

Remarks

ZXMP S385 SDH Based Multi-Service Node Equipment Installation Acceptance Report

1.3 Items for Hardware Acceptance


Item

Acceptance Contents and Acceptability

Result

Cabinets must be put into places designated in the design shop


drawing (or required by the user).
The reserved space around the cabinet for maintenance should meet
the equipment requirements.
Racks must be installed fixedly, with vertical and horizontal
deviations less than 0.1 of the rack height.
Racks in a row should be closely arranged in an orderly way. And the
gap between the racks should not be greater than 3 mm.
Rack

No parts of racks should fall off or be damaged or lost. The rack paint

installation

coating should be in good state, and the various device marks should

acceptance

be correct, clear and complete.


Racks must be fixed to the ground with expansion bolts, and to the
upper beam of the column conduit with clamps.
All fasteners must be screwed down. The part of the same type screws
that is shown out of the screw caps must be in the same height.

Acceptance Conclusion
 Pass  Fail
 Pass  Fail
 Pass  Fail
 Pass  Fail

 Pass  Fail

 Pass  Fail
 Pass  Fail

The device earthquake proof must be up to the relevant standards of


the Ministry of Posts and Telecommunications. The earthquake proof
measures must conform to the requirement of the design and shop

 Pass  Fail

drawings (or the user).


The reinforcement of racks and sub-racks must conform to the
requirements for equipment installation.
Sub-rack
installation
acceptance

Sub-racks must be installed firmly and arranged orderly, with


connection components in good contact.
The alarm box must be installed fixedly, with connection components
in good contact.
The cables inside a sub-rack should be correctly connected. And the
connection components should be in good contact.

EMS
installation
acceptance

The installation of the maintenance console should meet the


requirements of the design and shop drawings (or the user).
The installation of the network management equipment should meet
the requirements of the design and shop drawings (or the user).

Power cable
routing
process

The power cables and ground cables should be connected correctly


and placed firmly in order, and should be in good contact.

Optical fiber The routing and directions of optical fibers should meet the
routing

requirements of the design and shop drawings (or the user).

 Pass  Fail
 Pass  Fail
 Pass  Fail
 Pass  Fail
 Pass  Fail
 Pass  Fail

 Pass  Fail

 Pass  Fail

ZXMP S385 SDH Based Multi-Service Node Equipment Installation Acceptance Report

Item

Acceptance Contents and Acceptability

Result

process

The reserved length on both ends of the optical fibers should be the
same and up to the process requirements.
The curvature radius at the turning curve of an optical cable inside a
conduit should be within 38 mm ~ 40 mm.

Acceptance Conclusion
 Pass  Fail
 Pass  Fail

The optical cables in the slot should be protected with cable sleeves
and troughs. Fibers not protected with cable sleeves should be

 Pass  Fail

bundled with cable tie in a slipknot mode with appropriate tightness.


Bundled optical cables should be kept straight in conduits.

 Pass  Fail

Both ends of the routed pigtails should be clearly marked.

 Pass  Fail

The directions and routing of various types of cables should comply


with the corresponding design specifications.
Cables in a channel should be bundled. The bundled cables should be
kept together closely and neatly.
All cables and jumpers should be bundled with appropriate tightness
and kept straight.

 Pass  Fail
 Pass  Fail
 Pass  Fail

The turnings of all cables should be bent evenly and smoothly. The
part other than the turnings of the cables should be kept straight either

 Pass  Fail

vertically or horizontally.
Both ends of the inter-rack cables and wires must be clearly labeled to
Cable

avoid misconnection and neglect.

routing

Coaxial cables should have consistent reserved ends. The lengths of

process

stripped parts of the coaxial cables should correspond to the relevant

 Pass  Fail

 Pass  Fail

parts of the cable connectors.


The core wires should be soldered firmly and smoothly without sharp
points and knobs.
The connectors of the coaxial cables should be complete and
assembled correctly and firmly.
The RJ45 connectors of a network cable should be connected
correctly. And the connectors and wires should be in good contact.

 Pass  Fail
 Pass  Fail
 Pass  Fail

The stripped parts of shielded wires should be of the consistent


lengths. And they should be in good contact with the external
conductors of the coaxial cable terminals.

 Pass  Fail

1.4 Acceptance Conclusion

User
Representative:

Signature:
Date:

ZTE
representative

Signature:
Date:

Project
supervisor
representative
Signature:
Date:

Construction
contractor
representative
Signature:
Date:

-2-