Professional Documents
Culture Documents
MOM-SK309-64-ELITP-0001-00
Rev. No: 0
Page 1 of 4
MOM-SK309-64-PM-MOC-0034-00
BORF LONG-TERM POWER SOLUTION
PROJECT
REVISION HISTORY
REV.
DATE
DESCRIPTION
AUTHOR
CHECKED
June-16-15
VICTOR
SUHAILI
DISCIPLINE
CODE
EL
DOCUMENT
TYPE
ITP
SEQUENCE
NO.
0001
APPROVED
SHEET
NO.
01
REV.
NO.
Document No:
MOM-SK309-64-ELITP-0001-00
Rev. No: 0
Page 2 of 4
INDEX
TABLE OF CONTENTS
DESCRIPTION
PAGE
COVER PAGE
INDEX
1.0
PURPOSE
2.0
SCOPE
3.0
DEFINATION / ABBREVATION
4.0
Document No:
MOM-SK309-64-ELITP-0001-00
Rev. No: 0
1.0
Page 3 of 4
PURPOSE
The main purpose of this document Inspection and Test Plan (ITP) is to ensure the quality
control and testing activities are in-placed and performed with quality and safe in a different
activities by the QA/QC inspection personnel of Fatimah Bersatu Sdn Bhd (FBSB) and owners
representative.
2.0
SCOPE
The inspection and test plan covers all inspections, checking and testing activities to be
performed at all activities related to Electrical Installation scope of works both BUS-A and BUSB from SESCO Power Plant 33KV Substation to Murphy Oil Company.
The main scope is to ensure all Electrical installation such as HV cable, Power Transformer and
switchboard are inspected and tested according to owners company standards and engineering
global standard.
3.0
ABBREVIATION / DEFINITION
3.1
MRR
3.2
P.O
Purchase Order
3.3
QA/QC
3.4
MOC
3.5
FBSB
3.6
ITP
3.7
SESCO
3.8
4.0
Document No:
MOM-SK309-64-ELITP-0001-00
Rev. No: 0
Page 4 of 4
WITNESS (W) -
3.9
HOLD (H)
3.10
3.11
INSPECTION (I)
3.12
RECORD (RC)
3.13