You are on page 1of 2

Chemical-free Cleaning System High Capacity Unit

INSTALLATION GUIDE
High Capacity Unit
(HCU)

Stabilization Module
4.25

Filter Cartridge
Chemical-free cleaner, stain-remover, deodorizer
and sanitizer.

Performance Indicators
1.5

Service Light

System Ready
System Charging
Water/Ozone Low
Replace Filter

SERVICE

FLOW
OFF

ON

TO OPERATE:
1. To start Press FLOW to ON.
2. Dispense when SYSTEM READY is GREEN.
3. Press FLOW to OFF when not dispensing.

Ensure that the water


pressure is at minimum
30 PSI (207 kPa) and
maximum 65 PSI (488 kPa)

COLD WATER IN
hose

COLD WATER IN

FLOW
OFF/ON Switch

OZONE SOLUTION OUT

45
30
15

60

psi

75

QUICK DISCONNECTS

WATER IN TO
STABILIZATION MODULE

hose

OZONE SOLUTION OUT


hose
*Above diagram is a representation only

US and International Patents and Patents Pending.

INSTALLATION INSTRUCTIONS

For indoor / dry locations only


1. Carefully remove all of the items from the cartons.
2. Remove mounting hardware from plastic packages.
3. Attach HCU to wall using 4 screws in flanges top and bottom. If mounting to drywall, attach to 1/2 plywood backer board to
wall before mounting High Capacity unit.
4. Align Stabilization Module with High Capacity Unit as shown.
5. Mount Stabilization Module bracket to wall with a minimum spacing of 1.5 from the High Capacity Unit. Mount will be 4.25
from the closest HCU mount. Use bracket as template mark holes on wall using a 1/4 drill bit. Place a blue plastic insert in
each holes (4) using a hammer. Screw brackets to wall using supplied 8 X 1 1/4 screws.
6. Once brackets are mounted, hang Stabilization Module.
7. Attach quick disconnect to COLD WATER IN on Stabilization Module (blue color fittings on left side connection facing unit)
8. Attach connector hose supplied to right side outlet on Stabilization Module attach opposite end to WATER IN on HCU.
(white color fittings into grey)
9. Ensure that the water pressure is at minimum 30 PSI (207 kPa) and maximum 65 PSI (488 kPa). This can be checked with a
simple water pressure testing gauge available at most hardware stores.
10. Attach hose without fittings to OZONE SOLUTION OUT on HCU barbed fitting - clamp is not required.
11. Connect only to a circuit that is protected by a ground-fault circuit-interrupter (GFCI).
NOTE: Unit to be installed vertically as shown in the picture above never horizontally. Doing so will damage the unit.
NOTE: The new hose-sets supplied with the appliance are to be used, old hose-sets should not be reused.

www.tersanoprofessional.com

1-800-727-8835

HCUIG R2.0 08/11

Chemical-free Cleaning System High Capacity Unit

START-UP GUIDE

Stabilization Module
4.25

High Capacity Unit


(HCU)

Filter Cartridge
Chemical-free cleaner, stain-remover, deodorizer
and sanitizer.

Performance Indicators
1.5

Service Light

System Ready
System Charging
Water/Ozone Low
Replace Filter

SERVICE

FLOW
OFF

ON

TO OPERATE:
1. To start Press FLOW to ON.
2. Dispense when SYSTEM READY is GREEN.
3. Press FLOW to OFF when not dispensing.

Ensure that the water


pressure is at minimum
30 PSI (207 kPa) and
maximum 65 PSI (488 kPa)

COLD WATER IN
hose

COLD WATER IN

FLOW
OFF/ON Switch

OZONE SOLUTION OUT

45
30
15

60

psi

75

QUICK DISCONNECTS

WATER IN TO
STABILIZATION MODULE

hose

OZONE SOLUTION OUT


hose
*Above diagram is a representation only

START-UP INSTRUCTIONS

US and International Patents and Patents Pending.

1. Install the High Capacity unit as per INSTALLATION INSTRUCTIONS above.


2. Make sure the power cord is plugged into 110v power outlet.
3. Ensure COLD WATER IN hose is attached to open faucet or permanent cold water source with a minimum of 30 PSI (207 kPa) ,
and a maximum 65 PSI (488 kPa).
4. To start, press FLOW switch to ON position.
5. When SYSTEM READY indicator is GREEN, dispense into mop bucket, auto scrubber, carpet extractor or spray bottle.
6. Shut unit off when not in use by pressing FLOW switch to OFF position.
7. If you encounter a red light with initial installation you may need to turn the device on and off multiple times as it sets itself.
Once set and installed it will charge thereafter.
NOTE: If you still get a red light, check that the cold water is turned on. Check that there are no kinks in the line to allow
uninterrupted flow of water. Also check that the cartridge is in properly and the protective plastic on the cartridge has been
removed.
Testing was performed using a duty cycle of 5 minutes on, 25 minutes off, with a maximum 60 minutes per 24 hour periods. Do
not exceed this duty cycle.
GROUNDING INSTRUCTIONS This appliance must be grounded. In the event of a malfunction or breakdown, grounding
will reduce the risk of electric shock by providing a path of least resistance for electric current. This appliance is equipped
with a cord having an appliance-grounding conductor and a grounding plug. The plug must be plugged into an
appropriate outlet that is installed and grounded in accordance with all local codes and ordinances.
WARNING: Risk of Electric Shock. Disconnect power before servicing.
Never block or restrict OZONE SOLUTION OUT hose with nozzle, clamp or shut-off valve. This may damage unit and
will void the warranty. Always use FLOW ON/OFF switch to start or stop flow of Ozone Solution.
WARNING: Improper connection of the appliance-grounding conductor can result in a risk of electric shock. Check with
a qualified electrician or service representative if you are in doubt whether the appliance is properly grounded. Do not
modify the plug provided with the appliance; if it will not fit the outlet, have a proper outlet installed by a qualified
technician.
This appliance is not intended for use by children or those with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they
have been given supervision or instruction concerning use of the appliance by a person responsible for their safety

www.tersanoprofessional.com

1-800-727-8835

HCUIG R2.0 08/11

You might also like