Quality procedure:
1. Material to be check quality and certification.
2. NC form to be filled by purchase and engineer for rejected proof
(MOD007).
3. If QC department reject the material, then rejected material to be
informed and sent back to the supplier address.
4. The replacement for rejected material to be followed for delivery on time.
5. After material reach our premises, material to be check as per PO.
6. After material receipt the same to be informed to material requester. Then
follow material verification procedure.