ALEMBIC LIMITED

Formulation Division, Baddi


10.1.

Verification for AHU System No.: 1

10.1.1 Component Verification for AHU (System -1)


Sr.
No.
A.1
1

Component

2
3
4

Make
Location
Dimension
(LxWxH) mm
Frame work
Outer skin
Inner skin
Insulation
Thermal Break
Exterior
finish/Internal
cleanliness
Drain Tray
Door Gasket
Door Gasket
material

5
6
7
8
9
10
11
12
13

Specification

Observation

Remarks

Specification

Observation

Remarks

Overall Features
Type

Sr.
No.
A.2
1

Component

Model Number

Blower type

Motor KW

5
6

Alignment of Motor
with Blower
Vibration Isolator

Canvas connection

A.3
a)

Coil Section
Cooling Coil

Blower section
Blower make

ALEMBIC LIMITED
Formulation Division, Baddi
1

Size (H x L) mm

No. Rows

Tube material

Fin material

Fin Spacing

b)

Heating Coil

Size (H x L) mm

No. Rows

Tube material

Fin material

Fin Spacing

Sr.
No.
A.4

Component

a)

Primary Filter 10

Type

Make

3
4

Size (HxWxD) mm
& Number of Filter
Filter Media

Efficiency

Gasket

b)

Secondary Filter 5

Type

Make

3
4

Size (HxWxD) mm
& Number of Filter
Filter Media

Efficiency

Gasket

HEPA Filter

Filter Assembly

Specification

Observation

Remarks

ALEMBIC LIMITED
Formulation Division, Baddi
1

Type

Make

3
4

Size (HxWxD) mm
& Number of Filter
Filter Media

Efficiency

10.1.2. Verification of Ducting & Insulation (System -1):


Sr.
No.
B.1
1
2

Component

Specification

Sheet Metal
Ducting
Cleanliness of Duct

Gaskets between
duct flanges
Sealant

Duct Tested for Leak

5
6

Insulation of
Ducting
Insulation material

Insulation density

To be provided

Aluminium Foiling
over insulation
Supply air damper

10

Return air damper

As per ducting drawing

11

Fresh air damper

As per ducting drawing

12

Supply air Diffuser

As per ducting drawing

13

Return air Diffuser

As per ducting drawing

As per ducting drawing

Observation

Remarks

ALEMBIC LIMITED
Formulation Division, Baddi
10.1.3 Verification of Piping & Piping Insulation (System -1)
Sr.
No.
C.1
1

Component

2-way valve

To be provided

Drain Piping

To be done properly

U trap in drain piping

To be provided

Pressure Gauge
tapping
Bypass line for 2 way
valve
Insulation of line

To be provided

To be provided

C.2
1

Aluminum cladding
over insulation
Hot Water Piping
Piping work

3-way valve

To be provided

Drain Piping

To be done properly

U trap in drain piping

To be provided

Pressure Gauge
tapping
Bypass line for 3 way
valve
Insulation of line

To be provided

Aluminum cladding
over insulation

To be provided

6
7
8

6
7
8

Specification

Observation

Remarks

Chilled Water Piping


Piping work
As per drawing

To be provided
To be insulated

As per drawing

To be provided
To be insulated

10.1.4 Verification of Electrical Work (System-1)


Sr.
No.
1

Component

Specification

Cable laid on tray

To be laid properly

Earthing

To be provided

Cable termination

To be terminated
properly

10.1.5 Dust Extraction Unit (System -1)

Observation

Remarks

ALEMBIC LIMITED
Formulation Division, Baddi
Sr.
No.
1

Component

2
3
4

Make
Cartridge filter
Media/Qty.
Filter

5
7

Motor rating
Capacity

Compressed air line

Specification

Observation

Remarks

Body type

To be provided

10.1.6 Verification of Instruments (System -1)


Sr. Component
Specification
No.
1
Manometer
To be provided

Observation

Remarks