You are on page 1of 2

Federal Register / Vol. 73, No.

70 / Thursday, April 10, 2008 / Notices 19497

the Commission on or before the be received on or before the specified Hydroelectric Project would be located
specified comment date for the comment date for the particular on Kiser Creek in Delta County,
particular application (see 18 CFR 4.36). application. Colorado and would be entirely located
Submission of a timely notice of intent r. Filing and Service of Responsive in the Grand Mesa National Forest.
allows an interested person to file the Documents—Any filings must bear in f. Filed Pursuant to: Federal Power
competing preliminary permit all capital letters the title Act, 16 U.S.C. 791(a)–825(r).
application no later than 30 days after ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT g. Applicant contact: Mr. Michael D.
the specified comment date for the TO FILE COMPETING APPLICATION’’, Mason; 26380 Cedar Mesa Road,
particular application. A competing ‘‘COMPETING APPLICATION’’, Cedaredge, CO 81413, (970) 856–7022.
preliminary permit application must ‘‘PROTEST’’, or ‘‘MOTION TO h. FERC Contact: Tom Papsidero,
conform with 18 CFR 4.30 and 4.36. INTERVENE’’, as applicable, and the (202) 502–6002.
n. Competing Development Project Number of the particular i. Deadline for filing comments,
Application—Any qualified application to which the filing refers. protests, and motions to intervene: 60
development applicant desiring to file a Any of the above-named documents days from the issuance date of this
competing development application must be filed by providing the original notice.
must submit to the Commission, on or and the number of copies provided by All documents (original and eight
before a specified comment date for the the Commission’s regulations to: The copies) should be filed with: Kimberly
particular application, either a Secretary, Federal Energy Regulatory D. Bose, Secretary, Federal Energy
competing development application or a Commission, 888 First Street, NE., Regulatory Commission, 888 First
notice of intent to file such an Washington, DC 20426. An additional Street, NE., Washington, DC 20426.
application. Submission of a timely copy must be sent to Director, Division Comments, protests and interventions
notice of intent to file a development of Hydropower Administration and may be filed electronically via the
application allows an interested person Compliance, Federal Energy Regulatory Internet in lieu of paper; see 18 CFR
to file the competing application no Commission, at the above-mentioned 385.2001(a)(1)(iii) and the instructions
later than 120 days after the specified address. A copy of any notice of intent, on the Commission’s Web site under the
comment date for the particular competing application or motion to ‘‘e-Filing’’ link. The Commission
application. A competing license intervene must also be served upon each strongly encourages electronic filings.
application must conform with 18 CFR representative of the Applicant Please include the project number (P–
4.30 and 4.36. specified in the particular application. 13023–000) on any comments or
o. Notice of Intent—A notice of intent s. Agency Comments—Federal, state, motions filed.
must specify the exact name, business and local agencies are invited to file The Commission’s Rules of Practice
address, and telephone number of the comments on the described application. and Procedure require all intervenors
prospective applicant, and must include A copy of the application may be filing documents with the Commission
an unequivocal statement of intent to obtained by agencies directly from the to serve a copy of that document on
submit, if such an application may be Applicant. If an agency does not file each person in the official service list
filed, either a preliminary permit comments within the time specified for for the project. Further, if an intervenor
application or a development filing comments, it will be presumed to files comments or documents with the
application (specify which type of have no comments. One copy of an Commission relating to the merits of an
application). A notice of intent must be agency’s comments must also be sent to issue that may affect the responsibilities
served on the applicant(s) named in this the Applicant’s representatives. of a particular resource agency, they
public notice. must also serve a copy of the document
Kimberly D. Bose,
p. Proposed Scope of Studies under on that resource agency.
Permit—A preliminary permit, if issued, Secretary. j. Description of Existing Facilities
does not authorize construction. The [FR Doc. E8–7603 Filed 4–9–08; 8:45 am] and Proposed Project: The proposed
term of the proposed preliminary permit BILLING CODE 6717–01–P project would consist of: (1) A proposed
would be 36 months. The work diversion structure; (2) a proposed
proposed under the preliminary permit 5,755-foot-long, 16-inch-diameter
would include economic analysis, DEPARTMENT OF ENERGY plastic/steel penstock, (3) a proposed
preparation of preliminary engineering powerhouse containing one generator
Federal Energy Regulatory
plans, and a study of environmental unit with a total installed capacity of
Commission
impacts. Based on the results of these 644 kilowatts, (4) a proposed 918-foot-
studies, the Applicant would decide [Project No. 13023–000] long 12-kV transmission line
whether to proceed with the preparation interconnection, and (5) appurtenant
of a development application to Michael D. Mason; Notice of facilities. The project would have an
construct and operate the project. Application Accepted for Filingand annual generation of 1.5 GWh which
q. Comments, Protests, or Motions to Soliciting Comments, Protests, and would be sold to a local utility.
Intervene—Anyone may submit Motions to Intervene k. Location of Applications: A copy of
comments, a protest, or a motion to April 3, 2008. the application is available for
intervene in accordance with the Take notice that the following inspection and reproduction at the
requirements of Rules of Practice and hydroelectric application has been filed Commission in the Public Reference
Procedure, 18 CFR 385.210, .211, .214. with the Commission and is available Room or may be viewed on the
In determining the appropriate action to for public inspection: Commission’s Web site at http://
take, the Commission will consider all a. Type of Application: Preliminary www.ferc.gov using the ‘‘eLibrary’’ link.
mstockstill on PROD1PC66 with NOTICES

protests or other comments filed, but Permit. Enter the docket number excluding the
only those who file a motion to b. Project No.: 13023–000. last three digits in the docket number
intervene in accordance with the c. Date filed: September 17, 2007. field to access the document. For
Commission’s Rules may become a d. Applicant: Michael D. Mason. assistance, call toll-free 1–866–208–
party to the proceeding. Any comments, e. Name and Location of Project: The 3676 or e-mail
protests, or motions to intervene must proposed Upper Kiser Creek FERCOnlineSupport@ferc.gov. For TTY,

VerDate Aug<31>2005 16:48 Apr 09, 2008 Jkt 214001 PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 E:\FR\FM\10APN1.SGM 10APN1
19498 Federal Register / Vol. 73, No. 70 / Thursday, April 10, 2008 / Notices

call (202) 502–8659. A copy is also q. Comments, Protests, or Motions to DEPARTMENT OF ENERGY
available for inspection and Intervene—Anyone may submit
reproduction at the address in item g comments, a protest, or a motion to Federal Energy Regulatory
above. intervene in accordance with the Commission
l. Individuals desiring to be included requirements of Rules of Practice and
on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214. [Docket No. RR07–16–003]
so indicate by writing to the Secretary In determining the appropriate action to
of the Commission. take, the Commission will consider all North American Electric Reliability
m. Competing Preliminary Permit— Corporation; Notice of Filing
protests or other comments filed, but
Anyone desiring to file a competing
application for preliminary permit for a only those who file a motion to
April 3, 2008.
proposed project must submit the intervene in accordance with the
Commission’s Rules may become a Take notice that on April 1, 2008, The
competing application itself, or a notice
of intent to file such an application, to party to the proceeding. Any comments, North American Electric Reliability
the Commission on or before the protests, or motions to intervene must Corporation filed additional compliance
specified comment date for the be received on or before the specified filings in response to the Commission’s
particular application (see 18 CFR 4.36). comment date for the particular October 18, 2007, Order, North
Submission of a timely notice of intent application. American Electric Reliability
allows an interested person to file the r. Filing and Service of Responsive Corporation, Order Conditionally
competing preliminary permit Documents—Any filings must bear in Accepting 2008 Business Plan and
application no later than 30 days after all capital letters the title Budget if the North American Electric
the specified comment date for the ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT Reliability Corporation and Ordering
particular application. A competing Compliance Filings, 121 FERC ¶ 61,057
TO FILE COMPETING APPLICATION’’,
preliminary permit application must (2007) (2008 ERO Budget Order).
‘‘COMPETING APPLICATION’’,
conform with 18 CFR 4.30 and 4.36. Any person desiring to intervene or to
n. Competing Development ‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the protest this filing must file in
Application—Any qualified
development applicant desiring to file a Project Number of the particular accordance with Rules 211 and 214 of
competing development application application to which the filing refers. the Commission’s Rules of Practice and
must submit to the Commission, on or Any of the above-named documents Procedure (18 CFR 385.211, 385.214).
before a specified comment date for the must be filed by providing the original Protests will be considered by the
particular application, either a and the number of copies provided by Commission in determining the
competing development application or a the Commission’s regulations to: The appropriate action to be taken, but will
notice of intent to file such an Secretary, Federal Energy Regulatory not serve to make protestants parties to
application. Submission of a timely Commission, 888 First Street, NE., the proceeding. Any person wishing to
notice of intent to file a development Washington, DC 20426. An additional become a party must file a notice of
application allows an interested person copy must be sent to Director, Division intervention or motion to intervene, as
to file the competing application no of Hydropower Administration and appropriate. Such notices, motions, or
later than 120 days after the specified Compliance, Federal Energy Regulatory protests must be filed on or before the
comment date for the particular Commission, at the above-mentioned comment date. On or before the
application. A competing license address. A copy of any notice of intent, comment date, it is not necessary to
application must conform with 18 CFR serve motions to intervene or protests
competing application or motion to
4.30 and 4.36. on persons other than the Applicant.
o. Notice of Intent—A notice of intent intervene must also be served upon each
must specify the exact name, business representative of the Applicant The Commission encourages
address, and telephone number of the specified in the particular application. electronic submission of protests and
prospective applicant, and must include s. Agency Comments—Federal, state, interventions in lieu of paper using the
an unequivocal statement of intent to and local agencies are invited to file ‘‘eFiling’’ link at http://www.ferc.gov.
submit, if such an application may be comments on the described application. Persons unable to file electronically
filed, either a preliminary permit A copy of the application may be should submit an original and 14 copies
application or a development obtained by agencies directly from the of the protest or intervention to the
application (specify which type of Applicant. If an agency does not file Federal Energy Regulatory Commission,
application). A notice of intent must be comments within the time specified for 888 First Street, NE., Washington, DC
served on the applicant(s) named in this filing comments, it will be presumed to 20426.
public notice. have no comments. One copy of an This filing is accessible on-line at
p. Proposed Scope of Studies under agency’s comments must also be sent to
Permit—A preliminary permit, if issued, http://www.ferc.gov, using the
the Applicant’s representatives ‘‘eLibrary’’ link and is available for
does not authorize construction. The
term of the proposed preliminary permit Kimberly D. Bose,
review in the Commission’s Public
would be 36 months. The work Reference Room in Washington, DC.
Secretary.
proposed under the preliminary permit There is an ‘‘eSubscription’’ link on the
[FR Doc. E8–7602 Filed 4–9–08; 8:45 am]
would include economic analysis, Web site that enables subscribers to
BILLING CODE 6717–01–P receive e-mail notification when a
preparation of preliminary engineering
mstockstill on PROD1PC66 with NOTICES

plans, and a study of environmental document is added to a subscribed


impacts. Based on the results of these docket(s). For assistance with any FERC
studies, the Applicant would decide Online service, please e-mail
whether to proceed with the preparation FERCOnlineSupport@ferc.gov, or call
of a development application to (866) 208–3676 (toll free). For TTY, call
construct and operate the project. (202) 502–8659.

VerDate Aug<31>2005 16:48 Apr 09, 2008 Jkt 214001 PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 E:\FR\FM\10APN1.SGM 10APN1

You might also like