16294 Federal Register / Vol. 73, No.

60 / Thursday, March 27, 2008 / Notices

an unequivocal statement of intent to obtained by agencies directly from the filing documents with the Commission
submit, if such an application may be Applicant. If an agency does not file to serve a copy of that document on
filed, either a preliminary permit comments within the time specified for each person in the official service list
application or a development filing comments, it will be presumed to for the project. Further, if an intervenor
application (specify which type of have no comments. One copy of an files comments or documents with the
application). A notice of intent must be agency’s comments must also be sent to Commission relating to the merits of an
served on the applicant(s) named in this the Applicant’s representatives. issue that may affect the responsibilities
public notice. of a particular resource agency, they
p. Proposed Scope of Studies Under Kimberly D. Bose,
must also serve a copy of the document
Permit—A preliminary permit, if issued, Secretary. on that resource agency.
does not authorize construction. The [FR Doc. E8–6215 Filed 3–26–08; 8:45 am] k. Description of Project: The
term of the proposed preliminary permit BILLING CODE 6717–01–P proposed project using the U.S. Army
would be 36 months. The work Corps of Engineers’ William Bacon
proposed under the preliminary permit Oliver Lock and Dam and operated in a
would include economic analysis, DEPARTMENT OF ENERGY run-of-river mode would consist of: (1)
preparation of preliminary engineering A new powerhouse and switchyard; (2)
plans, and a study of environmental Federal Energy Regulatory three turbine/generator units with a
impacts. Based on the results of these Commission combined installed capacity of 25
studies, the Applicant would decide [Project No. 13005–000] megawatts; (3) a new 0.05-mile-long
whether to proceed with the preparation above ground 46-kilovolt transmission
of a development application to Oliver Hydro, LLC; Notice of line extending from the switchyard to
construct and operate the project. Application Accepted for Filing and an interconnection point with the utility
q. Comments, Protests, or Motions to Soliciting Motions to Intervene, distribution system owned by Black
Intervene—Anyone may submit Protests, and Comments Warrior Electric Membership
comments, a protest, or a motion to Corporation; and (4) appurtenant
March 20, 2008.
intervene in accordance with the facilities. The proposed William Bacon
requirements of Rules of Practice and Take notice that the following
Oliver Lock and Dam Project would
Procedure, 18 CFR 385.210, .211, .214. hydroelectric application has been filed
have an average annual generation of 80
In determining the appropriate action to with the Commission and is available
gigawatt-hours.
take, the Commission will consider all for public inspection: l. This filing is available for review at
a. Type of Application: Preliminary
protests or other comments filed, but the Commission in the Public Reference
Permit.
only those who file a motion to b. Project No.: 13005–000.
Room or may be viewed on the
intervene in accordance with the c. Date filed: September 7, 2007. Commission’s Web site at: http://
Commission’s Rules may become a d. Applicant: Oliver Hydro, LLC. www.ferc.gov using the ‘‘eLibrary’’ link.
party to the proceeding. Any comments, e. Name of Project: William Bacon Enter the docket number excluding the
protests, or motions to intervene must Oliver Lock and Dam Hydroelectric last three digits in the docket number
be received on or before the specified Project. field to access the document. For
comment date for the particular f. Location: Black Warrior River in assistance, call toll-free 1–866–208–
application. Tuscaloosa County, Alabama. It would 3676 or e-mail
r. Filing and Service of Responsive use the U.S. Army Corps of Engineers’ FERCONLINESUPPORT@FERC.GOV.
Documents—Any filings must bear in William Bacon Oliver Lock and Dam. For TTY, call (202) 502–8659. A copy is
all capital letters the title g. Filed Pursuant to: Federal Power also available for inspection and
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT Act, 16 U.S.C. 791(a)–825(r). reproduction at the address in item h
TO FILE COMPETING APPLICATION’’, h. Applicant Contact: Mr. Brent L. above.
‘‘COMPETING APPLICATION’’, Smith, COO, Symbiotics, LLC, P.O. Box m. Competing Preliminary Permit—
‘‘PROTEST’’, and ‘‘MOTION TO 535, Rigby, ID 83442, (208) 745–0834. Anyone desiring to file a competing
INTERVENE’’, as applicable, and the i. FERC Contact: Robert Bell, (202) application for preliminary permit for a
Project Number of the particular 502–4126. proposed project must submit the
application to which the filing refers. j. Deadline for filing comments, competing application itself, or a notice
Any of the above-named documents protests, and motions to intervene: 60 of intent to file such an application, to
must be filed by providing the original days from the issuance date of this the Commission on or before the
and the number of copies provided by notice. specified comment date for the
the Commission’s regulations to: The All documents (original and eight particular application (see 18 CFR 4.36).
Secretary, Federal Energy Regulatory copies) should be filed with: Kimberly Submission of a timely notice of intent
Commission, 888 First Street, NE., D. Bose, Secretary, Federal Energy allows an interested person to file the
Washington, DC 20426. An additional Regulatory Commission, 888 First competing preliminary permit
copy must be sent to Director, Division Street, NE., Washington, DC 20426. application no later than 30 days after
of Hydropower Administration and Comments, protests, and interventions the specified comment date for the
Compliance, Federal Energy Regulatory may be filed electronically via the particular application. A competing
Commission, at the above-mentioned Internet in lieu of paper; see 18 CFR preliminary permit application must
address. A copy of any notice of intent, 385.2001(a)(1)(iii) and the instructions conform with 18 CFR 4.30 and 4.36.
competing application or motion to on the Commission’s Web site under the n. Competing Development
intervene must also be served upon each ‘‘e-Filing’’ link. The Commission Application—Any qualified
representative of the Applicant strongly encourages electronic filings. development applicant desiring to file a
pwalker on PROD1PC71 with NOTICES

specified in the particular application. Please include the project number competing development application
s. Agency Comments—Federal, State, (P–13005–000) on any comments or must submit to the Commission, on or
and local agencies are invited to file motions filed. before a specified comment date for the
comments on the described application. The Commission’s Rules of Practice particular application, either a
A copy of the application may be and Procedure require all intervenors competing development application or a

VerDate Aug<31>2005 16:08 Mar 26, 2008 Jkt 214001 PO 00000 Frm 00050 Fmt 4703 Sfmt 4703 E:\FR\FM\27MRN1.SGM 27MRN1
Federal Register / Vol. 73, No. 60 / Thursday, March 27, 2008 / Notices 16295

notice of intent to file such an Washington, DC 20426. An additional assistance with any FERC Online
application. Submission of a timely copy must be sent to Director, Division service, please e-mail
notice of intent to file a development of Hydropower Administration and FERCOnlineSupport@ferc.gov, or call
application allows an interested person Compliance, Federal Energy Regulatory (866) 208–3676 (toll free). For TTY, call
to file the competing application no Commission, at the above-mentioned (202) 502–8659.
later than 120 days after the specified address. A copy of any notice of intent, Specifically, Columbia Gulf,
comment date for the particular competing application or motion to Tennessee, and Natural propose to
application. A competing license intervene must also be served upon each abandon in place the following
application must conform with 18 CFR representative of the Applicant facilities: (i) The segment of 20-inch
4.30 and 4.36. specified in the particular application. diameter pipeline owned by Natural,
o. Notice of Intent—A notice of intent s. Agency Comments—Federal, State, Segment 3991, comprised of
must specify the exact name, business and local agencies are invited to file approximately 1.58 miles, from Eugene
address, and telephone number of the comments on the described application. Island Block 331 to Block 314; (ii) the
prospective applicant, and must include A copy of the application may be segment of 20-inch diameter pipeline
an unequivocal statement of intent to obtained by agencies directly from the owned by Columbia Gulf, Segment 496,
submit, if such an application may be Applicant. If an agency does not file comprised of approximately 3.1 miles,
filed, either a preliminary permit comments within the time specified for from Eugene Island Block 314 to Block
application or a development filing comments, it will be presumed to 309; (iii) the segment of 20-inch
application (specify which type of have no comments. One copy of an diameter pipeline jointly owned by
application). A notice of intent must be agency’s comments must also be sent to Columbia Gulf, Tennessee, and Natural,
served on the applicant(s) named in this the Applicant’s representatives. Segment 5235, comprised of
public notice. approximately 16.1 miles, from Eugene
p. Proposed Scope of Studies Under Kimberly D. Bose, Island Block 309 to Eugene Island 250B;
Permit—A preliminary permit, if issued, Secretary. and (iv) side taps, measurement
does not authorize construction. The [FR Doc. E8–6216 Filed 3–26–08; 8:45 am] facilities, and other various
term of the proposed preliminary permit BILLING CODE 6717–01–P appurtenances attached to these
would be 36 months. The work facilities and certain non-jurisdictional
proposed under the preliminary permit facilities, located in the Eugene Island
would include economic analysis, DEPARTMENT OF ENERGY Areas 250, 264, 271, 286, 287, 292, 309,
preparation of preliminary engineering 314, and 331, all Offshore Louisiana.
plans, and a study of environmental Federal Energy Regulatory Any questions regarding this
impacts. Based on the results of these Commission application should be directed to
studies, the Applicant would decide [Docket No. CP08–91–000] Fredric J. George, Lead Counsel,
whether to proceed with the preparation Columbia Gulf Transmission Company,
of a development application to Columbia Gulf Transmission P. O. Box 1273, Charleston, West
construct and operate the project. Company; Tennessee Gas Pipeline Virginia 25325–1273, at (304) 357–2359
q. Comments, Protests, or Motions to Company; Natural Gas Pipeline or fax (304) 357–3206.
Intervene—Anyone may submit Company of America LLC; Notice of There are two ways to become
comments, a protest, or a motion to Application involved in the Commission’s review of
intervene in accordance with the this project. First, any person wishing to
requirements of Rules of Practice and March 20, 2008. obtain legal status by becoming a party
Procedure, 18 CFR 385.210, .211, .214. Take notice that on March 12, 2008, to the proceedings for this project
In determining the appropriate action to Columbia Gulf Transmission Company should, on or before the comment date
take, the Commission will consider all (Columbia Gulf), 5151 San Felipe, Suite stated below file with the Federal
protests or other comments filed, but 2500, Houston, Texas 77056, Tennessee Energy Regulatory Commission, 888
only those who file a motion to Gas Pipeline Company (Tennessee), First Street, NE., Washington, DC 20426,
intervene in accordance with the 1001 Louisiana Street, Houston, Texas a motion to intervene in accordance
Commission’s Rules may become a 77002, and Natural Gas Pipeline with the requirements of the
party to the proceeding. Any comments, Company of America LLC (Natural) 500 Commission’s Rules of Practice and
protests, or motions to intervene must Dallas Street, Houston, Texas 77002, Procedure (18 CFR 385.214 or 385.211)
be received on or before the specified filed in Docket No. CP08–91–000, an and the Regulations under the NGA (18
comment date for the particular application pursuant to section 7(b) of CFR 157.10). A person obtaining party
application. the Natural Gas Act (NGA) and Part 157 status will be placed on the service list
r. Filing and Service of Responsive of the Commission’s regulations, for maintained by the Secretary of the
Documents—Any filings must bear in authorization to abandon certain Commission and will receive copies of
all capital letters the title facilities located in Eugene Island, all documents filed by the applicant and
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT Offshore Louisiana, all as more fully set by all other parties. A party must submit
TO FILE COMPETING APPLICATION’’, forth in the application which is on file 14 copies of filings made in the
‘‘COMPETING APPLICATION’’, with the Commission and open to proceeding with the Commission and
‘‘PROTEST’’, and ‘‘MOTION TO public inspection. This filing is must mail a copy to the applicant and
INTERVENE’’, as applicable, and the accessible on-line at: http:// to every other party. Only parties to the
Project Number of the particular www.ferc.gov, using the ‘‘eLibrary’’ link proceeding can ask for court review of
application to which the filing refers. and is available for review in the Commission orders in the proceeding.
Any of the above-named documents Commission’s Public Reference Room in However, a person does not have to
pwalker on PROD1PC71 with NOTICES

must be filed by providing the original Washington, DC. There is an intervene in order to have comments
and the number of copies provided by ‘‘eSubscription’’ link on the web site considered. The second way to
the Commission’s regulations to: The that enables subscribers to receive e- participate is by filing with the
Secretary, Federal Energy Regulatory mail notification when a document is Secretary of the Commission, as soon as
Commission, 888 First Street, NE., added to a subscribed docket(s). For possible, an original and two copies of

VerDate Aug<31>2005 16:08 Mar 26, 2008 Jkt 214001 PO 00000 Frm 00051 Fmt 4703 Sfmt 4703 E:\FR\FM\27MRN1.SGM 27MRN1