Emami Cement is planning a cement manufacturing unit in West Bengal


July 18, 2015
Conceptual Stage
Emami Cement is planning a cement manufacturing unit in West Bengal.
Emami Cement is planning a 1.5-2 MTPA cement manufacturing unit & a 10 MW
coal based Captive power project at Panagarh, dist. Bardhaman, West
Bengal on 65 acres. Land has been allotted by the West Bengal Industrial
Development Corporation (WBIDC). The estimated cost of the project is Rs. 4180
million. The project is in a preliminary stage. The company will apply for
environmental clearance shortly. Other details are yet to be finalized. Work on the
project is expected to commence in H1 2016.

Krishnakath Agro Process is planning a integrated sugar plant in dist. Sangli,


Maharashtra.
July 14, 2015
Sugar
Status: Planning Stage
Promoter: Krishnakath Agro Process
Project: Plans an integrated sugar plant
Location: Village Amnapur, dist. Sangli, Maharashtra
Project Details: The project will spread over on 20 acres of acquired land.
Project Cost: The estimated cost of the project is Rs. 1,250 million
Project Details: The unit will manufacture candy sugar, a 30 KLD molasses-based
distillery to produce rectified sprit & a 9 MW bagasse-based co-gen power project.
The capacity of candy sugar is yet to be finalized. Out of the 9 MW, 3 MW will be
used for captive consumption & 6 MW will be sold out to Maharashtra State Power
Generation Company. The company is in the process of arranging the finance. Work
on the project will commence after receipt of financial closure.

Yashwant Sugar & Power is planning a molasses-based distillery in dist. Sangli,


Maharashtra.
July 14, 2015
Distillery
Status: Planning Stage
Promoter: Yashwant Sugar & Power
Project: Plans molasses-based distillery
Location: Village Nagewadi, dist. Sangli, Maharashtra
Product/ Capactiy: 45 KLD of Rectified spirit
Project Details: The project will come up along with an expansion of sugar plant &
a new bagasse-based co-gen power plant in the existing 200 acre plant premises.
Machinery is yet to be ordered. The project is in planning stage. DPR is yet to be
prepared.
Current Status: Work on the project is expected to commence in 2016 & is planned
for completion in 2 years thereafter.

Rain Cements is planning a waste heat recovery-based power plant in dist.


Kurnool, Andhra Pradesh.
April 13, 2015
Thermal Power generation
Status: Planning Stage
Promoter: Rain Cements
Project: Plans 7 MW waste heat recovery-based power plant
Location: Boincheruvupalli Village, Peapully Mandal, dist. Kurnool, Andhra Pradesh
Project Details: The estimated cost of the project is Rs. 700 million. The project
will come up in the existing cement plant premises. The project will generate up to 7
MW of gross electrical energy from the waste heat and the flue gases evolved during
the cement manufacturing process. The project that will be financed by a
combination of internal accruals and bank loans is expected to be completed in
about 14 months. The board of directors of the company has approved the project at
its meeting held on 27th February, 2015.

Jaiprakash Associates is planning an integrated cement project in dist.


Sonbhadra, Uttar Pradesh.
March 28, 2015
Cement
Status: Planning Stage
Promoter: Jaiprakash Associates
Project: Plans an integrated cement project
Location: Dalla, dist. Sonbhadra Uttar Pradesh
Project Cost: Rs. 12,000 million.
Project Details: The Project will spread over 67 acres of existing land. The project
will comprise of a 2.20 MTPA clinker plant and a 1.50 MTPA cement plant. This is an
expansion of the cement plant by setting up of an additional clinker and cement
plant. The existing plant has a production capacity of 2.0 MTPA clinker, 0.5 MTPA
cement, 27 MW power along with six nos. captive limestone mines. Limestone will
be received from the mine in same plant.
Current Status: The project is waiting for environmental clearance. Work on the
project will commence after receipt of environmental clearance.

Lakade Cane Sugar is planning an expansion of its Khandsari sugar manufacturing


project in dist. Sangli, Maharashtra.
February 19, 2015
Sugar
Status: Announcement
Promoter: Lakade Cane Sugar
Project: Plans a capacity expansion of its Khandsari sugar manufacturing unit from
existing 1000 TPD to 2500 TPD
Location: Vita-Mayani Road, dist. Sangli, Maharashtra
Current Status: The project is in conceptual stage. Work on the project is expected
to commence in 2017. Other details are yet to be finalized.

RSPL is planning a soda ash plant & CPP in dist. Jamnagar, Gujarat.
February 19, 2015
Chemicals
Status: Announcement
Promoter: RSPL
Project: 1500 TPD of ash plant and 50 MW of Captive Power Project
Location: Village Kuranga, dist. Jamnagar, Gujarat
Current Status: Land acquisition is in progress. 85% of land has been acquired.
The project is waiting for environmental clearance. The entire project is planned for
completion in 5 years from zero date.

Seven Star Steels is planning an expansion of its thermal captive power project in
Orissa.
January 31, 2015
Thermal Power generation
Status: Planning Stage
Promoter: Seven Star Steels
Project: Plans an expansion of its coal-based captive power project.
Capacity: from initial 8 MW to 12 MW
Location: Village Kalendamal, dist. Jharsuguda, Orissa
Project Cost: Rs. 600 million.
Project Details: The project will come up along with an expansion of its sponge
iron plant from 60,000 TPA to 180,000 TPA & ingot plant from 39,200 TPA to 80,000
TPA. Machinery will be partially procured locally and partially imported; orders are
yet to be placed.
Current Status: The project is waiting for industrial clearance. Work on the project
will commence in H1 2015.

Founders & Chair Persons of Group


Shri R. S. Agrawal
Shri R. S. Goenaka
Company Secretary :
Shri Sumit Jaiswal
Chief Financial Officer & President (Power Project):
Shri Manoranjan Ghosh
Regd. Office :
Emami Tower, 2nd Floor, 687 Anandapur, E.M. Bypass, Kolkata 700 107
Cement plant site office address :
Kesarwani Bhawan, Behind SBI,
Garden Chowk, Baloda Bazar,
Tehsil & District - Baloda Bazar (CG) 493 332
Contact Nos. :
Kolkata Office - 033 - 66136242 / 43
Raipur Office - 0771 - 4043411
Site Office - 07727 - 222033
Cement Plant Site :
Village - Risda
Tehsil & District - Baloda Bazar
Chhattisgarh

Managing Director
Krishnakath Shetimal Prakriya and Sathavnuk sahakari sanstha
ltd.Dudhondi
A/p- Dudhondi
Tal- Palus
Dist- Sangli Maharashtra 416308
Mobile.No.1:7588058001
Mobile No.2: 9372110900
Email:info@krishnakathfoods.com
krishnakath@hotmail.com

Rain Industries Limited


Rain Center
34, Srinagar Colony
Hyderabad 500 073, India.
Phone: +91 (40) 40401234
Fax: +91 (40) 40401214
Email: secretarial@rain-industries.com

Murli Dhar
Executive Chairman
Bimal Kumar
Managing Director
Manoj Kumar
Director
Delhi Corporate Office:
3rd Floor, C -1,2, and 3,
Netaji Subhash Place,
Wazirpur District Center,
Pithampura, New Delhi - 110 034.
Tel. + 91 -11- 27351856, 27351856
Fax. +91- 11- 27353193

Mr Ramji Lal Bathwal


(Chairman Emeritus)
Mr Nirmal Kumar Bathwal
(Managing Director)
Mr Nikunj Bathwal
(Director)
Address
Corporate Head Office
33A, Jawaharlal Nehru Road
Chatterjee International Centre
18th Floor, Room No. 3 & 4
Kolkata
Pin Code - 700 071
Phone +91 33 2226 7866 / 8818
Fax +91 33 2271 4033
E-mail ho@bathwalcorp.com

You might also like