15502 Federal Register / Vol. 73, No.

57 / Monday, March 24, 2008 / Notices

applicable during the April 2008 DEPARTMENT OF ENERGY mode would consist of: (1) A new
outages to the period commencing on powerhouse and switchyard; (2) four
the first gas day of the first outage Federal Energy Regulatory turbine/generator units with a combined
through and including the 30th gas day Commission installed capacity of 44 megawatts; (3) a
following the second outage. This [Project No. 13000–000] new 2-mile-long above ground 69-
amendment will allow Gulfstream’s firm kilovolt transmission line extending
customers who take loans of line pack Howell Heflin Hydro, LLC; Notice of from the switchyard to an
during the April 2008 outages up to 30 Application Accepted for Filing and interconnection point with the utility
days following the end of the second Soliciting Motions To Intervene, distribution system owned by Black
outage to return all line pack taken Protests, and Comments Warrior Electric Membership
during both outages. In addition, in Corporation; and (4) appurtenant
March 17, 2008. facilities. The proposed Howell Heflin
order to ensure that the firm shippers
have a timely understanding of the Take notice that the following Lock and Dam Project would have an
hydroelectric application has been filed average annual generation of 125
availability of, and cost associated with,
with the Commission and is available gigawatt-hours.
the parking and lending services
for public inspection: l. This filing is available for review at
described in the Petition, as amended, a. Type of Application: Preliminary the Commission in the Public Reference
Gulfstream requests that the Permit. Room or may be viewed on the
Commission expedite action on the b. Project No.: 13000–000. Commission’s Web site at http://
amended Petition, shorten the notice c. Date filed: September 7, 2007. www.ferc.gov using the ‘‘eLibrary’’ link.
period to five days from the date of this d. Applicant: Howell Heflin Hydro, Enter the docket number excluding the
filing, and grant the Petition by March LLC. last three digits in the docket number
21, 2008. e. Name of Project: Howell Heflin field to access the document. For
Any person desiring to protest this Lock and Dam Hydroelectric Project. assistance, call toll-free 1–866–208–
filing must file in accordance with Rule f. Location: Tombigbee River in 3676 or e-mail
211 of the Commission’s Rules of Greene County, Alabama. It would use FERCONLINESUPPORT@FERC.GOV.
Practice and Procedure (18 CFR the U.S. Army Corps of Engineers’ For TTY, call (202) 502–8659. A copy is
385.211). Protests to this filing will be Howell Heflin Lock and Dam. also available for inspection and
considered by the Commission in g. Filed Pursuant to: Federal Power reproduction at the address in item h
determining the appropriate action to be Act, 16 U.S.C. 791(a)–825(r). above.
h. Applicant Contact: Mr. Brent L. m. Competing Preliminary Permit—
taken, but will not serve to make
Smith, COO, Symbiotics, LLC, P.O. Box Anyone desiring to file a competing
protestants parties to the proceeding.
535, Rigby, ID 83442, (208) 745–0834. application for preliminary permit for a
Such protests must be filed on or before i. FERC Contact: Robert Bell, (202)
the date as indicated below. Anyone proposed project must submit the
502–4126. competing application itself, or a notice
filing a protest must serve a copy of that j. Deadline for filing comments, of intent to file such an application, to
document on all the parties to the protests, and motions to intervene: 60 the Commission on or before the
proceeding. days from the issuance date of this specified comment date for the
The Commission encourages notice. particular application (see 18 CFR 4.36).
electronic submission of protests in lieu All documents (original and eight Submission of a timely notice of intent
of paper using the ‘‘eFiling’’ link at copies) should be filed with: Secretary, allows an interested person to file the
http://www.ferc.gov. Persons unable to Federal Energy Regulatory Commission, competing preliminary permit
file electronically should submit an 888 First Street, NE., Washington, DC application no later than 30 days after
original and 14 copies of the protest to 20426. Comments, protests, and the specified comment date for the
the Federal Energy Regulatory interventions may be filed electronically particular application. A competing
Commission, 888 First Street, NE., via the Internet in lieu of paper; see 18 preliminary permit application must
Washington, DC 20426. CFR 385.2001(a)(1)(iii) and the conform with 18 CFR 4.30 and 4.36.
This filing is accessible on-line at instructions on the Commission’s Web n. Competing Development
http://www.ferc.gov, using the site under the ‘‘e-Filing’’ link. The Application—Any qualified
‘‘eLibrary’’ link and is available for Commission strongly encourages development applicant desiring to file a
review in the Commission’s Public electronic filings. Please include the competing development application
project number (P–13000–000) on any must submit to the Commission, on or
Reference Room in Washington, DC.
comments or motions filed. before a specified comment date for the
There is an ‘‘eSubscription’’ link on the
The Commission’s Rules of Practice particular application, either a
Web site that enables subscribers to
and Procedure require all intervenors competing development application or a
receive email notification when a
filing documents with the Commission notice of intent to file such an
document is added to a subscribed
to serve a copy of that document on application. Submission of a timely
docket(s). For assistance with any FERC
each person in the official service list notice of intent to file a development
Online service, please email for the project. Further, if an intervenor application allows an interested person
FERCOnlineSupport@ferc.gov, or call files comments or documents with the to file the competing application no
(866) 208–3676 (toll free). For TTY, call Commission relating to the merits of an later than 120 days after the specified
(202) 502–8659. issue that may affect the responsibilities comment date for the particular
Comment Date: 5 p.m. Eastern Time of a particular resource agency, they application. A competing license
mstockstill on PROD1PC66 with NOTICES

Tuesday, March 18, 2008. must also serve a copy of the document application must conform with 18 CFR
on that resource agency. 4.30 and 4.36.
Kimberly D. Bose,
k. Description of Project: The o. Notice of Intent—A notice of intent
Secretary. proposed project using the U.S. Army must specify the exact name, business
[FR Doc. E8–5827 Filed 3–21–08; 8:45 am] Corps of Engineers’ Howell Heflin Lock address, and telephone number of the
BILLING CODE 6717–01–P and Dam and operated in a run-of-river prospective applicant, and must include

VerDate Aug<31>2005 16:33 Mar 21, 2008 Jkt 214001 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 E:\FR\FM\24MRN1.SGM 24MRN1
Federal Register / Vol. 73, No. 57 / Monday, March 24, 2008 / Notices 15503

an unequivocal statement of intent to obtained by agencies directly from the also serve a copy of the document on
submit, if such an application may be Applicant. If an agency does not file that resource agency. A copy of any
filed, either a preliminary permit comments within the time specified for motion to intervene must also be served
application or a development filing comments, it will be presumed to upon each representative of the
application (specify which type of have no comments. One copy of an Applicant specified in the particular
application). A notice of intent must be agency’s comments must also be sent to application.
served on the applicant(s) named in this the Applicant’s representatives. k. Description of Request: Alabama
public notice. Power Company (APC) is requesting a
p. Proposed Scope of Studies Under Kimberly D. Bose, temporary variance of the Jordan Dam
Permit—A preliminary permit, if issued, Secretary. Project’s minimum flow requirements
does not authorize construction. The [FR Doc. E8–5845 Filed 3–21–08; 8:45 am] due to continuing drought conditions in
term of the proposed preliminary permit BILLING CODE 6717–01–P the southeast, and to ensure, to the
would be 36 months. The work extent possible, that there will be
proposed under the preliminary permit sufficient water available in the Coosa
would include economic analysis, DEPARTMENT OF ENERGY River to support both reservoir and
preparation of preliminary engineering downstream environmental, municipal
plans, and a study of environmental Federal Energy Regulatory and industrial water supply and
impacts. Based on the results of these Commission navigation needs. Beginning April 1, the
studies, the Applicant would decide [Project No. 618–175] project license requires a continuous
whether to proceed with the preparation minimum base flow of 4,000 cubic feet
of a development application to Alabama Power Company; Notice of per second (cfs) for 18 hours per day
construct and operate the project. Application for Amendment of License and a pulse flow release for 6 hours per
q. Comments, Protests, or Motions to and Soliciting Comments, Motions To day. During June, the base and pulse
Intervene—Anyone may submit Intervene, and Protests flows are ramped down in daily
comments, a protest, or a motion to increments, to a continuous 2,000 cfs,
intervene in accordance with the March 14, 2008.
which is required up to March 31. APC
requirements of Rules of Practice and Take notice that the following is requesting a variance to release from
Procedure, 18 CFR 385.210, .211, .214. hydroelectric application has been filed Jordan Dam no less than a continuous
In determining the appropriate action to with the Commission and is available flow of 2,000 cfs (± 5 percent) from
take, the Commission will consider all for public inspection: April 1 through December 31, 2008,
protests or other comments filed, but a. Type of Application: Request for unless further reduction in flows
only those who file a motion to Temporary Variance of Minimum Flow becomes necessary to address
intervene in accordance with the Requirement. emergency operating conditions. Any
Commission’s Rules may become a b. Project No.: 618–175. reduction in flows would be achieved
party to the proceeding. Any comments, c. Date Filed: March 13, 2008. by ramping down flows by no more than
protests, or motions to intervene must d. Applicant: Alabama Power 66.7 cfs per day. The licensee is also
be received on or before the specified Company. proposing to conduct weekly conference
comment date for the particular e. Name of Project: Jordan Dam. calls with the resource agencies to
application. f. Location: On the Coosa River, in discuss project releases and operations
r. Filing and Service of Responsive Elmore, Chilton, and Coosa Counties, to address drought related issues.
Documents—Any filings must bear in Alabama. l. Location of the Application: The
all capital letters the title g. Filed Pursuant to: Federal Power filing is available for inspection and
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT Act, 16 U.S.C. 791a–825r. reproduction at the Commission’s
TO FILE COMPETING APPLICATION’’, h. Applicant Contact: Barry Lovett, Public Reference Room, located at 888
‘‘COMPETING APPLICATION’’, Alabama Power Company, 600 N. 18th First Street, NE., Room 2A, Washington,
‘‘PROTEST’’, and ‘‘MOTION TO Street, P.O. Box 2641, Birmingham, AL DC 20426 or by calling (202) 502–8371,
INTERVENE’’, as applicable, and the 35291, (205) 257–1258. or by calling (202) 502–8371. This filing
Project Number of the particular i. FERC Contact: Peter Yarrington, may also be viewed on the
application to which the filing refers. peter.yarrington@ferc.gov, (202) 502– Commission’s Web site at http://ferc.gov
Any of the above-named documents 6129. using the ‘‘eLibrary’’ link. Enter the
must be filed by providing the original j. Deadline for filing comments, docket number (P–618) in the docket
and the number of copies provided by motions to intervene and protests: number field to access the document.
the Commission’s regulations to: The March 28, 2008. You may also register online at http://
Secretary, Federal Energy Regulatory All documents (original and eight www.ferc.gov/docsfiling/
Commission, 888 First Street, NE., copies) should be filed with: Kimberly esubscription.asp to be notified via e-
Washington, DC 20426. An additional D. Bose, Secretary, Federal Energy mail or new filings and issuances
copy must be sent to Director, Division Regulatory Commission, 888 First related to this or other pending projects.
of Hydropower Administration and Street, NE., Washington, DC 20426. For assistance, call 1–866–208–3676 or
Compliance, Federal Energy Regulatory The Commission’s Rules of Practice e-mail FERCOnlineSupport@ferc.gov,
Commission, at the above-mentioned and Procedure require all intervenors for TTY, call (202) 502–8659. A copy is
address. A copy of any notice of intent, filing documents with the Commission also available for inspection and
competing application or motion to to serve a copy of that document on reproduction at the address in item (h)
intervene must also be served upon each each person whose name appears on the above.
mstockstill on PROD1PC66 with NOTICES

representative of the Applicant official service list for the project. m. Individuals desiring to be included
specified in the particular application. Further, if an intervenor files comments on the Commission’s mailing list should
s. Agency Comments—Federal, state, or documents with the Commission so indicate by writing to the Secretary
and local agencies are invited to file relating to the merits of an issue that of the Commission.
comments on the described application. may affect the responsibilities of a n. Comments, Protests, or Motions to
A copy of the application may be particular resource agency, they must Intervene: Anyone may submit

VerDate Aug<31>2005 16:33 Mar 21, 2008 Jkt 214001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\24MRN1.SGM 24MRN1