PROPOSED CONSTRUCTION OF HOSPITAL AT NIZAMABAD

SUMMARY OF QUOTATION
SL NO

DESCRIPTION OF WORK

AMOUNT

Electrical Works

4,383,783.00

TV & LAN Networking

458,050.00

Lighting Arrester

264,520.00

DG Set Option -01

1,864,350.00

DG Set Option -02 ( With Out Exhuast Pipe )

1,742,100.00

UPS

1,780,000.00

Page 1 of 11

SUMMARY

PROPOSED CONSTRUCTION OF HOSPITAL AT NIZAMABAD


ELCTRICAL WORKS
QUOTATION
SL NO

DESCRIPTION OF WORK

UNITS

QTY
RATE

AMOUNT

Part - A External Electrical Works


1

Earth Stations

Providing of Copper Plate Earth station, with 600 X 600 X 3.15mm thick copper
plate including construction of brick pedestal, providing meshed funnel, CI cover and
other civil Engineering works, spreading a homogeneous mixture of salt charcoal
around the pipe etc, completely as per IS 3043, 1987 or latest revision
Supply
Installation

Nos
Nos

4.00
4.00

12,600.00
1,000.00

50,400.00
4,000.00

Supply
Installation

Nos
Nos

4.00
4.00

6,600.00
850.00

26,400.00
3,400.00

Providing of 100mm Cast Iron Pipe of 2 Mtr length with back filling compound,
including excavation, refilling complete as required including medium duty cast iron
cover and all associated civil works like construction of chamber and rough
plastering etc as required.
Supply
Installation

Nos
Nos

5.00
5.00

11,000.00
1,200.00

55,000.00
6,000.00

Supply
Installation

Rmtrs
Rmtrs

50.00
50.00

145.00
40.00

7,250.00
2,000.00

Supply
Installation

Rmtrs
Rmtrs

50.00
50.00

74.00
25.00

3,700.00
1,250.00

Supply
Installation

Rmtrs
Rmtrs

50.00
40.00

1,611.00
50.00

80,550.00
2,000.00

Supply
Installation

Rmtrs
Rmtrs

300.00
300.00

10.00
2.00

3,000.00
600.00

Supply
Installation

Rmtrs
Rmtrs

100.00
100.00

590.00
15.00

59,000.00
1,500.00

Supply
Installation

Rmtrs
Rmtrs

4.00
4.00

200.00
20.00

800.00
80.00

Providing G.I. Earth station, with 40mm dia 2500mm long Class C GI pipe including
construction of brick pedestal, providing meshed funnel,CI cover and other civil
Engineering works, spreading a homogenous mixture of salt, charcoal around the
pipe etc, completely as per IS 3043, 1987 or latest revision.
b

Supply and installation of GI / Copper strips of following sizes:

50 X 6mm GI strip

ii

iii

iv

vi

25 X 6mm GI strip

50 X 6mm copper strip

8 SWG

1c x 70 sqmm copper cable

1c x 70 sqmm copper cable end terminations

Sub Total Part - A - External Electrical Works

306,930.00

Part - B LT Panels & Rasing Mains


Design, fabrication, Supply, transport and unloading at site as per requirement of 3
Phase, 4 wire, 415 V, 0.8 P.F, 50 Hz. panels. The fabrication shall be made with
14SWG cold rolled sheet with M/C pressing. The surface shall be rigorously treated
for derusting in 7tank process with dephosphating and painting with at least 2 coats
of approved paint. The panel shall be totally enclosed metal clad type with double
gasketting with rubber / resin lining. The panel shall be off white painted inside and
shall be having control directory pasted inside the panel. The panel shall be
mounted on existing trench or as require and shall have cable entry provision from
the top and bottom with suitable alley as the case may be. The panel shall be tested
for the same KA rating of the relevant highest rating ACB / MCCB.All components
shall be from ISO-9001 companies and shall have relevant IS/IEC approvals
without fail. (Fabrication drawing( GAD) and list of components and panel detail
shall be got approved by consultants/client before fabrication).
The panel shall be fully interlocked as required.The panel shall include baseframe
channel support. (The Single Line Diagram may be closely be followed)
Note: Quoted rates shall include the following:

Page 2 of 11

ELECTRICAL

PROPOSED CONSTRUCTION OF HOSPITAL AT NIZAMABAD


ELCTRICAL WORKS
QUOTATION
SL NO

DESCRIPTION OF WORK

UNITS

QTY
RATE

AMOUNT

1. The Panel shall be fully as per the requirement of Electrical Inspectorate/ EB


authorities.
2. Auxilliary contactors to be provided along with auto-manual switch where ever
required.
3. All Breakers both Incoming & Outgoing shall have LED 'ON / OFF / TRIP'
indications with out fails.
4. CTs shall be with cast resin type only.
5. ACBs earthing shall be carried out with Cu Flexible. Bus.
6. For Capacitors earthing shall be provided.
7. Ventilators shall be provided for Panels with 2500A & above rated bus bars.
8. GI bus earthing shall be provided for all panels.
9. All ACBs shall confirm IS 13947-1/IEC 947-1 for general rules & IS 13947 rules &
IS 13947-2/IEC 947-2 for Circuit breakers.
10. All doors shall have double rubber gasket with shutter assembly & door seating
frame.
11. All AC feeders will have time delays of 0-60 Seconds.
12. All MCCBs will be microprocessor based only for above 250 A and below
250A thermal magnetic release is permitted.
13.Any panel if more than 1.5m width should be made in parts each part not
exceeding 1.5m
14. The current density for ALU busbars shall be 0.8 only.
15. The current density for CU busbars shall be 1.0 only.
16. All UPS outgoing panels shall have neutral busbars double the size of phase.
17. All MCCB's shall have plug setting from 40 to 100%.
18. All Lighting / Raw power and Lift panels shall have ELR for incomer of approved
make only.
19. All test certificates must be provided immediately before commissioning.
20. Safety certificate for the panels shall be produced from CEIG.
21. DC power pack shall be provided whever required in panels.
22. All panels shall be provided with potential free contacts to interface with IBMS /
PLC
23. All out door panels shall be IP - 65 and indoor panels shall be IP - 52 only.
24. Supply means panels ready on site including transportation with miscellaneous
components like nut and bolts for fixing and physical handling and unloading at site
as per requirement..
25. Client reserves the right to split the contract at any stage.
26. GAD shall be submitted with in 7 days from the date of purchase/ work order
27. All other accessories as shown in SLD like MCB's, Ammeters, Voltmenters,
CT's, etc shall be provided.
Desgin, fabricate , supply, transport and unloading at site as per requirement with all
accessories for the following panel boards. The switchgears are indicative and shall
follow SLD. The vendor shall submit the CPRI certificate along with the quote.

PCC -1
Supply
Installation

No
No

1.00
1.00

650,000.00
38,700.00

650,000.00
38,700.00

Supply
Installation
94.5

No
No

1.00
1.00

55,000.00
16,150.00

55,000.00
16,150.00

Supply
Installation

No
No

1.00
1.00

35,000.00
3,250.00

35,000.00
3,250.00

Supply
Installation

No
No

1.00
1.00

75,000.00
2,650.00

75,000.00
2,650.00

APFCR ( 100 KVAR )

UPS Panel

Power Distribution Panel

Sub Total Part - B - LT Panels

875,750.00

Part - C Distribution Boards


1

LDB TPN MCB DB -UB,GF,FF,SF,TF


Incomer:40 amps FP
Outgoings: 6/20 amps SP MCB
Supply
Installation

No
No

4.00
4.00

18,500.00
1,500.00

74,000.00
6,000.00

Supply

No

4.00

18,500.00

74,000.00

PDB TPN MCB DB -UB,GF,FF,SF,TF


Incomer:40 amps FP
Outgoings: 6/20 amps SP MCB

Page 3 of 11

ELECTRICAL

PROPOSED CONSTRUCTION OF HOSPITAL AT NIZAMABAD


ELCTRICAL WORKS
QUOTATION
SL NO

DESCRIPTION OF WORK

UNITS

QTY
RATE

AMOUNT

Installation

No

4.00

1,500.00

6,000.00

Supply
Installation

No
No

4.00
4.00

18,500.00
1,500.00

74,000.00
6,000.00

Supply
Installation

No
No

4.00
4.00

6,500.00
1,500.00

26,000.00
6,000.00

UDB TPN MCB DB -UB,GF,FF,SF,TF


Incomer: 63 amps FP
Outgoings: 16/20 amps SP MCB

ELDB SPN MCB DB -UB,GF,FF,SF,TF


Incomer: 32 amps DP
Outgoings: 16/20 amps SP MCB

Sub Total Part - C - Distribution Boards

240,000.00

Part - D Cable Trays

GI peroforated cable tray made out of 2mm thick MS sheet ,height of the tray shall
be 50mm and the tray covered with 2mm thick cover including MS supports for fixing
the tray, anchor fasteners etc complete as required for communication cables.Rate
shall include cost of 2 runs of 25 X 6 mm GI strips.

450 mm Wide

Supply
Installation

Rmtrs
Rmtrs

162.00
162.00

1,510.00
75.00

244,620.00
12,150.00

Supply
Installation

Rmtrs
Rmtrs

26.00
26.00

1,665.00
85.00

43,290.00
2,210.00

500 mm Wide

Sub Total Part - D - Cable Trays

302,270.00

Part - E LT Cables & End Terminations

1.5

1.6

1.13

1.14

1.15

1.16

1.17

1.18

Supply and laying of 1.1kV grade Aluminium / Copper conductor power/ control
cable (AYFY/XLPE insulated /AYRY/YRY/YY) in excavated / preformed trenches
/cable tray complete with necessary clamps and hardwares as per the
specifications.
Supply and installation of cable termination using single / double compression
brass cable glands with earth tags crimping type tinned copper lugs and
consumables for the following size of cables. Double Compression glands shall be
used for cable sizes 120sq mm and above.
3.5 C X 185 Sqmm Al Ar XLPE Cable
Supply
Installation

Rmtrs
Rmtrs

150.00
150.00

614.00
32.00

92,100.00
4,800.00

Supply
Installation

Nos
Nos

4.00
4.00

1,120.00
250.00

4,480.00
1,000.00

Supply
Installation

Rmtrs
Rmtrs

488.00
488.00

197.00
23.00

96,136.00
11,224.00

Supply
Installation

Nos
Nos

18.00
18.00

480.00
100.00

8,640.00
1,800.00

Supply
Installation

Rmtrs
Rmtrs

150.00
150.00

153.00
22.00

22,950.00
3,300.00

Supply
Installation

Nos
Nos

4.00
4.00

380.00
85.00

1,520.00
340.00

Supply
Installation

Rmtrs
Rmtrs

200.00
200.00

126.00
20.00

25,200.00
4,000.00

Supply
Installation

Nos
Nos

8.00
8.00

375.00
75.00

3,000.00
600.00

End Terminations for -3.5 C X 185 Sqmm Al Ar XLPE Cable

3.5 C X 50 Sqmm Al Ar XLPE Cable

End Terminations for -3.5 C X 50 Sqmm Al Ar XLPE Cable

3.5 C X 35 Sqmm Al Ar XLPE Cable

End Terminations for -3.5 C X 35 Sqmm Al Ar XLPE Cable

3.5 C X 25 Sqmm Al Ar XLPE Cable

End Terminations for -3.5 C X 25 Sqmm Al Ar XLPE Cable

Page 4 of 11

ELECTRICAL

PROPOSED CONSTRUCTION OF HOSPITAL AT NIZAMABAD


ELCTRICAL WORKS
QUOTATION
SL NO

DESCRIPTION OF WORK

UNITS

QTY
RATE

1.19

1.20

1.21

1.22

1.23

1.24

AMOUNT

4 C X 16 Sqmm Al Ar XLPE Cable


Supply
Installation

Rmtrs
Rmtrs

300.00
300.00

101.00
18.00

30,300.00
5,400.00

Supply
Installation

Nos
Nos

18.00
18.00

285.00
75.00

5,130.00
1,350.00

Supply
Installation

Rmtrs
Rmtrs

350.00
350.00

94.00
15.00

32,900.00
5,250.00

Supply
Installation

Nos
Nos

22.00
22.00

270.00
75.00

5,940.00
1,650.00

Supply
Installation

Rmtrs
Rmtrs

400.00
400.00

75.00
12.00

30,000.00
4,800.00

Supply
Installation

Nos
Nos

48.00
48.00

240.00
50.00

11,520.00
2,400.00

End Terminations for -4 C X 16 Sqmm Al Ar XLPE Cable

4 C X 10 Sqmm Al Ar XLPE Cable

End Terminations for -4 C X 10 Sqmm Al Ar XLPE Cable

4 C X 6 Sqmm Al Ar XLPE Cable

End Terminations for -4 C X 6 Sqmm Al Ar XLPE Cable

Sub Total - Part - E - LT Cables & End Terminations

417,730.00

Part - F Internal Light Fixtures

1
1.2

1.1

1.3

1.27

Installation of Light fixtures with Fluorescent / Halogen with electronic transformer


/PL luminaires housing with low loss Magnetic Ballast (MB) & Electronic Ballast (EB)
as specified and with all accessories as required with HIGH EFFICIENCY
Fluorescent lamps.
36 W T5 Lighting
Supply
Installation

Nos
Nos

250.00
250.00

450.00
100.00

112,500.00
25,000.00

Supply
Installation

Nos
Nos

159.00
159.00

750.00
150.00

119,250.00
23,850.00

Supply
Installation

Nos
Nos

18.00
18.00

750.00
150.00

13,500.00
2,700.00

1200mm sweep ceiling fan with standad down rod including all accessories such as
shackle, blades, wiring from ceiling rose to fan with 3core 1.5sq.mm cable but
without regulator
Supply
Installation

Nos
Nos

100.00
100.00

1,625.00
150.00

162,500.00
15,000.00

1x11W Ceiling light fixture

2x26 surface mounted

Sub Total Part - F - Internal Light Fixtures

474,300.00

Part - G Circuit Mains


Supply and Wiring of Submains / Circuit mains in concealed or surface FRLS PVC
conduit system. The wiring shall be carried out using FRLS PVC insulated,
multistrand copper conductor cables for phase, neutral and earth. The cost of
conduit shall include with necessary accessories, fixing hardware complete with
1
complete civil works.
1.1
3R X 6 sqmm + 1R X 2.5 sqmm
Supply
Installation
1.2

1.2

Rmtrs
Rmtrs

176.00
176.00

202.00
20.00

35,552.00
3,520.00

Supply
Installation

Rmtrs
Rmtrs

400.00
400.00

297.00
25.00

118,800.00
10,000.00

Supply
Installation

Rmtrs
Rmtrs

150.00
400.00

297.00
25.00

44,550.00
10,000.00

4R X 6 sqmm + 2R X 4 sqmm

5R X 6 sqmm + 2R X 2.5 sqmm

Page 5 of 11

ELECTRICAL

PROPOSED CONSTRUCTION OF HOSPITAL AT NIZAMABAD


ELCTRICAL WORKS
QUOTATION
SL NO

DESCRIPTION OF WORK

UNITS

QTY
RATE

1.5

1.6

1.7

1.9

AMOUNT

4R X 10 sqmm + 2R X 6 sqmm
Supply
Installation

Rmtrs
Rmtrs

400.00
400.00

547.00
30.00

218,800.00
12,000.00

Supply
Installation

Rmtrs
Rmtrs

300.00
300.00

611.00
30.00

183,300.00
9,000.00

Supply
Installation

Rmtrs
Rmtrs

2,625.00
2,625.00

91.00
12.00

238,875.00
31,500.00

Supply
Installation

Rmtrs
Rmtrs

1,750.00
1,750.00

123.00
15.00

215,250.00
26,250.00

5R X 10 sqmm + 2R X 4 sqmm

2R X 2.5 sqmm + 1 R X 1.5 sqmm

2R X 4 sqmm + 1R X 2.5 sqmm

Sub Total Part - G - Circuit Mains

1,157,397.00

Part - H Point Wiring


Supply and Wiring of light points, 6A socket outlets, lights points with switch contol
using 3 runs of 1.5 sq.mm 1100 V grade, FRLS PVC insulated , multistrand copper
wire using 2 mm thick 19 mm dia rigid FRLS PVC conduit, with modular type
switches with metal boxes and accessories with complete civil works .
1
1.1
One Way Primary Light point with switch Control
Supply
Installation

Nos
Nos

219.00
219.00

524.00
90.00

114,756.00
19,710.00

Supply
Installation

Nos
Nos

370.00
370.00

350.00
90.00

129,500.00
33,300.00

Same as above item 1 for fan point including 5 step, 2 modular electronic regulator
and switch.
Supply
Installation

Nos
Nos

100.00
100.00

1,260.00
175.00

126,000.00
17,500.00

Same as above item 1 for Exhaust fan point controlled by switch and 5 amps socket
at fan.
Supply
Installation

Nos
Nos

20.00
20.00

885.00
140.00

17,700.00
2,800.00

Nos
Nos

46.00
46.00

1,020.00
180.00

46,920.00
8,280.00

Secondary Points

Same as above item 1 for Bell point controlled by switch


Supply
Installation
Sub Total Part - H - Point Wiring

Part - I

516,466.00

Power Sockets
Supply and providing of 240/ 415V, Single phase decorative modular type power
receptacles complete with front , metal boxes and all required accessories. The rate
shall also include cost of proving numbered stickers on the switch plates

Indpendent 5 A sockets with switch control


Supply
Installation

Nos
Nos

80.00
80.00

245.00
40.00

19,600.00
3,200.00

Supply
Installation

Nos
Nos

104.00
104.00

245.00
40.00

25,480.00
4,160.00

Supply
Installation

Nos
Nos

45.00
45.00

850.00
50.00

38,250.00
2,250.00

1 nos of 5A Sockets with Switch control - UPS

25 A socket with switch control

Sub Total Part I - Power Sockets

92,940.00

TOTAL

4,383,783.00

GRAND TOTAL

4,383,783.00

Page 6 of 11

ELECTRICAL

PROPOSED CONSTRUCTION OF HOSPITAL AT NIZAMABAD


TV & LAN WORKS
QUOTATION
SL NO

DESCRIPTION OF WORK

UNITS

QTY
RATE

AMOUNT

Part - A TV, Telephone, Lan Works

Modular typeTelephone Socket outlet with anodised GI box and front plate complete
as required.
Supply
Installation

Nos
Nos

50.00
50.00

140.00
30.00

7,000.00
1,500.00

Modular type LAN outlet with anodised GI box and front plate complete as required.
Supply
Installation

Nos
Nos

50.00
50.00

325.00
40.00

16,250.00
2,000.00

Modular type TV Socket outlet with anodised GI box and front plate complete as
required.
Supply
Installation

Nos
Nos

35.00
35.00

150.00
30.00

5,250.00
1,050.00

Telephone wires of 0.51 mm dia FRLS PVC insulated Copper wires with in the FRLS
PVC conduit including connection etc,.rate shall include suitable size of PVC conduit
with all accessories
2 pair
Supply
Installation

Rmtrs
Rmtrs

2,250.00
2,250.00

41.00
10.00

92,250.00
22,500.00

Supply
Installation

Rmtrs
Rmtrs

2,250.00
2,250.00

63.00
12.00

141,750.00
27,000.00

Supply
Installation

Rmtrs
Rmtrs

1,000.00
1,000.00

67.00
12.00

67,000.00
12,000.00

Supply
Installation

Nos
Nos

4.00
4.00

525.00
100.00

2,100.00
400.00

Supply
Installation

Nos
Nos

4.00
4.00

12,500.00
500.00

50,000.00
2,000.00

Supply
Installation

Nos
Nos

4.00
4.00

1,500.00
500.00

6,000.00
2,000.00

Cat 6 cable including PVC conduit and accessories including connection etc,.

RG 11 Co-axial TV cable including PVC conduit and accessories

Krone connectors with Box and cover


10 pair

24 Port switch

Wifi Router

Sub Total TV, Telephone, Lan Works

458,050.00

Page 7 of 11

TV & LAN

PROPOSED CONSTRUCTION OF HOSPITAL AT NIZAMABAD


LIGHTENING ARRESTER WORKS
QUOTATION
SL NO

DESCRIPTION OF WORK

UNITS

QTY
RATE

AMOUNT

Part - A Lightning Arrestor

Early Piezo Electric Transducer based Early Streamer Emission Technology (ESE)
based Lightning arrester comprising of Air terminals or Dynasphere, down conductor
in GI pipe, event counter, FRP mast, SS cable tie, in line coupling, terminal lug
coupling, guy set, hardware, etc., complete. The rate shall also include all civil
works. The down conductor shall comprise of plastic fibre, main copper conductor,
semi conductive stress control layer, HV insulation, stress control layer, outer
conductor, outer sheath, all concentrically arranged. The overall dia of the conductor
shall be 36mm and characteristic impedance of 8 ohms max and radius of Protection
Supply
Installation

No
No

1.00
1.00

163,420.00
12,000.00

163,420.00
12,000.00

1100 volt grade PVC insulated PVC sheathed armoured 1C x 70 Sq.mm copper
cables as per specification with clamps, saddles fixing bolts including connecting
testing and commissioning.
Supply
Installation

Rmtrs
Rmtrs

60.00
60.00

590.00
15.00

35,400.00
900.00

50 mm dia UPVC pipe with necessary clamps on walls/ floor/ ceilng with all
accesseries
Supply
Installation

Rmtrs
Rmtrs

60.00
60.00

80.00
15.00

4,800.00
900.00

Supply and Installation of ASHLOK safe earth station conforming to IS 3043


complete with T-19/39 50mm dia. And 3Mtr. Long conductor (B.F.C), and 450 x
450mm brick masnory chamber, plastering , CI cover, CI frame, etc.
Supply
Installation

Nos
Nos

3.00
3.00

14,700.00
1,000.00

44,100.00
3,000.00

Sub Total - Lightning Arrestor

264,520.00

Page 8 of 11

Lighting Arrester

Hyderabad, India

PROPOSED CONSTRUCTION OF HOSPITAL AT NIZAMABAD


DG WORKS
QUOTATION
SL NO

DESCRIPTION OF WORK

UNITS

QTY
RATE

AMOUNT

Part - A DG SET ( Option -01 ) With Exhuast Pipe

Supply and Installation of 180KVA, 415V 3Phase Deisel Generator and Accoustic
enclosure and standard control panel with 630A 3P MCCB & AMF Relay with all
accessories like Mounting pads etc.silencer, 12V Battery, Diesel Tank

Supply
Installation

No
No

1.00
1.00

1,650,000.00
50,000.00

1,650,000.00
50,000.00

Nos
Nos

35.00
35.00

1,650.00
500.00

57,750.00
17,500.00

500.00
500.00

68.00

34,000.00

26.00

13,000.00

Nos
Nos

2.00
2.00

12,600.00
1,000.00

25,200.00
2,000.00

Nos
Nos

2.00
2.00

6,600.00
850.00

13,200.00
1,700.00

Supply and fixing of Exhaust piping with suitable exhaust MS pipe cladded with
glasswool insulation and aluminium cladding with 24SWG sheet.

Supply
Installation

Supply and fabrication of supports for Residential silencer/exhaust pipe


made out of MS channels/ angles including cutting, welding and
fabrication to the required size and painting with 2 coats of anti corrosive
paint and 2 coats of synthetic enamel paint of Grey/ Black colour
complete as per drawing as required etc Complete.
Supply
Installation
Providing of Copper Plate Earth station, with 600 X 600 X 3.15mm thick copper
plate including construction of brick pedestal, providing meshed funnel, CI cover and
other civil Engineering works, spreading a homogeneous mixture of salt charcoal
around the pipe etc, completely as per IS 3043, 1987 or latest revision
Supply
Installation

Kgs
Kgs

Providing G.I. Earth station, with 40mm dia 2500mm long Class C GI pipe including
construction of brick pedestal, providing meshed funnel,CI cover and other civil
Engineering works, spreading a homogenous mixture of salt, charcoal around the
pipe etc, completely as per IS 3043, 1987 or latest revision.
b
Supply
Installation
Sub Total DG SET

i1272_CCHSPL

1,864,350.00

Page 9 of 11

DG SET-01

PROPOSED CONSTRUCTION OF HOSPITAL AT NIZAMABAD


DG WORKS
QUOTATION
SL NO

DESCRIPTION OF WORK

UNITS

QTY
RATE

AMOUNT

Part - A DG SET ( Option -02 ) WithOut Exhuast Pipe

Supply and Installation of 180KVA, 415V 3Phase Deisel Generator and Accoustic
enclosure and standard control panel with 630A 3P MCCB & AMF Relay with all
accessories like Mounting pads etc.silencer, 12V Battery, Diesel Tank

Supply
Installation

No
No

1.00
1.00

1,650,000.00
50,000.00

1,650,000.00
50,000.00

Providing of Copper Plate Earth station, with 600 X 600 X 3.15mm thick copper
plate including construction of brick pedestal, providing meshed funnel, CI cover and
other civil Engineering works, spreading a homogeneous mixture of salt charcoal
around the pipe etc, completely as per IS 3043, 1987 or latest revision
Supply
Installation

Nos
Nos

2.00
2.00

12,600.00
1,000.00

25,200.00
2,000.00

Nos
Nos

2.00
2.00

6,600.00
850.00

13,200.00
1,700.00

Providing G.I. Earth station, with 40mm dia 2500mm long Class C GI pipe including
construction of brick pedestal, providing meshed funnel,CI cover and other civil
Engineering works, spreading a homogenous mixture of salt, charcoal around the
pipe etc, completely as per IS 3043, 1987 or latest revision.
b
Supply
Installation
Sub Total DG SET

1,742,100.00

Page 10 of 11

DG SET -02

PROPOSED CONSTRUCTION OF HOSPITAL AT NIZAMABAD


UPS WORKS
QUOTATION
SL NO

DESCRIPTION OF WORK

UNITS

QTY
RATE

AMOUNT

Supply, transport, unloading at site, installation, testing & commissioning and


handing over of online UPS complete with Digital Control Circuit and other
accessories as specified in the performance requirements.
The UPS shall as per specifications and drawings with high Frequency PWM using
IGBT, built- in power factor improvement devices, antiharmonic filters, 3phase input
and output including SMF batteries backup, battery stand, interconnecting wiring, etc
complete. The Cost must include necessary cabling between UPS & Battery cabinet
complete with all accessories
UPS shall have provision of parallel redundant mode with static by pass. The UPS
shall be supplied along with required all accessories like Battery bank with mounting
stand, interconnecting copper cables between UPS & Battery bank, mounting stand
for UPS
Provision of integration with BMS etc
Suitable cable termiantion boxes as required as shown in drawings on input and
output sides of UPS.
1

5 KVA UPS with 30 minutes backup


Supply Nos
Installation Nos

3.00
3.00

95,000.00
15,000.00

285,000.00
45,000.00

Supply Nos
Installation Nos

1.00
1.00

750,000.00
25,000.00

750,000.00
25,000.00

Supply Nos
Installation Nos

1.00
1.00

650,000.00
25,000.00

650,000.00
25,000.00

25 KVA UPS with 60 minutes backup

40 KVA UPS with 30 minutes backup

Sub Total

Page 11 of 11

1,780,000.00

UPS