Federal Register / Vol. 73, No.

48 / Tuesday, March 11, 2008 / Notices 12973

DEPARTMENT OF ENERGY mode would consist of: (1) A new filed, either a preliminary permit
powerhouse and switchyard; (2) two application or a development
Federal Energy Regulatory turbine/generator units with a combined application (specify which type of
Commission installed capacity of 15 megawatts; (3) a application). A notice of intent must be
[Project No. 12963–000] new 1.4-mile-long above ground 25- served on the applicant(s) named in this
kilovolt transmission line extending public notice.
Grays Landing Hydro, LLC; Notice of from the switchyard to an p. Proposed Scope of Studies Under
Application Accepted for Filing and interconnection point with West Penn Permit—A preliminary permit, if issued,
Soliciting Motions To Intervene, Power Company’s distribution system; does not authorize construction. The
Protests, and Comments and (4) appurtenant facilities. The term of the proposed preliminary permit
proposed Grays Landing Lock and Dam would be 36 months. The work
March 4, 2008. Project would have an average annual proposed under the preliminary permit
Take notice that the following generation of 47 gigawatt-hours. would include economic analysis,
hydroelectric application has been filed l. This filing is available for review at preparation of preliminary engineering
with the Commission and is available the Commission in the Public Reference plans, and a study of environmental
for public inspection: Room or may be viewed on the impacts. Based on the results of these
a. Type of Application: Preliminary Commission’s Web site at http:// studies, the Applicant would decide
Permit. www.ferc.gov using the ‘‘eLibrary’’ link. whether to proceed with the preparation
b. Project No.: 12963–000. Enter the docket number excluding the of a development application to
c. Date filed: August 15, 2007. last three digits in the docket number construct and operate the project.
d. Applicant: Grays Landing Hydro, field to access the document. For q. Comments, Protests, or Motions to
LLC. assistance, call toll-free 1–866–208– Intervene—Anyone may submit
e. Name of Project: Grays Landing 3676 or e-mail comments, a protest, or a motion to
Lock and Dam Hydroelectric Project FERCONLINESUPPORT@FERC.GOV. intervene in accordance with the
f. Location: Monongahela River in For TTY, call (202) 502–8659. A copy is requirements of Rules of Practice and
Greene County, Pennsylvania. It would also available for inspection and Procedure, 18 CFR 385.210, .211, .214.
use the U.S. Army Corps of Engineers’ reproduction at the address in item h In determining the appropriate action to
Grays Landing Lock and Dam. above. take, the Commission will consider all
g. Filed Pursuant to: Federal Power m. Competing Preliminary Permit— protests or other comments filed, but
Act, 16 U.S.C. 791(a)–825(r). Anyone desiring to file a competing only those who file a motion to
h. Applicant Contact: Mr. Brent L. application for preliminary permit for a intervene in accordance with the
Smith, COO, Symbiotics, LLC, P.O. Box proposed project must submit the Commission’s Rules may become a
535, Rigby, ID 83442, (208) 745–0834. competing application itself, or a notice party to the proceeding. Any comments,
i. FERC Contact: Robert Bell, (202) of intent to file such an application, to protests, or motions to intervene must
502–4126. the Commission on or before the be received on or before the specified
j. Deadline for filing comments, specified comment date for the comment date for the particular
protests, and motions to intervene: 60 particular application (see 18 CFR 4.36). application.
days from the issuance date of this Submission of a timely notice of intent r. Filing and Service of Responsive
notice. allows an interested person to file the Documents—Any filings must bear in
All documents (original and eight competing preliminary permit all capital letters the title
copies) should be filed with: Secretary, application no later than 30 days after ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT
Federal Energy Regulatory Commission, the specified comment date for the TO FILE COMPETING APPLICATION’’,
888 First Street, NE., Washington, DC particular application. A competing ‘‘COMPETING APPLICATION’’,
20426. Comments, protests, and preliminary permit application must ‘‘PROTEST’’, and ‘‘MOTION TO
interventions may be filed electronically conform with 18 CFR 4.30 and 4.36. INTERVENE’’, as applicable, and the
via the Internet in lieu of paper; see 18 n. Competing Development Project Number of the particular
CFR 385.2001(a)(1)(iii) and the Application—Any qualified application to which the filing refers.
instructions on the Commission’s Web development applicant desiring to file a Any of the above-named documents
site under the ‘‘e-Filing’’ link. The competing development application must be filed by providing the original
Commission strongly encourages must submit to the Commission, on or and the number of copies provided by
electronic filings. Please include the before a specified comment date for the the Commission’s regulations to: The
project number (P–12963–000) on any particular application, either a Secretary, Federal Energy Regulatory
comments or motions filed. competing development application or a Commission, 888 First Street, NE.,
The Commission’s Rules of Practice notice of intent to file such an Washington, DC 20426. An additional
and Procedure require all intervenors application. Submission of a timely copy must be sent to Director, Division
filing documents with the Commission notice of intent to file a development of Hydropower Administration and
to serve a copy of that document on application allows an interested person Compliance, Federal Energy Regulatory
each person in the official service list to file the competing application no Commission, at the above-mentioned
for the project. Further, if an intervenor later than 120 days after the specified address. A copy of any notice of intent,
files comments or documents with the comment date for the particular competing application or motion to
Commission relating to the merits of an application. A competing license intervene must also be served upon each
issue that may affect the responsibilities application must conform with 18 CFR representative of the Applicant
of a particular resource agency, they 4.30 and 4.36. specified in the particular application.
must also serve a copy of the document o. Notice of Intent—A notice of intent s. Agency Comments—Federal, State,
yshivers on PROD1PC62 with NOTICES

on that resource agency. must specify the exact name, business and local agencies are invited to file
k. Description of Project: The address, and telephone number of the comments on the described application.
proposed project using the U.S. Army prospective applicant, and must include A copy of the application may be
Corps of Engineers’ Grays Landing Lock an unequivocal statement of intent to obtained by agencies directly from the
and Dam and operated in a run-of-river submit, if such an application may be Applicant. If an agency does not file

VerDate Aug<31>2005 15:44 Mar 10, 2008 Jkt 214001 PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 E:\FR\FM\11MRN1.SGM 11MRN1
12974 Federal Register / Vol. 73, No. 48 / Tuesday, March 11, 2008 / Notices

comments within the time specified for each person in the official service list to file the competing application no
filing comments, it will be presumed to for the project. Further, if an intervenor later than 120 days after the specified
have no comments. One copy of an files comments or documents with the comment date for the particular
agency’s comments must also be sent to Commission relating to the merits of an application. A competing license
the Applicant’s representatives. issue that may affect the responsibilities application must conform with 18 CFR
of a particular resource agency, they 4.30 and 4.36.
Kimberly D. Bose, o. Notice of Intent—A notice of intent
must also serve a copy of the document
Secretary. on that resource agency. must specify the exact name, business
[FR Doc. E8–4742 Filed 3–10–08; 8:45 am] k. Description of Project: The address, and telephone number of the
BILLING CODE 6717–01–P proposed project using the U.S. Army prospective applicant, and must include
Corps of Engineers’ Green River Lock an unequivocal statement of intent to
and Dam #2 and operated in a run-of- submit, if such an application may be
DEPARTMENT OF ENERGY river mode would consist of: (1) A new filed, either a preliminary permit
powerhouse and switchyard; (2) three application or a development
Federal Energy Regulatory turbine/generator units with a combined application (specify which type of
Commission installed capacity of 19 megawatts; (3) a application). A notice of intent must be
[Project No. 12959–000] new 1.3-mile-long above ground 46- served on the applicant(s) named in this
kilovolt transmission line extending public notice.
Green River 2 Hydro, LLC; Notice of from the switchyard to an p. Proposed Scope of Studies Under
Application Accepted for Filing and interconnection point with the Kenergy Permit—A preliminary permit, if issued,
Soliciting Motions To Intervene, Corporation’s distribution system; and does not authorize construction. The
Protests, and Comments (4) appurtenant facilities. The proposed term of the proposed preliminary permit
Green River Lock and Dam #2 Project would be 36 months. The work
March 4, 2008. proposed under the preliminary permit
would have an average annual
Take notice that the following generation of 60 gigawatt-hours. would include economic analysis,
hydroelectric application has been filed l. This filing is available for review at preparation of preliminary engineering
with the Commission and is available the Commission in the Public Reference plans, and a study of environmental
for public inspection: Room or may be viewed on the impacts. Based on the results of these
a. Type of Application: Preliminary Commission’s Web site at http:// studies, the Applicant would decide
Permit. www.ferc.gov using the ‘‘eLibrary’’ link. whether to proceed with the preparation
b. Project No.: 12959–000. Enter the docket number excluding the of a development application to
c. Date filed: August 14, 2007. last three digits in the docket number construct and operate the project.
d. Applicant: Green River 2 Hydro, field to access the document. For q. Comments, Protests, or Motions to
LLC. assistance, call toll-free 1–866–208– Intervene—Anyone may submit
e. Name of Project: Green River Lock 3676 or e-mail comments, a protest, or a motion to
and Dam #2 Hydroelectric Project. FERCONLINESUPPORT@FERC.GOV. intervene in accordance with the
f. Location: Green River in McLean For TTY, call (202) 502–8659. A copy is requirements of Rules of Practice and
County, Kentucky. It would use the U.S. also available for inspection and Procedure, 18 CFR 385.210, .211, .214.
Army Corps of Engineers’ Green River reproduction at the address in item h In determining the appropriate action to
Lock and Dam #2. above. take, the Commission will consider all
g. Filed Pursuant to: Federal Power m. Competing Preliminary Permit— protests or other comments filed, but
Act, 16 U.S.C. 791(a)–825(r). Anyone desiring to file a competing only those who file a motion to
h. Applicant Contact: Mr. Brent L. application for preliminary permit for a intervene in accordance with the
Smith, COO, Symbiotics, LLC, P.O. Box proposed project must submit the Commission’s Rules may become a
535, Rigby, ID 83442, (208) 745–0834. competing application itself, or a notice party to the proceeding. Any comments,
i. FERC Contact: Robert Bell, (202) of intent to file such an application, to protests, or motions to intervene must
502–4126. the Commission on or before the be received on or before the specified
j. Deadline for filing comments, specified comment date for the comment date for the particular
protests, and motions to intervene: 60 particular application (see 18 CFR 4.36). application.
days from the issuance date of this Submission of a timely notice of intent r. Filing and Service of Responsive
notice. allows an interested person to file the Documents—Any filings must bear in
All documents (original and eight competing preliminary permit all capital letters the title
copies) should be filed with: Secretary, application no later than 30 days after ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT
Federal Energy Regulatory Commission, the specified comment date for the TO FILE COMPETING APPLICATION’’,
888 First Street, NE., Washington, DC particular application. A competing ‘‘COMPETING APPLICATION’’,
20426. Comments, protests, and preliminary permit application must ‘‘PROTEST’’, and ‘‘MOTION TO
interventions may be filed electronically conform with 18 CFR 4.30 and 4.36. INTERVENE’’, as applicable, and the
via the Internet in lieu of paper; see 18 n. Competing Development Project Number of the particular
CFR 385.2001(a)(1)(iii) and the Application—Any qualified application to which the filing refers.
instructions on the Commission’s Web development applicant desiring to file a Any of the above-named documents
site under the ‘‘e-Filing’’ link. The competing development application must be filed by providing the original
Commission strongly encourages must submit to the Commission, on or and the number of copies provided by
electronic filings. Please include the before a specified comment date for the the Commission’s regulations to: The
project number (P–12959–000) on any particular application, either a Secretary, Federal Energy Regulatory
yshivers on PROD1PC62 with NOTICES

comments or motions filed. competing development application or a Commission, 888 First Street, NE.,
The Commission’s Rules of Practice notice of intent to file such an Washington, DC 20426. An additional
and Procedure require all intervenors application. Submission of a timely copy must be sent to Director, Division
filing documents with the Commission notice of intent to file a development of Hydropower Administration and
to serve a copy of that document on application allows an interested person Compliance, Federal Energy Regulatory