INTRODUCTION

The main objective of industrial visit is to provide exposure in practical


engineering field. The industrial visits are meant to bridge the gap between practical learning
and practical application of theory.
The basic idea of industrial visit is to equip us with the local field
practices, thumb rules used by the experts, in having contact with experienced brains of the
field. The constructional practices followed, the flaws in practice the dos and donts in
practices are all the things one can gain from industrial visits.

COMPANY PORTFOLIO
Sree Nakshatra Projects and Developers PVT.LTD, is one of the largest company in
the construction arena. They spearheads quality focused best practices for building products to
enhance quality of life. They have a bench mark quality standards, uncompromising business
ethos, focused customer centric approach.
Sree Nakshatra Projects and Developers Pvt. Ltd building a home means much more than just
erecting a living space. They offer their customers a wide range of customized housing
solutions where every project is a labour of love.
Every home that they build is backed by the state of the art engineering, an abiding commitment
to aesthetics and taking into consideration the lifestyle imperatives of their clients. This ensures
that every project is customized to specific individual requirements. The emphasis on customer
satisfaction has seen the rapid growth of the company within a short span of time.
Operating out of a corporate office in Thiruvananthapuram. Their team of highly experienced
professionals in every aspect of construction workflow will execute projects from the drawing
board to completion with commitment to delivery schedules. Every aspect of a Sree Nakshatra
project is an investment in fine living. Starting from the choice of locations, the architecture
and the quality of materials used in construction then the amenities each component has been
tested for reliability and exudes good taste.

PROJECT DETAILS
NAME: GALAXY
LOCATION: SOCIETY JUNCTION, POWDI KONAM, SREEKARYAM, TRIVANDRUM
TYPE: VILLAS
LAND/PLOT AREA: 7 ACRES
TOTAL NO. OF UNITS: 71 UNITS
PLOT AREA: 4.5 to 9 CENTS

site location map

VILLAS
TYPE - 1
Total Area - 287.40 m2 (3092 Sq Ft)
Ground Floor
Area-187.48 m2 ( 2017 Sq Ft )
First Floor
Area - 99.91 m2 (1075 Sq Ft)- 2
TYPE - 2
Total Area - 232.30 m2 (2500 Sq Ft)
Ground Floor
Area - 139.97 m2 (1506 Sq Ft)
First Floor
Area - 92.33 m2 (994 Sq Ft)
TYPE - 2A/B
Total Area - 227.41 m2 (2447 Sq Ft)
Ground Floor
Area - 79.33 m2 (854 Sq Ft)
First Floor
Area - 148.08 m2 (1593 Sq Ft)
TYPE - 2C
Total Area - 224.10 m2 (2411 Sq Ft)
Ground Floor
Area-141.28 m2 ( 1520 Sq Ft )
First Floor
Area - 82.82 m2 (891 Sq Ft)
TYPE - 3
Total Area - 227.41 m2 (2447 Sq Ft)
Ground Floor
Area - 79.33 m2 (854 Sq Ft)
4

First Floor
Area - 148.08 m2 (1593 Sq Ft)
TYPE - 4
Total Area - 138.33 m2 (1488 Sq Ft)
Ground Floor
Area - 89.04 m2 (958 Sq Ft)
First Floor
Area - 49.29 m2 (530 Sq Ft)
SPECIFICATIONS
Foundation: As designed to suit the soil conditions of the project area.
Wall finish: All walls are constructed with first class country burnt bricks with cement mortar.
All walls plastered and trowel finished.
Painting: Putty finished internal walls painted with emulsion. External walls painted with
weather shield or equivalent.
Flooring: Elegant Vitrified tiles flooring for entire area and anti-skid ceramic tile flooring for
balconies and toilet.
Kitchen: Kitchen counters with granite top and stainless steel sink with drain board. Glazed
tiles above the counter dado up to a height of 2ft Water purifier provision included.
Work area: Single bowl sink with granite top in work area.
Toilets: Ordinary colour sanitary fixtures and good quality CP fittings .Glazed tiles for walls
dado up to 7 ft height. Heater provision in master bedroom toilet.
Doors & Windows: Teak wood decorative main door. Modular Flush doors for all internal
doors. PVC plain doors and frames for toilets. Seasoned hardwood frame door with enamel
paint finish for external doors. Decorative grills with enamel finished hardwood frame and
glass tor windows.
Staircase Handrails: Well-designed cast-iron handrails with wooden handhold.
Gate: Individual compound wall with gate, individual letterbox & name board.
Electrical: Three phase electrical supply, concealed copper wiring with modular switches, plug
points, adequate light and fan points controlled by MCB and ELCB. Independent KSEB meter.
Generator: Generator backup for common lighting & water pumps.
Internet connection: Internet connection in study/master bedroom
5

Cable TV: Connection in lower/upper living and master bedroom. (Subject to prevailing Govt
Rules) Telephone: Concealed wiring for telephone point in Living and master bedroom.
Water Supply: KWA water supply scheme with sump and individual overhead tank. Alternate
arrangement through centralized system.
Air Conditioning: Power point for fixing AC unit in master bedroom.
Home theatre: Home theatre provision in lower/upper living room.
Intercom facility: Intercom facility from security cabin to each villa.
Roads: The villas are well connected by a network of roads, the roads consists of a drive way
of 7m
RETAINING WALLS:-

+
FRONT RETAINING WALL DESIGN

MIX PROPORTIONS USED IN RCC AND PILING WORKS


M15: 1:2:4
For 1 m3 concrete
Mass of cement in kg/m3: 270
Mass of Fine aggregate in kg/m3: 711
Mass of Coarse Aggregate in kg/m3: 1460
Water cement ratio: .5

M20: 1:1.5:3
For 1 m3 concrete
Mass of cement in kg/m3: 290
Mass of Fine aggregate in kg/m3: 696
Mass of Coarse Aggregate in kg/m3: 1429
Water cement ratio: .5

DETAILS OF PILE, PILE CAP, PLINTH BEAM


PILE

PILE DIMENSIONS
12 mm dia bars
10 mm dia bars
Pile dia: 30cm
Pile depth 3-4 m

PILE CAP

Pile cap
Dimensions: 1X1X.35
8 mm dia bars @ 15cm c/c used
M20 Concrete used
SLAB
Ground floor: 8 mm dia bars are used @ 15cm c/c both directions First floor: 8
mm dia bars at 15 cm and 17.5cm c/c
COLUMNS
Dimensions: 23x23
16mm dia bars @15cm c/c Used as longitudinal reinforcement 8mm dia confining reinforcements
are provided

PLINTH BEAM

PLINTH BEAM
16 mm dia bars
12 mm dia bars
8 mm dia lateral Ties @ 15 cmc/c
M 20 concrete Fe 415 steel used

PILING
Rotary Piling Technique is used
Piles are cast in situ

Rotary piling

CONCLUSION
It was a worthy and enriching experience that we had during industrial training. The entire
training was very engaging, interesting and challenging. We could also witness construction
practices based on process manual. We are able to gain a new insights and a more
comprehensive understanding about the real industry, actual working conditions and practice.
This training also helped me acquaint with the actual difficulties a civil engineer has to face.