Federal Register / Vol. 73, No.

40 / Thursday, February 28, 2008 / Notices 10751

application allows an interested person and the number of copies provided by days from the issuance date of this
to file the competing application no the Commission’s regulations to: The notice.
later than 120 days after the specified Secretary, Federal Energy Regulatory All documents (original and eight
comment date for the particular Commission, 888 First Street, NE., copies) should be filed with: Kimberly
application. A competing license Washington, DC 20426. A copy of any D. Bose, Secretary, Federal Energy
application must conform with 18 CFR motion to intervene must also be served Regulatory Commission, 888 First
4.30 and 4.36. upon each representative of the Street, NE., Washington, DC 20426.
p. Notice of Intent: A notice of intent Applicant specified in the particular Comments, protests, and interventions
must specify the exact name, business application. may be filed electronically via the
address, and telephone number of the t. Agency Comments: Federal, State, Internet in lieu of paper; see 18 CFR
prospective applicant, and must include and local agencies are invited to file 385.2001(a)(1)(iii) and the instructions
an unequivocal statement of intent to comments on the described application. on the Commission’s Web site under the
submit, if such an application may be A copy of the application may be ‘‘e-Filing’’ link. The Commission
filed, either a preliminary permit obtained by agencies directly from the strongly encourages electronic filings.
application or a development Applicant. If an agency does not file Please include the project number (P–
application (specify which type of comments within the time specified for 13096–000) on any comments or
application). A notice of intent must be filing comments, it will be presumed to motions filed.
served on the applicant(s) named in this have no comments. One copy of an The Commission’s Rules of Practice
public notice. agency’s comments must also be sent to and Procedure require all intervenors
q. Proposed Scope of Studies under the Applicant’s representatives. filing documents with the Commission
Permit: A preliminary permit, if issued, to serve a copy of that document on
does not authorize construction. The Kimberly D. Bose,
each person in the official service list
term of the proposed preliminary permit Secretary.
for the project. Further, if an intervenor
would be 36 months. The work [FR Doc. E8–3760 Filed 2–27–08; 8:45 am] files comments or documents with the
proposed under the preliminary permit BILLING CODE 6717–01–P Commission relating to the merits of an
would include economic analysis,
issue that may affect the responsibilities
preparation of preliminary engineering
of a particular resource agency, they
plans, and a study of environmental DEPARTMENT OF ENERGY
must also serve a copy of the document
impacts. Based on the results of these
Federal Energy Regulatory on that resource agency.
studies, the Applicant would decide
whether to proceed with the preparation Commission k. Description of Project: The
of a development application to proposed project consists of: (1) 10
[Project No. 13096–000] arrays, each consisting of ten, 100
construct and operate the project.
r. Comments, Protests, or Motions to kilowatt hydrokinetic turbine units, for
Hydro Green Energy, LLC; Notice of
Intervene: Anyone may submit a total installed capacity of 10
Application Accepted for Filing and
comments, a protest, or a motion to megawatts, (2) a proposed transmission
Soliciting Motions To Intervene,
intervene in accordance with the line no greater than 2,000 feet from the
Protests, and Comments
requirements of Rules of Practice and ‘‘node’’ array to the shore, (3) a mooring
Procedure, 18 CFR 385.210, .211, .214. February 22, 2008. system which does not require the use
In determining the appropriate action to Take notice that the following of pilings to permanently attach the
take, the Commission will consider all hydroelectric application has been filed units to the bedrock but instead uses
protests or other comments filed, but with the Commission and is available tethers and Danforth type anchors, and
only those who file a motion to for public inspection: (4) appurtenant facilities. The project
intervene in accordance with the a. Type of Application: Preliminary would have an average annual
Commission’s Rules may become a Permit. generation of 65.745 gigawatt-hours,
party to the proceeding. Any comments, b. Project No.: 13096–000. which would be sold to a local utility.
protests, or motions to intervene must c. Date Filed: January 9, 2008. l. Locations of Applications: A copy of
be received on or before the specified d. Applicant: Hydro Green Energy, the application is available for
comment date for the particular LLC. inspection and reproduction at the
application. e. Name of Project: ‘‘Alaska 18’’ Commission in the Public Reference
Comments, protests and interventions Project. Room, located at 888 First Street, NE.,
may be filed electronically via the f. Location: The project would be Room 2A, Washington DC 20426, or by
Internet in lieu of paper; See 18 CFR located in a section of the Yukon River calling (202) 502–8371. This filing may
385.2001(a)(1)(iii) and the instructions in the Yukon-Koyukuk Census Area, also be viewed on the Commission’s
on the Commission’s Web site under Alaska. The project uses no dam or Web site at http://www.ferc.gov using
‘‘e-filing’’ link. The Commission impoundment. the ‘‘eLibrary’’ link. Enter the docket
strongly encourages electronic filing. g. Filed Pursuant to: Federal Power number excluding the last three digits in
s. Filing and Service of Responsive Act, 16 U.S.C. 791(a)–825(r). the docket number field to access the
Documents: Any filings must bear in all h. Applicant Contacts: Mr. Wayne F. document. For assistance, call toll-free
capital letters the title ‘‘COMMENTS’’, Krouse, Hydro Green Energy, LLC, 5090 1–866–208–3676 or e-mail
‘‘RECOMMENDATIONS FOR TERMS Richmond Avenue, #390, Houston, TX FERCOnlineSupport@ferc.gov. For TTY,
AND CONDITIONS’’, 77056, and Mr. James H. Hancock Jr., call (202) 502–8659. A copy is also
‘‘PROTEST’’,’’COMPETING Balch & Bingham LLP, 1710 Sixth available for inspection and
APPLICATION’’ or ‘‘MOTION TO Avenue North, Birmingham, Alabama reproduction at the address in item h
rwilkins on PROD1PC63 with NOTICES

INTERVENE’’, as applicable, and the 35203. above.


Project Number of the particular i. FERC Contact: Kelly Houff, (202) m. Individuals desiring to be included
application to which the filing refers. 502–6393. on the Commission’s mailing list should
Any of the above-named documents j. Deadline for filing comments, so indicate by writing to the Secretary
must be filed by providing the original protests, and motions to intervene: 60 of the Commission.

VerDate Aug<31>2005 18:23 Feb 27, 2008 Jkt 214001 PO 00000 Frm 00013 Fmt 4703 Sfmt 4703 E:\FR\FM\28FEN1.SGM 28FEN1
10752 Federal Register / Vol. 73, No. 40 / Thursday, February 28, 2008 / Notices

n. Competing Preliminary Permit: protests or other comments filed, but DEPARTMENT OF ENERGY
Anyone desiring to file a competing only those who file a motion to
application for preliminary permit for a intervene in accordance with the Federal Energy Regulatory
proposed project must submit the Commission’s Rules may become a Commission
competing application itself, or a notice party to the proceeding. Any comments, [Project No. 1881–050]
of intent to file such an application, to protests, or motions to intervene must
the Commission on or before the be received on or before the specified PPL Holtwood, LLC; Notice of
specified comment date for the comment date for the particular Application Accepted for Filing,
particular application (see 18 CFR 4.36). application. Soliciting Motions To Intervene and
Submission of a timely notice of intent Protests, Ready for Environmental
allows an interested person to file the Comments, protests and interventions Analysis, and Soliciting Comments,
competing preliminary permit may be filed electronically via the Recommendations, Terms and
application no later than 30 days after Internet in lieu of paper; See 18 CFR Conditions, and Fishway Prescriptions
the specified comment date for the 385.2001(a)(1)(iii) and the instructions
particular application. A competing on the Commission’s Web site under February 21, 2008.
preliminary permit application must ‘‘e-filing’’ link. The Commission Take notice that the following
conform with 18 CFR 4.30 and 4.36. strongly encourages electronic filing. hydroelectric application has been filed
o. Competing Development with the Commission and is available
s. Filing and Service of Responsive for public inspection:
Application: Any qualified development
Documents: Any filings must bear in all a. Application Type: Amendment of
applicant desiring to file a competing
capital letters the title ‘‘COMMENTS’’, license to increase the installed
development application must submit to
the Commission, on or before a ‘‘RECOMMENDATIONS FOR TERMS capacity.
specified comment date for the AND CONDITIONS’’, b. Project No.: 1881–050.
particular application, either a ‘‘PROTEST’’,’’COMPETING c. Date Filed: December 20, 2007, and
competing development application or a APPLICATION’’ or ‘‘MOTION TO supplemented on January 4 and
notice of intent to file such an INTERVENE’’, as applicable, and the February 20, 2008.
application. Submission of a timely Project Number of the particular d. Applicant: PPL Holtwood, LLC.
application to which the filing refers. e. Name of Project: Holtwood
notice of intent to file a development
Hydroelectric Project.
application allows an interested person Any of the above-named documents
f. Location: The project is located on
to file the competing application no must be filed by providing the original the Susquehanna River, in Lancaster
later than 120 days after the specified and the number of copies provided by and York Counties, Pennsylvania.
comment date for the particular the Commission’s regulations to: The g. Filed Pursuant to: Federal Power
application. A competing license Secretary, Federal Energy Regulatory Act, 16 U.S.C. 791a–825r.
application must conform with 18 CFR Commission, 888 First Street, NE., h. Applicant Contact: Dennis J.
4.30 and 4.36. Washington, DC 20426. A copy of any Murphy, Vice President & Chief
p. Notice of Intent: A notice of intent motion to intervene must also be served Operating Officer, PPL Holtwood, LLC,
must specify the exact name, business upon each representative of the Two North Ninth Street (GENPL6),
address, and telephone number of the Allentown, Pennsylvania 18101;
Applicant specified in the particular
prospective applicant, and must include telephone (610) 774–4316.
application.
an unequivocal statement of intent to i. FERC Contact: Linda Stewart,
submit, if such an application may be t. Agency Comments: Federal, State, telephone: (202) 502–6680, and e-mail:
filed, either a preliminary permit and local agencies are invited to file linda.stewart@ferc.gov.
application or a development comments on the described application. j. Deadline for filing motions to
application (specify which type of A copy of the application may be intervene and protests, comments,
application). A notice of intent must be obtained by agencies directly from the recommendations, terms and
served on the applicant(s) named in this Applicant. If an agency does not file conditions, and fishway prescriptions is
public notice. comments within the time specified for 60 days from the issuance of this notice;
q. Proposed Scope of Studies under filing comments, it will be presumed to reply comments are due 105 days from
Permit: A preliminary permit, if issued, have no comments. One copy of an the issuance date of this notice. All
does not authorize construction. The agency’s comments must also be sent to documents (original and eight copies)
term of the proposed preliminary permit the Applicant’s representatives. should be filed with: Kimberly D. Bose,
would be 36 months. The work Secretary, Federal Energy Regulatory
proposed under the preliminary permit Kimberly D. Bose, Commission, 888 First Street, NE.,
would include economic analysis, Secretary. Washington, DC 20426.
preparation of preliminary engineering [FR Doc. E8–3761 Filed 2–27–08; 8:45 am] The Commission’s Rules of Practice
plans, and a study of environmental and Procedure require all intervenors
BILLING CODE 6717–01–P
impacts. Based on the results of these filling documents with the Commission
studies, the Applicant would decide to serve a copy of that document on
whether to proceed with the preparation each person in the official service list
of a development application to for the project. Further, if an intervenor
construct and operate the project. files comments or documents with the
r. Comments, Protests, or Motions to Commission relating to the merits of an
Intervene: Anyone may submit issue that may affect the responsibilities
comments, a protest, or a motion to of a particular resource agency, they
rwilkins on PROD1PC63 with NOTICES

intervene in accordance with the must also serve a copy of the document
requirements of Rules of Practice and on that resource agency.
Procedure, 18 CFR 385.210, .211, .214. k. Description of Request:
In determining the appropriate action to (i) Amendment to Project Design: PPL
take, the Commission will consider all Holtwood proposes to increase the