Filed Date: 02/15/2008. Federal Energy Regulatory Commission, The Commission encourages
Accession Number: 20080220–0045. 888 First St., NE., Washington, DC electronic submission of protests and
Comment Date: 5 p.m. Eastern Time 20426. interventions in lieu of paper using the
on Friday, March 07, 2008. The filings in the above proceedings ‘‘eFiling’’ link at http://www.ferc.gov.
Docket Numbers: ER08–573–000; are accessible in the Commission’s Persons unable to file electronically
ER08–574–000. eLibrary system by clicking on the should submit an original and 14 copies
Applicants: PJM Interconnection, appropriate link in the above list. They of the protest or intervention to the
L.L.C., Virginia Electric and Power are also available for review in the Federal Energy Regulatory Commission,
Company. Commission’s Public Reference Room in 888 First Street, NE., Washington, DC
Description: Virginia Electric and Washington, DC. There is an 20426.
Power Co submits revised Attachment eSubscription link on the Web site that This filing is accessible on-line at
H–16D to the OATT. enables subscribers to receive e-mail http://www.ferc.gov, using the
Filed Date: 02/15/2008. notification when a document is added ‘‘eLibrary’’ link and is available for
Accession Number: 20080220–0203. to a subscribed dockets(s). For review in the Commission’s Public
Comment Date: 5 p.m. Eastern Time assistance with any FERC Online Reference Room in Washington, DC.
on Friday, March 07, 2008. service, please e-mail There is an ‘‘eSubscription’’ link on the
Docket Numbers: ER08–509–000. FERCOnlineSupport@ferc.gov. or call Web site that enables subscribers to
Applicants: Northeast Utilities (866) 208–3676 (toll free). For TTY, call receive e-mail notification when a
Service Company. (202) 502–8659. document is added to a subscribed
Description: Northeast Utilities docket(s). For assistance with any FERC
Nathaniel J. Davis, Sr.,
Service Company submits Transmission Online service, please email
Deputy Secretary. FERCOnlineSupport@ferc.gov, or call
and Ancillary Services Wholesale
[FR Doc. E8–3721 Filed 2–27–08; 8:45 am] (866) 208–3676 (toll free). For TTY, call
Revenue Allocation Agreement with the
Connecticut Light and Power Company BILLING CODE 6717–01–P (202) 502–8659.
et al under ER08–509. Comment Date: 5 p.m. Eastern Time
Filed Date: 01/31/2008. on March 14, 2008.
DEPARTMENT OF ENERGY
Accession Number: 20080204–0121. Kimberly D. Bose,
Comment Date: 5 p.m. Eastern Time Federal Energy Regulatory Secretary.
on Thursday, February 21, 2008. Commission [FR Doc. E8–3723 Filed 2–27–08; 8:45 am]
Any person desiring to intervene or to BILLING CODE 6717–01–P
[Docket No. EL08–40–000]
protest in any of the above proceedings
must file in accordance with Rules 211 Niagara Mohawk Power Corporation;
and 214 of the Commission’s Rules of Notice of Filing DEPARTMENT OF ENERGY
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern February 21, 2008. Federal Energy Regulatory
time on the specified comment date. It Take notice that on February 13, 2008, Commission
is not necessary to separately intervene Niagara Mohawk Power Corporation [Docket Nos. RM01–8–000; ER02–2001–000]
again in a subdocket related to a d/b/a/ National Grid pursuant to Rule
compliance filing if you have previously 207 of the Rules of Practice and Revised Public Utility Filing
intervened in the same docket. Protests Procedure of the Federal Energy Requirements, Electric Quarterly
will be considered by the Commission Regulatory Commission filed a Petition Reports; Supplemental Notice of
in determining the appropriate action to for Declaratory Order. National Grid Electric Quarterly Reports Technical
be taken, but will not serve to make requests that the Commission issue a Conference
protestants parties to the proceeding. declaratory order directing the NYISO to
Anyone filing a motion to intervene or revise the invoices for energy purchased February 21, 2008.
protest must serve a copy of that in the NYISO market between March On January 7, 2008, the Commission
document on the Applicant. In reference and August 2005 to eliminate the issued a Notice of Electric Quarterly
to filings initiating a new proceeding, impact of late-introduced and erroneous Reports (EQR) Technical Conference
interventions or protests submitted on consumption data that appeared late in regarding recent changes associated
or before the comment deadline need the invoicing cycle. with the EQR Data Dictionary. During
not be served on persons other than the Any person desiring to intervene or to the technical conference, Commission
Applicant. protest this filing must file in staff will review the EQR Data
The Commission encourages accordance with Rules 211 and 214 of Dictionary and address questions from
electronic submission of protests and the Commission’s Rules of Practice and EQR users. An agenda for the
interventions in lieu of paper, using the Procedure (18 CFR 385.211, 385.214). conference is attached.
FERC Online links at http:// Protests will be considered by the On September 24, 2007, the
www.ferc.gov. To facilitate electronic Commission in determining the Commission issued Order No. 2001-G,
service, persons with Internet access appropriate action to be taken, but will the Electric Quarterly Report (EQR) Data
who will eFile a document and/or be not serve to make protestants parties to Dictionary.1 The Commission issued an
listed as a contact for an intervenor the proceeding. Any person wishing to order on rehearing, Order No. 2001-H,
must create and validate an become a party must file a notice of on December 21, 2007. These orders
eRegistration account using the intervention or motion to intervene, as may be found at http://elibrary.ferc.gov.
eRegistration link. Select the eFiling appropriate. Such notices, motions, or The technical conference will be held
rwilkins on PROD1PC63 with NOTICES

link to log on and submit the protests must be filed on or before the Tuesday, February 26, 2008, in the
intervention or protests. comment date. On or before the 1 Revised Public Utility Filing Requirements for
Persons unable to file electronically comment date, it is not necessary to Electric Quarterly Reports, Order No. 2001–G, 120
should submit an original and 14 copies serve motions to intervene or protests FERC ¶ 61,270 (Sep. 24, 2007), 72 Fed. Reg. 56735
of the intervention or protest to the on persons other than the Applicant. (Oct. 4, 2007).

VerDate Aug<31>2005 18:23 Feb 27, 2008 Jkt 214001 PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 E:\FR\FM\28FEN1.SGM 28FEN1
10756 Federal Register / Vol. 73, No. 40 / Thursday, February 28, 2008 / Notices

Commission Meeting Room at 888 First Commission staff determine which • Replace 1.7 miles of field storage
Street, NE., Washington, DC and via issues need to be evaluated in the EA. pipeline;
teleconference. The conference will run Please note that the scoping period will • enhance the deliverability work on
from 10 a.m. to 3 p.m. (EST). close on April 7, 2008. Instructions on 26 existing storage wells;
All interested persons are invited to how to submit comments are provided • Install one gate valve setting;
participate in the technical conference in the Public Participation section of • Install a measurement station; and
by attending in person or by dialing in. this notice. • Install a regulation station.
Those interested in participating are If you are a landowner receiving this The storage project would provide an
asked to register on the FERC Web site notice, you may be contacted by a additional 103,400 dekatherms per day
at https://www.ferc.gov/whats-new/ Columbia representative about the of storage deliverability for service in
registration/eqr-02-26-form.asp. Please acquisition of an easement to construct, the eastern United States. Appendix A
indicate whether you will be attending operate, and maintain the planned presents detailed maps identifying all
in person or plan to dial in. There is no project facilities. The pipeline company facilities associated with this project.2
registration fee. Information and further would seek to negotiate a mutually
details about the technical conference acceptable agreement. However, if the Land Requirements for Construction
will be sent to registered participants. project is approved by the Commission, For new well installation, Columbia
For additional information, please that approval conveys with it the right would disturb a 400-foot-square. For
contact Christie Kim of FERC’s Office of of eminent domain. Therefore, if reconditioned wells, a 300-foot-square
Enforcement at (202) 502–8216 or by easement negotiations fail to produce an would be necessary. Columbia plans to
e-mail at eqr@ferc.gov. agreement, Columbia could initiate use between a 50-foot and 70-foot-wide
FERC conferences and meetings are condemnation proceedings in construction right-of-way for
accessible under section 508 of the accordance with Ohio state law. installation of its pipelines (ranging
Rehabilitation Act of 1973. Requests for A fact sheet prepared by the FERC
from 4 to 10 inches in diameter). Based
accessibility accommodations should be entitled ‘‘An Interstate Natural Gas
on preliminary information,
sent by e-mail to accessibility@ferc.gov Facility on My Land? What Do I Need
construction of the pipelines and
or by calling toll free (866) 208–3372 to Know?’’ addresses a number of
storage facilities would disturb about
(voice), 202–502–8659 (TTY), or by typically asked questions, including the
359 acres of land. Following
sending a fax to 202–208–2106. use of eminent domain and how to
construction, about 331 acres would be
participate in the Commission’s
Kimberly D. Bose, maintained as permanent right-of-way.
proceedings. It is available for viewing
Secretary. The remaining temporary workspace
on the FERC Internet Web site (http://
would be restored and allowed to revert
[FR Doc. E8–3722 Filed 2–27–08; 8:45 am] www.ferc.gov).
With this notice, we 1 are inviting to its former use.
BILLING CODE 6717–01–P
other Federal, State, local, and tribal The EA Process
agencies with jurisdiction and/or
DEPARTMENT OF ENERGY We are preparing this EA to comply
special expertise with respect to
with the National Environmental Policy
environmental issues to cooperate with
Federal Energy Regulatory Act of 1969 (NEPA) which requires the
us in the preparation of the EA.
Commission Commission to take into account the
Agencies that would like to request
environmental impacts that could result
[Docket No. PF08–6–000] cooperating status should follow the
from an action whenever it considers
instructions for filing comments
the issuance of a Certificate of Public
Columbia Gas Transmission; Notice of provided below.
Convenience and Necessity. NEPA also
Intent To Prepare an Environmental
Summary of the Proposed Project requires us to discover and address
Assessment for the Planned Ohio
Within the Crawford Storage Field concerns the public may have about
Storage Expansion Project and
(Fairfield and Hocking Counties, Ohio), proposals. This process is referred to as
Request for Comments on
Columbia seeks authorization to: ‘‘scoping.’’ The main goal of the scoping
Environmental Issues
• Construct 16 new storage wells; process is to focus the analysis in the
February 22, 2008. • Convert 11 existing counter storage EA on the important environmental
The staff of the Federal Energy wells to active storage wells; issues. By this notice, we are requesting
Regulatory Commission (FERC or • Convert 10 existing observation public comments on the scope of the
Commission) will prepare an wells to counter or active storage wells,; issues to be addressed in the EA. All
environmental assessment (EA) that will • Convert 2 high pressure wells to comments received will be considered
discuss the potential environmental counter storage wells; during the preparation of the EA. As
impacts of the Ohio Storage Expansion • Purchase 6 production wells and part of our Pre-Filing review, Columbia
Project, involving construction and convert to storage wells; previously sponsored public open
operation of natural gas facilities by • Install 13.6 miles of interconnecting houses in the project areas to explain its
Columbia Gas Transmission (Columbia) pipeline; and project, the environmental review
in Ashland, Fairfield, Hocking, and • Make minor modifications at process, and take comments about the
Holmes Counties, Ohio. The EA will be Columbia’s Crawford Compressor
used by the Commission in its decision- Station. 2 The appendices referenced in this notice are not
Within the Weaver Storage Field being printed in the Federal Register. Copies are
making process to determine whether
(Ashland and Holmes Counties, Ohio), available on the Commission’s Internet Web site
the project is in the public convenience
Columbia seeks authorization to: (http://www.ferc.gov) at the ‘‘eLibrary’’ link or from
and necessity. • Construct 4.1 miles of field storage
rwilkins on PROD1PC63 with NOTICES

the Commission’s Public Reference Room at (202)


This notice announces the opening of pipeline;
502–8371. For instructions on connecting to
the scoping period that will be used to eLibrary, refer to the ‘‘Additional Information’’
section at the end of this notice. Copies of the
gather environmental input from the 1 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the appendices are being sent to all those receiving this
public and interested agencies on the environmental staff of the FERC’s Office of Energy notice in the mail. Requests for detailed maps of the
project. Your input will help the Projects. facilities should be made directly to Dominion.