DRAFT 1
Agenda
• Roadway Closures
• Directional Changes
g
• Mitigation Measures
• Signal Timing Changes
• Lane Reconfiguration
DRAFT 2
Roadway Closures
DRAFT 3
Directional Changes
DRAFT 4
Mitigation Measures: TEA and VMS Locations
TEA Location
Variable Message Sign Location
Temporary Roadway Closure
Permanent Roadway Closure Note: VMS Locations are approximate.
DRAFT 5
Mitigation Measures: Signal Timing Changes
DRAFT 6
Mitigation Measures: Lane Reconfiguration
5th Av
Re-stripe to left
turn lane only
DRAFT 7
Mitigation Measures: Lane Reconfiguration
5th A
ned
Parking Retain
Av
Re-stripe left turn & thru
DRAFT 8
Mitigation Measures: Lane Reconfiguration
Add eastbound
left-turn bay
DRAFT 9
Mitigation Measures: Lane Reconfiguration
DRAFT 10
Mitigation Measures: Lane Reconfiguration
Dean St
DRAFT 11
Mitigation Measures: Lane Reconfiguration
Bergen St
DRAFT 12
Mitigation Measures: Lane Reconfiguration
DRAFT 13
Mitigation Measures: Lane Reconfiguration
R t i tto lleft
Re-stripe ft tturn only
l
DRAFT 14
Parking Regulation Changes
No Standing Anytime
on west side
Relocated NYPD
Parking: 11 Spaces*
Remove 2 metered
parking spaces 78th Relocated NYPD
Precinct Parking: 13 Spaces*
Remove approximately 5
parking spaces on north side
DRAFT 15
Bus Route Modifications
Bus Stop
Existing Cobble Hill-Bound B63 Route
Future Cobble Hill-Bound B63 Route
Temporary Roadway Closure
Permanent Roadway Closure Note: Ft Hamilton-bound B63 bus service not affected.