Federal Register / Vol. 73, No.

37 / Monday, February 25, 2008 / Notices 10011

competing application itself, or a notice party to the proceeding. Any comments, d. Applicant: David Terry Hydro,
of intent to file such an application, to protests, or motions to intervene must LLC.
the Commission on or before the be received on or before the specified e. Name of Project: David D. Terry
specified comment date for the comment date for the particular Lock and Dam Hydroelectric Project.
particular application (see 18 CFR 4.36). application. f. Location: Arkansas River in Pulaski
Submission of a timely notice of intent r. Filing and Service of Responsive County, Arkansas. It would use the U.S.
allows an interested person to file the Documents: Any filings must bear in all Army Corps of Engineers’ David D.
competing preliminary permit capital letters the title ‘‘COMMENTS’’, Terry Lock and Dam.
application no later than 30 days after ‘‘NOTICE OF INTENT TO FILE g. Filed Pursuant to: Federal Power
the specified comment date for the COMPETING APPLICATION’’, Act, 16 U.S.C. 791(a)–825(r).
particular application. A competing ‘‘COMPETING APPLICATION’’, h. Applicant Contact: Mr. Brent L.
preliminary permit application must ‘‘PROTEST’’, and ‘‘MOTION TO Smith, COO, Symbiotics, LLC, P.O. Box
conform with 18 CFR 4.30 and 4.36. INTERVENE’’, as applicable, and the 535, Rigby, ID 83442, (208) 745–0834.
n. Competing Development Project Number of the particular i. FERC Contact: Robert Bell, (202)
Application: Any qualified development application to which the filing refers. 502–4126.
applicant desiring to file a competing Any of the above-named documents j. Deadline for filing comments,
development application must submit to must be filed by providing the original protests, and motions to intervene: 60
the Commission, on or before a and the number of copies provided by days from the issuance date of this
specified comment date for the the Commission’s regulations to: The notice.
particular application, either a All documents (original and eight
Secretary, Federal Energy Regulatory
competing development application or a copies) should be filed with: Kimberly
Commission, 888 First Street, NE.,
notice of intent to file such an D. Bose, Secretary, Federal Energy
Washington, DC 20426. An additional
application. Submission of a timely Regulatory Commission, 888 First
copy must be sent to Director, Division
notice of intent to file a development Street, NE., Washington, DC 20426.
of Hydropower Administration and
application allows an interested person Comments, protests, and interventions
Compliance, Federal Energy Regulatory
to file the competing application no may be filed electronically via the
Commission, at the above-mentioned
later than 120 days after the specified Internet in lieu of paper; see 18 CFR
address. A copy of any notice of intent,
comment date for the particular 385.2001(a)(1)(iii) and the instructions
competing application or motion to
application. A competing license on the Commission’s Web site under the
intervene must also be served upon each
application must conform with 18 CFR ‘‘e-Filing’’ link. The Commission
representative of the Applicant
4.30 and 4.36. strongly encourages electronic filings.
specified in the particular application.
o. Notice of Intent: A notice of intent Please include the project number (P–
s. Agency Comments: Federal, state,
must specify the exact name, business 12954–000) on any comments or
and local agencies are invited to file
address, and telephone number of the motions filed.
comments on the described application. The Commission’s Rules of Practice
prospective applicant, and must include A copy of the application may be
an unequivocal statement of intent to and Procedure require all intervenors
obtained by agencies directly from the filing documents with the Commission
submit, if such an application may be Applicant. If an agency does not file
filed, either a preliminary permit to serve a copy of that document on
comments within the time specified for each person in the official service list
application or a development
filing comments, it will be presumed to for the project. Further, if an intervenor
application (specify which type of
have no comments. One copy of an files comments or documents with the
application). A notice of intent must be
agency’s comments must also be sent to Commission relating to the merits of an
served on the applicant(s) named in this
the Applicant’s representatives. issue that may affect the responsibilities
public notice.
p. Proposed Scope of Studies Under Nathaniel J. Davis, Sr., of a particular resource agency, they
Permit: A preliminary permit, if issued, Deputy Secretary. must also serve a copy of the document
does not authorize construction. The [FR Doc. E8–3438 Filed 2–22–08; 8:45 am] on that resource agency.
term of the proposed preliminary permit k. Description of Project: The
BILLING CODE 6717–01–P
would be 36 months. The work proposed project using the U.S. Army
proposed under the preliminary permit Corps of Engineers’ David D. Terry Lock
would include economic analysis, DEPARTMENT OF ENERGY and Dam and operated in a run-of-river
preparation of preliminary engineering mode would consist of: (1) A new
plans, and a study of environmental Federal Energy Regulatory powerhouse and switchyard; (2) four
impacts. Based on the results of these Commission turbine/generator units with a combined
studies, the Applicant would decide installed capacity of 90 megawatts; (3) a
[Project No. 12954–000]
whether to proceed with the preparation new 4-mile-long above ground 69-
of a development application to David Terry Hydro, LLC; Notice of kilovolt transmission line extending
construct and operate the project. Application Accepted for Filing and from the switchyard to an
q. Comments, Protests, or Motions to Soliciting Motions To Intervene, interconnection point with the local
Intervene: Anyone may submit Protests, and Comments utility’s distribution system; and (4)
comments, a protest, or a motion to appurtenant facilities. The proposed
intervene in accordance with the February 19, 2008. David D. Terry Lock and Dam Project
requirements of Rules of Practice and Take notice that the following would have an average annual
Procedure, 18 CFR 385.210, .211, .214. hydroelectric application has been filed generation of 300 gigawatt-hours.
rfrederick on PROD1PC67 with NOTICES

In determining the appropriate action to with the Commission and is available l. This filing is available for review at
take, the Commission will consider all for public inspection: the Commission in the Public Reference
protests or other comments filed, but a. Type of Application: Preliminary Room or may be viewed on the
only those who file a motion to Permit. Commission’s Web site at http://
intervene in accordance with the b. Project No.: 12954–000. www.ferc.gov using the ‘‘eLibrary’’ link.
Commission’s Rules may become a c. Date Filed: August 14, 2007. Enter the docket number excluding the

VerDate Aug<31>2005 14:34 Feb 22, 2008 Jkt 214001 PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 E:\FR\FM\25FEN1.SGM 25FEN1
10012 Federal Register / Vol. 73, No. 37 / Monday, February 25, 2008 / Notices

last three digits in the docket number of a development application to DEPARTMENT OF ENERGY
field to access the document. For construct and operate the project.
assistance, call toll-free 1–866–208– Federal Energy Regulatory
q. Comments, Protests, or Motions to
3676 or e-mail Commission
Intervene: Anyone may submit
FERCONLINESUPPORT@FERC.GOV. comments, a protest, or a motion to [Project No. 12952–000]
For TTY, call (202) 502–8659. A copy is
intervene in accordance with the
also available for inspection and Emmett Sanders Hydro, LLC; Notice of
requirements of Rules of Practice and
reproduction at the address in item h Application Accepted for Filing and
above. Procedure, 18 CFR 385.210, .211, .214.
Soliciting Motions To Intervene,
In determining the appropriate action to
m. Competing Preliminary Permit: Protests, and Comments
Anyone desiring to file a competing take, the Commission will consider all
application for preliminary permit for a protests or other comments filed, but February 19, 2008.
proposed project must submit the only those who file a motion to Take notice that the following
competing application itself, or a notice intervene in accordance with the hydroelectric application has been filed
of intent to file such an application, to Commission’s Rules may become a with the Commission and is available
the Commission on or before the party to the proceeding. Any comments, for public inspection:
specified comment date for the protests, or motions to intervene must a. Type of Application: Preliminary
particular application (see 18 CFR 4.36). be received on or before the specified Permit.
Submission of a timely notice of intent comment date for the particular b. Project No.: 12952–000.
allows an interested person to file the application. c. Date Filed: August 14, 2007.
d. Applicant: Emmett Sanders Hydro,
competing preliminary permit r. Filing and Service of Responsive LLC.
application no later than 30 days after Documents: Any filings must bear in all e. Name of Project: Emmett Sanders
the specified comment date for the capital letters the title ‘‘COMMENTS’’, Lock and Dam #4 Hydroelectric Project.
particular application. A competing ‘‘NOTICE OF INTENT TO FILE f. Location: Arkansas River in
preliminary permit application must COMPETING APPLICATION’’, Jefferson County, Arkansas. It would use
conform with 18 CFR 4.30 and 4.36. the U.S. Army Corps of Engineers’
‘‘COMPETING APPLICATION’’,
n. Competing Development Emmett Sanders Lock and Dam #4.
‘‘PROTEST’’, and ‘‘MOTION TO
Application: Any qualified development g. Filed Pursuant to: Federal Power
INTERVENE’’, as applicable, and the
applicant desiring to file a competing Act, 16 U.S.C. 791(a)–825(r).
Project Number of the particular
development application must submit to h. Applicant Contact: Mr. Brent L.
the Commission, on or before a application to which the filing refers.
Any of the above-named documents Smith, COO, Symbiotics, LLC, P.O. Box
specified comment date for the 535, Rigby, ID 83442, (208) 745–0834.
particular application, either a must be filed by providing the original
and the number of copies provided by i. FERC Contact: Robert Bell, (202)
competing development application or a 502–4126.
notice of intent to file such an the Commission’s regulations to: The
j. Deadline for filing comments,
application. Submission of a timely Secretary, Federal Energy Regulatory protests, and motions to intervene: 60
notice of intent to file a development Commission, 888 First Street, NE., days from the issuance date of this
application allows an interested person Washington, DC 20426. An additional notice.
to file the competing application no copy must be sent to Director, Division All documents (original and eight
later than 120 days after the specified of Hydropower Administration and copies) should be filed with: Kimberly
comment date for the particular Compliance, Federal Energy Regulatory D. Bose, Secretary, Federal Energy
application. A competing license Commission, at the above-mentioned Regulatory Commission, 888 First
application must conform with 18 CFR address. A copy of any notice of intent, Street, NE., Washington, DC 20426.
4.30 and 4.36. competing application or motion to Comments, protests, and interventions
o. Notice of Intent: A notice of intent intervene must also be served upon each may be filed electronically via the
must specify the exact name, business representative of the Applicant Internet in lieu of paper; see 18 CFR
address, and telephone number of the specified in the particular application. 385.2001(a)(1)(iii) and the instructions
prospective applicant, and must include on the Commission’s Web site under the
s. Agency Comments: Federal, State,
an unequivocal statement of intent to ‘‘e-Filing’’ link. The Commission
and local agencies are invited to file
submit, if such an application may be strongly encourages electronic filings.
filed, either a preliminary permit comments on the described application.
Please include the project number (P–
application or a development A copy of the application may be
12952–000) on any comments or
application (specify which type of obtained by agencies directly from the
motions filed.
application). A notice of intent must be Applicant. If an agency does not file The Commission’s Rules of Practice
served on the applicant(s) named in this comments within the time specified for and Procedure require all intervenors
public notice. filing comments, it will be presumed to filing documents with the Commission
p. Proposed Scope of Studies Under have no comments. One copy of an to serve a copy of that document on
Permit: A preliminary permit, if issued, agency’s comments must also be sent to each person in the official service list
does not authorize construction. The the Applicant’s representatives. for the project. Further, if an intervenor
term of the proposed preliminary permit Nathaniel J. Davis, Sr., files comments or documents with the
would be 36 months. The work Commission relating to the merits of an
proposed under the preliminary permit Deputy Secretary.
issue that may affect the responsibilities
[FR Doc. E8–3440 Filed 2–22–08; 8:45 am]
rfrederick on PROD1PC67 with NOTICES

would include economic analysis, of a particular resource agency, they


preparation of preliminary engineering BILLING CODE 6717–01–P must also serve a copy of the document
plans, and a study of environmental on that resource agency.
impacts. Based on the results of these k. Description of Project: The
studies, the Applicant would decide proposed project using the U.S. Army
whether to proceed with the preparation Corps of Engineers’ Emmett Sanders

VerDate Aug<31>2005 14:34 Feb 22, 2008 Jkt 214001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\25FEN1.SGM 25FEN1