You are on page 1of 2

Federal Register / Vol. 73, No.

37 / Monday, February 25, 2008 / Notices 10013

Lock and Dam #4 and operated in a run- submit, if such an application may be Applicant. If an agency does not file
of-river mode would consist of: (1) A filed, either a preliminary permit comments within the time specified for
new powerhouse and switchyard; (2) application or a development filing comments, it will be presumed to
four turbine/generator units with a application (specify which type of have no comments. One copy of an
combined installed capacity of 75 application). A notice of intent must be agency’s comments must also be sent to
megawatts; (3) a new 2.6-mile-long served on the applicant(s) named in this the Applicant’s representatives.
above ground 69-kilovolt transmission public notice.
p. Proposed Scope of Studies Under Nathaniel J. Davis, Sr.,
line extending from the switchyard to
an interconnection point with the local Permit: A preliminary permit, if issued, Deputy Secretary.
utility’s distribution system; and (4) does not authorize construction. The [FR Doc. E8–3439 Filed 2–22–08; 8:45 am]
appurtenant facilities. The proposed term of the proposed preliminary permit BILLING CODE 6717–01–P
Emmett Sanders Lock and Dam #4 would be 36 months. The work
Project would have an average annual proposed under the preliminary permit
generation of 230 gigawatt-hours. would include economic analysis, DEPARTMENT OF ENERGY
l. This filing is available for review at preparation of preliminary engineering
the Commission in the Public Reference plans, and a study of environmental Federal Energy Regulatory
Room or may be viewed on the impacts. Based on the results of these Commission
Commission’s Web site at http:// studies, the Applicant would decide [Project No. 12876–000]
www.ferc.gov using the ‘‘eLibrary’’ link. whether to proceed with the preparation
Enter the docket number excluding the of a development application to Hydro Green Energy, LLC; Notice of
last three digits in the docket number construct and operate the project. Application Accepted for Filing and
field to access the document. For q. Comments, Protests, or Motions to Soliciting Motions To Intervene,
assistance, call toll-free 1–866–208– Intervene: Anyone may submit Protests, and Comments
3676 or e-mail comments, a protest, or a motion to
intervene in accordance with the February 15, 2008.
FERCONLINESUPPORT@FERC.GOV.
For TTY, call (202) 502–8659. A copy is requirements of Rules of Practice and Take notice that the following
also available for inspection and Procedure, 18 CFR 385.210, .211, .214. hydroelectric application has been filed
reproduction at the address in item h In determining the appropriate action to with the Commission and is available
above. take, the Commission will consider all for public inspection:
m. Competing Preliminary Permit: protests or other comments filed, but a. Type of Application: Preliminary
Anyone desiring to file a competing only those who file a motion to Permit.
application for preliminary permit for a intervene in accordance with the b. Project No.: 12876–000.
proposed project must submit the Commission’s Rules may become a c. Date Filed: July 24, 2007.
competing application itself, or a notice party to the proceeding. Any comments, d. Applicant: Hydro Green Energy,
of intent to file such an application, to protests, or motions to intervene must LLC.
the Commission on or before the be received on or before the specified e. Name of Project: Maine 1 Project.
specified comment date for the comment date for the particular f. Location: The project would be
particular application (see 18 CFR 4.36). application. located on Lubec Narrows in
Submission of a timely notice of intent r. Filing and Service of Responsive Washington County, Maine. The project
allows an interested person to file the Documents: Any filings must bear in all uses no dam or impoundment.
competing preliminary permit capital letters the title ‘‘COMMENTS’’, g. Filed Pursuant to: Federal Power
application no later than 30 days after ‘‘NOTICE OF INTENT TO FILE Act, 16 U.S.C. 791(a)–825(r).
the specified comment date for the COMPETING APPLICATION’’, h. Applicant Contact: Mr. Wayne F.
particular application. A competing ‘‘COMPETING APPLICATION’’, Krouse, Hydro Green Energy, LLC, 5090
preliminary permit application must ‘‘PROTEST’’, and ‘‘MOTION TO Richmond Avenue #390, Houston, TX
conform with 18 CFR 4.30 and 4.36. INTERVENE’’, as applicable, and the 77056, phone (877) 556–6566.
n. Competing Development Project Number of the particular i. FERC Contact: Robert Bell, (202)
Application: Any qualified development application to which the filing refers. 502–6062.
applicant desiring to file a competing Any of the above-named documents j. Deadline for filing comments,
development application must submit to must be filed by providing the original protests, and motions to intervene: 60
the Commission, on or before a and the number of copies provided by days from the issuance date of this
specified comment date for the the Commission’s regulations to: The notice.
particular application, either a Secretary, Federal Energy Regulatory All documents (original and eight
competing development application or a Commission, 888 First Street, NE., copies) should be filed with: Kimberly
notice of intent to file such an Washington, DC 20426. An additional D. Bose, Secretary, Federal Energy
application. Submission of a timely copy must be sent to Director, Division Regulatory Commission, 888 First
notice of intent to file a development of Hydropower Administration and Street, NE., Washington, DC 20426.
application allows an interested person Compliance, Federal Energy Regulatory Comments, protests, and interventions
to file the competing application no Commission, at the above-mentioned may be filed electronically via the
later than 120 days after the specified address. A copy of any notice of intent, Internet in lieu of paper; see 18 CFR
comment date for the particular competing application or motion to 385.2001(a)(1)(iii) and the instructions
application. A competing license intervene must also be served upon each on the Commission’s Web site under the
application must conform with 18 CFR representative of the Applicant ‘‘e-Filing’’ link. The Commission
rfrederick on PROD1PC67 with NOTICES

4.30 and 4.36. specified in the particular application. strongly encourages electronic filings.
o. Notice of Intent: A notice of intent s. Agency Comments: Federal, State, Please include the project number (P–
must specify the exact name, business and local agencies are invited to file 12876–000) on any comments or
address, and telephone number of the comments on the described application. motions filed.
prospective applicant, and must include A copy of the application may be The Commission’s Rules of Practice
an unequivocal statement of intent to obtained by agencies directly from the and Procedure require all intervenors

VerDate Aug<31>2005 14:34 Feb 22, 2008 Jkt 214001 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 E:\FR\FM\25FEN1.SGM 25FEN1
10014 Federal Register / Vol. 73, No. 37 / Monday, February 25, 2008 / Notices

filing documents with the Commission competing development application or a the particular application to which the
to serve a copy of that document on notice of intent to file such an filing refers. Any of the above-named
each person in the official service list application. Submission of a timely documents must be filed by providing
for the project. Further, if an intervenor notice of intent to file a development the original and the number of copies
files comments or documents with the application allows an interested person provided by the Commission’s
Commission relating to the merits of an to file the competing application no regulations to: The Secretary, Federal
issue that may affect the responsibilities later than 120 days after the specified Energy Regulatory Commission, 888
of a particular resource agency, they comment date for the particular First Street, NE., Washington, DC 20426.
must also serve a copy of the document application. A competing license A copy of any motion to intervene must
on that resource agency. application must conform with 18 CFR also be served upon each representative
k. Description of Project: The 4.30 and 4.36. of the Applicant specified in the
proposed project consists of: (1) 15 p. Notice of Intent: A notice of intent particular application.
proposed 350 kilowatt dual ducted must specify the exact name, business t. Agency Comments: Federal, State,
horizontal axis hydrokinetic generating address, and telephone number of the and local agencies are invited to file
units having a total installed capacity of prospective applicant, and must include comments on the described application.
5 megawatts, (2) a proposed 800-foot- an unequivocal statement of intent to A copy of the application may be
long, 13.6-kV transmission line, and (3) submit, if such an application may be obtained by agencies directly from the
appurtenant facilities. The Hydro Green filed, either a preliminary permit Applicant. If an agency does not file
Energy, LLC’s project would have an application or a development comments within the time specified for
average annual generation of 24.65 application (specify which type of filing comments, it will be presumed to
gigawatt-hours and be sold to a local application). A notice of intent must be have no comments. One copy of an
utility. served on the applicant(s) named in this agency’s comments must also be sent to
l. Locations of Applications: A copy of public notice. the Applicant’s representatives.
the application is available for q. Proposed Scope of Studies under
inspection and reproduction at the Permit: A preliminary permit, if issued, Nathaniel J. Davis, Sr.,
Commission in the Public Reference does not authorize construction. The Deputy Secretary.
Room, located at 888 First Street, NE., term of the proposed preliminary permit [FR Doc. E8–3499 Filed 2–22–08; 8:45 am]
Room 2A, Washington DC 20426, or by would be 36 months. The work BILLING CODE 6717–01–P
calling (202) 502–8371. This filing may proposed under the preliminary permit
also be viewed on the Commission’s would include economic analysis,
Web site at http://www.ferc.gov using preparation of preliminary engineering DEPARTMENT OF ENERGY
the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental
number excluding the last three digits in impacts. Based on the results of these Federal Energy Regulatory
the docket number field to access the studies, the Applicant would decide Commission
document. For assistance, call toll-free whether to proceed with the preparation [Project No. 12955–000]
1–866–208–3676 or e-mail of a development application to
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project. Kentucky Hydro 3, LLC; Notice of
call (202) 502–8659. A copy is also r. Comments, Protests, or Motions to Application Accepted for Filing and
available for inspection and Intervene: Anyone may submit Soliciting Motions To Intervene,
reproduction at the address in item h comments, a protest, or a motion to Protests, and Comments
above. intervene in accordance with the
m. Individuals desiring to be included requirements of Rules of Practice and February 19, 2008.
on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214. Take notice that the following
so indicate by writing to the Secretary In determining the appropriate action to hydroelectric application has been filed
of the Commission. take, the Commission will consider all with the Commission and is available
n. Competing Preliminary Permit: protests or other comments filed, but for public inspection:
Anyone desiring to file a competing only those who file a motion to a. Type of Application: Preliminary
application for preliminary permit for a intervene in accordance with the Permit.
proposed project must submit the Commission’s Rules may become a b. Project No.: 12955–000.
competing application itself, or a notice c. Date Filed: August 14, 2007.
party to the proceeding. Any comments, d. Applicant: Kentucky Hydro 3, LLC.
of intent to file such an application, to protests, or motions to intervene must e. Name of Project: Kentucky River
the Commission on or before the be received on or before the specified Lock and Dam #3 Hydroelectric Project.
specified comment date for the comment date for the particular f. Location: Kentucky River in Henry
particular application (see 18 CFR 4.36). application. County, Kentucky. It would use the U.S.
Submission of a timely notice of intent Comments, protests and interventions Army Corps of Engineers’ Kentucky
allows an interested person to file the may be filed electronically via the River Lock and Dam #3.
competing preliminary permit Internet in lieu of paper. See 18 CFR g. Filed Pursuant to: Federal Power
application no later than 30 days after 385.2001 (a)(1)(iii) and the instructions Act, 16 U.S.C. 791(a)–825(r).
the specified comment date for the on the Commission’s Web site under ‘‘e- h. Applicant Contact: Mr. Brent L.
particular application. A competing filing’’ link. The Commission strongly Smith, COO, Symbiotics, LLC, P.O. Box
preliminary permit application must encourages electronic filing. 535, Rigby, ID 83442, (208) 745–0834.
conform with 18 CFR 4.30 and 4.36. s. Filing and Service of Responsive i. FERC Contact: Robert Bell, (202)
o. Competing Development Documents: Any filings must bear in all 502–4126.
rfrederick on PROD1PC67 with NOTICES

Application: Any qualified development capital letters the title ‘‘COMMENTS’’, j. Deadline for filing comments,
applicant desiring to file a competing ‘‘COMPETING APPLICATION’’, protests, and motions to intervene: 60
development application must submit to ‘‘RECOMMENDATIONS FOR TERMS days from the issuance date of this
the Commission, on or before a AND CONDITIONS’’, ‘‘PROTEST’’, or notice.
specified comment date for the ‘‘MOTION TO INTERVENE’’, as All documents (original and eight
particular application, either a applicable, and the Project Number of copies) should be filed with: Kimberly

VerDate Aug<31>2005 14:34 Feb 22, 2008 Jkt 214001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\25FEN1.SGM 25FEN1