(PIMS) in Russia
Challenges and Solutions
objectives
This presentation will review, through a client-specific case study, the issues and
challenges associated with the implementation of a state-of-the-art, integrated
asset and integrity management solution.
Key topics to be covered:
Slide 2
Detailed procedures,
Standards,
Regulations and
Guidelines
In house
Polyvalent
Engineers
Structured worldwide
Organization and
multidisciplinary
engineers,
QHSE, Risk, GIS, etc.
Design + As-built
+ visual
inspection + Hot
spot UT
inspection
No or simple
calculation tools
Challenges
Slide 4
resulting threats
Slide 5
DECISION
Often
anticipated to
be replaced by
math
Slide 6
Legislative driver
Detailed procedures,
Standards,
Regulations and
Guidelines
Main scope:
1. Identification, analysis and prediction of risk of accidents at hazardous production
facilities and related threats;
2. Planning, implementation, and timely adjustment of measures to reduce the risk of
accidents at hazardous production facilities.
Slide 7
The operator
Slide 8
Project partners
Localization
Technical Support
Slide 9
Project description
Slide 10
Project description
Global Reach and
strong Product Focus
Mandatory Local
Execution and Expertise
on Regulations
Slide 11
More than 10.000 documents scanned as basis for digitization towards final
destination being the PIMS database (PODS datamodel).
Slide 12
Slide 13
Slide 14
Threat Assessment:
Adjustment of threat model
based on regional peculiarities
(e.g. Permafrost,
Geotechnical sensitive areas)
Diagnostic Records:
Utilization of ILI and
Aboveground Surveys to
adjust specific threat results
Consequence Assessment:
Leak and Rupture Scenarios
considering Land Types,
Population Density etc.
Slide 15
Soil PH
Soil Resistivity
Coating Type
BPoF
Severity Ratio
PoF
PoF
ILI results
RPoF
Slide 17
Slide 18
View 1
Event/ Km/
Year
View 2
Event/ Km/
Year
View 3
Maximum every 3 Km
Event/3Km
/Year
View 4
Event/ Km/
Year
View 5
Event / Year
View n
CoF Categories
Slide 20
COF Process
Land Type
Population Count
XXXX
Receptor 1
Ignition
No Ignition
Receptor 2
Ignition
No Ignition
Leak
Rupture
?
t
s
o
C
Leak
Rupture
?
Cost
Total Cost
=
CR1+CR2
CoF value
CoF value
CoF value
CoF value
CoF value
Slide 21
Cof input
Slide 22
PoF matrix has a PoF value for each element along a pipeline
CoF matrix has a CoF value for each element along a pipeline
Multiplying PoF and CoF values for each element generates risk factors.
Risk factors may be expressed in monetary terms or as a rating on a corporate
RAM.
The result is a matrix of risk (or liability) values.
Slide 23
Risk reporting
Dynamic Segments
Slide 24
Diagnostic services
Centerline QA/QC
Immediate Repair Plans
Input to PoF evaluation
Corrosion Growth Assessments
for long-term repair strategies
Slide 25
Centerline QA/QC
Slide 26
Immediate repairs
Slide 27
Immediate repairs
Straightforward
Rules
Decision Tree
HCA
Conditio
n
Other
Priority
Target
Anomaly
Type
Query Definition
Metal Loss
Query Details
Depth >70% and
HCA = YES
Repair Condition
Immediate Repair
Dent
Immediate Repair
Dent
Immediate Repair
14
Gouge/
Groove
Scheduled
16
Crack
20
Metal Loss
Potential crack
corrosion pitting
Scheduled
Scheduled
16 RoCorrCMFL/SIC
HighRes
MFL
HighRes
CMFL
HighRes
XYZ GEO
Slide 29
corrosion growth
Slide 30
interfacing
Slide 31
Prerequisites
Global
Supplier
Local
Experts
Challenges
Localization / Translation
Variances in unit systems
Global varieties in data
input formats
Background know-how in
local legislations
Strong background in
local legislations
Native speaking
resources
Support and data
integration resources
Formalization of customer
requirements in supplier
format
Being the middle man
Risk model adjustments
to regional demands
Done!
Slide 32
conclusion