You are on page 1of 9

ACI 318-08/IBC 2009

Concrete Frame Design Report

Prepared by

Model Name: EDIT UTK JWN TPKB_gmp122222.edb

24 Juni 2015

ETABS v9.7.4 Concrete Frame Design Design Detailed Output


ACI 318-08/IBC 2009

Units: N-mm

Story Level: ATTIC


Element: C51
Section Name: K6-40/60
Frame Type: Sway Special

L=5000,000
B=400,000
E=25332,084
fy=400,000
RLLF=0,812

D=600,000
fc=29,050
fys=400,000

dc=40,000
Lt.Wt. Fac.=1,000

Axial Force & Biaxial Moment Check for Pu-Mu2-Mu3 Interaction


Column End
Rebar Area
Rebar %
D/C Ratio
Top
5105,571
2,127
0,277
Bottom
5105,571
2,127
0,313
Column End
Top
Bottom

Design Pu
Design Mu2
Design Mu3
545991,639 14872812,255 -124163413,6
575846,871 -16061003,65 145309517,10

Station Loc
4400,000
0,000

Controlling Combo
COMB6
COMB6

Shear Reinforcement for Major Shear (V2)


Column End
Rebar Av/s
Design Vu
Top
0,639
107319,842
Bottom
0,639
107319,842

Station Loc
4400,000
0,000

Controlling Combo
COMB9
COMB9

Shear Reinforcement for Minor Shear (V3)


Column End
Rebar Av/s
Top
0,000
Bottom
0,000

Design Vu
6895,674
6895,674

Station Loc
4400,000
0,000

Controlling Combo
COMB6
COMB6

Shear
phi*Vc
1095579,739
1095579,739

Joint
Area
240000,000
240000,000

Controlling
Combo
COMB5
COMB5

Beam/Column Capacity Ratios


(6/5)(B/C) Column/Beam
SumBeamCap
Ratio
Ratio
Moments
Major(33)
0,470
2,552 216074193,60
Minor(22)
0,803
1,495 250919693,96

SumColCap
Moments
551335624,4
375177195,7

Controlling
Combo
COMB8
COMB8

Joint Shear Check/Design


Joint Shear
Ratio
Major(V2)
0,469
Minor(V3)
0,548

Page 2

Shear
VuTot
513454,238
599851,554

ETABS v9.7.4 Concrete Frame Design Design Detailed Output


ACI 318-08/IBC 2009

Units: N-mm

Story Level: LT4


Element: C51
Section Name: K6-40/60
Frame Type: Sway Special

L=5000,000
B=400,000
E=25332,084
fy=400,000
RLLF=0,506

D=600,000
fc=29,050
fys=400,000

dc=40,000
Lt.Wt. Fac.=1,000

Axial Force & Biaxial Moment Check for Pu-Mu2-Mu3 Interaction


Column End
Rebar Area
Rebar %
D/C Ratio
Top
5105,571
2,127
0,352
Bottom
5105,571
2,127
0,414
Column End
Top
Bottom

Design Pu
Design Mu2
Design Mu3
1016363,990 27685755,080 -129103950,9
1046219,222 -28499011,60 167045923,19

Station Loc
4400,000
0,000

Controlling Combo
COMB6
COMB6

Shear Reinforcement for Major Shear (V2)


Column End
Rebar Av/s
Top
0,000
Bottom
0,000

Design Vu
70054,130
70054,130

Station Loc
4400,000
0,000

Controlling Combo
COMB9
COMB9

Shear Reinforcement for Minor Shear (V3)


Column End
Rebar Av/s
Top
0,000
Bottom
0,000

Design Vu
4755,927
4755,927

Station Loc
4400,000
0,000

Controlling Combo
COMB6
COMB6

Shear
phi*Vc
1095579,739
1095579,739

Joint
Area
240000,000
240000,000

Controlling
Combo
COMB5
COMB5

Beam/Column Capacity Ratios


(6/5)(B/C) Column/Beam
SumBeamCap
SumColCap
Ratio
Ratio
Moments
Moments
Major(33)
0,297
4,041 282999284,86 1143566742,5
Minor(22)
0,300
3,996 197782692,23 790390314,3

Controlling
Combo
COMB8
COMB8

Joint Shear Check/Design


Joint Shear
Ratio
Major(V2)
0,558
Minor(V3)
0,383

Page 3

Shear
VuTot
610803,149
420099,437

ETABS v9.7.4 Concrete Frame Design Design Detailed Output


ACI 318-08/IBC 2009

Units: N-mm

Story Level: LT3


Element: C51
Section Name: K6-40/60
Frame Type: Sway Special

L=5000,000
B=400,000
E=25332,084
fy=400,000
RLLF=0,400

D=600,000
fc=29,050
fys=400,000

dc=40,000
Lt.Wt. Fac.=1,000

Axial Force & Biaxial Moment Check for Pu-Mu2-Mu3 Interaction


Column End
Rebar Area
Rebar %
D/C Ratio
Top
5105,571
2,127
0,444
Bottom
5105,571
2,127
0,488
Column End
Top
Bottom

Design Pu
1485234,610
1515089,842

Design Mu2
Design Mu3
40457790,78 -134740066,3
-41271047,3 164799280,12

Station Loc
4400,000
0,000

Controlling Combo
COMB6
COMB6

Shear Reinforcement for Major Shear (V2)


Column End
Rebar Av/s
Top
0,000
Bottom
0,000

Design Vu
76949,770
76949,770

Station Loc
4400,000
0,000

Controlling Combo
COMB9
COMB9

Shear Reinforcement for Minor Shear (V3)


Column End
Rebar Av/s
Top
0,000
Bottom
0,000

Design Vu
3939,468
3939,468

Station Loc
4400,000
0,000

Controlling Combo
COMB2
COMB2

Shear
phi*Vc
1095579,739
1095579,739

Joint
Area
240000,000
240000,000

Controlling
Combo
COMB5
COMB5

Beam/Column Capacity Ratios


(6/5)(B/C) Column/Beam
SumBeamCap
SumColCap
Ratio
Ratio
Moments
Moments
Major(33)
0,306
3,918 311054606,44 1218826746,4
Minor(22)
0,279
4,297 199106002,89 855511830,6

Controlling
Combo
COMB8
COMB8

Joint Shear Check/Design


Joint Shear
Ratio
Major(V2)
0,614
Minor(V3)
0,386

Page 4

Shear
VuTot
673227,812
422957,173

ETABS v9.7.4 Concrete Frame Design Design Detailed Output


ACI 318-08/IBC 2009

Units: N-mm

Story Level: LT2


Element: C51
Section Name: K3-40/100
Frame Type: Sway Special

L=6000,000
B=400,000
E=25332,084
fy=400,000
RLLF=0,400

D=1000,000
fc=29,050
fys=400,000

dc=40,000
Lt.Wt. Fac.=1,000

Axial Force & Biaxial Moment Check for Pu-Mu2-Mu3 Interaction


Column End
Rebar Area
Rebar %
D/C Ratio
Top
7942,000
1,986
0,356
Bottom
7942,000
1,986
0,399
Column End
Top
Bottom

Design Pu
2357109,948
2023705,109

Design Mu3
-31791055,5
366736808,3

Station Loc
5400,000
0,000

Controlling Combo
COMB2
COMB6

Shear Reinforcement for Major Shear (V2)


Column End
Rebar Av/s
Design Vu
Top
0,000
110824,847
Bottom
0,000
110824,847

Station Loc
5400,000
0,000

Controlling Combo
COMB6
COMB6

Shear Reinforcement for Minor Shear (V3)


Column End
Rebar Av/s
Top
0,000
Bottom
0,000

Design Vu
4943,797
4943,797

Station Loc
5400,000
0,000

Controlling Combo
COMB2
COMB2

Shear
phi*Vc
1825966,232
1278176,362

Joint
Area
400000,000
280000,000

Controlling
Combo
COMB5
COMB5

Beam/Column Capacity Ratios


(6/5)(B/C) Column/Beam
SumBeamCap
SumColCap
Ratio
Ratio
Moments
Moments
Major(33)
0,173
6,917 319472244,1 2209636033,8
Minor(22)
0,218
5,515 204943509,26 1130286260,0

Controlling
Combo
COMB8
COMB8

Joint Shear Check/Design


Joint Shear
Ratio
Major(V2)
0,383
Minor(V3)
0,345

Page 5

Design Mu2
64207674,99
-55125727,2

Shear
VuTot
699497,948
440893,530

ETABS v9.7.4 Concrete Frame Design Design Detailed Output


ACI 318-08/IBC 2009

Units: N-mm

Story Level: LT1


Element: C51
Section Name: K3-40/100
Frame Type: Sway Special

L=4200,000
B=400,000
E=25332,084
fy=400,000
RLLF=0,400

D=1000,000
fc=29,050
fys=400,000

dc=40,000
Lt.Wt. Fac.=1,000

Axial Force & Biaxial Moment Check for Pu-Mu2-Mu3 Interaction


Column End
Rebar Area
Rebar %
D/C Ratio
Top
7942,000
1,986
0,454
Bottom
7942,000
1,986
0,463
Column End
Top
Bottom

Design Pu
3021290,067
3062001,747

Design Mu2
Design Mu3
82299941,42 -28640168,12
-83408927,6 42171191,89

Station Loc
3600,000
0,000

Controlling Combo
COMB2
COMB2

Shear Reinforcement for Major Shear (V2)


Column End
Rebar Av/s
Top
0,000
Bottom
0,000

Design Vu
44751,927
44751,927

Station Loc
3600,000
0,000

Controlling Combo
COMB9
COMB9

Shear Reinforcement for Minor Shear (V3)


Column End
Rebar Av/s
Top
0,000
Bottom
0,000

Design Vu
10972,380
10972,380

Station Loc
3600,000
0,000

Controlling Combo
COMB2
COMB2

Shear
phi*Vc
1825966,232
1278176,362

Joint
Area
400000,000
280000,000

Controlling
Combo
COMB5
COMB5

Beam/Column Capacity Ratios


(6/5)(B/C) Column/Beam
SumBeamCap
SumColCap
Ratio
Ratio
Moments
Moments
Major(33)
0,068
17,670 183515915,78
3242749742
Minor(22)
0,201
5,971 236914088,87 1414684796,5

Controlling
Combo
COMB8
COMB8

Joint Shear Check/Design


Joint Shear
Ratio
Major(V2)
0,215
Minor(V3)
0,398

Page 6

Shear
VuTot
392420,416
508334,849

ETABS v9.7.4 Concrete Frame Design Design Detailed Output


ACI 318-08/IBC 2009

Units: N-mm

Story Level: SB
Element: C51
Section Name: K3-40/100
Frame Type: Sway Special

L=3000,000
B=400,000
E=25332,084
fy=400,000
RLLF=0,400

D=1000,000
fc=29,050
fys=400,000

dc=40,000
Lt.Wt. Fac.=1,000

Axial Force & Biaxial Moment Check for Pu-Mu2-Mu3 Interaction


Column End
Rebar Area
Rebar %
D/C Ratio
Top
7942,000
1,986
0,551
Bottom
7942,000
1,986
0,556
Column End
Top
Bottom

Design Pu
Design Mu2
3643186,596 99240402,88
3677112,996 -100164558,0

Design Mu3
-56366634,5
54109790,96

Station Loc
3000,000
0,000

Controlling Combo
COMB2
COMB2

Shear Reinforcement for Major Shear (V2)


Column End
Rebar Av/s
Top
0,000
Bottom
0,000

Design Vu
40741,916
40741,916

Station Loc
3000,000
0,000

Controlling Combo
COMB6
COMB6

Shear Reinforcement for Minor Shear (V3)


Column End
Rebar Av/s
Top
0,000
Bottom
0,000

Design Vu
12770,728
12770,728

Station Loc
3000,000
0,000

Controlling Combo
COMB2
COMB2

Page 7

ETABS v9.7.4 Concrete Frame Design Design Detailed Output


ACI 318-08/IBC 2009

Units: N-mm

Story Level: B1
Element: C51
Section Name: K3-40/100
Frame Type: Sway Special

L=3000,000
B=400,000
E=25332,084
fy=400,000
RLLF=0,400

D=1000,000
fc=29,050
fys=400,000

dc=40,000
Lt.Wt. Fac.=1,000

Axial Force & Biaxial Moment Check for Pu-Mu2-Mu3 Interaction


Column End
Rebar Area
Rebar %
D/C Ratio
Top
7942,000
1,986
0,640
Bottom
7942,000
1,986
0,642
Column End
Top
Bottom

Design Pu
Design Mu2
4257551,440 115975701,22
4291477,840 -116899856,4

Design Mu3
-43244061,0
32723320,97

Station Loc
3000,000
0,000

Controlling Combo
COMB2
COMB2

Shear Reinforcement for Major Shear (V2)


Column End
Rebar Av/s
Top
0,000
Bottom
0,000

Design Vu
25322,461
25322,461

Station Loc
3000,000
0,000

Controlling Combo
COMB2
COMB2

Shear Reinforcement for Minor Shear (V3)


Column End
Rebar Av/s
Top
0,000
Bottom
0,000

Design Vu
8591,883
8591,883

Station Loc
3000,000
0,000

Controlling Combo
COMB2
COMB2

Page 8

ETABS v9.7.4 Concrete Frame Design Design Detailed Output


ACI 318-08/IBC 2009

Units: N-mm

Story Level: B2
Element: C51
Section Name: K3-40/100
Frame Type: Sway Special

L=500,000
B=400,000
E=25332,084
fy=400,000
RLLF=0,400

D=1000,000
fc=29,050
fys=400,000

dc=40,000
Lt.Wt. Fac.=1,000

Axial Force & Biaxial Moment Check for Pu-Mu2-Mu3 Interaction


Column End
Rebar Area
Rebar %
D/C Ratio
Top
7942,000
1,986
0,746
Bottom
7942,000
1,986
0,746
Column End
Top
Bottom

Design Pu
Design Mu2
Design Mu3
4985110,490 -135794409,8 -10798279,11
4985133,108 -6883043,96 -225527421,8

Station Loc
2,000
0,000

Controlling Combo
COMB2
COMB2

Shear Reinforcement for Major Shear (V2)


Column End
Rebar Av/s
Top
0,000
Bottom
0,000

Design Vu
65138,384
65138,384

Station Loc
2,000
0,000

Controlling Combo
COMB6
COMB6

Shear Reinforcement for Minor Shear (V3)


Column End
Rebar Av/s
Top
0,000
Bottom
0,000

Design Vu
61295,529
61295,529

Station Loc
2,000
0,000

Controlling Combo
COMB2
COMB2

Shear
phi*Vc
1825966,232
1278176,362

Joint
Area
400000,000
280000,000

Controlling
Combo
COMB5
COMB5

Beam/Column Capacity Ratios


(6/5)(B/C) Column/Beam
SumBeamCap
SumColCap
Ratio
Ratio
Moments
Moments
Major(33)
0,028
42,658 84410124,23
3600732680
Minor(22)
0,111
10,804 149824575,52 1618682063,1

Controlling
Combo
COMB8
COMB8

Joint Shear Check/Design


Joint Shear
Ratio
Major(V2)
0,076
Minor(V3)
0,194

Page 9

Shear
VuTot
137970,056
247852,972