Federal Register / Vol. 73, No.

28 / Monday, February 11, 2008 / Notices 7727

proposed under the preliminary permit DEPARTMENT OF ENERGY Irrigation District and the San Joaquin
would include economic analysis, Irrigation District’s Goodwin Dam and
preparation of preliminary engineering Federal Energy Regulatory operated in a run-of-river mode would
plans, and a study of environmental Commission consist of: (1) A new 300-foot-long, 120-
impacts. Based on the results of these [Project No. 12946–000] inch-diameter steel penstock; (2) a new
studies, the Applicant would decide powerhouse and switchyard; (3) two
whether to proceed with the preparation Goodwin Hydro, LLC; Notice of turbine/generator units with a combined
of a development application to Application Accepted for Filing and installed capacity of 5 megawatts; (4) a
construct and operate the project. Soliciting Motions To Intervene, new 3-mile-long above ground 15-
q. Comments, Protests, or Motions to Protests, and Comments kilovolt transmission line extending
Intervene—Anyone may submit from the switchyard to an
comments, a protest, or a motion to February 4, 2008. interconnection point with the
intervene in accordance with the Take notice that the following Tuolumne County Public Power
requirements of Rules of Practice and hydroelectric application has been filed Agency’s distribution system; and (5)
Procedure, 18 CFR 385.210, .211, .214. with the Commission and is available appurtenant facilities. The proposed
In determining the appropriate action to for public inspection: Goodwin Dam Project would have an
take, the Commission will consider all a. Type of Application: Preliminary average annual generation of 22
protests or other comments filed, but Permit. gigawatt-hours.
only those who file a motion to b. Project No.: 12946–000. l. This filing is available for review at
c. Date filed: August 8, 2007. the Commission in the Public Reference
intervene in accordance with the
d. Applicant: Goodwin Hydro, LLC.
Commission’s Rules may become a Room or may be viewed on the
e. Name of Project: Goodwin Dam
party to the proceeding. Any comments, Commission’s Web site at http://
Hydroelectric Project.
protests, or motions to intervene must f. Location: Stanislaus River in www.ferc.gov using the ‘‘eLibrary’’ link.
be received on or before the specified Tuolumne and Calaveras counties, Enter the docket number excluding the
comment date for the particular California. It would use the existing last three digits in the docket number
application. Goodwin Dam owned by Oakdale field to access the document. For
r. Filing and Service of Responsive Irrigation District and San Joaquin assistance, call toll-free 1–866–208–
Documents—Any filings must bear in Irrigation District. 3676 or e-mail
all capital letters the title g. Filed Pursuant to: Federal Power FERCONLINESUPPORT@FERC.GOV.
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT Act, 16 U.S.C. 791(a)–825(r). For TTY, call (202) 502–8659. A copy is
TO FILE COMPETING APPLICATION’’, h. Applicant Contact: Mr. Brent L. also available for inspection and
‘‘COMPETING APPLICATION’’, Smith, COO, Symbiotics, LLC, P.O. Box reproduction at the address in item h
‘‘PROTEST’’, and ‘‘MOTION TO 535, Rigby, ID 83442, (208) 745–0834. above.
INTERVENE’’, as applicable, and the i. FERC Contact: Robert Bell, (202) m. Competing Preliminary Permit—
Project Number of the particular 502–4126. Anyone desiring to file a competing
application to which the filing refers. j. Deadline for filing comments, application for preliminary permit for a
Any of the above-named documents protests, and motions to intervene: 60 proposed project must submit the
must be filed by providing the original days from the issuance date of this competing application itself, or a notice
and the number of copies provided by notice. of intent to file such an application, to
the Commission’s regulations to: The All documents (original and eight the Commission on or before the
Secretary, Federal Energy Regulatory copies) should be filed with: Kimberly specified comment date for the
Commission, 888 First Street, NE., D. Bose, Secretary, Federal Energy particular application (see 18 CFR 4.36).
Washington, DC 20426. An additional Regulatory Commission, 888 First Submission of a timely notice of intent
copy must be sent to Director, Division Street, NE., Washington, DC 20426. allows an interested person to file the
of Hydropower Administration and Comments, protests, and interventions competing preliminary permit
Compliance, Federal Energy Regulatory may be filed electronically via the application no later than 30 days after
Commission, at the above-mentioned Internet in lieu of paper; see 18 CFR the specified comment date for the
address. A copy of any notice of intent, 385.2001(a)(1)(iii) and the instructions particular application. A competing
competing application or motion to on the Commission’s Web site under the preliminary permit application must
intervene must also be served upon each ‘‘e-Filing’’ link. The Commission conform with 18 CFR 4.30 and 4.36.
representative of the Applicant strongly encourages electronic filings. n. Competing Development
specified in the particular application. Please include the project number Application—Any qualified
s. Agency Comments—Federal, state, (P–12946–000) on any comments or development applicant desiring to file a
and local agencies are invited to file motions filed. competing development application
comments on the described application. The Commission’s Rules of Practice must submit to the Commission, on or
A copy of the application may be and Procedure require all intervenors before a specified comment date for the
obtained by agencies directly from the filing documents with the Commission particular application, either a
Applicant. If an agency does not file to serve a copy of that document on competing development application or a
comments within the time specified for each person in the official service list notice of intent to file such an
filing comments, it will be presumed to for the project. Further, if an intervenor application. Submission of a timely
have no comments. One copy of an files comments or documents with the notice of intent to file a development
agency’s comments must also be sent to Commission relating to the merits of an application allows an interested person
the Applicant’s representatives. issue that may affect the responsibilities to file the competing application no
rwilkins on PROD1PC63 with NOTICES

of a particular resource agency, they later than 120 days after the specified
Kimberly D. Bose, must also serve a copy of the document comment date for the particular
Secretary. on that resource agency. application. A competing license
[FR Doc. E8–2415 Filed 2–8–08; 8:45 am] k. Description of Project: The application must conform with 18 CFR
BILLING CODE 6717–01–P proposed project using the Oakdale 4.30 and 4.36.

VerDate Aug<31>2005 16:44 Feb 08, 2008 Jkt 214001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 E:\FR\FM\11FEN1.SGM 11FEN1
7728 Federal Register / Vol. 73, No. 28 / Monday, February 11, 2008 / Notices

o. Notice of Intent—A notice of intent s. Agency Comments—Federal, state, project number (P–12949–000) on any
must specify the exact name, business and local agencies are invited to file comments or motions filed.
address, and telephone number of the comments on the described application. The Commission’s Rules of Practice
prospective applicant, and must include A copy of the application may be and Procedure require all intervenors
an unequivocal statement of intent to obtained by agencies directly from the filing documents with the Commission
submit, if such an application may be Applicant. If an agency does not file to serve a copy of that document on
filed, either a preliminary permit comments within the time specified for each person in the official service list
application or a development filing comments, it will be presumed to for the project. Further, if an intervenor
application (specify which type of have no comments. One copy of an files comments or documents with the
application). A notice of intent must be agency’s comments must also be sent to Commission relating to the merits of an
served on the applicant(s) named in this the Applicant’s representatives. issue that may affect the responsibilities
public notice. of a particular resource agency, they
p. Proposed Scope of Studies Under Kimberly D. Bose, must also serve a copy of the document
Permit—A preliminary permit, if issued, Secretary. on that resource agency.
does not authorize construction. The [FR Doc. E8–2416 Filed 2–8–08; 8:45 am] k. Description of Project: The
term of the proposed preliminary permit BILLING CODE 6717–01–P proposed project using the U.S. Army
would be 36 months. The work Corps of Engineers’ Lock and Dam #3
proposed under the preliminary permit and operated in a run-of-river mode
would include economic analysis, DEPARTMENT OF ENERGY would consist of: (1) A new powerhouse
preparation of preliminary engineering and switchyard; (2) four turbine/
plans, and a study of environmental Federal Energy Regulatory generator units with a combined
impacts. Based on the results of these Commission installed capacity of 100 megawatts; (3)
studies, the Applicant would decide [Project No. 12949–000] a new 2.6-mile-long above ground 69-
whether to proceed with the preparation kilovolt transmission line extending
of a development application to Arkansas River Hydro 3, LLC; Notice of from the switchyard to an
construct and operate the project. Application Accepted for Filing and interconnection point with the local
q. Comments, Protests, or Motions to Soliciting Motions To Intervene, utility’s distribution system; and (4)
Intervene—Anyone may submit Protests, and Comments appurtenant facilities. The proposed
comments, a protest, or a motion to Lock and Dam #3 Project would have an
intervene in accordance with the February 4, 2008. average annual generation of 300
requirements of Rules of Practice and Take notice that the following gigawatt-hours.
Procedure, 18 CFR 385.210, .211, .214. hydroelectric application has been filed l. This filing is available for review at
In determining the appropriate action to with the Commission and is available the Commission in the Public Reference
take, the Commission will consider all for public inspection: Room or may be viewed on the
protests or other comments filed, but a. Type of Application: Preliminary Commission’s Web site at http://
only those who file a motion to Permit. www.ferc.gov using the ‘‘eLibrary’’ link.
intervene in accordance with the b. Project No.: 12949–000. Enter the docket number excluding the
Commission’s Rules may become a c. Date filed: August 14, 2007. last three digits in the docket number
party to the proceeding. Any comments, d. Applicant: Arkansas River Hydro 3, field to access the document. For
protests, or motions to intervene must LLC. assistance, call toll-free 1–866–208–
be received on or before the specified e. Name of Project: Lock and Dam #3 3676 or e-mail
comment date for the particular Hydroelectric Project. FERCONLINESUPPORT@FERC.GOV.
application. f. Location: Arkansas River in Lincoln For TTY, call (202) 502–8659. A copy is
r. Filing and Service of Responsive County, Arkansas. It would use the U.S. also available for inspection and
Documents—Any filings must bear in Army Corps of Engineers’ Lock and Dam reproduction at the address in item h
all capital letters the title #3. above.
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT g. Filed Pursuant to: Federal Power m. Competing Preliminary Permit—
TO FILE COMPETING APPLICATION’’, Act, 16 U.S.C. 791(a)–825(r). Anyone desiring to file a competing
‘‘COMPETING APPLICATION’’, h. Applicant Contact: Mr. Brent L. application for preliminary permit for a
‘‘PROTEST’’, and ‘‘MOTION TO Smith, COO, Symbiotics, LLC, P.O. Box proposed project must submit the
INTERVENE’’, as applicable, and the 535, Rigby, ID 83442, (208) 745–0834. competing application itself, or a notice
Project Number of the particular i. FERC Contact: Robert Bell, (202) of intent to file such an application, to
application to which the filing refers. 502–4126. the Commission on or before the
Any of the above-named documents j. Deadline for filing comments, specified comment date for the
must be filed by providing the original protests, and motions to intervene: 60 particular application (see 18 CFR 4.36).
and the number of copies provided by days from the issuance date of this Submission of a timely notice of intent
the Commission’s regulations to: The notice. allows an interested person to file the
Secretary, Federal Energy Regulatory All documents (original and eight competing preliminary permit
Commission, 888 First Street, NE., copies) should be filed with: Secretary, application no later than 30 days after
Washington, DC 20426. An additional Federal Energy Regulatory Commission, the specified comment date for the
copy must be sent to Director, Division 888 First Street, NE., Washington, DC particular application. A competing
of Hydropower Administration and 20426. Comments, protests, and preliminary permit application must
Compliance, Federal Energy Regulatory interventions may be filed electronically conform with 18 CFR 4.30 and 4.36.
Commission, at the above-mentioned via the Internet in lieu of paper; see 18 n. Competing Development
rwilkins on PROD1PC63 with NOTICES

address. A copy of any notice of intent, CFR 385.2001(a)(1)(iii) and the Application—Any qualified
competing application or motion to instructions on the Commission’s Web development applicant desiring to file a
intervene must also be served upon each site under the ‘‘e-Filing’’ link. The competing development application
representative of the Applicant Commission strongly encourages must submit to the Commission, on or
specified in the particular application. electronic filings. Please include the before a specified comment date for the

VerDate Aug<31>2005 16:44 Feb 08, 2008 Jkt 214001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\11FEN1.SGM 11FEN1