You are on page 1of 2

Federal Register / Vol. 73, No.

28 / Monday, February 11, 2008 / Notices 7729

particular application, either a Secretary, Federal Energy Regulatory All documents (original and eight
competing development application or a Commission, 888 First Street, NE., copies) should be filed with: Kimberly
notice of intent to file such an Washington, DC 20426. An additional D. Bose, Secretary, Federal Energy
application. Submission of a timely copy must be sent to Director, Division Regulatory Commission, 888 First
notice of intent to file a development of Hydropower Administration and Street, NE., Washington, DC 20426.
application allows an interested person Compliance, Federal Energy Regulatory Comments, protests, and interventions
to file the competing application no Commission, at the above-mentioned may be filed electronically via the
later than 120 days after the specified address. A copy of any notice of intent, Internet in lieu of paper; see 18 CFR
comment date for the particular competing application or motion to 385.2001(a)(1)(iii) and the instructions
application. A competing license intervene must also be served upon each on the Commission’s Web site under the
application must conform with 18 CFR representative of the Applicant ‘‘e-Filing’’ link. The Commission
4.30 and 4.36. specified in the particular application. strongly encourages electronic filings.
o. Notice of Intent—A notice of intent s. Agency Comments—Federal, state, Please include the project number (P–
must specify the exact name, business and local agencies are invited to file 12948–000) on any comments or
address, and telephone number of the comments on the described application. motions filed.
prospective applicant, and must include A copy of the application may be The Commission’s Rules of Practice
an unequivocal statement of intent to obtained by agencies directly from the and Procedure require all intervenors
submit, if such an application may be Applicant. If an agency does not file filing documents with the Commission
filed, either a preliminary permit comments within the time specified for to serve a copy of that document on
application or a development filing comments, it will be presumed to each person in the official service list
application (specify which type of have no comments. One copy of an for the project. Further, if an intervenor
application). A notice of intent must be agency’s comments must also be sent to files comments or documents with the
served on the applicant(s) named in this the Applicant’s representatives. Commission relating to the merits of an
public notice. issue that may affect the responsibilities
p. Proposed Scope of Studies Under Kimberly D. Bose, of a particular resource agency, they
Permit—A preliminary permit, if issued, Secretary. must also serve a copy of the document
does not authorize construction. The [FR Doc. E8–2419 Filed 2–8–08; 8:45 am] on that resource agency.
term of the proposed preliminary permit BILLING CODE 6717–01–P k. Description of Project: The
would be 36 months. The work proposed project using the U.S. Army
proposed under the preliminary permit Corps of Engineers’ Clementine Dam
would include economic analysis, DEPARTMENT OF ENERGY and operated in a run-of-river mode
preparation of preliminary engineering would consist of: (1) A new 250-foot-
plans, and a study of environmental Federal Energy Regulatory long, 240-inch-diameter steel penstock;
impacts. Based on the results of these Commission (2) a new powerhouse and switchyard;
studies, the Applicant would decide [Project No. 12948–000] (3) one turbine/generator unit with an
whether to proceed with the preparation installed capacity of 3 megawatt; (4) a
of a development application to Clementine Dam Hydro, LLC; Notice of new 22-mile-long above ground 15-
construct and operate the project. Application Accepted for Filing and kilovolt transmission line extending
q. Comments, Protests, or Motions to Soliciting Motions To Intervene, from the switchyard to an
Intervene—Anyone may submit Protests, and Comments interconnection point with the local
comments, a protest, or a motion to utility’s distribution system; and (5)
intervene in accordance with the February 4, 2008. appurtenant facilities. The proposed
requirements of Rules of Practice and Take notice that the following Clementine Dam Project would have an
Procedure, 18 CFR 385.210, .211, .214. hydroelectric application has been filed average annual generation of 16
In determining the appropriate action to with the Commission and is available gigawatt-hours.
take, the Commission will consider all for public inspection: l. This filing is available for review at
protests or other comments filed, but a. Type of Application: Preliminary the Commission in the Public Reference
only those who file a motion to Permit. Room or may be viewed on the
intervene in accordance with the b. Project No.: 12948–000. Commission’s Web site at http://
Commission’s Rules may become a c. Date filed: August 8, 2007. www.ferc.gov using the ‘‘eLibrary’’ link.
party to the proceeding. Any comments, d. Applicant: Clementine Dam Hydro, Enter the docket number excluding the
protests, or motions to intervene must LLC. last three digits in the docket number
be received on or before the specified e. Name of Project: Clementine Dam field to access the document. For
comment date for the particular Hydroelectric Project. assistance, call toll-free 1–866–208–
application. f. Location: American River in Placer 3676 or e-mail
r. Filing and Service of Responsive County, California. It would use the U.S. FERCONLINESUPPORT@FERC.GOV.
Documents—Any filings must bear in Army Corps of Engineers’ Clementine For TTY, call (202) 502–8659. A copy is
all capital letters the title Dam. also available for inspection and
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT g. Filed Pursuant to: Federal Power reproduction at the address in item h
TO FILE COMPETING APPLICATION’’, Act, 16 U.S.C. 791(a)–825(r). above.
‘‘COMPETING APPLICATION’’, h. Applicant Contact: Mr. Brent L. m. Competing Preliminary Permit—
‘‘PROTEST’’, and ‘‘MOTION TO Smith, COO, Symbiotics, LLC, P.O. Box Anyone desiring to file a competing
INTERVENE’’, as applicable, and the 535, Rigby, ID 83442, (208) 745–0834. application for preliminary permit for a
Project Number of the particular i. FERC Contact: Robert Bell, (202) proposed project must submit the
rwilkins on PROD1PC63 with NOTICES

application to which the filing refers. 502–4126. competing application itself, or a notice
Any of the above-named documents j. Deadline for filing comments, of intent to file such an application, to
must be filed by providing the original protests, and motions to intervene: 60 the Commission on or before the
and the number of copies provided by days from the issuance date of this specified comment date for the
the Commission’s regulations to: The notice. particular application (see 18 CFR 4.36).

VerDate Aug<31>2005 16:44 Feb 08, 2008 Jkt 214001 PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 E:\FR\FM\11FEN1.SGM 11FEN1
7730 Federal Register / Vol. 73, No. 28 / Monday, February 11, 2008 / Notices

Submission of a timely notice of intent r. Filing and Service of Responsive use the U.S. Bureau of Reclamation’s
allows an interested person to file the Documents—Any filings must bear in Imperial Diversion Dam.
competing preliminary permit all capital letters the title g. Filed Pursuant to: Federal Power
application no later than 30 days after ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT Act, 16 U.S.C. 791(a)—825(r).
the specified comment date for the TO FILE COMPETING APPLICATION’’, h. Applicant Contact: Mr. Brent L.
particular application. A competing ‘‘COMPETING APPLICATION’’, Smith, COO, Symbiotics, LLC, P.O. Box
preliminary permit application must ‘‘PROTEST’’, and ‘‘MOTION TO 535, Rigby, ID 83442, (208) 745–0834.
conform with 18 CFR 4.30 and 4.36. INTERVENE’’, as applicable, and the i. FERC Contact: Robert Bell, (202)
n. Competing Development Project Number of the particular 502–4126.
Application—Any qualified application to which the filing refers. j. Deadline for filing comments,
development applicant desiring to file a Any of the above-named documents protests, and motions to intervene: 60
competing development application must be filed by providing the original days from the issuance date of this
must submit to the Commission, on or and the number of copies provided by notice.
before a specified comment date for the All documents (original and eight
the Commission’s regulations to: The
particular application, either a copies) should be filed with: Kimberly
Secretary, Federal Energy Regulatory
competing development application or a D. Bose, Secretary, Federal Energy
Commission, 888 First Street, NE.,
notice of intent to file such an Regulatory Commission, 888 First
Washington, DC 20426. An additional
application. Submission of a timely Street, NE., Washington, DC 20426.
copy must be sent to Director, Division
notice of intent to file a development Comments, protests, and interventions
of Hydropower Administration and
application allows an interested person may be filed electronically via the
Compliance, Federal Energy Regulatory
to file the competing application no Internet in lieu of paper; see 18 CFR
Commission, at the above-mentioned 385.2001(a)(1)(iii) and the instructions
later than 120 days after the specified address. A copy of any notice of intent,
comment date for the particular on the Commission’s Web site under the
competing application or motion to ‘‘e-Filing’’ link. The Commission
application. A competing license intervene must also be served upon each
application must conform with 18 CFR strongly encourages electronic filings.
representative of the Applicant Please include the project number (P–
4.30 and 4.36. specified in the particular application.
o. Notice of Intent—A notice of intent 12947–000) on any comments or
s. Agency Comments—Federal, state,
must specify the exact name, business motions filed.
and local agencies are invited to file The Commission’s Rules of Practice
address, and telephone number of the comments on the described application.
prospective applicant, and must include and Procedure require all intervenors
A copy of the application may be filing documents with the Commission
an unequivocal statement of intent to obtained by agencies directly from the
submit, if such an application may be to serve a copy of that document on
Applicant. If an agency does not file each person in the official service list
filed, either a preliminary permit comments within the time specified for
application or a development for the project. Further, if an intervenor
filing comments, it will be presumed to files comments or documents with the
application (specify which type of have no comments. One copy of an
application). A notice of intent must be Commission relating to the merits of an
agency’s comments must also be sent to issue that may affect the responsibilities
served on the applicant(s) named in this
the Applicant’s representatives. of a particular resource agency, they
public notice.
p. Proposed Scope of Studies Under Kimberly D. Bose, must also serve a copy of the document
Permit—A preliminary permit, if issued, Secretary. on that resource agency.
does not authorize construction. The [FR Doc. E8–2418 Filed 2–8–08; 8:45 am] k. Description of Project: The
term of the proposed preliminary permit proposed project using the U.S. Bureau
BILLING CODE 6717–01–P
would be 36 months. The work of Reclamation’s Imperial Diversion
proposed under the preliminary permit Dam and operated in a run-of-river
would include economic analysis, DEPARTMENT OF ENERGY mode would consist of: (1) A new
preparation of preliminary engineering powerhouse and switchyard; (2) two
plans, and a study of environmental Federal Energy Regulatory turbine/generator units with a combined
impacts. Based on the results of these Commission installed capacity of 2.1 megawatts; (3)
studies, the Applicant would decide a new 1-mile-long above ground 12.5-
[Project No. 12947–000]
whether to proceed with the preparation kilovolt transmission line extending
of a development application to Imperial Hydro, LLC; Notice of from the switchyard to an
construct and operate the project. Application Accepted for Filing and interconnection point with the local
q. Comments, Protests, or Motions to Soliciting Motions to Intervene, utility’s distribution system; and (4)
Intervene—Anyone may submit Protests, and Comments appurtenant facilities. The proposed
comments, a protest, or a motion to Imperial Diversion Dam Project would
intervene in accordance with the February 4, 2008. have an average annual generation of 10
requirements of Rules of Practice and Take notice that the following gigawatt-hours.
Procedure, 18 CFR 385.210, .211, .214. hydroelectric application has been filed l. This filing is available for review at
In determining the appropriate action to with the Commission and is available the Commission in the Public Reference
take, the Commission will consider all for public inspection: Room or may be viewed on the
protests or other comments filed, but a. Type of Application: Preliminary Commission’s Web site at http://
only those who file a motion to Permit. www.ferc.gov using the ‘‘eLibrary’’ link.
intervene in accordance with the b. Project No.: 12947–000. Enter the docket number excluding the
Commission’s Rules may become a c. Date Filed: August 8, 2007. last three digits in the docket number
rwilkins on PROD1PC63 with NOTICES

party to the proceeding. Any comments, d. Applicant: Imperial Hydro, LLC. field to access the document. For
protests, or motions to intervene must e. Name of Project: Imperial Diversion assistance, call toll-free 1–866–208–
be received on or before the specified Dam Hydroelectric Project. 3676 or e-mail
comment date for the particular f. Location: Colorado River in FERCONLINESUPPORT@FERC.GOV.
application. Imperial County, California. It would For TTY, call (202) 502–8659. A copy is

VerDate Aug<31>2005 16:44 Feb 08, 2008 Jkt 214001 PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 E:\FR\FM\11FEN1.SGM 11FEN1