Federal Register / Vol. 73, No.

20 / Wednesday, January 30, 2008 / Notices 5535

particular application, either a Project Number of the particular h. Applicant Contact: Mr. Brent
competing development application or a application to which the filing refers. Smith, Symbiotics, LLC, P. O. Box 535,
notice of intent to file such an Any of the above-named documents Rigby, ID 83442, Phone (208) 745–0834.
application. Submission of a timely must be filed by providing the original i. FERC Contact: Patricia W. Gillis,
notice of intent to file a development and the number of copies provided by (202) 502–8735.
application allows an interested person the Commission’s regulations to: The j. Deadline for filing comments,
to file the competing application no Secretary, Federal Energy Regulatory protests, and motions to intervene: 60
later than 120 days after the specified Commission, 888 First Street, NE., days from the issuance date of this
comment date for the particular Washington, DC 20426. An additional notice.
application. A competing license copy must be sent to Director, Division All documents (original and eight
application must conform with 18 CFR of Hydropower Administration and copies) should be filed with: Kimberly
4.30 and 4.36. Compliance, Federal Energy Regulatory D. Bose, Secretary, Federal Energy
p. Notice of Intent: A notice of intent Commission, at the above-mentioned Regulatory Commission, 888 First
must specify the exact name, business address. A copy of any notice of intent, Street, NE., Washington, DC 20426.
address, and telephone number of the competing application or motion to Comments, protests, and interventions
prospective applicant, and must include intervene must also be served upon each may be filed electronically via the
an unequivocal statement of intent to representative of the Applicant Internet in lieu of paper; see 18 CFR
submit, if such an application may be specified in the particular application. 385.2001(a)(1)(iii) and the instructions
filed, either a preliminary permit t. Agency Comments: Federal, State, on the Commission’s Web site under the
application or a development and local agencies are invited to file ‘‘e-Filing’’ link. The Commission
application (specify which type of comments on the described application. strongly encourages electronic filings.
application). A notice of intent must be A copy of the application may be Please include the project number
served on the applicant(s) named in this obtained by agencies directly from the (P–12987–000) on any comments or
public notice. Applicant. If an agency does not file motions filed.
q. Proposed Scope of Studies Under comments within the time specified for The Commission’s Rules of Practice
Permit: A preliminary permit, if issued, filing comments, it will be presumed to and Procedure require all intervenors
does not authorize construction. The have no comments. One copy of an filing documents with the Commission
term of the proposed preliminary permit agency’s comments must also be sent to
would be 36 months. The work to serve a copy of that document on
the Applicant’s representatives. each person in the official service list
proposed under the preliminary permit
would include economic analysis, Kimberly D. Bose, for the project. Further, if an intervenor
preparation of preliminary engineering files comments or documents with the
Secretary.
plans, and a study of environmental Commission relating to the merits of an
[FR Doc. E8–1630 Filed 1–29–08; 8:45 am]
impacts. Based on the results of these issue that may affect the responsibilities
BILLING CODE 6717–01–P
studies, the Applicant would decide of a particular resource agency, they
whether to proceed with the preparation must also serve a copy of the document
of a development application to on that resource agency.
DEPARTMENT OF ENERGY
construct and operate the project. k. Description of Project: The
r. Comments, Protests, or Motions To Federal Energy Regulatory proposed project would utilize the
Intervene: Anyone may submit Commission existing U.S. Army Corps of Engineers’
comments, a protest, or a motion to Lock and Dam #5 and would consist of:
intervene in accordance with the (1) A proposed powerhouse containing
[Project No. 12987–000]
requirements of Rules of Practice and four generating units with a total
Procedure, 18 CFR 385.210, .211, .214. Mississippi 5 Hydro, LLC; Notice of installed capacity of 30-megawatts; (2) a
In determining the appropriate action to Application Accepted for Filing and switchyard; (3) a proposed 0.1-mile-
take, the Commission will consider all Soliciting Comments, Motions To long, 69-kV transmission line; and (4)
protests or other comments filed, but Intervene, and Protests appurtenant facilities. The proposed
only those who file a motion to project would have an estimated annual
intervene in accordance with the January 24, 2008. generation of 135-gigawatts and would
Commission’s Rules may become a Take notice that the following be sold to a local utility.
party to the proceeding. Any comments, hydroelectric applications have been l. Location of Application: A copy of
protests, or motions to intervene must filed with the Commission and are the application is available for
be received on or before the specified available for public inspection: inspection and reproduction at the
comment date for the particular a. Type of Application: Preliminary Commission in the Public Reference
application. Permit. Room, located at 888 First Street, NE.,
Comments, protests and interventions b. Project No.: P–12987–000. Room 2A, Washington, DC 20426, or by
may be filed electronically via the c. Date Filed: August 30, 2007. calling (202) 502–8371. This filing may
Internet in lieu of paper. See 18 CFR d. Applicant: Mississippi 5 Hydro, also be viewed on the Commission’s
385.2001 (a)(1)(iii) and the instructions LLC. Web site at http://www.ferc.gov using
on the Commission’s Web site at http:// e. Name of the Project: Lock and Dam the ‘‘eLibrary’’ link. Enter the docket
www.ferc.gov under the ‘‘e-Filing’’ link. #5 Hydroelectric Project. number excluding the last three digits in
s. Filing and Service of Responsive f. Location: The project would be the docket number field to access the
Documents: Any filings must bear in all located on the Mississippi River in document. For assistance, call toll-free
mstockstill on PROD1PC66 with NOTICES

capital letters the title ‘‘COMMENTS’’, Winona County, Minnesota and Buffalo 1–866–208–3676 or e-mail
‘‘NOTICE OF INTENT TO FILE County, Wisconsin. The Lock and Dam FERCOnlineSupport@ferc.gov. For TTY,
COMPETING APPLICATION’’, #5 is owned and maintained by the U.S. call (202) 502–8659. A copy is also
‘‘COMPETING APPLICATION’’, Army Corps of Engineers. available for inspection and
‘‘PROTEST’’, and ‘‘MOTION TO g. Filed Pursuant to: Federal Power reproduction at the address in item h
INTERVENE’’, as applicable, and the Act, 16 U.S.C. 791a–825r. above.

VerDate Aug<31>2005 18:49 Jan 29, 2008 Jkt 214001 PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 E:\FR\FM\30JAN1.SGM 30JAN1
5536 Federal Register / Vol. 73, No. 20 / Wednesday, January 30, 2008 / Notices

m. Individuals desiring to be included requirements of Rules of Practice and DEPARTMENT OF ENERGY


on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214.
so indicate by writing to the Secretary In determining the appropriate action to Federal Energy Regulatory
of the Commission. take, the Commission will consider all Commission
n. Competing Preliminary Permit— protests or other comments filed, but [Project No. 12965–000]
Anyone desiring to file a competing only those who file a motion to
application for preliminary permit for a intervene in accordance with the Wickiup Hydro Group, LLC; Notice of
proposed project must submit the Commission’s Rules may become a Application Accepted for Filing and
competing application itself, or a notice Soliciting Motions To Intervene,
party to the proceeding. Any comments,
of intent to file such an application, to Protests, and Comments
protests, or motions to intervene must
the Commission on or before the
specified comment date for the be received on or before the specified January 24, 2008.
particular application (see 18 CFR 4.36). comment date for the particular Take notice that the following
Submission of a timely notice of intent application. hydroelectric application has been filed
allows an interested person to file the Comments, protests and interventions with the Commission and is available
competing preliminary permit may be filed electronically via the for public inspection:
application no later than 30 days after Internet in lieu of paper. See 18 CFR a. Type of Application: Preliminary
the specified comment date for the 385.2001 (a)(1)(iii) and the instructions Permit.
particular application. A competing on the Commission’s Web site at http:// b. Project No.: 12965–000.
preliminary permit application must www.ferc.gov under the ‘‘e-Filing’’ link. c. Date Filed: August 20, 2007.
conform with 18 CFR 4.30 and 4.36. d. Applicant: Wickiup Hydro Group,
o. Competing Development s. Filing and Service of Responsive LLC.
Application—Any qualified Documents—Any filings must bear in e. Name of Project: Wickiup Dam
development applicant desiring to file a all capital letters the title Hydroelectric Project.
competing development application ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT f. Location: Deschutes River in
must submit to the Commission, on or TO FILE COMPETING APPLICATION’’, Deschutes County, Oregon. It would use
before a specified comment date for the ‘‘COMPETING APPLICATION’’, the U.S. Bureau of Reclamation’s
particular application, either a ‘‘PROTEST’’, and ‘‘MOTION TO Wickiup Dam.
competing development application or a INTERVENE’’, as applicable, and the g. Filed Pursuant to: Federal Power
notice of intent to file such an Project Number of the particular Act, 16 U.S.C. 791(a)–825(r).
application. Submission of a timely application to which the filing refers. h. Applicant Contact: Mr. Brent L.
notice of intent to file a development Any of the above-named documents Smith, COO, Symbiotics, LLC, P.O. Box
application allows an interested person must be filed by providing the original 535, Rigby, ID 83442, (208) 745–0834.
to file the competing application no and the number of copies provided by i. FERC Contact: Robert Bell, (202)
later than 120 days after the specified 502–4126.
the Commission’s regulations to: The
comment date for the particular j. Deadline for filing comments,
Secretary, Federal Energy Regulatory protests, and motions to intervene: 60
application. A competing license Commission, 888 First Street, NE.,
application must conform with 18 CFR days from the issuance date of this
Washington, DC 20426. An additional notice.
4.30 and 4.36.
p. Notice of Intent—A notice of intent copy must be sent to Director, Division All documents (original and eight
must specify the exact name, business of Hydropower Administration and copies) should be filed with: Kimberly
address, and telephone number of the Compliance, Federal Energy Regulatory D. Bose, Secretary, Federal Energy
prospective applicant, and must include Commission, at the above-mentioned Regulatory Commission, 888 First
an unequivocal statement of intent to address. A copy of any notice of intent, Street, NE., Washington, DC 20426.
submit, if such an application may be competing application or motion to Comments, protests, and interventions
filed, either a preliminary permit intervene must also be served upon each may be filed electronically via the
application or a development representative of the Applicant Internet in lieu of paper; see 18 CFR
application (specify which type of specified in the particular application. 385.2001(a)(1)(iii) and the instructions
application). A notice of intent must be t. Agency Comments—Federal, state, on the Commission’s Web site under the
served on the applicant(s) named in this and local agencies are invited to file ‘‘e-Filing’’ link. The Commission
public notice. comments on the described application. strongly encourages electronic filings.
q. Proposed Scope of Studies Under Please include the project number (P–
A copy of the application may be
Permit—A preliminary permit, if issued, 12965–000) on any comments or
obtained by agencies directly from the
does not authorize construction. The motions filed.
term of the proposed preliminary permit Applicant. If an agency does not file The Commission’s Rules of Practice
would be 36 months. The work comments within the time specified for and Procedure require all intervenors
proposed under the preliminary permit filing comments, it will be presumed to filing documents with the Commission
would include economic analysis, have no comments. One copy of an to serve a copy of that document on
preparation of preliminary engineering agency’s comments must also be sent to each person in the official service list
plans, and a study of environmental the Applicant’s representatives. for the project. Further, if an intervenor
impacts. Based on the results of these Kimberly D. Bose, files comments or documents with the
studies, the Applicant would decide Commission relating to the merits of an
Secretary.
whether to proceed with the preparation issue that may affect the responsibilities
mstockstill on PROD1PC66 with NOTICES

of a development application to [FR Doc. E8–1632 Filed 1–29–08; 8:45 am] of a particular resource agency, they
construct and operate the project. BILLING CODE 6717–01–P must also serve a copy of the document
r. Comments, Protests, or Motions To on that resource agency.
Intervene—Anyone may submit k. Description of Project: The
comments, a protest, or a motion to proposed project using the U.S. Bureau
intervene in accordance with the of Reclamation’s Wickiup Dam and

VerDate Aug<31>2005 18:49 Jan 29, 2008 Jkt 214001 PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 E:\FR\FM\30JAN1.SGM 30JAN1

You might also like