You are on page 1of 3

4858 Federal Register / Vol. 73, No.

18 / Monday, January 28, 2008 / Notices

another opportunity to offer your For additional information, please the documents. Go to http://
comments on the project. Interested contact the Commission’s Office of www.ferc.gov/esubscribenow.htm.
groups and individuals are encouraged External Affairs at 1–866–208–FERC Finally, Dominion has established an
to attend the meeting and to present (3372). Internet Web site for this project at
comments on the environmental issues http://www.dom.com/about/gas-
Environmental Mailing List
they believe should be addressed in the transmission/storage/index.jsp. The
EA. A transcript of the meeting will be An effort is being made to send this Web site includes a project overview,
made so that your comments will be notice to all individuals, organizations, status, and answers to frequently asked
accurately recorded.3 and government entities interested in questions. You can also request
All public meetings will be posted on and/or potentially affected by the additional information by calling
the Commission’s calendar located at proposed project. This includes all Dominion at 1–888–882–5055.
http://www.ferc.gov/EventCalendar/ landowners who are potential right-of-
way grantors, whose property may be Kimberly D. Bose,
EventsList.aspx along with other related
used temporarily for project purposes, Secretary.
information.
Once Dominion formally files its or who own homes within distances [FR Doc. E8–1421 Filed 1–25–08; 8:45 am]
application with the Commission, you defined in the Commission’s regulations BILLING CODE 6717–01–P

may want to become an official party to of certain aboveground facilities. If you


the proceeding known as an do not return the attached form
‘‘intervenor.’’ Intervenors play a more (Appendix B), you will be removed from DEPARTMENT OF ENERGY
formal role in the process and are able the Commission’s environmental
mailing list. All individuals who Federal Energy Regulatory
to file briefs, appear at hearings, and be Commission
heard by the courts if they choose to provide written comments, attend the
appeal the Commission’s final ruling. scoping meeting, or return the ‘‘Keep on [Docket No. PF08–2–000]
An intervenor formally participates in a Mailing List Form’’ will remain on our
Commission proceeding by filing a environmental mailing list for this MarkWest Pioneer, L.L.C.; Notice of
request to intervene. Instructions for project. Intent To Prepare an Environmental
becoming an intervenor are included in Any individual who participated in Assessment for the Proposed Arkoma
the User’s Guide under the ‘‘e-filing’’ the first scoping period will remain on Connector Pipeline Project; and
link on the Commission’s Web site. our mailing list and does not need to Request for Comments on
Please note that you may not request mail back the enclosed ‘‘Keep on Environmental Issues
intervenor status at this time. You must Mailing List Form’’. This includes those
January 18, 2008.
wait until a formal application is filed who already have:
• Mailed in comments to FERC; The staff of the Federal Energy
with the Commission. Regulatory Commission (FERC or
• Mailed back the ‘‘Keep on the
Site Visit Mailing List Form’’ ; or Commission) will prepare an
• Attended the scoping meeting in environmental assessment (EA) that will
On February 6, 2008, the Office of discuss the environmental impacts of
Energy Projects staff will conduct a pre- Lawrenceville, Pennsylvania, on
September 18, 2007. the proposed Arkoma Connector
certification site visit of the proposed Pipeline Project which involves the
Middletown Compressor Station in Additional Information construction and operation of natural
Middletown, Maryland. We will view Additional information about the gas pipeline facilities in Coal, Atoka,
Dominion’s proposed compressor project is available from the and Bryan Counties, Oklahoma. This
station site and possibly alternative sites Commission’s Office of External Affairs notice announces the opening of the
that are being considered for the at 1–866–208–FERC (3372) or on the scoping period that will be used to
proposed project. Staff will tour these FERC Internet Web site (http:// gather environmental input from the
proposed project areas by automobile www.ferc.gov). Using the ‘‘eLibrary’’ public and interested agencies on the
and on foot. Representatives of link, select ‘‘General Search’’ from the project. Your input will help the
Dominion will accompany the OEP eLibrary menu, enter the selected date Commission staff determine which
staff. range and ‘‘Docket Number’’ excluding issues need to be evaluated in the EA.
All interested parties may attend the the last three digits (i.e., PF07–12), and Please note that the scoping period will
site visit. Those planning to attend must follow the instructions. For assistance close on February 20, 2008.
provide their own transportation. If you with access to eLibrary, the helpline can Comments may be submitted in
are interested in attending the site visit, be reached at 1–866–208–3676, TTY written form or verbally. Further details
please meet us at 1:30 p.m. at the (202) 502–8659, or at on how to submit written comments are
proposed Middletown Compressor FERCOnlineSupport@ferc.gov. The provided in the Public Participation
Station Site. The directions to the eLibrary link on the FERC Internet Web portion of this notice.
location of the proposed compressor site also provides access to the texts of If you are a landowner receiving this
station from Middletown, Maryland are formal documents issued by the notice, you may be contacted by a
as follows: Commission, such as orders, notices, pipeline company representative about
Take US–40–Alt West to Marker Road, turn and rule makings. the acquisition of an easement to
left. Travel on Marker Road about 1.5 miles In addition, the Commission now construct, operate, and maintain the
until you pass PL–1 pipeline and power offers a free service called eSubscription proposed facilities. MarkWest Pioneer,
lines. The proposed compressor station which allows you to keep track of all L.L.C. (MarkWest) would seek to
mstockstill on PROD1PC66 with NOTICES

property will be on your left (see Appendix formal issuances and submittals in negotiate a mutually acceptable
A map for location).
specific dockets. This can reduce the agreement. However, if the project is
3 We previously held a public scoping meeting on
amount of time you spend researching approved by the Commission, that
September 18, 2007, in Lawrenceville,
proceedings by automatically providing approval conveys with it the right of
Pennsylvania to address Dominion’s proposed you with notification of these filings, eminent domain. Therefore, if easement
facilities in Pennsylvania. document summaries and direct links to negotiations fail to produce an

VerDate Aug<31>2005 17:56 Jan 25, 2008 Jkt 214001 PO 00000 Frm 00092 Fmt 4703 Sfmt 4703 E:\FR\FM\28JAN1.SGM 28JAN1
Federal Register / Vol. 73, No. 18 / Monday, January 28, 2008 / Notices 4859

agreement, MarkWest could initiate the pipeline, and would maintain a 50- comments or concerns about the project.
condemnation proceedings in foot-wide permanent right-of-way for By filing comments, your concerns will
accordance with state law. operation of the pipeline. be addressed in the EA and considered
This notice is being sent to affected by the Commission. You should focus
landowners; federal, state, and local The EA Process
on the potential environmental effects of
government representatives and We 2 are preparing this EA to comply the proposal, reasonable alternatives to
agencies; elected officials; Native with the National Environmental Policy the proposal including alternative
American tribes; other interested Act (NEPA) which requires the locations and routes, and measures to
parties; and local libraries and Commission to take into account the avoid or lessen environmental impact.
newspapers. State and local government environmental impact that could result The more specific your comments, the
representatives are asked to notify their if it authorizes MarkWest’s proposal. By more useful they will be. Please
constituents of this proposed project this notice, we are also asking federal, carefully follow these instructions to
and to encourage them to comment on state, and local agencies with ensure that your comments are received
their areas of concern. jurisdiction and/or special expertise in time and properly recorded:
A fact sheet prepared by the FERC with respect to environmental issues to • Send an original and two copies of
entitled ‘‘An Interstate Natural Gas formally cooperate with us in the your letter to: Kimberly D. Bose,
Facility On My Land? What Do I Need preparation of the EA. Agencies that Secretary, Federal Energy Regulatory
To Know?’’ addresses a number of would like to request cooperating status Commission, 888 First St., NE., Room
typically asked questions, including the should follow the instructions for filing 1A, Washington, DC 20426.
use of eminent domain and how to comments provided below. • Label one copy of the comments for
participate in the Commission’s NEPA also requires the FERC to the attention of Gas Branch 3.
proceedings. It is available for viewing discover and address concerns the • Reference Docket No. PF08–2–000.
on the FERC Internet Web site (http:// public may have about proposals. This • Mail your comments so that they
www.ferc.gov). process is referred to as ‘‘scoping.’’ The will be received in Washington, DC, on
Summary of the Proposed Project main goal of the scoping process is to or before February 20, 2008.
focus the analysis in the EA on the The Commission encourages
MarkWest seeks authorization to important environmental issues. By this
construct new pipeline facilities in Coal, electronic filing of comments. See Title
Notice of Intent, we are requesting 18 Code of Federal Regulations, section
Atoka, and Bryan Counties, Oklahoma. public comments on the scope of the
The Arkoma Connector Pipeline Project 385.2001(a)(1)(iii) and the instructions
issues to address in the EA. All on the Commission’s Web site at http://
would consist of about 50 miles of 24- comments received will be considered
inch-diameter pipeline, a 10,000- www.ferc.gov under the ‘‘e-Filing’’ link
during the preparation of the EA. and the link to the User’s Guide. Prepare
horsepower compressor station and In the EA we will discuss impacts that
associated facilities, and two meter your submission in the same manner as
could occur as a result of the you would if filing on paper and save
stations. The pipeline project would be construction and operation of the
designed to deliver a peak day capacity it to a file on your hard drive. Before
proposed project under these general you can file comments you will need to
of 300,000 to 350,000 decatherms of headings:
natural gas from producers in the create an account by clicking on ‘‘Login
• Geology and soils. to File’’ and then ‘‘New User Account.’’
Arkoma Basin area of southeastern • Land use.
Oklahoma to the Midcontinent Express You will be asked to select the type of
• Water resources, fisheries, and filing you are making. This filing is
Pipeline that is currently proposed wetlands.
under Docket No. CP08–6–000. The considered a ‘‘Comment on Filing.’’
• Cultural resources. We might mail the EA for comment.
general location of the proposed project • Vegetation and wildlife.
facilities is shown in Appendix 1.1 If you are interested in receiving it,
• Air quality and noise. please return the Information Request
Land Requirements for Construction • Endangered and threatened species.
(Appendix 3). If you do not return the
• Hazardous waste.
Construction of the proposed project Information Request, you will be taken
• Public safety.
would affect a total of about 629 acres. off the mailing list.
We will also evaluate possible
Following construction, about 319 acres
alternatives to the proposed project or Additional Information
would be allowed to revert to its
portions of the project, and make Additional information about the
previous conditions. Disturbance
recommendations on how to lessen or project is available from the
associated with aboveground facilities
avoid impacts on the various resource Commission’s Office of External Affairs,
would permanently impact
areas. at 1–866–208–FERC or on the FERC
approximately 10 acres of land. The
Although no formal application has Internet Web site (http://www.ferc.gov)
compressor station would require about
been filed, the FERC staff has already using the ‘‘eLibrary’’ link. Click on the
8 acres and the two meter stations
initiated its NEPA review under its Pre- eLibrary link, click on ‘‘General Search’’
would each require about 1 acre of
filing Process. The purpose of the Pre- and enter the docket number excluding
disturbance. MarkWest would seek a 90-
filing Process is to encourage the early the last three digits in the Docket
foot-wide construction right-of-way for
involvement of interested stakeholders Number field. Be sure you have selected
1 The appendices referenced in this notice are not
and to identify and resolve issues before an appropriate date range. For
being printed in the Federal Register. Copies of all an application is filed with the FERC. assistance, please contact FERC Online
appendices are available on the Commission’s Web
site at the ‘‘eLibrary’’ link or from the Commission’s Public Participation Support at FercOnlineSupport@ferc.gov
mstockstill on PROD1PC66 with NOTICES

Public Reference Room, 888 First Street, NE., or toll free at 1–866–208–3676, or for
You can make a difference by
Washington, DC 20426, or call (202) 502–8371. For TTY, contact (202)502–8659. The
instructions on connecting to eLibrary refer to the providing us with your specific
eLibrary link also provides access to the
last page of this notice. Copies of the appendices
were sent to all those receiving this notice in the 2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the texts of formal documents issued by the
mail. Requests for detailed maps of the proposed environmental staff of the FERC’s Office of Energy Commission, such as orders, notices,
facilities should be made directly to MarkWest. Projects. and rulemakings.

VerDate Aug<31>2005 17:56 Jan 25, 2008 Jkt 214001 PO 00000 Frm 00093 Fmt 4703 Sfmt 4703 E:\FR\FM\28JAN1.SGM 28JAN1
4860 Federal Register / Vol. 73, No. 18 / Monday, January 28, 2008 / Notices

In addition, the Commission now the deadline above, SYNERGY is existing rate for the expanded service,
offers a free service called eSubscription authorized to issue securities and but states that a slightly higher rate
which allows you to keep track of all assume obligations or liabilities as a could be supported based on the actual
formal issuances and submittals in guarantor, indorser, surety, or otherwise costs of the project.
specific dockets. This can reduce the in respect of any security of another This filing is available for review at
amount of time you spend researching person; provided that such issuance or
the Commission in the Public Reference
proceedings by automatically providing assumption is for some lawful object
Room or may be viewed on the
you with notification of these filings, within the corporate purposes of
document summaries and direct links to SYNERGY, compatible with the public Commission’s Web site at http://
the documents. Go to http:// interest, and is reasonably necessary or www.ferc.gov using the ‘‘eLibrary’’ link.
www.ferc.gov/esubscribenow.htm. appropriate for such purposes. Enter the docket number excluding the
The Commission reserves the right to last three digits in the docket number
Kimberly D. Bose, field to access the document. For
require a further showing that neither
Secretary. public nor private interests will be assistance, please contact FERC Online
[FR Doc. E8–1419 Filed 1–25–08; 8:45 am] adversely affected by continued Support at
BILLING CODE 6717–01–P approvals of SYNERGY’s issuance of FERCOnlineSupport@ferc.gov or toll
securities or assumptions of liability. free at (866) 208–3676, or for TTY,
Copies of the full text of the Director’s contact (202) 502–8659.
DEPARTMENT OF ENERGY Order are available from the Any questions regarding the
Commission’s Public Reference Room, application are to be directed to Garth
Federal Energy Regulatory 888 First Street, NE., Washington, DC
Commission Johnson, General Manager, Certificates
20426. The Order may also be viewed
& Reporting, East Tennessee Natural
[Docket No. ER08–323–000] on the Commission’s Web site at
Gas, LLC, 5400 Westheimer Court, P.O.
http://www.ferc.gov, using the eLibrary
SYNERGY Power Marketing Inc.; link. Enter the docket number excluding Box 1642, Houston, Texas 77251–1642,
Notice of Issuance of Order the last three digits in the docket telephone no. (713) 627–5415 and E-
number filed to access the document. mail: gjohnson@spectraenergy.com.
January 18, 2008.
Comments, protests, and interventions Any person desiring to intervene or to
SYNERGY Power Marketing Inc.
(SYNERGY) filed an application for may be filed electronically via the protest this filing must file in
market-based rate authority, with internet in lieu of paper. See, 18 CFR accordance with Rules 211 and 214 of
accompanying tariff. The proposed 385.2001(a)(1)(iii) and the instructions the Commission’s Rules of Practice and
market-based rate tariff provides for the on the Commission’s web site under the Procedure (18 CFR 385.211 and
sale of energy and capacity at market- ‘‘e-Filing’’ link. The Commission 385.214). Protests will be considered by
based rates. SYNERGY also requested strongly encourages electronic filings. the Commission in determining the
waivers of various Commission Kimberly D. Bose, appropriate action to be taken, but will
regulations. In particular, SYNERGY Secretary. not serve to make protestants parties to
requested that the Commission grant [FR Doc. E8–1420 Filed 1–25–08; 8:45 am] the proceeding. Any person wishing to
blanket approval under 18 CFR Part 34 BILLING CODE 6717–01–P
become a party must file a notice of
of all future issuances of securities and intervention or motion to intervene, as
assumptions of liability by SYNERGY. appropriate. Such notices, motions, or
On January 18, 2008, pursuant to DEPARTMENT OF ENERGY protests must be filed on or before the
delegated authority, the Director, comment date. Anyone filing a motion
Division of Tariffs and Market Federal Energy Regulatory to intervene or protest must serve a copy
Development-West, granted the requests Commission of that document on the Applicant. On
for blanket approval under Part 34 or before the comment date, it is not
[Docket No. CP05–413–005]
(Director’s Order). The Director’s Order necessary to serve motions to intervene
also stated that the Commission would East Tennessee Natural Gas, LLC; or protests on persons other than the
publish a separate notice in the Federal Notice of Amendment Applicant.
Register establishing a period of time for
the filing of protests. Accordingly, any January 18, 2008. The Commission encourages
person desiring to be heard concerning Take notice that on January 7, 2008, electronic submission of protests and
the blanket approvals of issuances of East Tennessee Natural Gas, LLC (East interventions in lieu of paper using the
securities or assumptions of liability by Tennessee), 5400 Westheimer Court, ‘‘eFiling’’ link at http://www.ferc.gov.
SYNERGY, should file a protest with the Houston, Texas 77056–5310, filed an Persons unable to file electronically
Federal Energy Regulatory Commission, abbreviated application pursuant to should submit the original and 14
888 First Street, NE., Washington, DC section 7(c) of the Natural Gas Act copies of the protest or intervention to
20426, in accordance with Rules 211 (NGA) and Part 157 of the Commission’s the Federal Energy Regulatory
and 214 of the Commission’s Rules of regulations, for an amendment to its Commission, 888 First Street, NE.,
Practice and Procedure. 18 CFR 385.211, certificate of public convenience and Washington, DC 20426.
385.214 (2007). The Commission necessity to increase the capacity of its Comment Date: February 8, 2008.
encourages the electronic submission of Jewell Ridge Lateral, located in
protests using the FERC Online link at Tazewell and Smyth Counties, Virginia, Kimberly D. Bose,
mstockstill on PROD1PC66 with NOTICES

http://www.ferc.gov. from 235,000 Dth per day, as certificated Secretary.


Notice is hereby given that the in an order issued on February 8, 2006, [FR Doc. E8–1422 Filed 1–25–08; 8:45 am]
deadline for filing protests is February to 275,862 Dth per day. East Tennessee
BILLING CODE 6717–01–P
19, 2008. does not request authorization to
Absent a request to be heard in construct any facilities. East Tennessee
opposition to such blanket approvals by proposes to continue to charge its

VerDate Aug<31>2005 17:56 Jan 25, 2008 Jkt 214001 PO 00000 Frm 00094 Fmt 4703 Sfmt 4703 E:\FR\FM\28JAN1.SGM 28JAN1