You are on page 1of 13

Pump Testing Requirement

ISO 9906:2012
Rotodynamic pumps -- Hydraulic
performance acceptance tests -- Grades
1, 2 and 3

Pump Testing Requirement


ISO 9906:2012 specifies hydraulic performance tests for customers'
acceptance of rotodynamic pumps (centrifugal, mixed flow and
axial pumps). It is intended to be used for pump acceptance testing
at pump test facilities, such as manufacturers' pump test facilities or
laboratories. ISO 9906:2012 can be applied to pumps of any size
and to any pumped liquids which behave as clean, cold water.
It specifies three levels of acceptance:
grades 1B, 1E and 1U with tighter tolerance;
grades 2B and 2U with broader tolerance;
grade 3B with even broader tolerance.
It applies either to a pump itself without any fittings or to a
combination of a pump associated with all or part of its upstream
and/or downstream fittings.

Pump Testing Requirement

Main Objective
Confirm pump performance parameters:
Capacity
Head
Power
Efficiency
NPSH

Pump Testing Requirement

Others
Confirm pump performance parameters:
Temperature rise
Noise
Dimension
Material
Protection coating

Pump Testing Requirement

Consideration
Confirm pump performance parameters:
Water Temperature
Speed
Power
Efficiency
NPSH

Pump Testing Requirement


Arrangement

Pump Testing Requirement


Item
Particulars
Unit
No.
1. Quantity of water delivered against
m3/hr
Total Head by each pump
2. Total Dynamic Head
m
3. Water Power (base on item 1 & 2)
kW
4. Maximum Power input for Motor
kW
5. Overall Efficiency of Pump and Motor
%
6. Pump Speed
rpm
7.

NPSH

Pump Testing Requirement


Computation

Flow meter

Pump Testing Requirement


Item
Particulars
Unit
No.
1. Quantity of water delivered against
m3/hr
Total Head by each pump
2. Total Dynamic Head
m
3. Water Power (base on item 1 & 2)
kW
4. Maximum Power input for Motor
kW
5. Overall Efficiency of Pump and Motor
%
6. Pump Speed
rpm
7.

NPSH

Pump Testing Requirement


Computation
Pressure
gauge P1

Pressure
gauge P2

= P2 P1 + (V22 V12/2g)

Pump Testing Requirement


Item
Particulars
Unit
No.
1. Quantity of water delivered against
m3/hr
Total Head by each pump
2. Total Dynamic Head
m
3. Water Power (base on item 1 & 2)
kW
4. Maximum Power input for Motor
kW
5. Overall Efficiency of Pump and Motor
%
6. Pump Speed
rpm
7.

NPSH

1
2

Pump Testing Requirement


Computation

kW, (after power


factor) 4

Speed 5

Water Power =

x 2

x 9.81

Pump Testing Requirement


4

Item
Particulars
Unit
No.
1. Quantity of water delivered against
m3/hr
Total Head by each pump
2. Total Dynamic Head
m
3. Water Power (base on item 1 & 2)
kW
4. Maximum Power input for Motor
kW
5. Overall Efficiency of Pump and Motor
%
6. Pump Speed
rpm
7.

NPSH

1
2
3
4

2 3 3

X 100

You might also like