You are on page 1of 8

New Course Content on FLNG in 2013!

FPSO & FLNG


Design & Technology - Level 2
20 - 23 May 2013, Kuala Lumpur 3rd instalment in Asia & 6th globally!

Expert Trainers:

Jean - Paul Denise


Senior Consultant, Azur Offshore Ltd
FPSO / FLNG & Floaters with Subsea Production
ENSEEIHT Toulouse: Engineering Degree (Mechanical) and MSc (Fluid Mechanics)
Mc Gill University: Montreal Canada, MEng ( Fluid Mechanics and Vibrations)
Chartered Engineer, RINA, MIMechEng

Jean Luc Chasserot


TPA Professor BSc / MSc
Technical Director & Senior Consultant - Azur Offshore Ltd

www.petroedgeasia.net

FPSO & FLNG DESIGN & TECHNOLOGY LEVEL 2


20 - 23 May 2013, Kuala Lumpur
About the Training Course
This 4 day training course will focus on the key technical questions that an FPSO and/or FLNG project team need to address as part of
the overall design project. The course has been exclusively designed to equip participants with the key tools needed to find answers to
these questions and to make the appropriate decisions to advance future projects.
The course will cover the full spectrum of issues relating to FPSO and/or FLNG design projects which will allow technical personnel
obtain a better understanding of challenges and risk areas associated with this. This course has also been recently updated 2013 to
include the latest developments in FLNG technology and market developments.
By attending this 4 day training course, you will be able to:
Understand the floating production market by geography and their design types & characteristics
Examine the key design and technology considerations for FPSO construction today
Identify the critical design requirements, codes and standards which govern FPSO design
Review the main functions of topside process systems, its typical production capabilities and related disciplines
Understand key design considerations for Hull, Mooring, Swivels & Fluid Transfers Systems and Risers
Learn Oil export and offshore offloading requirements and systems
Gain an overview of FPSO design development projects and the key factors for success
Review the introduction of FLNG technology and current projects in Asia and Europe
Featured Case Study Discussions on:
Case Study One; Processing system operations on BP FPSO Greater Plutonio
Review of the Training CD every BP Operator must learn before going offshore to operate the Subsea Production Facilities and the FPSO
Facilities, from Reservoir to Oil and Gas Export systems.
Case Study Two; Chevron ALBA FSO; First Internal Turret in the North Sea
A detailed review of the Turret system with mooring lines design & installation, Chain table & Riser connections, main deck turret piping
& pigging system, fluid Swivel & back-up, leak detection system, interfaces with cargo piping and Oil & Gas export lines including
Integrity Monitoring Systems.
Case Study Three; The TOTAL Angola FPSO DALIA Story, operating in deep water Block 17.
This course is recommended for personnel involved in FPSO projects who require specific knowledge on FPSO design and technology:
Current and future Offshore Installation Managers, Conceptual Design Engineers, Development Engineers , Engineering & Integration
Managers, Naval Architects, FPSO Project Managers, Process Engineers, Operations Managers
What others have said about this course:
A very good & comprehensive sharing. Thumbs up to both the presenter and petroEDGE. Design Engineer, Sembawang Shipyard
I am glad to be one of the participants & can absorb knowledge from real experts. Engineering Analyst, PETRONAS
Very effective course Senior Coordinator, INPEX
Its useful and interesting training Staff Maritime, BP Migas
Very good, informative & helpful E & P Lead, Lloyd's Register Technical Services
Excellent video that I have never seen before PT Pertamina Hulu Energi Offshore North West Java
JP is a professional trainer. I learnt much from him Senior Production Setup & Planning, Husky-CNOOC Madura Ltd
Good training and presentation Naval Architect, MTE Engineering Sdn Bhd
Very professional and organised great material and a wealth of experience Project Engineer, Petrofac Malaysia
Both speakers are very knowledgeable in their subject. A lot of experience sharing from both speakers Manager, PETRONAS
Previous participants include:
Technip Geoproduction, Germanischer Lloyd GLM, Petronas Carigali, INPEX Operations Australia, MASP Engineering Services, Lam Son
Joint Operating Company, Talisman Malaysia, International Energy Services, MMHE, MISC, HRM Holding Company, Murphy Sarawak,
PTT Exploration & Production, Conoco Phillips Indonesia, BP MIGAS, Sarawak Shell, Anggerik Laksana, MTC Engineering, Regional
Maritime University, Petrofac, Husky-CNOOC Madura, Bumi Armada, JX Nippon Oil & Gas Exploration PTT Exploration & Production
Public Company Limited, PETRONAS, PT Pertamina Hulu Energi Offshore North West Java, Lloyd's Register Technical Services, Wartsila
Singapore, Vietsovpetro, Sembawang Shipyard and many others

Learn about our in-house training solutions and save more!


Call +65 67419927 or email info@asiaedge.net
www.petroedgeasia.net

FPSO & FLNG DESIGN & TECHNOLOGY LEVEL 2


20 - 23 May 2013, Kuala Lumpur
Day ONE
08.30
Course Introduction
Overall course objectives
Summary of course content and planning
Safety brief
09.00
Lecture L1: Floating Production Market
Floating production market: presentation by geographical
areas: North Sea, West Africa, North America, Brazil, Asiapacific (including Australia), etc., Arctic.
Characteristics of main areas: location, environment, water
depth, others
Major floating production developments in each area (field
names, floaters).
Typical field layouts and field development requirements
Lecture L2: Trends in the Floating LNG Business by DouglasWestwood
Floating LNG 2012/2017 by Mike Haney
Lecture L3: Floater Design and Technology
Presentation of the different types of floaters: Mono-hull,
Semi-submersible, Deep draught Semi-submersible, Spar,
TLP, FDPSO, others.
Functional requirements
Field characteristics
Production characteristics
Operation Characteristics
Topsides
Storage / export facilities
Constructability (and construction materials)
Scheme maturity
Flexibility
Cost drivers
Decommissioning and re-use
Lunch Break TBA

Lecture L4: Field Architecture with Floating Production Units


and Subsea Systems;
Factors driving the Field lay-out; Reservoir & Fluids, Subsea
Wells trajectories, SPS & SURF Building blocks & lay-out,
Choice of Floater, Mooring lay-out, choice of Risers
systems, Export system & requirements for subsea WorkOver operations.
Detailed System Design Analysis and Flow Assurance main
issues, constrains & mitigations.
Analysis of specific Fields Lay-outs in Shallow waters and
Deep waters with Semi-subs FPV & FPSO/FLNG.
Lecture L5: Topsides Design Introduction to Process Systems
Introduction to reservoir fluids: oil, condensate, gas
Reservoir data, API density
Emulsion, foam, hydrates, naphtenates, wax, sulphates
Presentation of the main functions of topsides processing:
Oil separation
Gas treatment and compression
Water injection
Produced water
Flare
Other process systems
Utility systems
Completed by identification of specific process requirements
for a floater:
Vessel motion, weather considerations, lay-out
Case Study 1: Process systems operations on BP Angola FPSO
Greater Plutonio
Review of the training CD every BP operator must learn
before going offshore, to operate the FPSO facilities and
the Subsea Production facilities. (from Reservoir to oil and
gas export systems with Full Processing operations &
controls).Copy of CD to be provided, courtesy of BP Angola.
17.00 Q&A Session
17.30 End of Day ONE

Day TWO
08.30
Lecture L6: Topsides Design Introduction to other
Disciplines
Presentation of the important disciplines (besides process)
regarding topsides design:
Safety: health, safety and environment (fire and gas
detection, active and passive protection, escape,
evacuation, rescue, emergency systems, etc)
Piping and layout: equipment piping, pipe racks, routing,
spools, pipe supports

Structures: module design, pancakes, space frames,


supports
Electrical: power generation (main generators, essential
and emergency generators, electrical distribution)
Instrumentation: integrated control and safety system
(ICSS), etc
Telecommunications
Handling: cranes, monorails, lay-down, access
Corrosion protection
Accommodation

Learn about our in-house training solutions and save more!


Call +65 67419927 or email info@asiaedge.net
www.petroedgeasia.net

FPSO & FLNG DESIGN & TECHNOLOGY LEVEL 2


20 - 23 May 2013, Kuala Lumpur
Lecture L7: Design Requirements, Codes and Standards
Identification of the main requirements, rules and
standards, which govern the design;
Country-enforced rules and regulations
Classification Societies rules and regulations
Project specific documents
Operating Oil & Gas Companies general specifications
International Codes and Standards References.

Lecture L9: Mooring Design


Types of mooring : spread mooring, turret mooring
Mooring system design(loads, layout, analysis)
Mooring system components(winches & fairleads, chains,
wire ropes, etc)
Mooring system installation
Developments for deep water
Maintenance, inspection and replacement of mooring lines

Lunch Break TBA

Lecture L10: Turret Mooring and Swivels


Turret mooring : types of systems
Weathervaning and mooring forces
Turret position on FPSO
Turret size
Turret bearing system
Mooring lines connection and handling
Risers connection and handling
Fluid control and power transfer system (swivel
technology, drag chain system, etc.)
Other aspects (safety, fabrication, installation and testing,
operation, patents)

Lecture L8: Hull Design


Presentation of the main Design issues
New Hull or second hand tanker conversion
Main hull features
Main hull systems
Detail design general requirements
Detail design requirements for ship areas
Detail design requirements for offshore areas

17.00 Q & A Session


17.30 -- End of Day TWO

Day THREE
08.30
Case Study 2: Chevron Alba FSO; First SBM internal turret in
the North Sea
--A detailed review of the turret system, mooring lines design
and installation, Chain table & Flexible
Risers connections, main deck turret piping & valves, pigging
system, fluid swivel and back-up, leak
Detection system, interfaces with cargo piping & Oil export +
Diesel export to ANP, Integrity
monitoring and Surge systems.

Lecture L12: Oil Export Options and Offshore Offloading


Different types of Offloading tankers
Direct Offloading systems : Side by side, Tandem offloading
Remote offloading systems: CALM buoy, UKOLS, STL, SAL &
SALM, etc.
Safety requirements during offloading
Cargo offloading metering systems
Shuttle tanker operations and safety track record
Lunch Break TBA

Lecture L11: Riser Design for Floaters


Different types of riser systems: Dynamic flexible risers,
SCRs, Hybrid tower systems with multiple or single risers &
other current solutions. History & track records
Design requirements
Characteristics (structural design, dimensions, fluid types,
etc.)
Key functional requirements and drivers (including dynamic
loads)
Analysis methodologies, model testing & dynamic
stimulation demonstration of a design example

Case Study 3: TheTotal Angola FPSO DALIA Story, operating in


deep water Block 17-1400m
A review of this very large, spread moored FPSO, designed
for heavy oil production. Largest Subsea Production system
operating 71 subsea wells. CD/Video of the FPSO
construction to be provided, courtesy of Total Angola.
Update on current operations.
Lecture L13: FPSO Design Development
Development phases: conceptual, FEED, detail design
Conceptual design : Objectives and deliverables
Pre-project design or FEED : Objectives and deliverables,
FEED activities

Learn about our in-house training solutions and save more!


Call +65 67419927 or email info@asiaedge.net
www.petroedgeasia.net

FPSO & FLNG DESIGN & TECHNOLOGY LEVEL 2


20 - 23 May 2013, Kuala Lumpur
Detail design : Objectives and deliverables, Detail design
activities
Critical subjects are addressed :
Schedule and man-hours
Interfaces
Risk management: technical audits, technical reviews,
HAZOPs, etc.
Weight Control
New Case Study W of S TBA if time.
17.00 Q & A Session
17.30 End of Day THREE
Day FOUR Special LNG / FLNG 1 Day Session
08.30
Lecture L14 : Introduction to LNG Production on a Floater
General information on LNG and LPG
Gas Processing and Pre-Treatment plant
Introduction to Liquefaction Thermodynamics
Natural Gas pre-treatment
Main liquefaction processes (nitrogen cycle, single mixed
refrigerant cycle, propane pre-cooled mixed refrigerant
cycle, dual mixed refrigerant cycle, cascade cycle), their
advantages and disadvantages, their applicability on a
floater
Selection of Offshore liquefaction process
Lecture L15 : LNG Storage on a Floater
Main storage systems (MOSS spherical tanks, IHI and GTT
prismatic tanks), containment designs and insulation
techniques
LNG sloshing in tanks
Boil-off on LNG tankers & FLNG vessels
Inspection and testing of tanks, repairs
Lecture L16 : LNG Offloading
LNG offloading solutions (FMC, SBM, Framo and Bluewater
systems)
Rigid LNG transfer systems
Aerial Flexible hoses systems

Tandem offloading
Cryogenic pipe designs
Lunch Break TBA
Lecture L17 : FLNG Safety Issues
Safety philosophy to be adopted for the design of an FLNG
vessel
Differences between Onshore and Offshore operations
Main process Hazards and Event Types
Specific issue of large hydrocarbon inventories: BLEVE
phenomenon
Description of main systems, equipment and procedures to
protect against major hazards
Safety reviews & Environmental Assessments.
Control of Leaks & Releases. Control of Ignitions
Lecture L18 : LNG Re-gasification Units
Principle of LNG re-gasification
Current re-gasification developments
Market and applications
Potential FSRU Projects
Lecture L19: Review and Brief Analysis of Current Floating Gas
Projects (with updates)
L18 A- Shtokman FPU and onshore LNG in the Barents Sea
by Gazprom & Total/Statoil
L18 B- Belanak FPSO and FLNG applications by Conoco
Phillips
L18 C- Abadi FLNG Project by INPEX / BP MIgas, West of
the Timor Sea
L18 D- Prelude and Concerto Fields: currently world largest
FLNG projects by Shell & partners
L18 E- Petronas FLNG Project Kanowit Field offshore
Bintulu, Sarawak.
++ FLNG Unit design & construction Animation by DSME
17:00 Q&A session
+ Presentation of Course Certificates
17:30 End of Training Course

The training course has a limited attendance for up to 25 participants only. Sessions commence at 9am on all days, with short intervals
at 10.30am and 3.30pm respectively. Lunch will be provided at 12:30pm for 1.5 hours. Sessions will end at 5pm on all days.

Learn about our in-house training solutions and save more!


Call +65 67419927 or email info@asiaedge.net
www.petroedgeasia.net

FPSO & FLNG DESIGN & TECHNOLOGY LEVEL 2


20 - 23 May 2013, Kuala Lumpur
About Your Expert Trainers: Jean-Paul Denise, Senior Consultant with particular experience in
FPSO, Floating Production Systems & FLNG.
Qualified in France in Mechanical Engineering and Fluid Mechanics, and further in Fluid Mechanics and
Vibrations in Canada. Started in the Oil & Gas industry in 1975 for the French Petroleum Institute, then in
England with Atkins Franlab, Principia, Foster Wheeler, seconded to BP, Fina, Total, etc., finally in France
with Technip and Saipem, before joining AOL in 2012.
Detailed Professional Experience from 2000 to 2012 (main projects only)
2001 to 2012: SAIPEM s.a. Paris; Senior Technical Advisor;
From October 07: Shtokman Development AG (GAZPROM/
STATOILHYDRO/ TOTAL/) Study Manager for Conceptual
development of the Sthokman field (Barents Sea) with a Floating
Production Unit (FPU): icebreaker shaped vessel, internal turret
mooring disconnectable in ice conditions, large topsides, seakeeping
tests, ice model tests.
July 05 July 07: TOTAL FPSOs - Contribution to preparation of several
proposals for FPSO developments: Pazflor (ex-Miocene) and Usan.
January June 2005: EXXONMOBIL ERHA Project Technical audit
and workshop: Review of piping design issues of Erha FPSO.
July 03 - Nov. 2004: TOTAL Miocene Project Angola - Technical
Advisor on Optimization study relative to development of the Miocene
fields, offshore Cabinda, Angola, with FPSO vessel.
Oct. 03 - June 2004: TOTAL Akpo Project Project Engineering
Manager responsible for all technical aspects and FEED design
endorsement, for the proposal of a large FPSO to be applied on the
Akpo field, offshore Nigeria, in 1325 m water depth.

2001: TECHNIP France Lead Naval Architect; Paris : TotalFinaElf


AKPO Project Lead Naval Architect for the Basic Engineering of a
FPSO and export buoy to be applied in deep water offshore Nigeria.
Mooring ystem design, write-up of specifications, topsides lay-out,
Hazid, etc...
1993 2001 Offshore Design Engineering (ODE); Technical Advisor ;
London
Jan.-March 2001: Confidential Client Isis Field (Tunisia) Technical
adviser for the independent assessment of a FPSO project on behalf of
the financing house. Audit included vessel / mooring system
specification, conversion works, topsides production facilities, subsea
facilities and risers.
2000-2001: PREMIER OIL Patos-Marinza Project Conceptual design
of a FSU (Floating Storage Unit) and its mooring system for the storage
of heavy crude at a shallow water location offshore Albania (Adriatic
Sea).
2000: DORIS Development of a method for the float-out installation
of two large topside decks (10,000 tonnes each) onto a novel FPSO
(the OCTOPLUS concept), for application in deep waters on the West
coast of Africa.

Feb. - May 2004: CHEVRON TEXACO Agbami Project Project


Engineering Manager responsible for all technical aspects and FEED
design verification, for the proposal of a large FPSO to be applied on
the Agbami field, offshore Nigeria, in 1500 m water depth.

ELF Angola, Girassol Technical consultant for explosion response


analysis of FPSO topsides.

Oct. 02- July 2003: PETROBRAS P51 & P52 Project Project
Engineering Manager responsible for all technical aspects of two
parallel proposals for two semi-submersible production vessels to be
applied offshore Brazil on the Roncador and Marlim fields,
respectively.

1999-2000 TOTALFINA, Otter & Nuggets Projects - Following merger


of Total and Fina, extension of previously ongoing work on Finas Otter
prospect (see below) to incorporate parallel Nuggets subsea
development. Detailed technical support to both TotalFinas preproject group in Paris and project management group in Aberdeen.
Supervision of the completion of FEED activities on both of these
projects and support to Client for compilation of ITB documentation.

Jan. Sept. 2002: SAKHALIN ENERGY Sakhalin II Project Offshore


Pipelines Area Manager responsible for all technical aspects of FEED
design relative to several pipelines offshore Sakhalin island.
Nov - Dec. 2001: TEXACO - Agbami Project - Technical consultant on
the preparation of a bid for a Wellhead Barge to be applied in deep
water (1,500 m) offshore Nigeria.
Co writer / Owner of this 4 days FPSO / FLNG Level 2 Course.

Design Patents:
Improvements in or relating to Turret Moored Vessels, UK and
Norwegian Applications filed in Feb. 1995.Two applications on Arctic
turret, references FR2008-51832 and FR2008-51833, both filed on 21
March 2008
Active trainer and contributor for various Azur lectures and courses
on FPSO/Floaters since 1994 Joined Azur Offshore in 2012.

Learn about our in-house training solutions and save more!


Call +65 67419927 or email info@asiaedge.net
www.petroedgeasia.net

FPSO & FLNG DESIGN & TECHNOLOGY LEVEL 2


20 - 23 May 2013, Kuala Lumpur
TPA Professor Jean-Luc CHASSEROT BSc . MSc - Technical Director & Senior Consultant Field
development with SPS, URF & Floaters, Azur Offshore Ltd. + 5 years with construction of LNG
carriers in La Ciotat & Newport News shipyards.
Started to work for the Energy Industry in 1972, after qualifying in Mechanical Engineering (BSc) & Industrial Engineering (BSc) in
France. Worked on design & construction of several LNG carriers in French & US Shipyards. Returned to France in 78 to join the
Comex Group /Cx Seal/Cx Industries, to move to Aberdeen & London to work in the North Sea until 98.
Joined A.O.L. in Jan 83 to work in London on new Subsea field development Projects. Seconded to various Operators for;
83/ 85 BALMORAL Field for Sun Oil UK-New Semi FPV & large SPS /Template +Export Pipeline system. Involved from system design up to offshore HUC.
86 / 88 Various short involvements on Glamis, Draugen FPV for Aker/Shell, GASP R&D subsea separation, Emerald, FROY for Elf Norge, Shell Brent
ESDVs, TONI SPS for Agip UK and LYELL SPS large Cluster / Intra field Flowlines & Umbilicals for tie-back to Ninian Host platform for Conoco.
89 / 94 ALBA Field for CHEVRON UK Pipeline / Subsea supervisor Northern Platform and New Floating Storage.Involved from conceptual design up to
first oil start-up and trouble shooting offshore. ANP platform to FSU internal turret, pipeline bundle and provision for South subsea development.
95/ 96 SCOTT / TELFORD Subsea tie-back for Hamerada Hess / Laing Oil & Gas. Special retrofit multi riser system, including offshore work.
Mid 96 /Mar 98 OTTER Field FINA UK Subsea engineering manager responsible for FEED, detail design & bids. Simple SPS to FPSO & long Tie-back.
98 / 00 Cameron France SA for ELF Angola, GIRASSOL Field, Senior Project Engineer based in Pau & Beziers looking after Hybrid riser,SPS,etc..
DALIA FEED + prequalification and evaluation of novel Drill Through Horizontal XTree, leading to major Drilling cost savings.
Also worked in Houston & Singapore on the Shell Philippines MALAMPAYA Field to sort out the Field Architecture, System Design, the F.A. issues , the
FEED and started Detail Design. Later on, was invited to monitored the SIT in Singapore.
Mid 00 / 04 Various missions for A.O.L. in Australia / Singapore / Paris / Malaysia / Sarawak assisting clients in field development studies & training.
Mid 04 / Feb 05 Senior Project Engineer / Auditor on TIOF Field studies for WOODSIDE Mauritania.in Perth & Nouakshot, up to contract award to Doris
05/06 Assisted BP Operations on GREATER PLUTONIO Field to develop the Operation Manual (on CD) level one, for large SPS/full SURF & FPSO.
06/ Feb 07-2nd mission in Pau, to assist Total Angola on DALIA field development, deep water, world largest SPS / FPSO with 71 Subsea Wells for
Production, Water Injection & Gas disposal. Also worked with all Package Managers to Prepare 7 Papers for OTC Conference - May 07.
Apr 07 to Sep 09; assisted Petronas Carigali trained new group of Subsea / Offshore Engineers. Assisted Petronas at the early stage of the first Gas
Subsea Tie-back Pilot project to jacket platform (shallow water) & Petronas Mauritania on the Chinguetti Field FPSO replacement & the evaluation
/engineering of W.O. operations using the very compact Host 4 wells system.
From Jul 09, developed Malaysia operations with JV Partner, SLT International in Kuala Lumpur (FLNG bid INPEX)
March10 / February 13- Organised & delivered Eight SUT Africa Branch 5 days Subsea Engineering Courses in Nigeria, Angola & Ghana. Continued with
Courses Level 1 & Level 2 on FPSO Technologies, Subsea Production Systems and Subsea Control systems in Asia and UK, Canada (for Technip) & France
( for Bureau Vritas Paris).
For the past 24 years, regular lecturer in Offshore and Subsea Engineering at various engineering Schools / Universities in UK and France.
OTHER QUALIFICATIONS; UK S.U.T. Certified / Registered Subsea Engineer in 88 and Fellowship awarded in 92. Cranfield Institute modular MSc 87/ 88.
Fellowship awarded in 96. Made TPA Total Professeurs Associs in Oct 2006 to present Lectures in Subsea / FPSO Deep W Field Developments.
Specific LNG experience; Involved with the construction of 3 LNG carriers, Tellier, Ben Franklin and El Paso Southern, using the Technigaz Mark I & III
insulation techniques with the S.S. primary membrane. In 2006 assisted Singapore Ship Owner IMC to evaluate LNG carrier construction in China. Visited
GTT Research Centre near Paris (including a course on the GTT N0 96 double Invar barriers) and LNG carrier Provalys (for Gas de France) under
construction in St Nazaire Shipyard. Also assisted IMC in discussions with SBM Offshore for the provision & operation of a new leased FSRU.

Learn about our in-house training solutions and save more!


Call +65 67419927 or email info@asiaedge.net
www.petroedgeasia.net

FPSO & FLNG DESIGN


& TECHNOLOGY
LEVEL 2
REGISTRATION
FORM
20 - 23 May 2013, Kuala Lumpur

FPSO & FLNG: DESIGN & TECHNOLOGY - LEVEL 2

Kuala Lumpur
20 - 23 May 2013

Bird
Price

FPSO & FLNG:


Design & Technology Level 2

SGD
4049

Normal
Price

TEAM DISCOUNTS!
PetroEdge recognises the value of learning in teams. Group
bookings at the same time from the same company receive the
following:

SGD
4249

PetroEdge In-house Training


{ } Yes, I would like to organise this training on-site and save on total course fees!
For further information about On-site Training Solutions, please call +65 67419927 or
email info@asiaedge.net

3 or more at 5% off
5 or more at 7% off
8 of more at 10%
Team discounts are based on Normal Price only and are not
applicable for other promotions.

DELEGATE DETAILS
EGA
TE DETAILS
Delegate 1: Mr Mrs
Ms Dr Other

Company: :---------Address:

Telephone: Email:
Job Title:

Country: ---------------------------------------

Department: ----------------------------------------------Postcode: Delegate 2: Mr


Mrs Ms Dr Other

Attention Invoice to:

Telephone: Email:
Telephone:
Job Title:
Fax:
Department:
Email: --Head of Department:

4 Easy Ways to Register


Online: www.petroedgeasia.net
Email: info@asiaedge.net
Phone: (65) 6741 9927
Fax: (65) 67478737

Please note:
- indicate if you have already registered by Phone Fax Email Web
- if you have not received an acknowledgement before the training course, please call us to confirm
your booking.
- photocopy this form to register multiple delegates.

Payment Methods
By Cheque/ Bank Draft: Make Payable to Asia Edge Pte. Ltd.
By Direct Transfer: Please quote AE1 with the remittance advise
Account Name: Asia Edge Pte. Ltd.
Bank Number: 508 Account Number: 762903-001Swift Code: OCBCSGSG
All bank charges to be borne by payer. Please ensure that Asia Edge Pte Ltd receive the full
invoiced amount.
PAYMENT POLICY: Payment is due in full at the time of registration. Full payment is mandatory
for event attendance. I agree to Asia Edge Pte Ltd. payment terms
CANCELLATIONS & SUBSTITUTIONS: You may substitute delegates at any time. ASIA EDGE PTE
LTD does not provide refunds for cancellations. For cancellations received in writing more than
seven (7) days prior to the training course you will receive a 100% credit to be used at another
ASIA EDGE PTE LTD training course for up to one year from the date of issuance. For cancellations
received seven (7) days or less prior to an event (including day 7), no credits will be issued. In the
event that ASIA EDGE PTE LTD cancels an event, delegate payments at the date of cancellation
will be credited to a future ASIA EDGE PTE LTD event. This credit will be available for up to one
year from the date of issuance. In the event that ASIA EDGE PTE LTD postpones an event,
delegate payments at the postponement date will be credited towards the rescheduled date. If
the delegate is unable to attend the rescheduled event, the delegate will receive a 100% credit
representing payments made towards a future ASIA EDGE PTE LTD event. This credit will be

available for up to one year from the date of issuance. No refunds will be available for
cancellations or postponements.
ASIA EDGE PTE LTD is not responsible for any loss or damage as a result of a substitution,
alteration or cancellation/postponement of an event. ASIA EDGE PTE LTD shall assume no liability
whatsoever in the event this training course is cancelled, rescheduled or postponed due to a
fortuitous event, Act of God, unforeseen occurrence or any other event that renders
performance of this training course impracticable or impossible. For purposes of this clause, a
fortuitous event shall include, but not be limited to: war, fire, labor strike, extreme weather or
other emergency.
PROGRAM CHANGE POLICY: Please note that speakers and topics were confirmed at the time of
publishing; however, circumstances beyond the control of the organizers may necessitate
substitutions, alterations or cancellations of the speakers and/or topics. As such, ASIA EDGE PTE
LTD reserves the right to alter or modify the advertised speakers and/or topics if necessary. Any
substitutions or alterations will be updated on our web page as soon as possible.
ASIA EDGE PTE. LTD.
Company Registration No: No. 200710561C
Copyright@ 2005 ASIA EDGE PTE LTD. All rights reserved. This brochure may not be copied,
photocopied, reproduced, translated, or converted to any electronic or machine-readable form in
whole or in part without prior written approval of ASIA EDGE PTE LTD

Learn about our in-house training solutions and save more!


Call +65 67419927 or email info@asiaedge.net
www.petroedgeasia.net

You might also like