You are on page 1of 2

1868 Federal Register / Vol. 73, No.

7 / Thursday, January 10, 2008 / Notices

and interventions via the Internet in lieu that enables subscribers to receive email environmental review process.
of paper. See 18 CFR 385.2001(a)(1)(iii) notification when a document is added Environmental commentors will not be
and the instructions on the to a subscribed docket(s). For assistance required to serve copies of filed
Commission’s Web site (http:// with any FERC Online service, please e- documents on all other parties.
www.ferc.gov) under the ‘‘e-Filing’’ link. mail FERCOnlineSupport@ferc.gov, or However, the non-party commentors
Comment Date: January 24, 2008. call (866) 208–3676 (toll free). For TTY, will not receive copies of all documents
call (202) 502–8659. filed by other parties or issued by the
Kimberly D. Bose,
Any questions regarding this Commission (except for the mailing of
Secretary. application should be directed to environmental documents issued by the
[FR Doc. E8–223 Filed 1–9–08; 8:45 am] Michael T. Loeffler, Director, Commission) and will not have the right
BILLING CODE 6717–01–P Certificates and Government Affairs for to seek court review of the
Northern Natural Gas Company , 1111 Commission’s final order.
South 103rd Street, Omaha, Nebraska Comments, protests and interventions
DEPARTMENT OF ENERGY 68124, at (402) 398–7103. may be filed electronically via the
There are two ways to become Internet in lieu of paper. See 18 CFR
Federal Energy Regulatory involved in the Commission’s review of
Commission 385.2001(a)(1)(iii) and the instructions
this project. First, any person wishing to on the Commission’s Web site under the
[Docket No. CP08–43–000] obtain legal status by becoming a party ‘‘e-Filing’’ link at http://www.ferc.gov.
to the proceedings for this project The Commission strongly encourages
Northern Natural Gas Company, PVR should, on or before the comment date intervenors to file electronically.
Midstream LLC; Notice of Application stated below, file with the Federal Persons unable to file electronically
Energy Regulatory Commission, 888 should submit an original and 14 copies
January 3, 2008.
First Street, NE., Washington, DC 20426, of the protest or intervention to the
Take notice that on December 21, a motion to intervene in accordance
2007, Northern Natural Gas Company Federal Energy Regulatory Commission,
with the requirements of the 888 First Street, NE., Washington, DC
(Northern), 1111 South 103rd Street, Commission’s Rules of Practice and
Omaha, Nebraska 68124, and PVR 20426.
Procedure (18 CFR 385.214 or 385.211) Comment Date: January 24, 2008.
Midstream LLC (PVR), TownCenter and the Regulations under the NGA (18
One, 1450 Lake Robbins Drive, The CFR 157.10). A person obtaining party Kimberly D. Bose,
Woodlands, Texas 77380–3258, filed a status will be placed on the service list Secretary.
joint application in Docket No. CP08– maintained by the Secretary of the [FR Doc. E8–225 Filed 1–9–08; 8:45 am]
43–000. Included in that filing is an Commission and will receive copies of BILLING CODE 6717–01–P
application by Northern pursuant to all documents filed by the applicant and
section 7(b) of the Natural Gas Act by all other parties. A party must submit
(NGA), as amended, and sections 157.7 14 copies of filings made with the DEPARTMENT OF ENERGY
and 157.18 of the Commission’s Commission and must mail a copy to
Regulations, requesting permission and the applicant and to every other party in Federal Energy Regulatory
approval to abandon by sale to Saleco, the proceeding. Only parties to the Commission
a new yet to be named Delaware limited proceeding can ask for court review of [Docket No. CP08–42–000]
liability company, certain pipeline, Commission orders in the proceeding.
compression, dehydration, and delivery However, a person does not have to Northern Natural Gas Company; Notice
and receipt point facilities (Hemphill intervene in order to have comments of Request Under Blanket
System), with appurtenances facilities considered. The second way to Authorization
located in Ochiltree, Roberts and participate is by filing with the
Hemphill Counties, Texas, and Roger Secretary of the Commission, as soon as January 3, 2008.
Mills County, Oklahoma. Northern also possible, an original and two copies of Take notice that on December 21,
requests Commission approval to comments in support of or in opposition 2007, Northern Natural Gas Company
abandon the services it provides with to this project. The Commission will (Northern), 1111 South 103rd Street,
respect to primary receipt and/or consider these comments in Omaha, Nebraska 68124, filed in Docket
delivery points located on the facilities determining the appropriate action to be No. CP08–42–000 a prior notice request
proposed for abandonment. Northern taken, but the filing of a comment alone pursuant to sections 157.205 and
and PVR state that once Saleco is will not serve to make the filer a party 157.210 of the Commission’s regulations
assigned to PVR, the Hemphill System to the proceeding. The Commission’s under the Natural Gas Act (NGA) and
will be operated by PVR as part of its rules require that persons filing Northern’s blanket certificate issued
non-jurisdictional gathering system. comments in opposition to the project September 1, 1982 in Docket No. CP82–
Northern and PVR also request in the provide copies of their protests only to 401–000, for authorization to up-rate the
application a determination that, upon the party or parties directly involved in maximum allowable operating pressure
transfer to PVR, the facilities in question the protest. (MAOP) on approximately twenty-four
will be classified as gathering under Persons who wish to comment only miles of 26-inch pipeline in Yoakum
section 1(b) of the NGA, all as more on the environmental review of this and Gaines Counties, Texas, and Lea
fully set forth in the application which project should submit an original and County, New Mexico, and operate such
is on file with the Commission and open two copies of their comments to the segment of pipeline at the higher
to public inspection. This filing is Secretary of the Commission. MAOP, all as more fully set forth in the
accessible on-line at http:// Environmental commentors will be application, which is on file with the
yshivers on PROD1PC62 with NOTICES

www.ferc.gov, using the ‘‘eLibrary’’ link placed on the Commission’s Commission and open to public
and is available for review in the environmental mailing list, will receive inspection. The filing may also be
Commission’s Public Reference Room in copies of the environmental documents, viewed on the Web at http://
Washington, DC. There is an and will be notified of meetings www.ferc.gov using the ‘‘eLibrary’’ link.
‘‘eSubscription’’ link on the Web site associated with the Commission’s Enter the docket number excluding the

VerDate Aug<31>2005 14:29 Jan 09, 2008 Jkt 214001 PO 00000 Frm 00007 Fmt 4703 Sfmt 4703 E:\FR\FM\10JAN1.SGM 10JAN1
Federal Register / Vol. 73, No. 7 / Thursday, January 10, 2008 / Notices 1869

last three digits in the docket number DEPARTMENT OF ENERGY Commission in its decision-making
field to access the document. For process to determine whether the
assistance, contact FERC at Federal Energy Regulatory project is in the public convenience and
FERCOnlineSupport@ferc.gov or call Commission necessity.
toll-free, (886) 208–3676 or TYY (202) [Docket Nos. EG07–80–000; EG07–81–000; This notice announces the opening of
502–8659. EG07–82–000; EG07–83–000; EG07–84–000; the scoping process the Commission
The estimated cost of constructing the EG07–85–000; EG07–86–000; EG07–87–000; will use to gather input from the public
EG07–88–000; EG07–89–000; FC07–54–000; and interested agencies on the project.
proposed facilities is $1,015,000. FC07–55–000; FC07–56–000; FC07–57–000; Your input will help determine which
Any questions regarding the FC07–58–000; FC07–59–000] issues need to be evaluated in the EA.
application should be directed to Please note that the scoping period will
Michael T. Loeffler, Senior Director of NRG Cedar Bayou Development
Company, LLC; EnergyCo Cedar close on February 4, 2008. Details on
Certificates and External Affairs, 1111 how to submit comments are provided
Bayou 4, LLC; Hackberry Wind, LLC;
South 103rd Street, Omaha, Nebraska in the Public Participation section of
Smoky Hills Wind Farm, LLC; Cloud
68124, Northern Natural Gas Company, this notice.
County Wind Farm, LLC; Pioneer
phone (402) 398–7103. This notice is being sent to affected
Prairie Wind Farm I, LLC; Sagebrush
Any person or the Commission’s Staff Power Partners, LLC; Tatanka Wind landowners; federal, state, and local
may, within 60 days after the issuance Power, LLC; Snyder Wind Farm, LLC; government agencies; elected officials;
of the instant notice by the Commission, FPL Energy Point Beach, LLC; Native American tribes; other interested
file pursuant to Rule 214 of the Enbridge Gas New Brunswick Inc.; parties; and local libraries and
Commission’s Procedural Rules (18 CFR Enbridge Wind Power Inc.; Gazifere newspapers. State and local government
385.214) a motion to intervene or notice Inc.; Inuvik Gas Ltd.; NRGreen Power representatives are asked to notify their
of intervention and, pursuant to section Limited Partnership; Wirebury constituents of this proposed project
157.205 of the Commission’s Connections Inc.; Notice of and to encourage them to comment on
Effectiveness of Exempt Wholesale their areas of concern.
Regulations under the Natural Gas Act
Generator or Foreign Utility Company A fact sheet prepared by the FERC
(NGA) (18 CFR 157.205) a protest to the
Status entitled ‘‘An Interstate Natural Gas
request. If no protest is filed within the
Facility On My Land? What Do I Need
time allowed therefore, the proposed December 26, 2007. To Know?’’ addresses a number of
activity shall be deemed to be Take notice that during the month of typically asked questions, including the
authorized effective the day after the November 2007, the status of the above- use of eminent domain and how to
time allowed for protest. If a protest is captioned entities as Exempt Wholesale participate in the Commission’s
filed and not withdrawn within 30 days Generators or Foreign Utility Companies proceedings. It is available for viewing
after the time allowed for filing a became effective by operation of the on the FERC Internet Web site (http://
protest, the instant request shall be Commission’s regulations. 18 CFR www.ferc.gov).
treated as an application for 366.7(a).
authorization pursuant to section 7 of Summary of the Proposed Project
the NGA. Kimberly D. Bose,
Vector proposes to:
Secretary.
The Commission strongly encourages • Construct the Athens Compressor
[FR Doc. E8–240 Filed 1–9–08; 8:45 am] Station, a new 15,000-horsepower
electronic filings of comments, protests
BILLING CODE 6717–01–P
and interventions in lieu of paper using compressor station along Vector’s
the ‘‘eFiling’’ link at http:// existing pipeline system in Calhoun
www.ferc.gov. Persons unable to file County, Michigan; and
DEPARTMENT OF ENERGY
electronically should submit an original • Complete modifications at Vector’s
and 14 copies of the protest or Federal Energy Regulatory existing Springville and Highland
intervention to the Federal Energy Commission Compressor Stations, which are located
Regulatory Commission, 888 First along Vector’s existing pipeline system
[Docket No. CP08–29–000] in LaPorte County, Indiana and Oakland
Street, NE., Washington, DC 20426.
County, Michigan, respectively.
This filing is accessible on-line at Vector Pipeline L.P.; Notice of Intent
To Prepare an Environmental Vector purchased a 20-acre parcel of
http://www.ferc.gov, using the land for construction of the Athens
‘‘eLibrary’’ link and is available for Assessment for the Proposed Athens
Compressor Expansion Project and Compressor Station. Approximately 6.3
review in the Commission’s Public acres within the site would be used for
Reference Room in Washington, DC. Request for Comments on
Environmental Issues operation of the compressor station. An
There is an ‘‘eSubscription’’ link on the additional 2.2 acres of land would be
Web site that enables subscribers to January 3, 2008. disturbed by construction of an access
receive e-mail notification when a The staff of the Federal Energy road to Athens Compressor Station. The
document is added to a subscribed Regulatory Commission (FERC or remainder of the 20 acre site would be
docket(s). For assistance with any FERC Commission) will prepare an maintained as a buffer area.
Online service, please e-mail environmental assessment (EA) that will Construction of the proposed
FERCOnlineSupport@ferc.gov, or call discuss the environmental impacts of modifications at the existing Springville
(866) 208–3676 (toll free). For TTY, call the Athens Compressor Expansion and Highland Compressor Stations
(202) 502–8659. Project involving construction and would disturb up to 2 acres of land at
yshivers on PROD1PC62 with NOTICES

operation of natural gas transmission each station. The land affected by


Kimberly D. Bose,
system facilities by Vector Pipeline L.P. construction and operation of the
Secretary. (Vector) in Calhoun and Oakland modifications would occur within
[FR Doc. E8–224 Filed 1–9–08; 8:45 am] County, Michigan and LaPorte County, previously disturbed areas that are
BILLING CODE 6717–01–P Indiana. The EA will be used by the inside buildings or in graveled areas

VerDate Aug<31>2005 14:29 Jan 09, 2008 Jkt 214001 PO 00000 Frm 00008 Fmt 4703 Sfmt 4703 E:\FR\FM\10JAN1.SGM 10JAN1

You might also like