You are on page 1of 147

VisionsReportCatalogue

Folder

v4.1.12

Report

Description

Reportsingreyarenotincludedinthiscataloguethelayoutofthereportisidenticaltotheformindicated.
Analysis

DashboardReport

12

Attachments

Attachment
AttachmentSummary

14

AttachmentsGOLog

15

Checklist
ChecklistGoLog

16

ComponentGoLog

17

ListofComponentsincludingall
fieldsontheComponentGoLog.

ComponentList(LinkedEquipment)

18

ListoflinkedComponentswiththe
associatedEquipment.
CompleteCriticalValveComponent
Dataform.
CompleteExpansionJoint
ComponentDataform.
CompleteHangerComponentData
form.
CompleteMiscellaneous
ComponentDataform.
CompletePipeComponentData
form.
ThecompleteContinuousHistory
form.Includesequipment
informationandcombinesall
inspectionreportswhereapieceof
equipmentwasinspected,including
inspectiondetails.

Checklist

Components

CriticalValveDataSheet
ExpansionJointDataSheet
HangerDataSheet
MiscComponentDataSheet
PipeComponentDataSheet
Equipment

VisionsReportCatalogue
v4.1.12

DetailedlistingofDashboardresults.
Includesequipmentandrecord
information.
CompleteAttachmentform.
Listofattachmentsinspreadsheet
style.Listsplant,type,number,
status,attachmentnumber,date,
description,andcomments.
Listofallattachmentsincludingall
fieldsontheAttachmentGoLog.
CompleteChecklistform.
ListofallChecklistsincludingall
fieldsontheChecklistGoLog.

ContinuousHistory

19

EquipmentCircuitList

21

EquipmentDesign&MaterialsList

22

EquipmentHistory

23

Summaryofstaticdata,scheduling,
riskassessment,TMLinformation,
linkedequipmentandinspection
reportsummaries.

EquipmentIndex

24

Spreadsheetstylelistofequipment.
IncludesallfieldsontheEquipment
Index.

Listofequipmentwithlinked
circuits.
Listofequipmentdesignand
materialsinformationin
spreadsheetstyle.Includes
equipmentinformationanddesign
andmaterialspressureand
temperatureinformation.

Page1of11

VisionsReportCatalogue
Folder

v4.1.12

Report
EquipmentLink/ScheduleList

25

EquipmentListLinkedPSVs

26

EquipmentListManufacturer

27

EquipmentRecommendationsSummary

28

Listofequipmentwithrisk
assessmentrecommendationsand
inspectionreportrecommendations.

EquipmentRegistrationFeeList

29

Listofequipmentregistrationfeesin
spreadsheetstyle.Generate
registrationfeetotalsforinitial,
annualorallregisteredequipment.
Listsequipment,andregistration
information.

FailureModes
FailureModesSummary

30

LinkedEquipmentList

31

OperatingLimitSummary

32

OperatingLimits
RegulatorySummary

General

VisionsReportCatalogue
v4.1.12

33

Description
Listofequipmentschedulingand
linkinginspreadsheetstyle.Includes
equipmentinformation,lastand
nextfullinspectiondates,IRC,linked
equipmentandcircuitids.
ListsallequipmentwithlinkedPSVs.
Includesequipmentthathaveno
PSVslinked.
Listofequipmentinspreadsheet
style.Listsequipment,location,and
manufacturerinformation.

CompleteFailureModesform.
SummaryofFailureModesgrouped
byFailureCategory.Include
equipmentdetail.
Listofequipmentwithalltheir
associatedlinkedequipmentin
spreadsheetstyle.Listsequipment
information,typeoflinkandlinked
equipment.
SummaryofOperatingLimitsfor
equipment.GroupedbyOperating
LimitID.
CompleteOperatingLimitsform.
Listofregisteredequipment.
Includesequipment,inspectionand
protectingequipmentinformation.

ReliabilityPlan

CompleteReliabilityPlanformwith
anoverviewofriskassessment,
designandmaterials,scheduling,
memos,inspection/servicereports,
andTMLs.

BusinessUnitConfiguration

CompleteBusinessUnit
Configurationform.
Listofallbusinessunitswithall
fieldsincludedontheBusinessUnit
Log.
Listofdeletedcomponents.

BusinessUnitLog

34

ComponentRecycleBin

35

Page2of11

VisionsReportCatalogue
Folder

v4.1.12

Report
ComponentTypeConfiguration

36

ComponentTypeFieldCloneList

37

EquipmentFileSummary

38

EquipmentRecycleBin
EquipmentServiceStatus

39
40

EquipmentTypeConfiguration

41

EquipmentTypeFieldCloneList

42

PlantConfiguration
43

SummaryreportgroupedbyPlant.
Includescountsoftrainsandcounts
ofeachtypeofequipment.

PlantSummary

44

Listofplantsinspreadsheetstyle.
Listsplantinformation,and
associatedunitinformation.

ReportAssignment

45

ReportList

46

Listofformswithrelatedprimary
andsecondaryreports.
ListofallreportsintheReport
Generator.
CompleteServiceConfiguration
form.
Listofservicesinspreadsheetstyle.
Listsserviceidanddescription.

ServiceList

47

TMin/MAWPFormula

48

TrainConfiguration

49

WorkEventList
WorkEventUsage

50
51

FullInspectionReport
FullInspectionReport(withoutProcessHistory)

VisionsReportCatalogue
v4.1.12

Listofcomponentfieldsthatare
clonedusingtheVisionsclone
procedure.Groupedbystandard
componentmodule.
Listofalldocumentscreatedfor
eachpieceofequipment.
Listofdeletedequipment.
Spreadsheetstylereportlisting
equipmentandthestatus,location,
andInServicevalues.Groupedby
plant.
Listofequipmenttypesand
associatedmodulesinspreadsheet
style.
Listofequipmentfieldsthatare
clonedusingtheVisionsclone
procedure.Groupedbystandard
equipmentmodule.
CompletePlantConfigurationform.

PlantStatistics

ServiceConfiguration

InspectionReports

Description
Listofcomponentsinspreadsheet
style.Listscomponenttypeand
associatedcomponentdatasheets.

ListoftminandMAWPformulain
spreadsheetstyle.Liststheformula
name,codeinfoanddescriptionfor
eachformula.
ListofTrains/Unitsgroupedby
Plants.
Listofallworkevents.
Summaryoftheworkcycletasksfor
aselectedworkevents.
CompleteInspectionReportform.

52

CompleteInspectionReportform
excludingProcessHistory.

Page3of11

VisionsReportCatalogue
Folder

LookupData

VisionsReportCatalogue
v4.1.12

v4.1.12

Report
InspectionHistory

53

Description
Summaryofinspectiontasks,work
requestsandinspectionreports.
Groupssummarydetailsfor
inspectionreports,inspectiontasks
andworkrequestsforeachpieceof
equipment.

InspectionHistoryDetail

54

Summaryofinspectiontasks,work
requestsandinspectionreports.
Liststheworkdescriptionfor
inspectiontasksandworkrequests
andinspectiondetailsforinspection
reportsforeachpieceofeq

InspectionRecommendations

55

Summaryofinspectionreport
recommendations.Includes
equipmentdetail,inspectionreport
andrecommendationinformation.

InspectionReportDetail

56

Summaryofinspectionreport
details.Includesequipmentdetail,
inspectionreportinformation,and
inspectiondetailsforwhole
equipmentorcomponents,as
applicable.

InspectionReportGOLog

57

InspectionReportLog

58

Listofinspectionreportsincluding
allfieldsontheInspectionReport
GoLogs.
Listofinspectionreportsin
spreadsheetstyle.Listsplant,type,
number,reportnumber,title,date
created,anddatecompleted.

InspectionReportRepairSummary

59

Summaryofrepairscompletedand
actiontakenfrominspection
reports.Includesequipmentdetail
andsummarydetailforinspection
reportswithrepaircomments.

InspectionReportSummary

60

ComponentIntervals

61

DefectClassification

62

DistributionList

63

Summaryofinspectionreports.
Includesequipmentdetailanda
summaryforeachinspectionreport
fortheequipment.
Listofcomponentintervals,
includingCodeNo,Description,and
Name.
Completelistofalldefectclasses,
includingdefectcategoriesand
defecttypes.
Listofalldistributionlistentries,
includingName,Description,andE
mailAddress.

Page4of11

VisionsReportCatalogue
Folder

NDE

NonconformanceReports

VisionsReportCatalogue
v4.1.12

v4.1.12

Report
DropListValueReport

64

GaugeThickness

65

GenericExternalComments

66

InspectionRiskCodes

67

Listofinternalandexternal
inspectionriskcodesinspreadsheet
style.Includesriskconfiguration
informationandriskcodedetails.

LineTypeClassification

68

LookupListFields

69

LookupListsinUse

70

ListofLineTypesandalldetailfor
eachID.
SpreadsheetstylelistofF3listsand
theField,Table,andFormtheyare
boundto.
Spreadsheetstylereportlistingall
LookupListsinuse,includingthe
form,table,fieldsize.

MaterialCodes

71

MaterialCodesSummary

72

MonitoringTags

73

PipeSpecification

74

UnitsofMeasureFactors

75

NDEME
NDEMT
NDEPT
NDERT
NDEUT
NDEGoLog

76

NDEReportSummary

77

FullNonconformanceReport

Description
Listofdynamic(F3)lookuplistsin
spreadsheetformat.Includeslist
name,listitem,itemdescription,
andsourceofadditionalitem
information.
Spreadsheetstylereportlisting
GaugeThickness.IncludesType,
Size,andNominal(Metricand
Imperial).
Listofstandardgenericexternal
commentsfortheexternalcondition
oftheequipment.Includes
equipmenttype,commentcategory,
andcomment.

Completelistofallmaterialcodes
anddetail,includingtemperature
andstress.
Listofmaterialcodesavailablefor
thetmincalculationsin
spreadsheetstyle.Liststhematerial
informaitonsimilartotheASME
listings.
Listofuserdefinedmonitoringtags.
Spreadsheetstylereportlistingall
pipespecifications,sortedbypipe
nominal.
Listofallunitsofmeasurefactors.
CompleteNDEMEfrom.
CompleteNDEMTform.
CompleteNDEPTform.
CompleteNDERTform.
CompleteNDEUTform.
ListofNDEreports.Includesall
fieldsontheNDEGoLog.
Summaryofallnonconformance
reports.Includesdescriptionand
disposition.
CompleteNonConformanceReport
form.

Page5of11

VisionsReportCatalogue
Folder

Pipeline

PSVReports

v4.1.12

Report
NCRGOLog

78

NCRLog

79

NCRSummary

80

NonEquipmentNCRLog

81

InlineInspection
InlineInspectionGoLog

82

InlineInspectionGraphs

83

UpstreamEquipment

85

Verifications
VerificationsGoLog

86

PSVServiceHistoryReport

87

88

PSVServiceReportSummary

89

RBIInspectionandExaminationRecommendationsbyEquipmen90

RiskAssessment

VisionsReportCatalogue
v4.1.12

ListofILIRunsaslistedontheInline
InspectionGoLog.
Inlineinspectiongraphing
indicationsaxialdistanceversus
orientation.
CompleteUpstreamEquipment
form.
CompletedVerificationform.
ListofVerificationsaslistedonthe
VerficationGoLog.
Listofoutstanding,completedorall
PSVservicereports.Lists
plant/area,type,number,location,
reportnumber,company,newset
pressure,newcapacity,date
serviced,nextservicedue.
CompletePSVServiceReportform.

PSVServiceReportGOLog

RiskAssessmentGoLog

Listofallnonequipmentrelated
nonconformancereports.
CompleteInlineInspectionform.

PSVServiceReport

RiskAssessment

Description
ListofallNCRs.Includesallfieldson
theNCRGoLog.
Listofallequipmentrelatednon
conformancereports.Groupedby
equipment.
Summaryofoutstanding,completed
orallnonconformancereports.
Includesncrnumber,title,issued
date,issuedto,description,work
ordernumber,prioritycode,
completionstatus,dispositiondate.

91

ListofallPSVservicereports
includingallfieldsonthePSV
ServiceReportGoLog.
SummaryofPSVservicereports.
Includesequipmentdetail(plant,
type,number,name,manufacturer,
serialnumber,location,model
number,lastandnextservicedates,
inspectionriskcode,intervals).
ListssequipmentwithlastRBI
recommendations.Groupedby
plant/area.
CompleteRiskAssessmentform.
ListofallRiskAssessmentsincluding
allfieldsontheRiskAssessmentGo
Log.

Page6of11

VisionsReportCatalogue
Folder

RiskConfiguration

Scheduling

Report
RiskAssessmentInspectionRecommendations

92

RiskAssessmentSummary

93

Listofriskassessmentsin
spreadsheetstyle.Includesnumber,
description,assessmenttype,IRC
value,riskrankandXandYAxis
information.

RiskRankingEquipment

94

Listoftheriskrankingfor
equipmentinspreadsheetstyle.
Listsequipment,riskassessment
andconfigurationinformation.

InspectionRiskCodeList

95

Listofinternalandexternal
inspectionriskcodesinspreadsheet
style.Includesriskconfiguration
informationandriskcodedetails.

RiskConfiguration
RiskConfigurationGoLog

96

RiskConfigurationSummary

97

Listofriskassessmentsin
spreadsheetstyle.Includesnumber,
description,assessmenttype,IRC
value,riskrankandXandYAxis
information.

ComponentSchedulingReport

98

Listofscheduledcomponentsbased
onthenextfullinspectiondatein
spreadsheetstyle.Listsnumber,
type,name,registrationnumber,
lastinspectiondate,duedateand
calculatedduedate.

EquipmentIRCSummary

99

Summarizedcountofequipment
groupedbyequipmenttypeand
inspectionriskcodeincrosstab
style.Includestotalsforeach
inspectionriskcodegroupedon
eachequipmenttype.

Description
Listofriskassessmentinspection
recommendationsforequipment
assessments.Includesequipment
informationandRBIdescription,
date,RAID,riskrankingand
completioncriteria.

FullRiskConfigurationform.
Listofriskconfigurationsin
spreadsheetstyle.Includesallfields
ontheRickConfigurationGoLog.

FullScheduling

CompleteSchedulingformforminor
andstandardequipment.

FullSchedulingMajorequipment

CompleteSchedulingformformajor
equipment.
CompleteSchedulingformforminor
andstandardequipment.

FullSchedulingPSV

VisionsReportCatalogue
v4.1.12

v4.1.12

Page7of11

VisionsReportCatalogue
Folder

StaticData

Report
ITandWRPlanningSummary

Description
101 Summaryofoutstandingactivities
frominspectiontasksandwork
requests.Requirementsforthe
planningdepartment.Includes
equipmentandsummarydetailfor
inspectiontasksandworkrequests.

SchedulingGoLog

102 Listofallequipmentscheduling
records.Inlcludesallfieldsonthe
SchedulingGoLog.

SchedulingSummary

103 Spreadsheettypeequipmentlist
includinglinkedcircuits,last
inspectiondateandduedates.

UnscheduledInspection

104 Listofequipmentwherethenext
fullinspectiondateisblankin
spreadsheetstyle.Listsplant,
number,type,name,circuit,last
inspectiondate,duedateand
calculatedduedate.

BoilerStaticData

CompleteBoilerStaticDataform.

BundleStaticData

CompleteBundleStaticDataform.

CoolingTowerStaticData

CompleteCoolingTowerStaticData
form.
CompleteExchangerStaticData
form.
CompleteFilterStaticDataform.

ExchangerStaticData
FilterStaticData
FiretubeBoilerStaticData
FurnaceStaticData
InjectionPointStaticData
MajorEquipmentStaticData
MiscellaneousStaticData
PipeStaticData
PipelineMiscellaneousStaticData

PipelineSegmentStaticData

CompleteFiretubeBoilerStaticData
form.
CompleteFurnaceStaticDataform.
CompleteInjectionPointStaticData
form.
CompleteStaticDataformforMajor
equipment.
CompleteMiscellaneousStaticData
form.
CompletePipeStaticDataform.
CompletePipelineMiscellaneous
StaticDataform.

PSVStaticData
StackStaticData

CompletePipelineSegmentStatic
Dataform.
CompletePlateExchangerStatic
Dataform.
CompletePSVStaticDataform.
CompleteStackStaticDataform.

TankStaticData

CompleteTankStaticDataform.

PlateExchangerStaticData

VisionsReportCatalogue
v4.1.12

v4.1.12

Page8of11

VisionsReportCatalogue
Folder

Report
ValveStaticData

Description
CompleteValveStaticDataform.

VesselStaticData

CompleteVesselStaticDataform.

WellheadStaticData
TMLTrending

CorrosionEquipmentSummary

CompleteWellheadStaticData
form.
105 Listoftheearliestexpirationdate
andthemaximumshortandlong
lossesforeachpieceofequipment
inspreadsheetstyle.Lists
equipmentinformation,dateand
losses.

CorrosionRateDetail

106 Summaryofshortandlonglosses
(corrosionrates)foreachtestdate.
Includesequipmentdetail,pointand
readinginformation.

CorrosionRate(MinimumLosses)

107 Listofshortandlongcorrosionrates
foreachtestpointinspreadsheet
style.Listspointinformationand
corrosionrates(fromminimum
readings).
108 Listofminimumshortandlong
losses(corrosionrates)foreachtest
pointinspreadsheetstyle.Lists
equipment,point,andcorrosion
information.
109 Listofoverallequipmentmetal
losseswiththeaverageshortand
longlossfromallactiveTMLsfora
pieceofequipment,inspreadsheet
style.
CompleteTMLTrendingform.
110 Listofthethicknessdatawith
projectedreadings;calculatedfrom
thelastreadingusingtheshortand
longlossrates.
111 Summaryofthicknessdatareadings
foreachTMLoneachpieceof
equipment.Includesequipment
detail,pointinformationand
thicknessreadings.

CorrosionTMLSummary

EquipmentOverallMetalLoss

FullTMLTrending
ThicknessDataProjectedReadings

ThicknessDataReadingDetail

VisionsReportCatalogue
v4.1.12

v4.1.12

ThicknessDataScheduleDetail

112 Summaryofthicknessdata
schedulingforeachTML.Includes
equipmentdetail,pointinformation
andthicknessanddateinformation.

ThicknessDataScheduleSummary

113 Listofthicknessdataschedulingfor
eachTMLinspreadsheetstyle.Lists
equipmentdetail,pointinformation,
duedatesandexpirationdates.

Page9of11

VisionsReportCatalogue
Folder

Report
ThicknessDataTMLDetail

Description
114 ListofTMLdetail,withoutreadings,
inspreadsheetstyle.IncludesTML
thicknesses,RBI,stream,material,
diameter,streamandclassification.

TMLGOLog

115 ListofallTMLs;includesallfieldson
theTMLGoLog.
116 ListofTMLlastreadingwithin
selectedpercentagetocritical
thickness,inspreadsheetstyle.Lists
equipment,TMLandthickness
information.
117 TMLTrendinggraphsforeachTML.

TMLLastReadingtoCriticalSummary

TMLTrendingGraphs
Trending

BatchInhibitorApplication
BatchInhibitorApplicationSummary
CathodicProtection
CathodicProtectionGraphs

CathodicProtectionSchedulingSummary

ContinuousInhibitorInjection
ContinuousInhibitorInjectionSummary

FullGeneralTrending
GeneralTrendingGoLog

GeneralTrendingGraphs(ReadingType)
GeneralTrendingGraphs(TestDate)
GeneralTrendingSummary
GlycolAdditionSummary

GlycolSamples
ProductContentTesting
ProductContentTestingGoLog

ProductContentTestingGraph

VisionsReportCatalogue
v4.1.12

v4.1.12

CompleteBatchInhibitor
Applicationform.
119 SummaryofBatchInhibitor
ApplicationRuns.
CompleteCathodicProtectionform.
120 Graphscathodicprotectiontest
dates:Voltage,Currentand
Resistance.
122 SummaryofCathodicProtection
testdates,includingduedatesand
intervals.
CompleteContinuousInhibitor
Injectionform.
123 SummaryofContinuousInhibitor
Injectionratesforequipment.
IncludesStartDateandChemical
Type.
CompleteGeneralTrendingform.
124 Listofallgeneraltrendingrecords,
includingallfieldsontheGeneral
TrendingGoLog.
125 Generaltrendingreadingstypes
groupedbytestdate.
127 Generaltrendingtestdatesgrouped
byreadingtype.
129 Summaryofgeneraltestpointsand
readingsforequipment.
130 Summaryofglycolsamplesby
equipmentinspreadsheetformat.
Groupedbyplant.
131 ListofGlycolSamplesfor
equipment.
CompleteProductContentTesting
form.
132 ListofallProductContentTesting
records;includesallfieldsonthe
ProductContentTestingGoLog.
133 ProductContentTestinggraphsby
AnalysisTypeandChemical
Component.
Page10of11

VisionsReportCatalogue
Folder

Report
ProductContentTestingSummary
ProductionTest
ProductionTestGoLog

ProductionTestSummary
SodiumSamples
SodiumSamplingLevelGraph
TankVolumeTrending
TankVolumeTrendingSummary

WorkLog

WorkTemplates

Description
134 SummaryofProductContent
Testingdates.
CompleteProductTestform.
135 ListofallProductionTestrecords;
includesallfieldsontheProduction
TestGoLog.
136 SummaryofProductionTestdates.
137 ListofSodiumSamplesfor
equipment.
138 Graphofsodiumlevelsbydatefor
eachexchanger.
CompleteTankVolumeTrending
form.
139 Spreadsheetstylelistoftank
volumes,includingDesignLiquid
Levels,LastTestDate,FlowRate,
UsedVolume,andProjectedLife.

FullInspectionTask
FullWorkRequest
InspectionTaskProjectedPlanning

CompleteInspectionTaskform.
CompleteWorkRequestform.
140 Graphstheprojectedscheduleof
fulland/orpartialrecurring
inspectiontasksforselectednumber
ofyears.ExtractsoutstandingITs
andusesintervaltoincrementfor
specifiednumberofyears.

WorkLogGoLog

141 Listofallmemos(workrequestsand
inspectiontasks)includingallfields
ontheWorkLogGoLog.

WorkLogMemoSummary

142 Summaryofmemos.Includes
equipmentdetailandsummary
informationforeachmemoforthe
equipment;includesdistributionlist.

WorkLogSummary

143 Summaryofmemos(WorkRequests
andInspectionTasks).Includes
equipmentdetailandsummary
informationforeachmemoforthe
equipment.

EquipmentWorkTemplate

144 Listofequipmentandcomplete
linkedworktemplate.

FullWorkTemplate
WorkTemplateGoLog

FullWorkTemplateform.
145 ListofallWorkTemplatesincluding
allfieldsontheWorkTemplateGo
Log.
146 CompleteWorkTemplatememo
detail.
147 Summaryofequipmentwork
templates.Includesequipment
detail,worktemplateinformation
andworkorderinformation.

WorkTemplateMemo
WorkTemplateSummary

VisionsReportCatalogue
v4.1.12

v4.1.12

Page11of11

Dashboard Report
Visions 4

TMLs
Plant ID

Equipment Type

NPL-IDO4

Pipeline Segment

Equipment Number
PipeSeg4.2

TML ID
PSeg4.2TML01

TML Description
Demo TML.

Last Min Reading Last Reading Date Next Insp Date Due
0.001

4/25/2008

4/19/2008

Based On
DEG

TMLs Expiring
Plant ID

Equipment Type

NPL-IDO4

Pipeline Segment

Equipment Number
PipeSeg4.2

TML ID
PSeg4.2TML01

TML Description

Last Min Reading Last Reading Date Expiration Date

Demo TML.

0.001

4/25/2008

4/24/2008

Equipment NCRs
Plant ID

Equipment Type

NPL-IDO4

Pipeline Segment

Equipment Number
PipeSeg4.2

NCR Number
154

NCR Title

Due Date

PSeg4.2NCR

4/25/2008

Other NCRs
NCR Number

NCR Title

Due Date

Non-Equip NCR 001100101 - 001100101 - 001100101 @ KOP009222123 AKWA #22123124235TOWERKOPERHAGERNGOPE

3/20/2008

Inspection Tasks
Plant ID

Equipment Type

NPL-IDO4

Pipeline Segment

Equipment Number
PipeSeg4.2

Memo No

Memo Title

Due Date

3528

4/25/2008

Work Requests
Plant ID

Equipment Type

NPL-IDO4

Pipeline Segment

Equipment Number
PipeSeg4.2

Memo No

Memo Title

Due Date

3744

4/25/2008

External Inspection
Plant ID

Equipment Type

NPL-IDO4

Pipeline Segment

Equipment Number
PipeSeg4.2

Next Ext Due Date

Last Ext Due Date

Ext Interval

4/25/2008

Next Full Inspection


Plant ID

Equipment Type

Equipment Number

Next Insp Full Due Next Insp Full Calc Next Insp Date
Based On

NPL-IDO4

Pipeline Segment

PipeSeg4.2

4/18/2008

4/25/2008

PSVs
Plant ID

Equipment Type

NPL-IDO4

PSV

Equipment Number
PSV4.0

Next Service Due


4/25/2017

Next Service Calc


4/25/2017

Last Service Date


4/25/2008

Components
Plant ID

Component Type

NPL-IDO4

Expansion Joint

Component Number
ExpJoin4.0

Next Service Due

Next Service Calc

Last Service Date

4/25/2008

General Trending
Plant ID
NPL-IDO4

Equipment Type
Pipeline Segment

Equipment Number
PipeSeg4.0

Trend Type
Trending Type 1

Trend Point
TP1

Next Due Date


4/14/2008

Next Due Date Calc

Last Date
4/15/2008

Tank Volume Trending


Print Date: 4/25/2008
Report Criteria: No criteria selected.

Page 1 of 2

Dashboard Report
Visions 4

Plant ID

Equipment Type

Equipment Number

Projected Life

Remaining Volume Last Test Date


Flow Rate

NPL-IDO4

Tank

Tank4.0

4/27/2008

4/27/2008

50

Critical Thickness
Plant ID
NPL-IDO4

Equipment Type
Pipeline Segment

Equipment Number
PipeSeg4.2

TML ID
PSeg4.2TML01

TML Description
Demo TML.

Last Min Reading Last Reading Date Critical Thick.


0.001

4/25/2008

3.15 in

Minimum Thickness
Plant ID
NPL-IDO4

Equipment Type
Pipeline Segment

Equipment Number
PipeSeg4.2

TML ID
PSeg4.2TML01

TML Description
Demo TML.

Last Min Reading Last Reading Date Minimum Thick.


0.001

4/25/2008

2 in

Expired TMLs
Plant ID
NPL-IDO4

Equipment Type
Pipeline Segment

Print Date: 4/25/2008


Report Criteria: No criteria selected.

Equipment Number
PipeSeg4.2

TML ID
PSeg4.2TML01

TML Description
Demo TML.

Last Min Reading Last Reading Date Expiration Date


0.001

4/25/2008

4/24/2008

Page 2 of 2

Attachment Summary
Visions 4

Derewonko
Number

Description

Date

Plant ID:
NPL-IDO1
Equipment Number: Misc1.0
Equipment Name:
AKID

Type

File Name

File Size

Equipment Type: Misc


Status:
In Service

41 KB
1

Test atachment on report.

12/12/2007

Embedded

auto.jpg

TestER

12/12/2007

Embedded

Marcin graph.jpg

207 KB

Print Date: 4/25/2008


Report Criteria: Unit Id = 'Derewonko', Plant = 'NPL-IDO1', Equipment Type = 'Misc'

Page 1 of 1

Attachment Go Log
Visions 4

MM Unit12
Plant ID

MM
MM
MM
MM
MM
MM

Plant
Plant
Plant
Plant
Plant
Plant

Equipment Type

Equipment Number

Associated Major
Equipment Number

Attachment
Number

Description

Date

Attachment
Type

155
155
160
160
160
160

Exchanger
Exchanger
Boiler
Boiler
Exchanger
Exchanger

EX-0010
EX-0010
BL-0010
BL-0010
EX-0010
EX-0050

1
2
1
2
1
1

1/16/2008 Embedded
1/16/2008
3/3/2008
3/4/2008
1/28/2008
2/5/2008 Linked

MM Plant 160

Exchanger

EX-0060

3/7/2008

Linked

MM Plant 160

Exchanger

EX-0060

3/7/2008

Linked

MM
MM
MM
MM

Plant
Plant
Plant
Plant

160
160
160
160

Exchanger
Exchanger
Exchanger
Major

EX-0060
EX-0070
EX-0070
MJ-0030

4
1
2
1

3/7/2008
3/3/2008
3/3/2008
3/3/2008

Embedded
Embedded
Linked

MM
MM
MM
MM
MM

Plant
Plant
Plant
Plant
Plant

160
170
170
170
170

Pipe
Boiler
Boiler
Exchanger
Exchanger

PP-0010
Minor BL-001
Minor BL-002
EX-00010
EX-0020

1
1
1
1
1

3/3/2008 Embedded
4/3/2008
4/3/2008
3/11/2008
3/11/2008 Linked

Print Date: 4/25/2008


Report Criteria: No criteria selected.

MJ-0010
MJ-0010

File Name

Water lilies.jpg

C:\Documents
and Settings\All
Users\Document
s\My
Pictures\Sample
Pictures\Water
lilies.jpg
C:\Documents
and Settings\All
Users\Document
s\My
Pictures\Sample
Pictures\Water
lilies.jpg
C:\Documents
and Settings\All
Users\Document
s\My
Pictures\Sample
Pictures\Sunset.j
pg

Winter.jpg
Water lilies.jpg
C:\Documents
and Settings\All
Users\Document
s\My
Pictures\Sample
Pictures\Sunset.j
pg
Sunset.jpg

File Size

82 KB
0 bytes
0 bytes
0 bytes
0 bytes
0 bytes

0 bytes

0 bytes

0 bytes
103 KB
82 KB
0 bytes

70 KB
0 bytes
0 bytes
0 bytes
0 bytes

C:\Documents
and Settings\All
Users\Document
s\My
Pictures\Sample
Pictures\Water
lilies.jpg

Page 11 of 14

Checklist Go Log
Visions 4

Plant ID

Equipment Type

Equipment Number

Checklist No

Date
Created

Inspected
By

Checklist
Title

AUT

Reviewed
By
HW

IR Title

IR Date

IR Insp
Date

4123

Title IR-0010

12/11/2007 3/1/2008

3782

IR Title1

12/28/2007 12/28/2007

IR Memo No

IR
Completed

MM Plant 170

Exchanger

EX-00010

12/11/2007 Hao Wang

HWPlant

Filter

F1

12/28/2007

HWPlant

Pipeline Segment

PS1

12/31/2007

T-34

Tank

TTestA

3/7/2008

HW

First Checklist1

CKLST

HW

4097

IR Title 00

3/7/2008

Test-PlantA

Stack

Sc

3/19/2008

HW

Checklist [6]

Acces

HW

4166

IR Title000

3/19/2008 3/19/2008

HWPlant4

Pipeline Segment

PS1

4/4/2008

4291

IR Title0000

4/4/2008

4/15/2008

HWPlant4

Pipeline Segment

PS1

4/7/2008

4291

IR Title0000

4/7/2008

4/15/2008

Print Date: 4/25/2008


Report Criteria: No criteria selected.

Checklist1

Activity
Code

3769

12/31/2007
3/7/2008

Page 1 of 1

Component Go Log
Visions 4

Component No

Component Type

ERP Number

Location

Year Installed

PID Number

Plant ID

Function

In Service

Outage Extent

Flow Diagram

Serial Number

Scaffold
Required

Ladder
Required

Interval
Description

AD- Hanger

Hanger-1

ADPlant1

Expansion Joint

te

L2

Flare Tip

test

Plant

CV1
HWPlant

CV2

Critcal Valve

90

L1

Outlet Piping

Train

1/17/2003

1/17/2003

Test
1/17/2003

Test

Expansion Joint
1/17/2003

Test

Expansion Joint
1/17/2003

Test

Expansion Joint

HWPlant

H1

1/17/2003

Expansion Joint

HWPlant

EJ4

26

Train

Test

Hanger

HWPlant

Print Date: 4/25/2008


Report Criteria: No criteria selected.

Test

Test

HWPlant

EJ3

S1

60

Critcal Valve

HWPlant

EJ2

F1

PID1

Test

HWPlant

EJ1

1998

Critcal Valve

HWPlant

CV3

Next Insp Due


Date

Hanger

ADPlant1

test

Manlift Inspection
Required
Code

1/17/2003

Page 1 of 6

Component List (Linked Equipment)


Visions 4

Component Type

Component Number

Plant ID

Component Description

Linked Equipment
Plant ID

Critcal Valve
Critcal Valve
Critcal Valve
Critcal Valve
Expansion Joint
Expansion Joint
Hanger
Hanger
Hanger
Hanger
Hanger
Hanger
Hanger
Hanger
Hanger
Misc
Misc
Misc
Misc
Misc
Misc
Misc
Misc
Pipe
Pipe

1
CV2
CV3
CV1
EJ3
EJ1
Be2
Ae1
CHanger1.0
HG-0010
HG-0020
HG-002
HG-001
H2
H1
M1
CMisc2.0
CMisc1.2
CMisc1.1
CMisc1.0
M3
M2
CLONE-MISC-2
P1
CPipe1.0

Print Date: 4/25/2008


Report Criteria: No criteria selected.

TiagoTest
HWPlant
HWPlant
HWPlant
HWPlant
HWPlant
MM Plant 152
MM Plant 152
NPL-IDO1
MM Plant 170
MM Plant 170
Test-PlantB
Test-PlantB
HWPlant
HWPlant
HWPlant
NPL-IDO2
NPL-IDO1
NPL-IDO1
NPL-IDO1
HWPlant
HWPlant
NADINE
HWPlant
NPL-IDO1

sdf
Test
Test
Test
Test
Test

Test
Test
Test

Tester
Ne
Test Misc Component
Test
Test
Test Misc Component
Test

Test-PlantC
T-34
HWPlant
HWPlant2
HWPlant4
T-34
MM Plant 160
MM Plant 160
NPL-IDO1
MM Plant 170
HWPlant4
Test-PlantB
Test-PlantB
HWPlant
T-34
T-34
NPL-IDO2
NPL-IDO1
NPL-IDO1
NPL-IDO1
HWPlant
HWPlant
HWPlant
T-34
ADPlant1

Equipment Type

Boiler
Tank
Filter
Exchanger
Pipeline Segment
Filter
Exchanger
Exchanger
Misc
Exchanger
Exchanger
Exchanger
Exchanger
Filter
Tank
Tank
Pipeline Segment
Pipeline Segment
Misc
Misc
Boiler
Boiler
Exchanger
Tank
Boiler

Equipment Number

Tiago-Boiler1
TTestB
F1
E1
PS1
F6
EX-0010
EX-0010
Misc1.0
EX-00010
E1
EX-0010
EX-0010
F1
TTestA
TTestA
PipeSeg2.0
PipeSeg1.0
Misc1.0
Misc1.0
B1
B1
1H-1204-Pass 9
TTestB
Boiler-2

Page 1 of 1

Process / Continuous History Report


Visions 4

Derewonko

Plant ID:
NPL-IDO1
Equipment Classification: Circuit
Equipment Number:
Circuit1.0
Equipment Name:
UIDS

In Service:

Status:
In Service
Equipment Type: Circuit

Linked Minor Equipment


Plant ID: NPL-IDO3

Equipment Type: Exchanger

IR Memo No
Report Number
4175
534

Title
Category
aWRa

Print Date: 4/25/2008


Report Criteria: Unit ID = 'Derewonko'

Date Inspected
Date Created

Work
Event

Equipment Number: Exchanger3.0

Process/History

Inspection Details

3/20/2008
3/20/2008

1 of 38

Process / Continuous History Report


Visions 4

Derewonko

Plant ID:
NPL-IDO1
Equipment Classification: Equipment
Equipment Number:
Exchanger1.0
Equipment Name:
OOSD

In Service:

Status:
In Service
Equipment Type: Exchanger

Continuous History
IR Memo No
Report Number
3820
REPTEST

Title
Category
IR TITLE @ 234
Operating Condition

3821
32
3822
TESTER

Print Date: 4/25/2008


Report Criteria: Unit ID = 'Derewonko'

Date Inspected
Date Created
1/17/2008
1/17/2008

Work Event

Process/History

Inspection Details

The first
event used
for testing
purpose

1/1/2008
1/17/2008
1/3/2008
1/17/2008

2 of 38

Equipment Circuit List


Visions 4

LNA

Plant ID

Plant ID:
NADINE
Equipment Number: NADJamiePlant
NPL-IDO1

Circuit Type

Circuit Number

Circuit Name

Circuit

Equipment Type: Boiler


Equipment Name:
j3

j3test

Circuit

Circuit1.0

UIDS

Plant ID:
NADINE
Equipment Number: TANK-MAR17
HWPlant

dsfsd

Equipment Type: Tank


Equipment Name:
2456245

56546

JamiePlant

Circuit

j3

j3test

MM Plant 155

Circuit

CC-0010

Major Scheduling Test: Jan 11, 2008

MM Plant 155

Circuit

CC-0020

MM Plant 160

Circuit

CC-0010

MM Plant 160

Circuit

CC-0020

NPL-IDO1

Circuit

Circuit1.0

UIDS

T-34

Circuit

C1

Circuit1

T-34

Circuit

C2

Circuit2

Print Date: 4/25/2008


Report Criteria: No criteria selected.

Status: In Service

Status: Mothballed

Major-Minor Test: Jan 18, 2008

Page 6 of 7

Equipment Design and Materials List


Visions 4

HWBusinessUnit
Equipment Type
Equipment Number

Equipment Name

Location

MAWP

MAWT

MDMT

@
Press.

Oper.
Press.

Oper.
Temp.

Orig. Test
Press.

Test Type

Design
Press.

Design
Temp.

Plant ID: HWPlant


Filter
J test prefix E

Filter1

J test prefix E

Filter1

K test prefix F

Filter1

K test prefix F

Filter1

L test prefix G

Filter1

L test prefix G

Filter1

Location 2

FTB1

Firetube Boiler1

JOFFRE ETHYLENE
UNIT I

FTB1

Firetube Boiler1

FTB2

Firetube Boiler2

FTB3

Firetube Boiler3

F1

Furance1

F1

Furance1

F2

Furnace2

F2

Furnace2

F2

Furnace2

IP1

Injection Point1

IP1

Injection Point1

JOFFRE ETHYLENE
UNIT III

Ma1

Major1

JOFFRE ETHYLENE
UNIT III

Ma1

Major1

Ma2

Major2

Ma2

Major2

Ma2

Major2

Filter
Location 2

Filter
Filter
Location 2

Filter
Filter
Firetube Boiler
1
Firetube Boiler
1
Firetube Boiler
43t43t
Firetube Boiler

Firetube Boiler
Firetube Boiler
Firetube Boiler
Furnace
JOFFRE ETHYLENE
UNIT III

-20 F

Furnace
-20

Furnace
90

90

90

90

90

90

Pneumatic

90

70

90 F

90 psig

90 psig

90 F

90 psig

Pneumatic

90 psig

70 F

Furnace
Location 2

90 psig

90 F

Furnace
Injection Point
Injection Point

Major

Major
Major
Major
Major
Location 1

Major
Mx
Misc
M1

Misc1

M1

Misc1

M2

Misc2

M2

Misc2

Misc
JOFFRE ETHYLENE
UNIT III

Misc
Misc
Print Date: 4/25/2008
Report Criteria: No criteria selected.

Page 15 of 100

Equipment History
Visions 4

Derewonko
Plant ID:
Number:

Type:
Name:

NPL-IDO1
Exchanger1.0

Registration Number:
Location:

33250001

Exchanger
OOSD

ERP Number: #343@00012

Status: In Service

Scheduling
IRC: 5
Last Insp Date:

Risk Rank: 6
1/1/2008

TML Expiry Date:


Next Full Insp Due: 1/1/2017

Outage Date:
Next Ext Due Date: 7/1/2012

RBI
RBI Number: 272

RBI Date: 4/25/2008

Description:

Failure Mode:
Factors Affect Occurence:

TMLs
TML Id
TML Description
EX1.0TML01

TML
Class

Act. Code
Stream

IRC
Active

RI
108

Last Reading Date

Next Insp Date

Expiration Date

Nominal

Min Thick

Min Short Loss

Inspection Reports
IR Memo No
IR Title
3820
IR TITLE @ 234

Extent

Chief Inspector
Work Event

Completed
Date Inspected

Inspection Details

Partial

The first event used for


testing purpose

1/17/2008

Linked Equipment
Type of Link

Plant ID
NPL-IDO3

Equipment Type
Pipe

Equipment Number
Pipe3.0

Equipment Name
KOLA

Page 2 of 38
Print Date: 4/25/2008
Report Criteria: Unit Id = 'Derewonko'

Equipment Index
Visions 4

Classification

Plant Id

Equipment Number

Location

Assoc Major
Equip Number

Registration
Number

Status

Mfg Serial
Number

@MAWT

@Press

Oper Press

Restricted
Interval

Next Ext Due


Date

TML Expiry

Paint Code

Unit ID

Train

Equipment Type

Equipment Name

ERP
Number

In Service

Outage
Extent

MAWP

MDMT

Oper
Temp

Insp Risk

Next Full
Insp Due

Next Thickness
Due

Risk
Rank

Outage

Equipment

NPL-IDO1

Derewonko

PSV1.5
PSV

KOPA

Equipment

NPL-IDO1

Derewonko

PSV1.6
PSV

POOP

Equipment

NPL-IDO1

Derewonko

PSV1.7 - Long
Number Test
PSV

FORZ

Equipment

NPL-IDO1

Derewonko

Tank1.0
Tank

In Service
IIUD

6 psig

PC1

21 F

Equipment

NPL-IDO1

Derewonko

Vessel1.0
Vessel

IIAD

Equipment

NPL-IDO2

Derewonko

PipeSeg2.0
Pipeline Segment

In Service
4

OIDS

72

4/22/2011

1/4/2008

4/22/2014

1/4/2008

119.25

Equipment

NPL-IDO3

Derewonko

Boiler3.0
Boiler

OKAY

Equipment

NPL-IDO3

Derewonko

Pipe3.0
Pipe

KOLA

Equipment

NPL-IDO3

Derewonko

PSV3.0
PSV

UPKA

Equipment

NPL-IDO3

Derewonko

PSV3.1
PSV

NOGA

Equipment

NPL-IDO4

Derewonko

PipeSeg4.0
Pipeline Segment

POKY

Equipment

NPL-IDO4

Derewonko

PipeSeg4.1
Pipeline Segment

INDY

4/9/2008

Equipment

NPL-IDO4

Derewonko

PipeSeg4.2
Pipeline Segment

4/25/2008
PIKI

4/18/2008

4/24/2008

Equipment

NPL-IDO4

Derewonko

PSV4.0
PSV

108
JOKE

4/25/2017

10.625

4/24/2008

Equipment

NPL-IDO4

Derewonko

Tank4.0
Tank

WHIP

Minor

NPL-IDO1

Derewonko

Misc1.0
Misc

Circuit1.0

In Service

AKID

72
4

119.25

Minor
Derewonko

NPL-IDO3

Exchanger3.0
Exchanger

Circuit3.0

In Service

DOPE

108
5

3/25/2017

17.25

Print Date: 4/25/2008


Report Criteria: Unit Id = 'Derewonko'

Page 2 of 3

Equipment Link / Schedule List


Visions 4

Derewonko
Plant ID:
NPL-IDO1
Equipment Number: Exchanger1.0
Equipment Name:
OOSD
Flow Diagram:

Equipment Type: Exchanger


Outage Extent:

IRC: 5

Status: In Service
Last Insp. Date:
1/1/2008
Next Full Inspection Due:1/1/2017

Linked Equipment
Type of Link

Plant ID

Equipment Type

NPL-IDO3

Pipe

Plant ID:
NPL-IDO3
Equipment Number: Exchanger3.0
Equipment Name:
DOPE
Flow Diagram:

Equipment Number
Pipe3.0

Equipment Type: Exchanger


Outage Extent:

IRC: 5

Status: In Service
Last Insp. Date:
Next Full Inspection Due:

Linked Circuits
Plant ID

Equipment Type

NPL-IDO3

Equipment Number

Circuit

Plant ID:
NPL-IDO3
Equipment Number: Pipe3.0
Equipment Name:
KOLA
Flow Diagram:

Circuit3.2
Equipment Type: Pipe
Outage Extent:

IRC:

Status:
Last Insp. Date:
Next Full Inspection Due:

Linked Equipment
Type of Link

Plant ID

Equipment Type

NPL-IDO1

Exchanger

Equipment Number
Exchanger1.0

Linked Circuits
Plant ID
NPL-IDO3

Equipment Type
Circuit

Plant ID:
NPL-IDO3
Equipment Number: PipeSeg3.0
Equipment Name:
LOPE
Flow Diagram:

Equipment Number
Circuit3.0

Equipment Type: Pipeline Segment


Outage Extent:

IRC: 5

Status: In Service
Last Insp. Date:
Next Full Inspection Due:

Linked Circuits
Plant ID
NPL-IDO3
NPL-IDO3
NPL-IDO3

Print Date: 4/25/2008


Report Criteria: Unit Id = 'Derewonko'

Equipment Type
Circuit
Circuit
Circuit

Equipment Number
Circuit3.0
Circuit3.1
Circuit3.2

Page 1 of 1

Equipment List - Linked PSVs


Visions 4

Derewonko
Type of Link

Equipment Number

Plant ID:
NPL-IDO1
Equipment Number: Exchanger1.0
Equipment Name: OOSD
PSV1.0
PSV1.1
PSV1.2
Plant ID:
NPL-IDO1
Equipment Number: Pipe1.0
Equipment Name: IJAJ
Shellside
PSV1.0
Shellside
PSV1.1
Tubeside
PSV1.2
Shellside
PSV1.3
Tubeside
PSV1.4
Tubeside
PSV1.5
Plant ID:
NPL-IDO1
Equipment Number: Tank1.0
Equipment Name: IIUD
PSV1.0
Plant ID:
NPL-IDO3
Equipment Number: Exchanger3.0
Equipment Name: DOPE
Tubeside
PSV1.0
Shellside
PSV1.2

Print Date: 4/25/2008


Report Criteria: Main Unit Id = 'Derewonko'

Plant ID

Equipment Type

Equipment Type: Exchanger


Registration:
33250001

NPL-IDO1
NPL-IDO1
NPL-IDO1

MAWP: 1,234 psig

Location:
JOFFRE ETHYLENE UNIT I
ERP Number:
Status:

MAWP:

Location:
ERP Number:
Status:
In Service

MAWP:

Location:
ERP Number:
Status:
In Service

MAWP:

PSV

Equipment Type: Exchanger


Registration:

NPL-IDO1
NPL-IDO1

Location:
ERP Number: #343@00012
Status:
In Service

PSV
PSV
PSV
PSV
PSV
PSV

Equipment Type: Tank


Registration:

NPL-IDO1

Set Pressure

PSV
PSV
PSV

Equipment Type: Pipe


Registration:
10034A

NPL-IDO1
NPL-IDO1
NPL-IDO1
NPL-IDO1
NPL-IDO1
NPL-IDO1

Capacity

PSV
PSV

Page 1 of 1

Equipment List - Manufacturer


Visions 4

Derewonko
Plant ID
NPL-IDO1

Equipment Number
Circuit1.0

Equipment Type
Circuit

UIDS

NPL-IDO1

Exchanger1.0

Exchanger

OOSD

NPL-IDO1

Misc1.0

Misc

AKID

NPL-IDO1

Pipe1.0

Pipe

IJAJ

NPL-IDO1

Pipe1.1

Pipe

DSAS

NPL-IDO1

Pipe1.2

Pipe

OKLS

NPL-IDO1

Pipe1.3

Pipe

OPOS

NPL-IDO1

Pipe1.4

Pipe

IUJS

NPL-IDO1

Pipe1.5

Pipe

OLAF

NPL-IDO1

Pipe1.7

Pipe

OLPP

NPL-IDO1

Pipe1.8

Pipe

HYSA

NPL-IDO1

PipeMisc

Pipeline Misc

KODI

NPL-IDO1

PipeSeg1.0

Pipeline Segment

FIKU

BRYAN STEAM CORPORATION

NPL-IDO1

PSV1.0

PSV

KOSD

Anderson Greenwood and Crosby

NPL-IDO1

PSV1.1

PSV

DOLI

NPL-IDO1

PSV1.2

PSV

KOSD

NPL-IDO1

PSV1.3

PSV

ILOP

NPL-IDO1

PSV1.4

PSV

UPAR

NPL-IDO1

PSV1.5

PSV

KOPA

NPL-IDO1

PSV1.6

PSV

POOP

NPL-IDO1

PSV1.7 - Long Number


Test

PSV

FORZ

NPL-IDO1

Tank1.0

Tank

IIUD

NPL-IDO1

Vessel1.0

Vessel

IIAD

NPL-IDO2

PipeSeg2.0

Pipeline Segment

OIDS

NPL-IDO3

Boiler3.0

Boiler

OKAY

NPL-IDO3

Circuit3.0

Circuit

YUEP

NPL-IDO3

Circuit3.1

Circuit

ISKA

NPL-IDO3

Circuit3.2

Circuit

OMFG

NPL-IDO3

Exchanger3.0

Exchanger

DOPE

NPL-IDO3

Pipe3.0

Pipe

KOLA

Print Date: 4/25/2008


Report Criteria: Unit Id = 'Derewonko'

Equipment Name

Manufacturer

Location

Farris

JOFFRE ETHYLENE UNIT I

1st Stg Discharge Scrubber (D.O.T.)

Consolidated

Page 1 of 2

Equipment Recommendations Summary


Visions 4

HWBusinessUnit
Plant ID: HWPlant
Number: E1

Equipment Type: Exchanger


Equipment Name: Exchanger1

Risk Assessment
RBI Number
53

RBI Date

Recommendation

1/24/2008

Plant ID: HWPlant


Number: 13223r321

Equipment Type: Filter


Equipment Name:

Risk Assessment
RBI Number
220

RBI Date

Recommendation

3/26/2008

Plant ID: HWPlant


Number: F1

Equipment Type: Filter


Equipment Name: Filter1

Inspection Report
IR Memo No:
3782
Date Inspected: 12/28/2007

IR Title1

Report Number: RN001


Job File Number: JFN001
Recommendations for Equipment
Number
1

Work Order No.: 1


Inspection Date: 12/28/2007

Recommendation

Action Taken

Recommendations for Component: CV3 (Critcal Valve)


Number
1

Recommendation

Recommendations for Component: H2 (Hanger)


Number
1

Recommendation

Plant ID: HWPlant


Number: 1

Complete

Complete

Action Taken

Complete

Action Taken

Equipment Type: Firetube Boiler


Equipment Name:

Risk Assessment
RBI Number
220

RBI Date

Recommendation

3/26/2008

Plant ID: HWPlant


Number: FTB1

Equipment Type: Firetube Boiler


Equipment Name: Firetube Boiler1

Risk Assessment
RBI Number

RBI Date

Recommendation
Page 5 of 37

Equipment Registration Fee List


Visions 4

ADBusinessUnit- Dec7

Plant ID

Equipment Type

Equipment Number

Equipment Name

ADPlant1

Exchanger

Exchanger-test

test

ADPlant1

Exchanger

TD-07122007

Exchanger-1

ADPlant1

Injection Point

Injection point

ADPlant1

Injection Point

test

ADPlant1

Major

Major

ADPlant1

Major Exchanger

MKajor Exchanger

ADPlant1

Pipe

Pipe -1

ADPlant1

Pipeline Segment

test 294

ADPlant1

Plate Exchanger

SV_TEST100

ADPlant1

PSV

ADPlant1

Year
Installed

Status

Registration No.
National Board No.

Registration
Fee

In Service

test

In Service
Test

Removed

PSV-1

PSV One

In Service

Tank

SV_TEST-100

Test

ADPlant1

Tank

SV-Test-250

Testing Tank Vol Trending

ADPlant1

Tank

tank test

ADPlant1

Tank

Tank-225 test defect

test

ADPlant1

Tank

Test for the #225

test- entered manualy

open

ADPlant1

Tank

Test for the #225-1

test- entered manualy

open

ADPlant1

Tank

test tank

ADPlant1

Tank

test281

test

ADPlant1

Tank

test297

test

ADPlant1

Tank

testt

ADPlant2 - Pipeline

Pipeline Segment

PipeLine Segment -1

PipelIneSegment one

Initial
Initial

2008

In Service

Annual
123
2
123
2

Suspended

Page 3 of 109
Print Date: 4/25/2008
Report Criteria: No criteria selected.

Failure Modes Summary


Visions 4

Environmental Crack
Failure Mode

Foreseeable

Unit Id

Plant ID

Equipment Type

Equipment Number

Equipment Name

MM Unit12

MM Plant 160

Exchanger

EX-0010

Main Test: Jan 18, 2008

HWBusinessUnit

HWPlant

Pipeline Segment

PS1

Pipeline Segment1

Fabrication Factor
General Corrosion

External Corrosion
Failure Mode

Foreseeable

Unit Id

Plant ID

Equipment Type

Equipment Number

Equipment Name

KG_BU

KG_Plant

Wellhead

SHELL-1

SHELL-1

HWBusinessUnit

HWPlant

Bundle

Bu1

Bundle1

Crevice Corrosion
Fabrication Factor

Internal Corrosion
Failure Mode

Foreseeable

Unit Id

Plant ID

Equipment Type

Equipment Number

Test-Unit

Test-PlantA

Pipeline Segment

PS1

TiagoTest

TiagoTest

PSV

Tiago-PSV_2

HWBusinessUnit

HWPlant

Tank

T2

Equipment Name

Design Factor
Design Factor
Fatigue

Tank2

Material Defect
Failure Mode

Foreseeable

Unit Id
HWBusinessUnit

Plant ID
HWPlant

Equipment Type
Pipeline Segment

Equipment Number
PS1

Equipment Name
Pipeline Segment1

Fabrication Factor

Print Date: 4/25/2008


Report Criteria: No criteria selected.

Page 1 of 1

Linked Equipment List


Visions 4

HWBusinessUnit

Plant ID

Equipment Type

Equipment Number

Plant ID:
HWPlant
Equipment Number: B1
Equipment Name:
Boiler1
HWPlant
HWPlant
HWPlant

Equipment Type: Boiler


Status:
Mothballed

Boiler
Bundle
Bundle

B2
Bu1
Bu2

Plant ID:
HWPlant
Equipment Number: B2
Equipment Name:
Boiler2
HWPlant
HWPlant

Boiler
Bundle

Boiler
Boiler

Plant ID:
HWPlant
Equipment Number: CT1
Equipment Name:
Cooling Tower1
HWPlant

B1
B2

Exchanger

Bundle
Bundle

Location:

Boiler1
Boiler2

B1

Equipment
Bundle

Location:

Boiler1

Equipment Type: Cooling Tower


Status:
Decommissioned

Plant ID:
HWPlant
Equipment Number: 1H-1204-Pass A
Equipment Name:
Radiant Pass A

Print Date: 4/25/2008


Report Criteria: No criteria selected.

Boiler1
Bundle1

Equipment Type: Bundle


Status:
In Service

Boiler

Bundle
Equipment
Equipment

Location:

Equipment Type: Bundle


Status:
Mothballed

Plant ID:
HWPlant
Equipment Number: Bu2
Equipment Name:
Bundle2
HWPlant

Boiler2
Bundle1
Bundle2

B1
Bu1

1H-1204-Pass A

Equipment Type: Exchanger


Status:
In Service

Type of Link

Location:

Equipment Type: Boiler


Status:
In Service

Plant ID:
HWPlant
Equipment Number: Bu1
Equipment Name:
Bundle1
HWPlant
HWPlant

Equipment Name

Equipment

Location:

Radiant Pass A

Bundle

Location:

Page 3 of 9

Operating Limits Summary


Visions 4

Max Flow Rate


Unit Id

Plant ID

Equipment Type

Equipment Number

Equipment Name

HWBusinessUnit

HWPlant

Boiler

Boiler1

JH_BusinessUnit2

JH_Plant2

Boiler

JH_Boiler9999

Status

Operating Limit
7000 ft3/day

Mothballed
200 ft3/day
In Service
Max Op Press
Unit Id

Plant ID

Equipment Type

Equipment Number

Equipment Name

HWBusinessUnit

HWPlant

Tank

Tank2

MM Unit12

MM Plant 160

Exchanger

Main Test: Jan 18, 2008

Status

Operating Limit
12 ft3/day

Mothballed
3232 F
In Service
MM Unit12

MM-BCD-1

Bundle

TiagoTest

TiagoTest

PSV

BCD Test: Mar 25, 2008

12345678.1234 F
1 ft3/day

Max Op Temp
Unit Id
JH_BusinessUnit2

Plant ID
JH_Plant2

Equipment Type

Equipment Number

Boiler

Equipment Name

Status

JH_Boiler9999

Operating Limit
2000 F

In Service
Min Flow Rate
Unit Id
Test-Unit

Plant ID
Test-PlantA

Equipment Type

Equipment Number

Equipment Name

Status

Pipeline Segment

Operating Limit
90 F

Min Op Temp
Unit Id
HWBusinessUnit

Plant ID
HWPlant

Equipment Type
Boiler

Equipment Number

Equipment Name

Status

Boiler1

Operating Limit
8000 F

Mothballed

Print Date: 4/25/2008


Report Criteria: No criteria selected.

Page 1 of 1

Regulatory Summary
Visions 4

Derewonko
Linked PSVs:
Registration Number
Tube MAWP
Shell MAWP
Last Full Insp Date

Plant ID
Equipment Type
Equipment Number
Equipment Name

Manway | Restricted Interval


Linked Services (Side)

IR Memo No. | Report Number | Date Inspected


Activity Codes
Regulatory Comment

Plant ID
Equipment Number
Equipment Type

Last Service Date RI (mths) Set Press


Next Servide Due EI (mths)

Actual Capacity
Certified Capacity
Required Capacity

108 mths
NPL-IDO3
Exchanger
Exchanger3.0
DOPE

4175

534

3/20/2008

NPL-IDO1
PSV1.0
PSV
NPL-IDO1
PSV1.2
PSV

1/16/2008
1/16/2014

72
12

3/20/2008
7/20/2010

28
14

NPL-IDO1
PSV1.0
PSV
NPL-IDO1
PSV1.2
PSV

1/16/2008
1/16/2014

72
12

3/20/2008
7/20/2010

28
14

10000 psig 3284 F


548 F
215 F
2 psig
32 F
31 F
23 F

72 mths

4/22/2008

NPL-IDO2
Pipeline Segment
PipeSeg2.0
OIDS

4331

NPL-IDO1
Pipeline Segment
PipeSeg1.0
FIKU

PSeg2.0IR01

4/22/2008

72 mths
0409301
12.02 psig

4295

108 mths
33250001
32 psig
1234 psig
1/1/2008

NPL-IDO1
Exchanger
Exchanger1.0
OOSD

Print Date: 4/25/2008


Report Criteria: No criteria selected.

Gas (S)

3820
REPTEST
1/17/2008
A1, A2, A4, A3
Please do not reply to this email. If you DO NOT wish to
receive updates from SIRIUS, please click t

10000 psig 3284 F


548 F
215 F
2 psig
32 F
31 F
23 F

Page 4 of 25

Business Unit Log


Visions 4

Unit ID

Unit Description

Corporate Name

Location

Country

AD- Bu April

test for the April Release

ADBusinessUnit- Dec7

New Business unit for my testing

Metegrity

Edmonton

Canada

Derewonko

BZNS UNT

DM

Edmonton, AB

Canada

DEV-BusinessUnit

Business unit created for development team due


to the database duplicate record issue

Metegrity

Edmonton, AB

Canada

HWBusinessUnit

New business unit created after the database


changes

METEGRITY

Edmonton, Alberta

Canada

HWBusinessUnit2

Unit created used to test the report

Metegrity

5715 76 AVE, Edmonton, AB

Canada

4th business created by Hao Wang

Metegrity

Edmonton, AB

Canada

None

Metegrity

Edmonton

Canada

MM Unit11

QA Unit

Metegrity

Edmonton

Canada

MM Unit12

QA Unit_12

Metegrity

Edmonton

Canada

MM Unit12-2

test

BLOCK0-TAK
CAB Unit - Do Not Use

Drummond
EXTRACTION/TAILINGS
Haggith CNRL Training

HWBusinessUnit3
HWBusinessUnit4
JH_Business1
JH_BusinessUnit2
KG_BU
KG_BU_1
LNA
MH_BUSINESSUNIT
MHelwich

TEAM IMP
Test-Unit

QA Unit

Metegrity

Edmonton

Canada

TiagoTest

TEST

TEST

TEST

TEST

TML Testing - Implementation

Print Date: 4/25/2008


Report Criteria: No criteria selected.

Page 1 of 1

Component Recycle Bin


Visions 4

Component Type

Component Number

Plant ID

Description

Critcal Valve

CV4

HWPlant

New CV use for testing purpose

Expansion Joint

EJ1

HWPlant2

The first expansion joint

Hanger

MM Plant 152

Hanger

1eeeeeA

MM Plant 152

Hanger

MM Plant 152

Hanger

2eeeeeB

MM Plant 152

Hanger

MM Plant 152

Hanger

33

MM Plant 170

Hanger

H1

HW_Plant

Pipe

P1

Test-PlantA

Print Date: 4/25/2008


Report Criteria: No criteria selected.

Description

Page 1 of 1

Component Type Configuration


Visions 4

Component Type
Critcal Valve
Expansion Joint
Hanger
Misc
Pipe

Description
Original
Original
Original
Original
Original

Supplied Type
Critical Valve
Expansion Joint
Hanger
Misc
Pipe

Print Date: 4/25/2008


Page 1 of 1

Component Type Field Clone List


Visions 4

Uses Standard Component Module: Expansion Joint


Description: Expansion Joint components
User-defined Component Type:
Expansion Joint
Table Name
Component
Component
Component
Component
Component
Component
Component
Component
Component
Component
Component
Component
Component
Component
Component
Component
Comp Schedule
Comp Schedule
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint Hardware
Joint Hardware
Joint Hardware
Joint Hardware

Print Date: 4/25/2008


Report Criteria: No criteria selected.

Field Name
Description
Function
Flow Diagram
Install Type
Ladder Required
Location
Manlift Required
Manufacturer
Model Number
Notes
Outage Extent
PID Number
PID Tag Number
Scaffold Required
Year Built
Year Installed
Inspection Code
Interval
Angular Rotation
Angular Rotation Unit
Bellows Convolusions
Bellows Material
Bellows OD
Bellows OD Unit
Bellows Type
Compression
Compression Unit
Cylinder OD
Cylinder OD Unit
Effective Area
Effective Area Unit
Lateral Offset
Lateral Offset Unit
Liner OD
Liner OD Unit
Pipe Material
Pipe Size
Pipe Size Unit
Description
Item No
Material
Part Name

Clone Order
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
4
4
4
4

Page 3 of 7

Equipment File Summary

Visions 4

Derewonko
Module

Number

Plant ID:
NPL-IDO4
Equipment Number: Boiler4.0

Title/Description
Equipment Type: Boiler
Equipment Name: OOPS

Attachment

Demo

Inspection Report

4338

Demo IR

Inspection Task
Work Request

3529
3745

Demo IT
Demo Work Request

NCR

159

Demo NCR

RBI Assessment
TML Trending
Work Template

273
B4.0TML01
180

Demo TML
Demo Work Template

Print Date: 4/28/2008


Report Criteria: Unit Id = 'Derewonko', Plant ID = 'NPL-IDO4', Equipment Type = 'Boiler', Equipment Number between 'Boiler4.0 AND Boiler4.0'

Page 1 of 1

Equipment Recycle Bin


Visions 4

DEV-BusinessUnit
Plant ID

Equipment Type

Equipment Number

Equipment Name

Dev-Plant4

Filter

10

10

Dev-Plant4

Filter

11

11

Dev-Plant4

Filter

12

12

Dev-Plant4

Filter

13

13

Dev-Plant4

Filter

14

14

Dev-Plant4

Filter

clone 1

clone 1

Dev-Plant4

Filter

clone 2

clone 2

Dev-Plant4

Filter

clone 3

clone 3

Dev-Plant4

Filter

clone 4

clone 4

Dev-Plant4

Filter

clone 5

clone 5

Dev-Plant4

Filter

clone 6

clone 6

Dev-Plant4

Filter

clone 7

clone 7

Dev-Plant4

Filter

clone 8

clone 8

Dev-Plant4

Filter

clone 9

clone 9

Print Date: 4/25/2008


Report Criteria: No criteria selected.

Page 3 of 17

Equipment Service Status


Visions 4

Unit Description: BZNS UNT

Derewonko
Train
Plant ID:

Plant ID:

Equipment Type

Company Name: DM
Equipment Number

Equipment Name

Status

Location

In Service

NPL-IDO1
Circuit
Exchanger
Misc
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipeline Misc
Pipeline Segment
PSV

Circuit1.0
Exchanger1.0
Misc1.0
Pipe1.0
Pipe1.1
Pipe1.2
Pipe1.3
Pipe1.4
Pipe1.5
Pipe1.7
Pipe1.8
PipeMisc
PipeSeg1.0
PSV1.0

UIDS
OOSD
AKID
IJAJ
DSAS
OKLS
OPOS
IUJS
OLAF
OLPP
HYSA
KODI
FIKU
KOSD

In Service
In Service
In Service

PSV
PSV
PSV
PSV
PSV
PSV
PSV
Tank
Vessel

PSV1.1
PSV1.2
PSV1.3
PSV1.4
PSV1.5
PSV1.6
PSV1.7 - Long Number Test
Tank1.0
Vessel1.0

DOLI
KOSD
ILOP
UPAR
KOPA
POOP
FORZ
IIUD
IIAD

In Service
In Service

PipeSeg2.0

OIDS

Boiler3.0
Circuit3.0
Circuit3.1
Circuit3.2
Exchanger3.0
Pipe3.0
PipeSeg3.0
PSV3.0
PSV3.1

OKAY
YUEP
ISKA
OMFG
DOPE
KOLA
LOPE
UPKA
NOGA

JOFFRE ETHYLENE UNIT I

In Service
In Service
In Service
1st Stg Discharge Scrubber
(D.O.T.)

In Service

NPL-IDO2
In Service
Pipeline Segment

Plant ID:

Unit 67A

NPL-IDO3
Boiler
Circuit
Circuit
Circuit
Exchanger
Pipe
Pipeline Segment
PSV
PSV

Print Date: 4/25/2008


Report Criteria: No criteria selected.

In Service

In Service

Page 5 of 95

Equipment Type Configuration


Visions 4

Equipment Type
11A
16
2
4
8
Boiler
Bundle
Circuit
Cooling Tower
dsfsd
Exchanger
Filter
Firetube Boiler
Furnace
Injection Point
Major
Major Exchanger
Misc
Pipe
Pipeline Misc
Pipeline Segment
Plate Exchanger
PSV
sdas
Stack
Tank
Valve
Vessel
Wellhead

Print Date: 4/25/2008


Report Criteria: No criteria selected.

Description
test

Original
Original
Original
Original

Boiler
Bundle
Circuit
Cooling Tower

Original Exchanger
Original Filter
Original Firetube Boiler
Original Furnace
Original Injection Point
Original Major
Major Exchanger
Original Misc
Original Pipe
Original Pipeline Misc
Original Pipeline Segment
Original Plate Exchanger
Original PSV

Original
Original
Original
Original
Original

Stack
Tank
Valve
Vessel
Wellhead

Supplied Type
Boiler
Cooling Tower
Bundle
Circuit
Bundle
Boiler
Bundle
Circuit
Cooling Tower
Circuit
Exchanger
Filter
Firetube Boiler
Furnace
Injection Point
Major
Major
Misc
Pipe
Pipeline Misc
Pipeline Segment
Plate Exchanger
PSV
Filter
Stack
Tank
Valve
Vessel
Wellhead

Page 1 of 1

Equipment Type Field Clone List


Visions 4

Bundle
Uses Standard Equipment Module:
Description: Removeable bundles for exchangers
Table Name
Bundle Static
Bundle Static
Bundle Static
Bundle Static
Bundle Static
Bundle Static
Circuit Equip Link
Coatings Linings Claddings
Coatings Linings Claddings
Coatings Linings Claddings
Coatings Linings Claddings
Coatings Linings Claddings
Coatings Linings Claddings
Coatings Linings Claddings
Coatings Linings Claddings
Coatings Linings Claddings
Coatings Linings Claddings
Coatings Linings Claddings
Coatings Linings Claddings
Coatings Linings Claddings
Coatings Linings Claddings
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Print Date: 4/25/2008
Report Criteria: No criteria selected.

Field Name
Bundle Model/ID
Bundle Weight
Bundle Weight Unit
Other 5
Other 6
Tube Type
Circuit Equipment ID
Coating/Lining/Cladding
Coating Type
How Applied
Installer
Coating Counter
Manufacturer
Material
Min Required Thick
Min Required Thick Unit
Specification No
Thick
Thick Unit
Where Applied
Year Applied
Code
Addenda
Division
Section
Stamp
Year
Design Press
Design Press Unit
Design Temp
Design Temp Unit
Length/Height
Length/Height Unit
MAWP
MAWP Unit
MDMT
MDMT Press
MDMT Press Unit
MDMT Unit
Operating Limit
Operating Limit Unit
Operating Press
Operating Press Unit
Operating Temp
Operating Temp Unit
Orig Test Press
Orig Test Press Unit
Other 1
Other 2
Other 3
Other 4

Clone Order
6
6
6
6
6
6
5
7
7
7
7
7
7
7
7
7
7
7
7
7
7
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3

Page 5 of 76

Plant Statistics
Visions 4

Plant ID: NPL-IDO1


Plot Plan:
Description:
Testing Plant #1 - DON'T TOUCH MY EQUIPMENT

Unit ID: Derewonko

Trains
Train Number

Description

UNIT1

Unit 1 for Plant #1

Total of Trains:

Equipment
Plant ID

Equipment Type

Equipment Number

Classification
Circuit

NPL-IDO1

Circuit

Circuit1.0

Circuit count:
Plant ID

Equipment Type

Equipment Number

1
Classification

Equipment
NPL-IDO1

Exchanger

Exchanger1.0

Exchanger count:
Plant ID

Equipment Type

Equipment Number

1
Classification

Minor
NPL-IDO1

Misc

Misc1.0

Misc count:
Plant ID
NPL-IDO1
NPL-IDO1
NPL-IDO1
NPL-IDO1
NPL-IDO1
NPL-IDO1
NPL-IDO1
NPL-IDO1

Equipment Type
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe

Equipment Number

1
Classification

Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment

Pipe1.0
Pipe1.1
Pipe1.2
Pipe1.3
Pipe1.4
Pipe1.5
Pipe1.7
Pipe1.8

Pipe count:
Plant ID

Equipment Type

Equipment Number

8
Classification

Equipment
NPL-IDO1

Pipeline Misc

PipeMisc

Pipeline Misc count:


Plant ID

Equipment Type

Equipment Number

1
Classification

Equipment
NPL-IDO1

Pipeline Segment

PipeSeg1.0

Pipeline Segment count:

Print Date: 4/25/2008


Report Criteria: No criteria selected.

Page 8 of 183

Plant Summary
Visions 4

Description
Pipeline
Plant

Plant ID
Plot Plan

Unit ID: AD- Bu April


AD_ Plant1 April

Testing for the April release!

Unit ID: ADBusinessUnit- Dec7


AD-Dashboard
ADPlant1
ADPlant2 - Pipeline

test
Plant for testing
Test plant for the Pipelines

Unit ID: BLOCK0-TAK


BAN-WPA

Unit ID: CAB Unit - Do Not Use


CAB - Please don't touch

Please don't change my equipment

Unit ID: Derewonko


NPL-IDO1
NPL-IDO2
NPL-IDO3
NPL-IDO4

Testing
Testing
Testing
Testing

Plant
Plant
Plant
Plant

#1
#2
#3
#4

DON'T
DON'T
DON'T
DON'T

TOUCH
TOUCH
TOUCH
TOUCH

MY
MY
MY
MY

EQUIPMENT
EQUIPMENT
EQUIPMENT
EQUIPMENT

Unit ID: DEV-BusinessUnit


Dev-Plant1
Dev-Plant2
Dev-Plant3
Dev-Plant4

The
The
The
The

first plant for DEV-Business unit


second plant for DEV-Business unit
third plant for DEV-Business unit
fourth plant for DEV-Business unit

Unit ID: Drummond


JamiePlant

Unit ID: EXTRACTION/TAILINGS


330 Tailings Field

Unit ID: Haggith CNRL Training


240 Extraction

Unit ID: HWBusinessUnit


HWPlant
T-34

The plant created for testing purpose

Unit ID: HWBusinessUnit2


HW_Plant

Use to test reports

Unit ID: HWBusinessUnit3


HWPlant2

Print Date: 4/25/2008


Report Criteria: No criteria selected.

Page 1 of 4

Report Assignment
Visions 4

Form

Primary Report

Secondary Report

Archives
Archives Log
Attachment Log

Attachment Summary

Attachments

Attachment

Batch Application

Batch Inhibitor Application

Batch Injection Log

Batch Inhibitor Application Summary

Boiler Static Data

Boiler Static Data

Bundle Static Data

Bundle Static Data

Business Unit Configuration

Business Unit Configuration

Cathodic Protection

Cathodic Protection

Cathodic Protection Log

Cathodic Protection Scheduling Summary

Checklist

Checklist

Checklist

Checklist Log

Checklist Go Log

Checklist Go Log

Component Intervals

Component Intervals

Component Log

Component Go Log

Component Types

Component Type Configuration

Component Type Field Clone List

Configuration Log
Continuous History

Continuous History

Continuous Injection

Continuous Inhibitor Injection

Continuous Injection Log

Continuous Inhibitor Injection Summary

Contractors
Contractors Log
Cooling Tower Static Data

Cooling Tower Static Data

Critical Valve Data Sheet

Critical Valve Data Sheet

Dashboard
Defect Classes

Defect Classification

Distribution Lookup

Distribution List

Drawing Detail
Drawings Log
Equipment File

Equipment File Summary

Equipment Index

Equipment Index

Equipment Types

Equipment Type Configuration

Equipment Type Field Clone List

Exchanger Sampling

Full Scheduling - Major equipment

Equipment Link / Schedule List

Exchanger Sampling Log

Glycol Samples

Sodium Samples

Exchanger Static Data

Exchanger Static Data

Expansion Joint Data Sheet

Expansion Joint Data Sheet

External Comments

Generic External Comments

Factor Conversions

Units of Measure Factors

Failure Modes

Failure Modes

Filter Static Data

Filter Static Data

Firetube Boiler Static Data

Firetube Boiler Static Data

Furnace Static Data

Furnace Static Data

Gauge Thickness

Gauge Thickness

Gauges
Gauges Log
General Trending

Print Date: 4/25/2008


Report Criteria: No criteria selected.

Full General Trending

Page 1 of 4

Folder

Report No.

22 Analysis
186
1 Attachments
117
76
153
21 Checklist
135
134
3 Components
36
35
80
78
71
77
79
15 Equipment
42
124
39
37
5
125
43
41
44
160
102
165
40
113
168
97
180

Report Name

Author

Last Modified

Access

Type

Dashboard Report

MARCIN

4/25/2008 4:13:33 PM

Public

Client

Attachment
Attachment Summary
Attachments GO Log

MARCIN
MARCIN
MARCIN

4/25/2008 4:13:33 PM
4/25/2008 4:13:33 PM
4/25/2008 4:13:33 PM

Public
Public
Public

Client
Client
Client

Checklist
Checklist Go Log

MARCIN
MARCIN

4/25/2008 4:13:33 PM
4/25/2008 4:13:33 PM

Public
Public

Client
Client

Component Go Log
Component List (Linked Equipment)
Critical Valve Data Sheet
Expansion Joint Data Sheet
Hanger Data Sheet
Misc Component Data Sheet
Pipe Component Data Sheet

MARCIN
MARCIN
MARCIN
MARCIN
MARCIN
MARCIN
MARCIN

4/25/2008
4/25/2008
4/25/2008
4/25/2008
4/25/2008
4/25/2008
4/25/2008

4:13:33
4:13:33
4:13:33
4:13:33
4:13:33
4:13:33
4:13:33

PM
PM
PM
PM
PM
PM
PM

Public
Public
Public
Public
Public
Public
Public

Client
Client
Client
Client
Client
Client
Client

Continuous History
Equipment Circuit List
Equipment Design & Materials List
Equipment History
Equipment Index
Equipment Link / Schedule List
Equipment List - Linked PSVs
Equipment List - Manufacturer
Equipment Recommendations Summary
Equipment Registration Fee List
Failure Modes
Failure Modes Summary
Linked Equipment List
Operating Limit Summary
Operating Limits
Regulatory Summary
Reliability Plan

MARCIN
MARCIN
MARCIN
MARCIN
MARCIN
MARCIN
MARCIN
MARCIN
MARCIN
MARCIN
MARCIN
MARCIN
MARCIN
MARCIN
MARCIN
MARCIN
MARCIN

4/25/2008
4/25/2008
4/25/2008
4/25/2008
4/25/2008
4/25/2008
4/25/2008
4/25/2008
4/25/2008
4/25/2008
4/25/2008
4/25/2008
4/25/2008
4/25/2008
4/25/2008
4/25/2008
4/25/2008

4:13:33
4:13:33
4:13:33
4:13:33
4:13:33
4:13:33
4:13:33
4:13:33
4:13:33
4:13:33
4:13:33
4:13:33
4:13:33
4:13:33
4:13:33
4:13:33
4:13:33

PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM

Public
Public
Public
Public
Public
Public
Public
Public
Public
Public
Public
Public
Public
Public
Public
Public
Public

Client
Client
Client
Client
Client
Client
Client
Client
Client
Client
Client
Client
Client
Client
Client
Client
Client

Print Date: 4/25/2008


Report Criteria: No criteria selected.

Page 1 of 6

Service List
Visions 4

Service ID
Gas
Tiago-Service_1
Water

Description

Tiago-Service_1 Description

Print Date: 4/25/2008


Page 1 of 1

t-Min / MAWP Formula


Visions 4

t-Min
Formula Name

Description

Code

t = 2.6D(H-1)G / S

Calculation of thickness by 1-foot method. Only on tanks


where D is less than or equal to 200 ft.

API

t = d (sqrt(CP / SE))

Flat Unstayed Circular Heads, Covers and Blind Flanges except when the head, cover or blind flange is attached by
bolts causing edge moment.

ASME

t = d (sqrt(CP / SE + 1.9WHg / SEd))

Flat Unstayed Circular Head, Covers and Blind Flanges, with


Bolts causing edge moment - Shell be calculated for operating
conditions

ASME

Print Date: 4/25/2008


Report Criteria: No criteria selected.

Code Division

Code Section

Code Year

Expected Unit

650

1999

in

VIII

1998

in

VIII

1998

in

Page 5 of 5

Train Configuration
Visions 4

Train Number

Description

Plant ID: NPL-IDO1


UNIT1

Unit 1 for Plant #1

Plant ID: NPL-IDO2


Train 2.0

Testing

Plant ID: Test-PlantA


T1
T2

Train1
Train2

Plant ID: Test-PlantB


T1
T2

Train1
Train2

Plant ID: Test-PlantC


T1
T2

Train1
Train2

Plant ID: TML Testing


Train 1

Vessel

Print Date: 4/25/2008


Report Criteria: No criteria selected.

Page 2 of 2

Work Event List


Visions 4

Work Events Description


The first event used for testing purpose

Active

The second event used for testing purpose

Print Date: 4/25/2008


Report Criteria: No criteria selected.

Page 1 of 1

Work Event Usage


Visions 4

Memo No

Comp.

Memo Title

Due Date

Plant ID/Equipment Type


Equipment Number

The first event used for testing purpose


Event Active:

Inspection Tasks
4/12/2008

JH_Plant2
BO_9999

Boiler

Test Inspection

4/2/2008

KG_Plant_1
Boiler_TML_test

Boiler

NADINE
NAD-

Boiler

1/2/2008

1/31/2008

HWPlant
72-FTR-12A

Vessel

Work Request1

12/30/1899

HWPlant
72-FTR-12A

Vessel

Work Request1

12/30/1899

HWPlant
72-FTR-12A

Vessel

Work Request1

1/31/2008

HWPlant
Ve1

Vessel

Memo Title1

2/29/2008

MM Plant 160
EX-0040

Exchanger

WR-IR Date Created Test

JamiePlant
j3

Pipe

MM Plant 160
EX-0050

Exchanger

MM Plant 160
EX-0050

Exchanger

JamiePlant
frn1

Furnace

JamiePlant
frn1

Furnace

JamiePlant
frn1

Furnace

MM Plant 160
PP-0010

Pipe

JamiePlant
frn1

Furnace

grey out

JamiePlant
boil1

Boiler

dfsfd

3487

3524

Work Requests
3316

3426

3427

3428

3429

3446

3447

3474

3475

Test WR

2/13/2008

3478

3479

3480

3488

TEST WR

3525

3526

Print Date: 4/25/2008


Report Criteria: No criteria selected.

3/2/2008

Page 4 of 8

Full Inspection Report (without Process History)

Visions 4

Derewonko
Plant ID:
Equipment Number:

NPL-IDO4
PipeSeg4.0

ERP Number:

In Service:

Equipment Type:
Equipment Name:

Pipeline Segment
POKY

Classification:

Equipment

Inspection Report 4340


IR Memo No: 4340
Report Number:
Date Created:
Job File Number:
Workorder No:
Extent:

IR Demo

R001
4/28/2008
J001

Date Inspected:
Date Completed:
Completed:
Stream:
Visual External:

Full

A.I. Name:
Chief Inspector:
Chief Insp. Date:
Operating Time:
Regulatory Comment:




Reason for Inspection:


Work Event:
Reset Operating Time:

Engineering Request


Inspectors

James Bond
Marcin Derewonko
Johny Walker

Inspection Summary
Inspection Details
Equipment
Problem Code: FAIL1
Inspection Details:

Detail Equipment Completed:

Demo
External Comments
Category Code
External Condition

Comments
Condition is good and quite

Action Taken:

Demo
Activity Codes
A1
A2
Repairs
Repair No:
1
Repair Type: Insulation
Repairs:
Demo

Completed: 
Repair Date: 4/28/2008

Location: Upper Level

Recommendations
Recommendation No: 1
Completed:

Action Taken:
Done
Recommendation:
Just Do It.

Created Memo No:


Created Memo Type:
Report Number:
23

3746

NDE
NDE Number:
NDE Type:
Report Date:

4
PT

Job File Number:


NDE Title:

NDE - PT Attach Test


Check Lists

Checklist No: 9
Inspected By:

Date Created: 4/28/2008


IR Title:

Print Date: 4/28/2008


Report Criteria: Unit Id = 'Derewonko', Plant/Area = 'NPL-IDO4', Equipment Type = 'Pipeline Segment', Equipment Number between
'PipeSeg4.0 AND PipeSeg4.0', Completed = 'No', IR Memo No = '4340'

Page 1 of 2

Inspection History
Visions 4

Derewonko
Plant ID: NPL-IDO1
Number: PipeSeg1.0
Name: FIKU

Equipment Type: Pipeline Segment


IRC: 4
Next Full Inspection Due:

Inspection Reports
4295
Job File No.:
Date Created: 4/17/2008
Inspection Summary:
4294

Stream:

Extent:
Date Completed:

Stream:

Extent:
Partial
Date Completed:

Job File No.:


asdas
Date Created: 4/17/2008
Inspection Summary:

Inspection Tasks
3504
Job File No.:
Date Created: 4/17/2008
Work Description:

Stream:
Due Date:

Extent:
Date Completed:

Stream:
Due Date:

Extent:
Partial
Date Completed: 4/17/2008

3148
Job File No.:
Date Created: 12/27/2007
Work Description:

Work Requests
3307
Job File No.:
Date Created: 12/27/2007
Work Description:

Stream:
Due Date:

Plant ID: NPL-IDO2


Number: PipeSeg2.0
Name: OIDS

Extent:
Partial
Date Completed: 3/18/2008

Equipment Type: Pipeline Segment


IRC: 4
Next Full Inspection Due:

4/22/2014

Inspection Reports
4333

432se

Job File No.:


42
Date Created: 4/25/2008
Inspection Summary:
4332

Extent:
Partial
Date Completed:

Stream:

Extent:
Partial
Date Completed:

re

Job File No.:


wt
Date Created: 4/25/2008
Inspection Summary:
4331

Stream:

Demo IR

Job File No.:


JBF001
Date Created: 4/25/2008
Inspection Summary:

Print Date: 4/25/2008


Report Criteria: Unit Id = 'Derewonko'

Stream:

External (Off)

Extent:
Full
Date Completed: 4/25/2008

Page 2 of 3

Inspection History-Detail

Visions4

Derewonko

Plant ID: NPL-IDO4


Number: PipeSeg4.0
Name:
POKY

Type: Pipeline Segment


IRC:
Next Full Inspection Due:

Inspection Reports
4340

IR Demo

Job File No.: J001


Date Created: 4/28/2008
Inspection Summary:

Stream:

Extent:
Full
Date Completed:

Equipment

Demo 123
Work Requests
3746
Job File No.:
Date Created: 4/28/2008
Work Description:

Stream:
Due Date:

Extent:
Partial
Date Completed:

Print Date: 4/28/2008


Report Criteria: Unit Id = 'Derewonko', Plant/Area = 'NPL-IDO4', Equipment Type = 'Pipeline Segment', Equipment Number between
'PipeSeg4.0 AND PipeSeg4.0', IR Memo No = '4340', Type = 'WR', Memo No = '3746'

Page 1 of 1

Inspection Recommendations

Visions 4

Derewonko

Plant ID: NPL-IDO4


Number: PipeSeg4.0
Name:
POKY

Equipment Type:
Registration No.:

Pipeline Segment

Inspection Report
IR Memo No:

4340

IR Demo

Report Number: R001


Job File Number: J001

Work Order No.:


Inspection Date:
Inspection Recommendations

Equipment Recommendations:
Recommendation No: 1
Created Memo:
Action Taken:
Done
Recommendation: Just Do It.

Completed:

Department:
Inspection
Report Number: 23

Print Date: 4/28/2008


Report Criteria: Unit Id = 'Derewonko', Plant/Area = 'NPL-IDO4', Equipment Type = 'Pipeline Segment', Equipment Number between
'PipeSeg4.0 AND PipeSeg4.0', IR Memo No = '4340', Completed = 'Yes'

Page 1 of 1

Inspection Report Detail

Visions 4

Derewonko
Plant ID: NPL-IDO4
Number: PipeSeg4.0
Name:
POKY

Equipment Type: Pipeline Segment


Mfg. Serial No.:
Registration No.:

IRC:

Circuits
Circuit4.0

4340 Inspection Report


4340

IR Demo

Report Number: R001


Work Order No.:

Date Created: 4/28/2008


Extent:
Full

Stream:
Completed:


IR Details

Equipment
Activity Codes:
A1
A2
Inspection Details:

Demo 123

Print Date: 4/28/2008


Report Criteria: Unit Id = 'Derewonko', Plant/Area = 'NPL-IDO4', Equipment Type = 'Pipeline Segment', Equipment Number between
'PipeSeg4.0 AND PipeSeg4.0', IR Memo No = '4340', Report Number = 'R001', Extent = 'Full', Completed = 'No'

Page 1 of 1

Inspection Report Go Log

Visions 4

Derewonko
Classification

Plant ID
Equipment

Equipment
Type

Equipment Number

IR Memo No

Date Created

Title

Exchanger

Exchanger1.0

3822

1/17/2008

TESTER

Exchanger

Exchanger1.0

3821

1/17/2008

32

NPL-IDO1
Equipment

NPL-IDO1
Equipment

Exchanger

Exchanger1.0

3820

1/17/2008

NPL-IDO1
Equipment

NPL-IDO1
Equipment

NPL-IDO1
Equipment

NPL-IDO2
Equipment

NPL-IDO2
Equipment

NPL-IDO2
Minor

Pipeline
Segment

PipeSeg1.0

4295

4/17/2008

Pipeline
Segment

PipeSeg1.0

4294

4/17/2008

Pipeline
Segment

PipeSeg2.0

Pipeline
Segment

PipeSeg2.0

Pipeline
Segment

PipeSeg2.0

Exchanger

Exchanger3.0

4333

4/25/2008

Equipment

a
432se

erw3
4332

4/25/2008

re

2354
4331

4/25/2008

Demo IR

PSeg2.0IR01
4175

3/20/2008

aWRa

534
Boiler

Boiler4.0

4338

4/28/2008

Demo IR

B4.0IR01
Pipeline
Segment

PipeSeg4.0

Print Date: 4/28/2008


Report Criteria: No criteria selected.

4340

4/28/2008

Work Event ID

Extent

Work Event

Stream

Date
Inspected

Job File Number

1/3/2008
Full

1/1/2008

1/17/2008

External (On)
MIBS0000000001X

Partial

The first event used


for testing purpose

External (Off)

#123

Partial

asdas

Partial

42

Partial

wt

Full

Full

Full

10032

Full

J001

Date Completed

Workorder No

1/17/2008 Job File Number

NPL-IDO4
NPL-IDO4

IR TITLE @ 234

REPTEST

NPL-IDO3
Equipment

Completed

Report Number

IR Demo

R001

4/22/2008 JBF001

4/25/2008

External (Off)
3/20/2008 3654

Page 4 of 27

Inspection Report Log

Visions 4

Derewonko
IR Memo No
Plant ID:
NPL-IDO1
Equipment Number: Exchanger1.0
3822

Date Created

IR Title

Completed

Equipment Type: Exchanger


Equipment Name: OOSD
1/17/2008

3821

1/17/2008

3820

1/17/2008

Plant ID:
NPL-IDO1
Equipment Number: PipeSeg1.0
4295
4294
Plant ID:
NPL-IDO2
Equipment Number: PipeSeg2.0
4333

IR TITLE @ 234

Equipment Type: Pipeline Segment


Equipment Name: FIKU

4/17/2008
4/17/2008

a
Equipment Type: Pipeline Segment
Equipment Name: OIDS

4/25/2008

432se

4332

4/25/2008

re

4331

4/25/2008

Demo IR

Plant ID:
NPL-IDO3
Equipment Number: Exchanger3.0
4175
Plant ID:
NPL-IDO4
Equipment Number: Boiler4.0
4338
Plant ID:
NPL-IDO4
Equipment Number: PipeSeg4.0
4340

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Equipment Type: Exchanger


Equipment Name: DOPE
3/20/2008

aWRa

4/28/2008

Equipment Type: Boiler


Equipment Name: OOPS
Demo IR

4/28/2008

Equipment Type: Pipeline Segment


Equipment Name: POKY
IR Demo

Page 4 of 30

Inspection Report Repair Summary

Visions 4

Derewonko

Plant ID: NPL-IDO4


Name: POKY

Type: Pipeline Segment

Number: PipeSeg4.0
4340

IR Memo No: 4340


Insp. Date:

Inspection Report

IR Demo
Reason: Engineering Request

Work Order No.:

Inspectors
James Bond
Johny Walker
Marcin Derewonko
No.

Type

Date

Completed

Location

Repairs

Equipment

Insulation

4/28/2008

Upper Level

Demo

Print Date: 4/28/2008


Report Criteria: Unit Id = 'Derewonko', Plant/Area = 'NPL-IDO4', Equipment Type = 'Pipeline Segment', Equipment Number between 'PipeSeg4.0 AND PipeSeg4.0', IR Memo No = '4340', Completed =
'No'

Page 1 of 1

Inspection Report Summary

Visions 4

Derewonko

Plant ID: NPL-IDO4


Number: PipeSeg4.0
Name:
POKY

Type:
Pipeline Segment
Mfg. Serial No.:
Registration No.:

IRC:
Circuits

Circuit4.0
4340 Inspection Report
4340
Report No.:
Work Order No.:
Inspection Date:

IR Demo
R001
Completed:

Date Created: 4/28/2008


Full
Extent:
Stream:

Inspection Summary:
IR Details
Equipment
Activity Codes:
A1
A2
Inspection Details:

Demo 123

Print Date: 4/28/2008


Report Criteria: Unit Id = 'Derewonko', Plant/Area = 'NPL-IDO4', Equipment Type = 'Pipeline Segment', Equipment Number between
'PipeSeg4.0 AND PipeSeg4.0', IR Memo No = '4340', Report Number = 'R001', Extent = 'Full', Completed = 'No'

Page 1 of 1

Component Intervals
Visions 4

Code No

Interval

Description

Code Name

12

3 months

3333333

21
22
23
24
25
26
27
28
29

6 months
12 months
24 months
36 months
48 months
60 months
72 months
96 months
120 months

Half-year
1 year
2 year
3 year
4 year
5 year
6 year
8 year
10 year

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Page 1 of 1

Defect Classification
Visions 4

Classification Type:

Volumetric

Description:

Category

Defect ID
1000

Defect Type
Volumetric Anomaly

Category ID:
1100
Corrosion
Metal loss from the pipe wall due to the environmental conditions
surrounding the pipe.

1100
1105
1110
1115

Corrosion Wall Loss


General Wall Loss
Isolated Wall Loss
Erosion Corrosion

Category ID:
1200
Mill Related
Wall loss due to manufacturing processes

1200
1205
1225
1220
1210
1215

Mill Related Wall Loss


Inclusion
Mill Wall Thinning
Increasing Wall Thickness
Mill Slug
Seamless Marks

Category ID:
1300
Mechanical
Anomaly created when pipe wall is forcefully removed during construction
process

1305
1300
1310

Gouge
Mechanical Wall Loss Anom
Scratch

Category ID:
1400
Construction
Anomalies created during the construction processes

1400
1425
1420
1415
1410
1405

Construction wall loss


Handling Mark
Grind Mark
Cable Burn
Puddle Weld
Arc Burn

Description

Category ID:
1000
Unknown
Any anomaly on the pipe changing the cross-sectional area of the pipe wall
(with no further defining capacity)

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Construction related wall loss

Page 2 of 12

Distribution List
Visions 4

Name
Ivan Raikov
James Bond

Description
A character in metal gear - subsistence
007

e-mail
IRaikov@MetalGear.com
Jbond@metegrity.com

Print Date: 4/28/2008


Page 1 of 1

Drop List Value Report


Visions 4

Code Value

Description

Additional Information

API Class List (89)


Class 1

Class 2

Class 3

Services with the highest potential of resulting in an immediate


emergency if a leak were to occur.
Services that are flammable and significantly vaporize when they leak.
Services that are potentially harmful to human tissue and are located in
high-activity areas.
Services which are flammable but do not significantly vaporize when they
leak. Services which are potentially harmful to human tissue but are
located in remote areas.

Application Type List (63)


Condensor
Deaerator
Filter
Fin Fan
Hairpin
Heat
Jacketed
Kettle
Process
Receiver
Separator
Silencer
Stack
Tower

Deaerator, spray, trayed, ceramic fill, etc.


Filter
Fin Fan Exchanger
Hairpin Exchanger
Heat exchanger
Jacketed exchanger
Kettle exchanger
Process Vessel
Receiver for process streams.
Separator

Exhaust stack, flare stack, etc.


Tower

Application Type List (316)


ATL1
ATL2
ATL3

Application Type List1


Application Type List2
Application Type List3

C:\Documents and Settings\Hwang\Desktop\Tracker864(1).bmp


C:\Documents and Settings\Hwang\Desktop\Tracker864(2).bmp
C:\Documents and Settings\Hwang\Desktop\Tracker864(3).bmp

AT1

Application Type1

AT2

Application Type2

C:\Documents and Settings\All Users\Documents\My Pictures\Sample


Pictures\Blue hills.jpg
C:\Documents and Settings\All Users\Documents\My Pictures\Sample
Pictures\Sunset.jpg

Application Type List (323)

Application Type List (326)


AT1
AT2

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Application Type1
Application Type2

Page 4 of 62

Gauge Thickness
Visions 4

Gauge Type
BWG
BWG
BWG
BWG
BWG
BWG
BWG
BWG
BWG
BWG
BWG
BWG
BWG
BWG
SWG
SWG
SWG
SWG
SWG
SWG
SWG
SWG
SWG
SWG
SWG
SWG
SWG
SWG
SWG
SWG
SWG
SWG
SWG
SWG
SWG
SWG
SWG
SWG
SWG
SWG
SWG
Print Date: 4/28/2008
Report Criteria: No criteria selected.

Gauge Size
10
11
12
14
16
18
20
3
4
5
6
7
8
9
1
1/0
10
11
12
13
14
15
16
17
18
19
2
2/0
20
21
22
23
24
25
26
27
28
29
3
3/0
30

Nominal - Imperial
0.134
0.12
0.109
0.083
0.065
0.049
0.035
0.259
0.238
0.22
0.203
0.18
0.165
0.148
0.3
0.324
0.128
0.116
0.104
0.092
0.08
0.072
0.064
0.056
0.48
0.04
0.276
0.348
0.036
0.032
0.028
0.024
0.022
0.02
0.018
0.0164
0.0148
0.0136
0.252
0.372
0.0124

Nominal - Metric
3.4
3.048
2.769
2.108
1.651
1.2446
0.889
6.579
6.045
5.588
5.156
4.572
4.19
3.76
7.62
8.23
3.25
2.95
2.64
2.34
2.03
1.83
1.63
1.42
1.22
1.02
7.01
8.8392
0.9144
0.813
0.7111
0.61
0.5588
0.508
0.4572
0.417
0.3759
0.345
6.4
9.4488
0.315
Page 1 of 2

Generic External Comments


Visions 4

Comments
Type

Category Code
External Condition

External Condition is really good

Nameplate

No Nameplate for this equipment

External Condition

Test External Comments

External Condition

34324

External Condition

Condition is very good and very quite

Nameplate

There is no nameplate

External Condition

Condition is good and quite

Boiler
Boiler
Exchanger
Exchanger
Filter
Filter
Pipeline Segment

Page 1 of 1
Print Date: 4/28/2008
Report Criteria: No criteria selected.

Inspection Risk Codes


Visions 4

IRC Number

IRC Name

Color

Remaining Remaining Restricted


Life (Internal)
Life
Interval
(External) (Internal)

Restricted
Interval
(External)

Comments (Internal)

Comments (External)

IRC Short
Name

10

PSV 1 Year

Red

12

12

PSV-1

11

PSV 2 Year

Blue

24

12

PSV-2

12

PSV 3 Year

Lime

36

12

PSV-3

13

PSV 4 Year

Yellow

48

12

PSV-4

14

PSV 5 Year

Black

60

12

PSV-5

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Page 1 of 1

Line Type Classification


Visions 4

Line Type ID

Description

Line TD-001

Test Line Type

Line TD-002

Test Line Type Second Created By HAO


WANG

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Flow Rule

No Rules, just right

Chloride Conc.
Operator

CaCo3

Chloride
Concentration

50

Sulphur

H2S
Percentage

70

Condensate
Percentage

30

Line Type Color

Olive

Page 1 of 1

Lookup List Fields


Visions 4

Form Name
Bundle
Bundle
Bundle
Bundle
Bundle
Bundle
Bundle
Bundle

Static
Static
Static
Static
Static
Static
Static
Static

Data
Data
Data
Data
Data
Data
Data
Data

Checklist
Checklist
Cooling
Cooling
Cooling
Cooling
Cooling
Cooling
Cooling
Cooling
Cooling
Cooling
Cooling
Cooling
Cooling
Cooling
Cooling
Cooling
Cooling
Cooling
Cooling
Cooling
Cooling
Cooling
Cooling
Cooling
Cooling
Cooling
Cooling

Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

Data
Data
Data
Data
Data
Data
Data
Data
Data
Data
Data
Data
Data
Data
Data
Data
Data
Data
Data
Data
Data
Data
Data
Data
Data
Data
Data

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Table

Field

List Number

List Name

Field Size

Section Design
Static Data
Section Design
Static Data
Section Design
Static Data
Coatings Linings Claddings
Static Data

Shape Type
Status
Fireproofing Material
Application Type
Location
Location
Manufacturer
Manufacturer

28
2
35
63
128
10
60
111

Section Shape Type List


Status List
Fireproof Material List
Application Type List
Section Location List
Location List
Coatings Manufacturer List
Manufacturer List

25
25
30
35
35
40
50
50

Check List
Check List Hangers

Activity Code
Load Scale

48
308

Activity Code List


Load Scale List

5
20

Section Design
Design Materials
Static - Nozzles
Design Materials
Design Materials
Design Materials
Static - Nozzles
Static - Nozzles
Cooling Tower Nozzles
Cooling Tower Static
Section Design
Static - Nozzles
Cooling Tower Nozzles
Design Materials
Equip Regulatory Authorities
Static - Nozzles
Section Design
Coatings Linings Claddings
Cooling Tower Static
Static - Nozzles
Coatings Linings Claddings
Section Design
Section Design
Static - Nozzles
Static Data
Static - Nozzles
Coatings Linings Claddings

Flange Rating
Code
Connection Rating
Division
Section
Stamp
Connection Type
Flange Material
Material
Material
Material
Nozzle Neck Material
Nozzle Type
Paint Code
Regulatory Authority
Reinforcement Material
Section Type
Coating Type
Draft Type
Flange: How Attached
How Applied
How Attached
Insulation Type
Nozzle: How Attached
Outage Extent
Purpose
Specification No

-1
121
39
103
14
16
75
27
27
27
27
27
99
124
117
27
26
59
20
18
62
18
31
18
340
36
132

Unbound Lists
Code List
Connection Rating List
Division List
Design Code Section List
Design Code Stamp List
Connection Type List
Material List
Material List
Material List
Material List
Material List
Spray Nozzle Type List
Paint Code List
Regulatory Authority List
Material List
Section Type List
Coating Type List
Draft Type List
How Attached List
How Applied List
How Attached List
Insulation Type List
How Attached List
test
Nozzle Purpose List
Specification No List

0
10
10
10
10
10
15
15
15
15
15
15
15
15
15
15
15
20
20
20
20
20
20
20
20
20
20
Page 3 of 31

Lookup Lists In Use


Visions 4

Form
Access Required List (45)
Boiler Static Data
Exchanger Static Data
Filter Static Data
Firetube Boiler Static Data
Furnace Static Data
Inspection Tasks
Inspection Tasks
Major Static Data
Miscellaneous Static Data
Plate Exchanger Static Data
Tank Static Data
Vessel Static Data
Work Requests
Work Requests
Access Required List (204)
Pipe Segment Static Data
PSV Static Data
TML Detail
Accessory Type List (170)
Valve Static Data
Activity Code List (48)

Table

Field

Field Size

Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Work Memos
Work Template Work Memos
Design Materials
Design Materials
Design Materials
Design Materials
Design Materials
Work Memos
Work Template Work Memos

Other Access
Other Access
Other Access
Other Access
Other Access
Access Required
Access Required
Other Access
Other Access
Other Access
Other Access
Other Access
Access Required
Access Required

20
20
20
20
20
20
20
20
20
20
20
20
20
20

PL Soil Information
PSV Static - Access
TML 2

Texture ID
Access Required
Other Access

15
15
15

Valve Accessories

Accessory Type

15

Checklist
Inspection Tasks
Inspection Tasks
Risk Configuration
TML Detail
TML Detail
TML Detail
Work Requests
Work Requests
Activity Code List (306)

Check List
Work Memos
Work Template Work Memos
RBI Config Degr. Method Activity Codes
TML 2
TML Grid Detail
TML Reading Detail
Work Memos
Work Template Work Memos

Activity
Activity
Activity
Activity
Activity
Activity
Activity
Activity
Activity

Code
Code
Code
Code
Code
Code
Code
Code
Code

5
5
5
5
5
5
5
5
5

Inspection Reports
Actuator Type List (157)
Valve Static Data
Agitator List (272)
Tank Static Data
Analysis Type List (313)
Product Content Testing
Anchor Device List (192)
Pipe Segment Static Data

IR Activity Code

Activity Code

Valve Static

Actuator Type

15

Tank Static

Agitator

20

Product Content Test Results

Analysis Type

20

PL Segment Crossings

Anchor Device

25

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Page 1 of 35

Material Codes
Visions 4

Material ID:
Material:
Group:
Description:

213 T11/98A99
SA-213 T11/98A99
1
1 1/4 Cr - 1/2 Mo - Si, Smls. tube

Code Year: 1998


P Number: 4

Material Stress
Temperature

Stress Value

100

17,100

200

17,100

300

17,100

400

16,800

500

16,200

600

15,700

650

15,400

700

15,100

750

14,800

800

14,400

850

14,000

900

13,600

950

9,300

1,000

6,300

1,050

4,200

1,100

2,800

1,150

1,900

1,200

1,200

Material ID:
Material:
Group:
Description:

213 T12/98A99
SA-213 T12/98A99
1
1Cr - 1/2 Mo, Smls. tube

Code Year: 1998


P Number: 4

Material Stress
Temperature

Stress Value

100

17,100

200

16,800

300

16,500

400

16,500

500

16,500

600

16,300

650

16,000

700

15,800

750

15,500

800

15,300

850

14,900

900

14,500

950

11,300

1,000

7,200

1,050

4,500

1,100

2,800

1,150

1,800

1,200

1,100

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Page 5 of 14

Material Codes Summary


Visions 4

Material ID
105 A/99

SA- 105A/99

Material
C, Smls. pipe

Code Year
1999

105/98

SA-105/98

C - Si, Forgings

1998

106 B/98

SA-106 B/98

C - Si, Smls. pipe

1998

111

test

test for the Material COdes

2000

12

123

178 C/98A99

SA-178 C/98A99

C, Wld. tube

1998

182 F304/98A99

SA-182 F304/98A99

18Cr - 8Ni, Forgings

1998

213 T11/98A99

SA-213 T11/98A99

1 1/4 Cr - 1/2 Mo - Si, Smls. tube

1998

213 T12/98A99

SA-213 T12/98A99

1Cr - 1/2 Mo, Smls. tube

1998

213 T21/98A99

SA-213 T21/98A99

3Cr - 1Mo, Smls. tube

1998

5A

213 T22/98A99

SA-213 T22/98A99

2 1/4 Cr - 1Mo, Smls. tube

1998

5A

213 TP304/98

SA-213 TP304/98

18Cr - 8Ni, Smls. tube

1998

249 TP304/98

SA-249 TP304/98

18Cr - 8Ni, Wld. tube

1998

312 TP304/98A99

SA-312 TP304/98A99

18Cr - 8Ni, Smls. & wld. pipe

1998

333 6/98

SA-333 6/98

C - Mn - Si, Smls. & wld. pipe

1998

335 P11/98A99

SA-335 P11/98A99

1 1/4 Cr - 1/2 Mo - Si, Smls. pipe

1998

335 P12/98A99

SA-335 P12/98A99

1Cr - 1/2 Mo, Smls. pipe

1998

335 P21/98A99

SA-335 P21/98A99

3Cr - 1Mo, Smls. pipe

1998

5A

335 P22/98

SA-335 P22/98

2 1/4 Cr - 1Mo, Smls. pipe

1998

5A

515 65/98A99

SA-515 65/98A99

C - Si, Plate

1998

516 70/98

SA 516 70/98

C - Mn - Si, Plate

1998

53 B/98

SA-53 B/98

C - Mn, Wld. pipe

1998

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Description

Group

P Number

Page 1 of 1

Monitoring Tags
Visions 4

Monitoring Tag
Test
test1
test2
test3

Print Date: 4/28/2008


Page 1 of 1

Pipe Specification
Visions 4

IMPERIAL

Pipe Nominal
10

Schedule
8.625

Nominal Thickness
0.148

Code Standard
ASME

100

8.625

0.593

ASME

120

8.625

0.718

ASME

140

8.625

0.812

ASME

160

8.625

0.906

ASME

20

8.625

0.25

ASME

30

8.625

0.277

ASME

40

8.625

0.322

ASME

8.625

0.109

ASME

60

8.625

0.406

ASME

80

8.625

0.5

ASME

STD

8.625

0.322

ASME

XS

8.625

0.5

ASME

XXS

8.625

0.875

ASME

STD

9.625

0.342

ASME

XS

9.625

0.5

ASME

10

10

10.75

0.165

10

ASME

10

100

10.75

0.718

10

ASME

10

120

10.75

0.843

10

ASME

10

140

10.75

10

ASME

10

160

10.75

1.125

10

ASME

10

20

10.75

0.25

10

ASME

10

30

10.75

0.307

10

ASME

10

40

10.75

0.365

10

ASME

10

10.75

0.134

10

ASME

10

60

10.75

0.5

10

ASME

10

80

10.75

0.593

10

ASME

10

STD

10.75

0.365

10

ASME

10

XS

10.75

0.5

10

ASME

11

STD

11.75

0.375

11

ASME

11

XS

11.75

0.5

11

ASME

12

10

12.75

0.18

12

ASME

12

100

12.75

0.843

12

ASME

12

120

12.75

12

ASME

12

140

12.75

1.125

12

ASME

12

160

12.75

1.312

12

ASME

12

20

12.75

0.25

12

ASME

12

30

12.75

0.33

12

ASME

12

40

12.75

0.406

12

ASME

12

12.75

0.165

12

ASME

12

60

12.75

0.562

12

ASME

12

80

12.75

0.687

12

ASME

12

STD

12.75

0.375

12

ASME

12

XS

12.75

0.5

12

ASME

Print Date: 4/28/2008


Report Criteria: No criteria selected.

OD

NPS

Page 4 of 17

Units of Measure Factors


Visions 4

Unit From
F
C
1
L
m
in
in
in
mL
mL
in
m
m
m
L
cm
ft
mm
cm
mm
cm
mm
lb
lbs/hr
lbs/hr
psia
mile
psi
psig
bbl
gal
kg
kg/hr
kg/sec
ft
yd
ft
yd
bbl
ft
usgal
km
fl.oz UK
fl.oz US
in
in
in
kPa
kgf/cm
kPag
m
m
m

Unit To
C
F
123
bbl
bbl
cm
cm
cm
fl.oz UK
fl.oz US
ft
ft
ft
ft
gal
in
in
in
in
in
in
in
kg
kg/hr
kg/sec
kgf/cm
km
kPa
kPag
L
L
lb
lbs/hr
lbs/hr
m
m
m
m
m
m
m
mile
mL
mL
mm
mm
mm
psi
psia
psig
usgal
yd
yd

Factor
1
1
3
158.987295
0.15898729
0.39370078
0.15500031
16.3871
28.41
29.5735296
12
0.3048
0.09290304
0.02831684
4.54609
2.54
0.0833333
25.4
6.4516
645.16
16.387064
16387.064
2.20462262
2.20462262
7936.64144
14.22
0.62137119
0.14503773
0.14503773
0.00628981
0.21996924
0.45359237
0.45359237
0.00012599
3.2808398
1.0936132
10.7639104
1.19599005
6.28981077
35.3146667
264.172052
1.609344
0.03519507
0.03381402
0.03937007
0.00155003
0.06102374
6.89475729
0.0703
6.89475729
0.00378541
0.9144
0.83612736

Print Date: 4/28/2008


Page 1 of 1

NDE Go Log
Visions 4

NDE Number
NDE Type

Report Number

Report Date

NDE Title

NDE Job File Number

Company Name

Linked

Inspection Date

Equipment Detail

Linked NDE Reports


1
UT

RN0000

12/11/2007

NDE1

JFNa

METEGRITY

2
ME

NDE - ME Attach Test

3/5/2008

3
MT

RN00

NDE - MT Attach Test

3/7/2008

5
RT

RN-0010

NDE - RT Attach Test

3/1/2008

11
RT

RN001

12/28/2007

12
PT

RN001

12/28/2007

13
PT

4/15/2008

3/4/2008

14
MT

RN002

12/31/2007

15
ME

RN002

12/31/2007

17
PT
19
UT

3/4/2008

RN000

3/19/2008

NDE - UT [19]

JFN00

Metegrity

3/19/2008

Plant ID: HWPlant4


Type:
Pipeline Segment
Number: PS1
Plant ID: ADPlant1
Type:
Boiler
Number: Boiler-2
Plant ID: T-34
Type:
Tank
Number: TTestA
Plant ID: MM Plant 170
Type:
Exchanger
Number: EX-00010
Plant ID: HWPlant
Type:
Filter
Number: F1
Plant ID: HWPlant
Type:
Filter
Number: F1
Plant ID: T-34
Type:
Filter
Number: F6
Plant ID: HWPlant
Type:
Major
Number: Ma2
Plant ID: HWPlant
Type:
Major
Number: Ma2
Plant ID: T-34
Type:
Filter
Number: F6
Plant ID: Test-PlantA
Type:
Stack
Number: Sc

Unlinked NDE Reports


4
PT
6
UT
16
ME
21
Print Date: 4/28/2008
Report Criteria: No criteria selected.

3/19/2008

JFN02
Page 1 of 2

NDE Report Summary


Visions 4

NDE Number

NDE Type

Report Date

Job File
Number

Title

Company
Name

Equipment Detail

Linked IR

14

MT

Unit Id:
Plant ID:
Type:
Number:

HWBusinessUnit
HWPlant
Major
Ma2

IR Memo No:
3784
Inspection Date: 12/31/2007
Report Number: RN002
Completed:

15

ME

Unit Id:
Plant ID:
Type:
Number:

HWBusinessUnit
HWPlant
Major
Ma2

IR Memo No:
3784
Inspection Date: 12/31/2007
Report Number: RN002
Completed:

16

ME

17

PT

Unit Id:
Plant ID:
Type:
Number:

HWBusinessUnit
T-34
Filter
F6

IR Memo No:
4068
Inspection Date: 3/4/2008
Report Number:
Completed:

19

UT

3/19/2008

JFN00

NDE - UT [19]

Metegrity

Unit Id:
Plant ID:
Type:
Number:

Test-Unit
Test-PlantA
Stack
Sc

IR Memo No:
4166
Inspection Date: 3/19/2008
Report Number: RN000
Completed:

20
21
22
23
24

RT
PT
MT
ME
RT

3/19/2008
3/19/2008
3/19/2008
3/19/2008

JFN01
JFN02
JFN04
JFN05

NDE
NDE
NDE
NDE

Metegrity

ME Attachemnt
TEST

Print Date: 4/28/2008


Report Criteria: No criteria selected.

RT [20]
PT [21]
MT [22]
ME [23]

Page 2 of 2

NCR Go Log
Visions 4

Classification

Plant ID

Equipment Type

Equipment Number

Associated Major
Equipment Number

NCR Number

Work Order No

Job File Number

NCR Title

Priority Code Completed Issued Date Due Date


Issued To

Equipment

Test-PlantB

Exchanger

EX-0010

123

534

High

NPL-IDO2

PipeSeg2.0

155

Demo NCR

Low

PipeSeg4.2

154

PSeg4.2NCR

Low

MM Plant 170

Pipeline
Segment
Pipeline
Segment
Boiler

132

342

High

JH_Plant2

Boiler

BO_9999

NCR Test

Low

test

Crit

NCR Title

Med

109

test

High

86
95
96
97
122

test
Test 1412
Test 133
test
543

Alex MORPH &


Talla 2XLC - Full
Prelude
(Relocate vs
Solid Globe
RMX) - Alex
MORPH & Talla
2XLC - Ful
NCR Title1
High

Equipment

Equipment
NPL-IDO4
Minor

Minor BL-001

MJ-0010

Equipment

133

954854

12345

56

49

JFN000

Equipment

Minor
Equipment
Equipment
Equipment
Equipment

Test-PlantC

Boiler

Boiler-2

Test-PlantC
ADPlant1
ADPlant1
ADPlant1
Test-PlantB

Boiler
Tank
Tank
Tank
Exchanger

Boiler-1
tank test
tank test
tank test
EX-0010

NPL-IDO1

Exchanger

Exchanger1.0

78

T-34

Filter

F3

33

MM-BCD-1

Bundle

BD-0010

128

ADPlant1
Test-PlantC
Test-PlantC
Test-PlantC
Test-PlantC
Test-PlantC
Test-PlantC
Test-PlantC
Test-PlantC
Test-PlantC
Test-PlantC
Test-PlantC

Tank
Bundle
Bundle
Bundle
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler

tank test
Bundle-1
Bundle-1
Bundle-1
Boiler-3
Boiler-3
Boiler-3
Boiler-3
Boiler-3
Boiler-2
Boiler-2
Boiler-2

100
101
102
103
104
105
106
107
108
110
111
112

test55

Low

Low

Equipment

Equipment
1

JFN00

Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment

Print Date: 4/28/2008


Report Criteria: No criteria selected.

test-2

test

4/26/2008

4/25/2008

4/17/2008

3/27/2008

3/20/2008

3/22/2008

Equipment
1

5/3/2008
543
4/25/2008
Demo
4/18/2008
Demo
4/15/2008
4234
4/10/2008
Cleveland
3/26/2008
test
3/20/2008
HW
3/19/2008
23
3/19/2008
3/19/2008
3/19/2008
3/19/2008
3/18/2008
534
3/18/2008

Low

2/4/2008
HW
3/1/2000
mm

2/4/2008

Page 1 of 4

NCR Log
Visions 4

Derewonko
NCR Number

NCR Title

Priority Code

Completed

Plant ID:
NPL-IDO1
Equipment Number: Exchanger1.0
Equipment Name:
OOSD
78

Alex MORPH & Talla 2XLC - Full Prelude


(Relocate vs Solid Globe RMX) - Alex
MORPH & Talla 2XLC - Ful

Demo NCR

Job File Number

Issued Date

Issued To

Equipment Type: Exchanger


Status:
In Service

3/18/2008

Plant ID:
NPL-IDO2
Equipment Number: PipeSeg2.0
Equipment Name:
OIDS
155

Workorder No

Equipment Type: Pipeline Segment


Status:
In Service

Low

4/25/2008

Demo

4/18/2008

Demo

Plant ID:
NPL-IDO4
Equipment Number: PipeSeg4.2
Equipment Name:
PIKI
154

PSeg4.2NCR

Equipment Type: Pipeline Segment


Status:

Low

Page 3 of 12
Print Date: 4/28/2008
Report Criteria: No criteria selected.

NCR Summary
Visions 4

NCR Number: 123


Title:
534
Issued To:
543
Work Order No.:

Date Issued: 5/3/2008


Priority Code: High

Equipment Detail
Unit ID: Test-Unit
Type: Exchanger
Name: Main Test: Mar 18, 2008

Plant ID: Test-PlantB


Number: EX-0010

Description
Disposition
Completed:

Disposition Date:

NCR Number: 155


Title:
Demo NCR
Issued To:
Demo
Work Order No.:

Date Issued: 4/25/2008


Priority Code: Low

Equipment Detail
Unit ID: Derewonko
Type: Pipeline Segment
Name: OIDS

Plant ID: NPL-IDO2


Number: PipeSeg2.0

Description
Disposition
Completed:

Disposition Date: 4/26/2008

NCR Number: 154


Title:

PSeg4.2NCR

Issued To:
Demo
Work Order No.:

Date Issued: 4/18/2008


Priority Code: Low

Equipment Detail
Unit ID: Derewonko
Type: Pipeline Segment
Name: PIKI

Plant ID: NPL-IDO4


Number: PipeSeg4.2

Description
Disposition
Completed:

Disposition Date: 4/25/2008

NCR Number: 132


Title:
342
Issued To:
4234
Work Order No.:

Date Issued: 4/15/2008


Priority Code: High

Equipment Detail
Unit ID: MM Unit12
Type: Boiler
Name:

Plant ID: MM Plant 170


Number: Minor BL-001

Description
Disposition
Completed:

Disposition Date:

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Page 1 of 30

Non-Equipment NCR Log


Visions 4

56

Number
test

NCR Title

NCR Type
Priority Code Completed
Crit
Procedure Deviations

49

NCR Title

Med

113
114
121
16
18

test

35
36
37
38
40
41
42
43
44
46
47
48
50
51
52
53
55
57
58
59
6
61
62
63
64
65

Procedure Deviations 1

Workorder No

Job File Number

JFN000

Issued Date

Issued To

3/26/2008

test

3/20/2008

HW

Page 1 of 2

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Inline Inspection Go Log


Visions 4

Derewonko

Classification
Plant ID

Equipment Type
Equipment Number

Equipment
NPL-IDO1

Pipeline Segment
PipeSeg1.0

Minor
NPL-IDO3

Pipeline Segment
PipeSeg3.0

Associated Major Company Name


Equipment Number
Description

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Metegrity

Circuit3.0

Marcin & Marcin


Test Graphs

Tool Type
Run Type
A

Girth Weld
Orientation
Upstream

Start Location
End Location

Run Time
Indication Count

234
423

Deepest Length
Deepest Depth

Wall Loss
Percent
2

Short CR
Long CR

Min Calc
Burst Press

RL Factor
Equation Name

5
A

Poly Sleeve

Page 2 of 10

Inline Inspection Graphs


Visions 4

Derewonko
Plant ID: NPL-IDO3

Equipment Type:

Indication ID
1
2
3
4
5

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Pipeline Segment

Equipment Number: PipeSeg3.0

Axial Distance
23
22
24
25
22

ft
ft
ft
ft
ft

Orientation (hh:mm)
12:08
12:07
12:09
11:51
11:11

Page 3 of 32

Inline Inspection Graphs


Visions 4

Derewonko
Plant ID: NPL-IDO3

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Equipment Type:

Pipeline Segment

Equipment Number: PipeSeg3.0

Page 4 of 32

Upstream Equipment
Visions 4

MM Unit12
Plant ID:
Equipment Number:
Classification:
Status:

MM Plant 160
EX-0010
Equipment
In Service

Equipment Type:
Name:
In Service:

Exchanger
Main Test: Jan 18, 2008

Upstream Equipment

Classification
Plant ID
Major
MM Plant 160

Equipment Type
Equipment Number
Major
MJ-0020

Equipment Name
In Service

Associated Major
Equipment Number

Start Date
End Date
1/10/2008

Products

Product

Flow Percent

Gas

32 %

Condensate

33 %

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Page 8 of 13

Verification Go Log
Visions 4

Classification
Plant ID
Equipment
ADPlant2 - Pipeline

Equipment

HW_Plant

Equipment

HWPlant

Equipment

HWPlant

Equipment

HWPlant2

Equipment

HWPlant2

Equipment

HWPlant4

Equipment

KG_Plant

Equipment

KG_Plant

Equipment

KG_Plant

Equipment

MH_PLANT

Equipment

MH_PLANT

Equipment

MH_PLANT

Equipment

MH_PLANT

Equipment

MH_PLANT

Equipment

MH_PLANT

Equipment

MH_PLANT

Equipment

MH_PLANT

Equipment

MH_PLANT

Equipment

MH_PLANT

Equipment

MH_PLANT

Equipment

MM Plant 155

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Equipment Type/Number
Pipeline Segment
PipeLine Segment -1
Pipeline Segment
PS1
Pipeline Segment
PS1
Pipeline
PS1
Pipeline
PS1
Pipeline
PS2
Pipeline
PS1

Associated Major Equip Number

Site ID
New Verificatio

Date/Type
3/18/2008

New Verificatio

New Verificatio

2/8/2008
Leak/Repair
1/18/2008

Segment

New Verificatio

3/13/2008

Segment

New Verificatio

3/7/2008

Segment

New Verificatio

3/7/2008

Segment

New Verificatio

4/15/2008
Coating Eval
1/7/2008

Pipeline Segment
C_TEST_PIPELINE
Pipeline Segment
C_TEST_PIPELINE
Pipeline Segment
C_TEST_PIPELINE
Pipeline Segment
MH_413_TEST3
Pipeline Segment
MH_413_TEST3

New Verificatio

Reason

Land Owner

Recoating Project

Leak

New Excavation

New Verificatio

1/7/2008

New Verificatio

4/14/2008

Maintenance

New Verificatio

4/14/2008

Leak

Pipeline Segment
MH_413_TEST4
Pipeline Segment
MH_413_TEST5
Pipeline Segment
MH_413_TEST6
Pipeline Segment
MH_413_TEST6

New Verificatio

4/14/2008

Maintenance

New Verificatio

4/14/2008

Maintenance

New Verificatio

4/14/2008

New Verificatio

4/14/2008

Leak

Pipeline Segment
MH_413_TEST7
Pipeline Segment
MH_PS1
Pipeline Segment
MH_PS1
Pipeline Segment
MH_PS1

New Verificatio

4/14/2008

Maintenance

New Verificatio

4/3/2008

New Verificatio

4/14/2008

New Verificatio

4/3/2008

Pipeline Segment
MH_PS1
Pipeline Segment
PSEG-0010

New Verificatio

3/4/2008

New Verificatio

1/25/2008

Page 1 of 2

PSV Service History Report


Visions 4

Service No

Location

Plant ID:
NPL-IDO1
Equipment Number: PSV1.0
1818
1st Stg Discharge Scrubber
(D.O.T.)
1609

1st Stg Discharge Scrubber


(D.O.T.)

Report
Number

Company

Set
Pressure

New
Capacity

Date
Serviced

10000 psig

A123

Equipment Type: PSV


Equipment Name: DOLI

Plant ID:
NPL-IDO1
Equipment Number: PSV1.2
1857

Equipment Type: PSV


Equipment Name: KOSD

10000 psig

3/4/2008

2F

1/16/2008

1/17/2008

2 psig

3/29/2008

1856

2 psig

10/20/1992

1855

2 psig

3/20/1999

1854

2 psig

3/20/2008

2 psig

1/17/2008

2 psig

3/20/2008

2 psig

3/12/2008

556 psig

3/29/2008

556 psig

3/20/2008

Plant ID:
NPL-IDO1
Equipment Number: PSV1.6
1853

456

Equipment Type: PSV


Equipment Name: POOP

1852
Plant ID:
NPL-IDO3
Equipment Number: PSV3.0
1863

Equipment Type: PSV


Equipment Name: UPKA

Plant ID:
NPL-IDO3
Equipment Number: PSV3.1
1890

Equipment Type: PSV


Equipment Name: NOGA

Plant ID:
NPL-IDO4
Equipment Number: PSV4.0
1970

Equipment Type: PSV


Equipment Name: JOKE

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Derewonko
Calc Last
Service Date

Equipment Type: PSV


Equipment Name: KOSD

Plant ID:
NPL-IDO1
Equipment Number: PSV1.1
1669

1670

Actual Last
Service Date

4 psig

89 ft3/day

3/20/2008

3/31/2008

4/25/2008

Page 2 of 10

PSV Service Report Go Log


Visions 4

MM Unit12
Plant ID
MM Plant 160
MM Plant 160

Equipment Type
PSV
PSV

Equipment Number
PSV-0010
PSV-0010

Service No

Report Number

1836
1817

Date Serviced

PSV IR Title

Company

3/12/2008
3/4/2008

Completed
Work Event

The first event


used for testing
purpose

MM
MM
MM
MM
MM
MM
MM
MM
MM

Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant

160
160
160
160
160
160
160
160
160

PSV
PSV
PSV
PSV
PSV
PSV
PSV
PSV
PSV

PSV-0010
PSV-0010
PSV-0010
PSV-0020
PSV-0020
PSV-0020
PSV-0020
PSV-0030
PSV-0030

1709
1690
1689
1816
1814
1812
1811
1815
1813

TEST LINK WR

RN-SR-1812

RV
RN-TEST-0010

1/28/2008
1/23/2008
1/10/2008
3/3/2008
3/3/2008
2/13/2008
1/15/2008
3/3/2008
3/3/2008

test

Test Company

test
The first event
used for testing
purpose

MM
MM
MM
MM
MM
MM
MM
MM
MM
MM
MM
MM
MM
MM

Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant

170
170
170
170
170
170
170
170
170
170
170
170
170
170

PSV
PSV
PSV
PSV
PSV
PSV
PSV
PSV
PSV
PSV
PSV
PSV
PSV
PSV

Print Date: 4/28/2008


Report Criteria: No criteria selected.

A-PSV-1111
A-PSV-1111
B-PSV-1111
PSV-0050
PSV-0050
PSV-0060
PSV-0060
PSV-0060
PSV-0060
PSV-3001
PSV-3001
PSV-3001
PSV-3001
PSV-3001

1931
1930
1932
1952
1950
1956
1955
1954
1953
1914
1913
1912
1911
1910

4/1/2008
1/8/2006
4/4/2007
4/15/2008
4/1/2008
4/16/2008
4/10/2008
4/16/2008
4/1/2008
4/2/2008
3/31/2008
4/2/2003
4/2/2008
3/10/2007

Page 7 of 9

PSV Service Report Summary


Visions 4

Derewonko
Service No

Report Number

Date Serviced

PSV IR Title

Plant ID:
NPL-IDO1
Equipment Number: PSV1.0
Equipment Name:
KOSD
1818
1609

Equipment Type: PSV


Status:
In Service

3/4/2008
A123

1/16/2008

Plant ID:
NPL-IDO1
Equipment Number: PSV1.1
Equipment Name:
DOLI
1669

BLEH!

Equipment Type: PSV


Status:
In Service

1/17/2008

Plant ID:
NPL-IDO1
Equipment Number: PSV1.2
Equipment Name:
KOSD

Equipment Type: PSV


Status:
In Service

1857

3/29/2008

1856

10/20/1992

1855

3/20/1999

1854

3/20/2008

1670

Company

456

1/17/2008

3/20/2008

3/12/2008

Plant ID:
NPL-IDO1
Equipment Number: PSV1.6
Equipment Name:
POOP

Equipment Type: PSV


Status:

1853

3/29/2008

1852

3/20/2008

Plant ID:
NPL-IDO3
Equipment Number: PSV3.0
Equipment Name:
UPKA
1863

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Equipment Type: PSV


Status:

3/20/2008

Page 2 of 11

RBI Inspection and Examination Recommendations by Equipment


Visions 4

AD-Dashboard
Equipment Type
Circuit

Equipment Number

Inspection Recommendations

Equipment Number

Inspection Recommendations

Circuit1

ADPlant1
Equipment Type
Cooling Tower
Pipe

TD-07122007
Pipe -1

HWPlant
Equipment Type
Boiler
Boiler
Boiler
Bundle
Cooling Tower
Cooling Tower
Exchanger
Exchanger
Filter
Firetube Boiler
Firetube Boiler
Furnace
Furnace
Injection Point
Major
Misc
Pipe
Pipeline Misc
Pipeline Misc
Pipeline Segment
Pipeline Segment
Pipeline Segment
Plate Exchanger
PSV
Stack
Stack
Stack
Tank
Valve
Vessel
Vessel
Vessel
Wellhead
Wellhead

Equipment Number

Inspection Recommendations

B1
B1
B1
Bu1
CT
CT1
1H-1204-Pass 1
E1
13223r321
1
FTB1
F1
F2
IP1
Ma1
M2
P1
PM1
PM1
PS1
PS2
PS4
TREST
PSV1
S1
S1
S1
T2
V1
72-FTR-11A
Ve1
Ve1
W2
W2

HWPlant4
Equipment Type
Exchanger

Equipment Number

Inspection Recommendations

E1

JH_Plant1
Equipment Type
Boiler

Equipment Number

Inspection Recommendations

BO_123

JH_Plant2
Equipment Type
Print Date: 4/28/2008
Report Criteria: No criteria selected.

Equipment Number

Inspection Recommendations
Page 1 of 13

Risk Assessment Go Log


Visions 4

Description
RBI Date

RBI Number

4/25/2008
4/25/2008
4/25/2008
4/23/2008
4/23/2008
4/23/2008
4/18/2008
4/18/2008
4/18/2008
4/17/2008

270
271
272
267
268
269
264
265
266
263

4/14/2008
4/14/2008

Risk Code

Risk Rank

RAID Completed

10.625

68

109

14.25

36

261
262

11

4/10/2008

254

103.25

64

4/10/2008
4/10/2008
4/10/2008
4/10/2008

255
256
257
258

5
1

28
486

1
64

4/10/2008

259

141.75

4/9/2008
4/9/2008

246
247

1
1

4/9/2008

248

4/9/2008

249

294

4/9/2008
4/9/2008
4/9/2008
4/9/2008

250
251
252
253

2
5
4
2

290
6
74.25
294

1
2
1
64

4/8/2008
4/8/2008
4/7/2008
4/7/2008

244
245
242
243

294

2
2

294
294

1
1
1
62

4/4/2008
4/4/2008
4/3/2008
4/3/2008
4/2/2008
4/1/2008
4/1/2008

240
241
238
239
237
230
231

4
5
2
2
2

58.5
43.875
294
294
294

1
1
1
1
1

7.5

31

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Page 1 of 9

Risk Assessment Inspection Recommendations


Visions 4

RBI Number: 42
RBI Date: 1/18/2008
Inspection Recommendations:
Unit ID

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Description:
RAID: 1

Completed:

Risk Ranking: 294

Plant ID

Equipment Type

Equipment Number

Equipment Name

Page 18 of 79

Risk Assessment Summary


Visions 4
RBI
Number

Description

Assessment Type

Complete

Equip

RBI Date

IRC

12/6/2007

Metegrity, a Met Inc.


company

12/7/2007
12/11/2007
12/11/2007

12/12/2007

12/17/2007

12/17/2007

Metegrity,
company
Metegrity,
company
Metegrity,
company
Metegrity,
company

2
3
4

Equip
Equip
Equip

Equip

Equip

Equip

Prepared By

Risk
Rank
294

Stream

X-Axis

Y-Axis

14

21

a Met Inc.

74.25

4.5

16.5

a Met Inc.

132.25

11.5

11.5

a Met Inc.

57.5

11.5

a Met Inc.

68.25

6.5

10.5

8
9

Equip

12/17/2007
12/17/2007

Metegrity, a Met Inc.


company

119.25

13.25

10
12

Equip
Equip

12/17/2007
12/17/2007

a Met Inc.

97.5

19.5

13

Equip

12/19/2007

a Met Inc.

74.25

4.5

16.5

12/19/2007

a Met Inc.

74.25

4.5

16.5

12/19/2007

Metegrity,
company
Metegrity,
company
Metegrity,
company
Metegrity,
company

a Met Inc.

74.25

4.5

16.5

1/7/2008

a Met Inc.

73.5

10.5

1/7/2008

a Met Inc.

486

18

27

1/7/2008

a Met Inc.

29

7.25

1/7/2008

a Met Inc.

294

14

21

1/7/2008

Metegrity,
company
Metegrity,
company
Metegrity,
company
Metegrity,
company
Metegrity,
company
MAKOTO

a Met Inc.

294

14

21

14

Equip

15

Equip

17

Equip

18

Equip

19

Equip

22

Equip

23

Equip

24

Equip

1/7/2008

25

Equip

1/8/2008

MAKOTO

80

16

1/8/2008
1/8/2008
1/8/2008
1/9/2008

Metegrity, a Met Inc.


company

294

14

21

1/16/2008
1/16/2008

26
27
28
29

Equip
Equip

Equip

30
31

Equip
Equip

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Page 1 of 21

Risk Ranking - Equipment


Visions 4

Derewonko
Plant ID
NPL-IDO1

Equipment Type /
Number
Exchanger
Exchanger1.0

IRC

RBI Date

4/25/2008

NPL-IDO1

Misc
Misc1.0

12/17/2007

NPL-IDO1

Pipeline Segment
PipeSeg1.0

12/17/2007

NPL-IDO1

PSV
PSV1.0

12/17/2007

NPL-IDO2

Pipeline Segment
PipeSeg2.0

12/17/2007

NPL-IDO3

Exchanger
Exchanger3.0

3/19/2008

NPL-IDO3

Pipeline Segment
PipeSeg3.0

3/19/2008

4/9/2008

4/9/2008

NPL-IDO4

PSV
PSV4.0

Print Date: 4/28/2008


Report Criteria: No criteria selected.

4/25/2008

Configuration
Default Configuration for
Pressure Equipment built
based on ASME standards
Default Configuration for
Pressure Equipment built
based on ASME standards
Default Configuration for
Pressure Equipment built
based on ASME standards
Default Configuration for
Pressure Equipment built
based on ASME standards
Default Configuration for
Pressure Equipment built
based on ASME standards
Default Configuration for
Pressure Equipment built
based on ASME standards
Default Configuration for
Pressure Equipment built
based on ASME standards
Default Configuration for
Pressure Equipment built
based on ASME standards
Default Configuration for
Pressure Equipment built
based on ASME standards
Default Configuration for
Pressure Equipment built
based on ASME standards

Description

Risk
Ranking
6

RBI
IRC
5

X-Axis

Y-Axis

2
Likelihood of Failure

3
Consequence of Failure

119.25

9
Likelihood of Failure

13.25
Consequence of Failure

119.25

9
Likelihood of Failure

13.25
Consequence of Failure

119.25

9
Likelihood of Failure

13.25
Consequence of Failure

119.25

9
Likelihood of Failure

13.25
Consequence of Failure

17.25

3
Likelihood of Failure

5.75
Consequence of Failure

17.25

3
Likelihood of Failure

5.75
Consequence of Failure

2
Likelihood of Failure

3
Consequence of Failure

2
Likelihood of Failure

3
Consequence of Failure

10.625

2.5
Likelihood of Failure

4.25
Consequence of Failure

Page 2 of 14

Inspection Risk Code List


Visions 4

IRC

Short
Interval
Color
Life
Name
RAID Title: Default Configuration for Pressure Equipment built based on ASME standards
IRC Name

RAID: 1

Comments

Type: Internal
1

Very High

VH

Red

0.25

12

High

Yellow

0.5

24

Medium

Green

0.5

36

Low

Blue

0.5

72

Very Low

VL

Black

0.5

108

VH

Red

0.25

Type: External
1

Very High

High

Yellow

0.5

12

Medium

Green

0.5

18

Low

Blue

0.5

36

Very Low

VL

Black

0.5

54

Page 1 of 89
Print Date: 4/28/2008
Report Criteria: No criteria selected.

Risk Configuration Go Log


Visions 4

RAID
1
2
3
5
6
7
8
10
11

Date
Configured
6/1/2006
2/28/2007
12/11/2007
12/17/2007
12/17/2007
12/17/2007
6/1/2006
12/18/2007
1/9/2008

Title
Default Configuration for Pressure
Equipment built based on ASME standards
Default PSV Configuration based on ASME
Standards
Default Configuration for Pressure
Equipment built based on ASME standards
Default Configuration for Pressure
Equipment built based on ASME standards
Default Configuration for Pressure
Equipment built based on ASME standards
Default PSV Configuration based on ASME
Standards
Default Configuration for Pressure
Equipment built based on ASME standards
Default Configuration for Pressure
Equipment built based on ASME standards
Risk Config Test

14

1/9/2008

Risk Config Test

15

1/9/2008

20

1/22/2008

Risk Config Test

21

1/22/2008

Risk Config Test

22

1/22/2008

Risk Config Test

23

1/22/2008

Risk Config Test

24

1/22/2008

25

1/22/2008

Default Configuration for Pressure


Equipment built based on ASME standards
Risk Config Test

26

1/22/2008

27

1/22/2008

28
30

1/22/2008
2/7/2008

Default Configuration for Pressure


Equipment built based on ASME standards
Default Configuration for Pressure
Equipment built based on ASME standards
Default PSV Configuration based on ASME
Standards
RAID Test - Incident 17

Complete

Active

Notes

Metegrity, a Met Inc. company


Metegrity, a Met Inc. company
HAO
TIAGO
TIAGO
TIAGO
Metegrity, a Met Inc. company
TIAGO
MAKOTO
MAKOTO
MAKOTO
HAO

RAID Note

HAO

RAID Note

TIAGO

RAID Note

TIAGO

RAID Note

VISIONS_ADMIN
VISIONS_ADMIN

RAID Note

VISIONS_ADMIN
VISIONS_ADMIN
VISIONS_ADMIN

31

7/7/2005

Chevron - Cabinda Gulf Oil Co.

32

5/5/2003

Meterity's Configuration Built Based On


Asme Standards

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Author

MAKOTO

Test RAID

Rick Peterson

Chevron - CABGOC RBI, API 580 compliant, quantitative on the


likelihood methods, semi-quantitative/qualitative on the
consequence methods.
Metegrity's risk assessment configuration

Metegrity Inc.

Page 1 of 4

Risk Configuration Summary


Visions 4

RAID
1

Date
Configured
6/1/2006

2/28/2007

12/11/2007

12/17/2007

12/17/2007

12/17/2007

6/1/2006

10

12/18/2007

11

1/9/2008

14

1/9/2008

X-Axis
Label
Equation
Size
Likelihood of Failure
5
(PredDamLoc+InspDataConf)/2+ProbOccur
Likelihood of Failure
5
(PredDamLoc+InspDataConf)/2+(ProbOccur+PSV
Service)/2
Likelihood of Failure
5

Likelihood of Failure
5
(PredDamLoc+InspDataConf)/2+ProbOccur
Likelihood of Failure
5
(PredDamLoc+InspDataConf)/2+ProbOccur
Likelihood of Failure
5
(PredDamLoc+InspDataConf)/2+(ProbOccur+PSV
Service)/2
Likelihood of Failure
5
(PredDamLoc+InspDataConf)/2+ProbOccur
Likelihood of Failure
5
(PredDamLoc+InspDataConf)/2+ProbOccur
Likelihood of Failure
3
L1+L2
Likelihood of Failure
3

15

1/9/2008

Likelihood of Failure

20

1/22/2008

Likelihood
L1+L2
Likelihood
L1+L2
Likelihood
L1+L2
Likelihood

21

22

1/22/2008

1/22/2008

23

1/22/2008

24

1/22/2008

25

1/22/2008

26

1/22/2008

27

28

30

31

32

34

35

1/22/2008

1/22/2008

2/7/2008

7/7/2005

5/5/2003

2/7/2008

7/7/2005

36

7/7/2005

37

7/7/2005

38

7/7/2005

of Failure

of Failure

of Failure

of Failure

Y-Axis
Label
Equation
Size
Consequence of Failure
5
(RelRate+RelVol+ToxHarm+Flam)/4+EnvImp+BizImp
Consequence of Failure
5
(RelRate+RelVol+ToxHarm+Flam)/4+EnvImp+BizImp

Consequence of Failure
5
(RelRate+RelVol+ToxHarm+Flam)/4+EnvImp+BizImp
Consequence of Failure
5
(RelRate+RelVol+ToxHarm+Flam)/4+EnvImp+BizImp
Consequence of Failure
5
(RelRate+RelVol+ToxHarm+Flam)/4+EnvImp+BizImp
Consequence of Failure
5
(RelRate+RelVol+ToxHarm+Flam)/4+EnvImp+BizImp

Consequence of Failure
5
(RelRate+RelVol+ToxHarm+Flam)/4+EnvImp+BizImp
Consequence of Failure
5
(RelRate+RelVol+ToxHarm+Flam)/4+EnvImp+BizImp
Consequence of Failure
3
C 1*C 2
Consequence of Failure
3
C 1*C 2
Consequence of Failure
3
Consequence of Failure
C 1*C 2
Consequence of Failure
C 1*C 2
Consequence of Failure

Likelihood of Failure
(PredDamLoc+InspDataConf)/2+ProbOccur
Likelihood of Failure

Consequence of Failure

Likelihood of Failure
(PredDamLoc+InspDataConf)/2+ProbOccur
Likelihood of Failure
(PredDamLoc+InspDataConf)/2+ProbOccur
Likelihood of Failure

Likelihood of Failure
Test 1+Test 2
Likelihood of Failure
(PredDamLoc+InspDataConf)/2+ProbFail
Likelihood of Failure
(PredDamLoc+InspDataConf)/2+ProbOccur
Likelihood of Failure
(PredDamLoc+InspDataConf)/2+ProbOccur
Likelihood of Failure
(PredDamLoc+InspDataConf)/2+ProbFail
Likelihood of Failure
(PredDamLoc+InspDataConf)/2+ProbFail
Likelihood of Failure
(PredDamLoc+InspDataConf)/2+ProbFail
Likelihood of Failure
(PredDamLoc+InspDataConf)/2+ProbFail

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Consequence of Failure

Consequence of Failure

Consequence of Failure
C 1*C 2
Consequence of Failure

Cloned

Active

Consequence of Failure
5
Max (EnvImp,BizImp,ToxHarm)
Consequence of Failure
3
(Flam+RelRate+RelVol+ToxHarm)/4+BizImp+EnvImp
Consequence of Failure
5
(Flam+RelRate+RelVol+ToxHarm)/4+BizImp+EnvImp
Consequence of Failure
3
(RelRate+RelVol+ToxHarm+Flam)/4+EnvImp+BizImp
Consequence of Failure
3
(RelRate+RelVol+ToxHarm+Flam)/4+EnvImp+BizImp
Consequence of Failure
5
(Flam+RelRate+RelVol+ToxHarm)/4+BizImp+EnvImp
Consequence of Failure
5
(Flam+RelRate+RelVol+ToxHarm)/4+BizImp+EnvImp
Consequence of Failure
5
(Flam+RelRate+RelVol+ToxHarm)/4+BizImp+EnvImp
Consequence of Failure
5
(Flam+RelRate+RelVol+ToxHarm)/4+BizImp+EnvImp

Page 1 of 3

Component Scheduling Report


Visions 4

Component Type
Critcal Valve
Critcal Valve
Critcal Valve
Critcal Valve
Critcal Valve
Expansion Joint
Expansion Joint
Expansion Joint
Expansion Joint
Expansion Joint
Expansion Joint
Expansion Joint
Expansion Joint
Expansion Joint
Hanger
Hanger
Hanger
Hanger
Hanger
Hanger
Hanger
Hanger
Hanger
Hanger
Hanger
Hanger
Hanger
Hanger
Hanger
Hanger
Hanger
Misc
Misc
Misc
Misc
Misc
Misc
Misc
Misc
Misc
Misc
Misc
Misc

Component Number
1
CCritValve1.0
CV1
CV2
CV3
CExpanJoint1.0
EJ-0010
EJ1
EJ2
EJ3
EJ4
ExpJoin4.0
test
Tiago-Expansion_1
1AA1
2AA2
657
AD- Hanger
Ae1
Be2
CHanger1.0
Clone-HG-000A
H1
H2
H3
HG-001
HG-0010
HG-0010
HG-002
HG-0020
HG-003
1
CLONE-MISC-1
CLONE-MISC-2
CLONE-MISC-3
CLONE-MISC-4
CLONE-MISC-5
CLONE-MISC-6
CLONE-MISC-7
CLONE-MISC-8
CMisc1.0
CMisc1.1
CMisc1.2

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Component Description

IRC

RI

sdf

26

333

Test
Test
Test

26

60

Test
Test
Test
Test

Next Insp Full


Due

Next Insp Full


Calc

1/17/2003
1/17/2003
1/17/2003
1/17/2003
1/17/2003
1/17/2003
1/17/2003
1/17/2003

22

12

21
21

12
12

12

4/25/2008

test

Hanger-1

1/17/2003
Test
Test
Test

1
Test Misc
Test Misc
Test Misc
Test Misc
Test Misc
Test Misc
Test Misc
Test Misc
Test Misc
Ne
Tester

1/17/2003
1/17/2003
1/17/2003
22

30

21

12

Component
Component
Component
Component
Component
Component
Component
Component
Component
60

Page 1 of 2

Equipment IRC Summary


Visions 4

Inspection Risk Code


Equipment Type

Boiler

Bundle

Circuit

Cooling Tower

20

Filter

Firetube Boiler

Furnace

Injection Point

Major

Major Exchanger

Misc
2

11

Pipeline Misc

Pipeline Segment

Plate Exchanger

PSV
Stack

Tank

Valve

Vessel

Wellhead

Total

11

Exchanger

Pipe

10

7 (4.8%)

Print Date: 4/28/2008


Report Criteria: No criteria selected.

69 (47.6%)

1
2

1
1

5 (3.4%)

35 (24.1%)

18 (12.4%)

3 (2.1%)

4 (2.8%)

4 (2.8%)

Page 1 of 2

Equipment Type

Total

Boiler

18 (12.4%)

Bundle

7 (4.8%)

Circuit

3 (2.1%)

Cooling Tower

3 (2.1%)

Exchanger

32 (22.1%)

Filter

15 (10.3%)

Firetube Boiler

2 (1.4%)

Furnace

3 (2.1%)

Injection Point

1 (0.7%)

Major

4 (2.8%)

Major Exchanger

1 (0.7%)

Misc

2 (1.4%)

Pipe

14 (9.7%)

Pipeline Misc

1 (0.7%)

Pipeline Segment

10 (6.9%)

Plate Exchanger

1 (0.7%)

PSV

13 (9%)

Stack

3 (2.1%)

Tank

5 (3.4%)

Valve

2 (1.4%)

Vessel

3 (2.1%)

Wellhead

2 (1.4%)

Total

145 (100%)

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Page 2 of 2

Scheduling Go Log
Visions 4

Derewonko
Major Equip Num
Class

Plant ID

Equipment Type

Equipment Number

Equipment RL
Date

Last External
Date

External
Interval
54

Outage
Date

Next Full
Insp Due
1/1/2017

Equipment

NPL-IDO1

Exchanger

Exchanger1.0

Equipment

NPL-IDO1

Pipe

Pipe1.0

Equipment

NPL-IDO1

Pipe

Pipe1.1

Equipment

NPL-IDO1

Pipe

Pipe1.2

Equipment

NPL-IDO1

Pipe

Pipe1.3

Equipment

NPL-IDO1

Pipe

Pipe1.4

Equipment

NPL-IDO1

Pipe

Pipe1.5

Equipment

NPL-IDO1

Pipe

Pipe1.7

Equipment

NPL-IDO1

Pipe

Pipe1.8

Equipment

NPL-IDO1

Pipeline Misc

PipeMisc

Equipment

NPL-IDO1

Pipeline Segment

PipeSeg1.0

36

Equipment

NPL-IDO1

PSV

PSV1.0

12

1/16/2014

Equipment

NPL-IDO1

PSV

PSV1.1

Equipment

NPL-IDO1

PSV

PSV1.2

14

7/20/2010

Equipment

NPL-IDO1

PSV

PSV1.3

Equipment

NPL-IDO1

PSV

PSV1.4

Equipment

NPL-IDO1

PSV

PSV1.5

Equipment

NPL-IDO1

PSV

PSV1.6

Equipment

NPL-IDO1

PSV

PSV1.7 - Long Number Test

Equipment

NPL-IDO1

Tank

Tank1.0

Equipment

NPL-IDO1

Vessel

Vessel1.0

Equipment

NPL-IDO2

Pipeline Segment

PipeSeg2.0

4/22/2011

36

4/22/2014

Equipment

NPL-IDO3

Boiler

Boiler3.0

Equipment

NPL-IDO3

Pipe

Pipe3.0

Equipment

NPL-IDO3

PSV

PSV3.0

Equipment

NPL-IDO3

PSV

PSV3.1

Equipment

NPL-IDO4

Pipeline Segment

PipeSeg4.0

Equipment

NPL-IDO4

Pipeline Segment

PipeSeg4.1

Equipment

NPL-IDO4

Pipeline Segment

PipeSeg4.2

4/25/2008

Equipment

NPL-IDO4

PSV

PSV4.0

Equipment

NPL-IDO4

Tank

Tank4.0

Print Date: 4/28/2008


Report Criteria: No criteria selected.

1/1/2008

Next Ext Due


Date
7/1/2012

1/4/2008

4/22/2008

54

4/18/2008
4/24/2008

4/25/2017

Page 4 of 97

IT and WR Planning Summary

Visions 4

Derewonko
Plant ID: NPL-IDO1
Number: Pipe1.0
Name:
IJAJ

Type:
Pipe
ERP Number:

Work Requests
3487
Activity Code:
Work Order No.:
Job File No.:
Priority Code:

Stream:
Extent:
Full
Date Created:
3/3/2008
Due Date:
3/3/2008
Estimated Hours:

Work Description
Plant ID: NPL-IDO1
Number: PipeSeg1.0
Name:
FIKU

Type:
Pipeline Segment
ERP Number:

Inspection Tasks
3504
Activity Code:
Work Order No.:
Job File No.:
Priority Code:

Stream:
Extent:
Date Created:
4/17/2008
Due Date:
Estimated Hours:

Work Description
3148
Activity Code:
AE
Work Order No.: 22222
Job File No.:
Priority Code:
2

Stream:
Extent:
Partial
Date Created:
12/27/2007
Due Date:
Estimated Hours:

Work Description

Work Requests
3307
Activity Code:
Work Order No.: TEST1-Attachments
Job File No.:
Priority Code:

Stream:
Extent:
Partial
Date Created:
12/27/2007
Due Date:
Estimated Hours:

Work Description
Plant ID: NPL-IDO4
Number: Boiler4.0
Name:
OOPS

Type:
Boiler
ERP Number:

Inspection Tasks
3529

Demo IT

Activity Code:
CKLST
Work Order No.: 123
Job File No.:
Priority Code:
2

Stream:
Extent:
Partial
Date Created:
4/28/2008
Due Date:
Estimated Hours:

Work Description

Work Requests
3745

Demo Work Request

Activity Code:
AUT
Work Order No.: B4.0WO01
Job File No.:
Priority Code:
Crit
Print Date: 4/28/2008
Report Criteria: Unit Id = 'Derewonko'

Stream:
Extent:
Date Created:
Due Date:

Partial-Recurring
4/28/2008
Page 1 of 3

Scheduling Summary
Visions 4

Derewonko
Plant ID

Equipment Type

Equipment Number

Equipment Name

NPL-IDO1

Circuit

Circuit1.0

UIDS

NPL-IDO1

Exchanger

Exchanger1.0

OOSD

NPL-IDO1

Misc

Misc1.0

AKID

NPL-IDO1

Pipe

Pipe1.0

IJAJ

NPL-IDO1

Pipe

Pipe1.1

DSAS

NPL-IDO1

Pipe

Pipe1.2

OKLS

NPL-IDO1

Pipe

Pipe1.3

OPOS

NPL-IDO1

Pipe

Pipe1.4

IUJS

NPL-IDO1

Pipe

Pipe1.5

OLAF

NPL-IDO1

Pipe

Pipe1.7

OLPP

NPL-IDO1

Pipe

Pipe1.8

HYSA

NPL-IDO1

Pipeline Misc

PipeMisc

KODI

NPL-IDO1

Pipeline Segment

PipeSeg1.0

FIKU

NPL-IDO1

PSV

PSV1.0

KOSD

NPL-IDO1

PSV

PSV1.1

DOLI

NPL-IDO1

PSV

PSV1.2

KOSD

NPL-IDO1

PSV

PSV1.3

ILOP

NPL-IDO1

PSV

PSV1.4

UPAR

NPL-IDO1

PSV

PSV1.5

KOPA

NPL-IDO1

PSV

PSV1.6

POOP

NPL-IDO1

PSV

PSV1.7 - Long Number Test

FORZ

NPL-IDO1

Tank

Tank1.0

IIUD

NPL-IDO1

Vessel

Vessel1.0

IIAD

NPL-IDO2

Pipeline Segment

PipeSeg2.0

OIDS

NPL-IDO3

Boiler

Boiler3.0

OKAY

NPL-IDO3

Circuit

Circuit3.0

YUEP

NPL-IDO3

Circuit

Circuit3.1

ISKA

NPL-IDO3

Circuit

Circuit3.2

OMFG

NPL-IDO3

Exchanger

Exchanger3.0

DOPE

NPL-IDO3

Pipe

Pipe3.0

KOLA

Linked Circuits

Last Inspection

Due Date

Calc. Due Date

1/1/2008

1/1/2017

1/1/2017

1/16/2008

1/16/2014

1/16/2014

3/20/2008

7/20/2010

7/20/2010

4/22/2014

4/22/2014

3/29/2008

4/22/2008

Circuit3.2
Circuit3.0

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Page 5 of 92

Unscheduled Inspection
Visions 4

Derewonko
Plant ID

Equipment Type

NPL-IDO1
NPL-IDO1
NPL-IDO1
NPL-IDO1
NPL-IDO1
NPL-IDO1
NPL-IDO1
NPL-IDO1
NPL-IDO1
NPL-IDO1
NPL-IDO1
NPL-IDO1
NPL-IDO1
NPL-IDO1
NPL-IDO1
NPL-IDO1
NPL-IDO1
NPL-IDO1

Circuit
Misc
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipeline Misc
Pipeline Segment
PSV
PSV
PSV
PSV
PSV
PSV

NPL-IDO1
NPL-IDO1
NPL-IDO3
NPL-IDO3
NPL-IDO3
NPL-IDO3
NPL-IDO3
NPL-IDO3
NPL-IDO3

NPL-IDO3
NPL-IDO3
NPL-IDO4
NPL-IDO4
NPL-IDO4

Equipment Number

Equipment Name
UIDS
AKID
IJAJ
DSAS
OKLS
OPOS
IUJS
OLAF
OLPP
HYSA
KODI
FIKU
DOLI
ILOP
UPAR
KOPA
POOP
FORZ

Tank
Vessel
Boiler
Circuit
Circuit
Circuit
Exchanger
Pipe
Pipeline Segment

Circuit1.0
Misc1.0
Pipe1.0
Pipe1.1
Pipe1.2
Pipe1.3
Pipe1.4
Pipe1.5
Pipe1.7
Pipe1.8
PipeMisc
PipeSeg1.0
PSV1.1
PSV1.3
PSV1.4
PSV1.5
PSV1.6
PSV1.7 - Long Number
Test
Tank1.0
Vessel1.0
Boiler3.0
Circuit3.0
Circuit3.1
Circuit3.2
Exchanger3.0
Pipe3.0
PipeSeg3.0

PSV
PSV
Pipeline Segment
Pipeline Segment
Tank

PSV3.0
PSV3.1
PipeSeg4.0
PipeSeg4.1
Tank4.0

UPKA
NOGA
POKY
INDY
WHIP

Print Date: 4/28/2008


Report Criteria: No criteria selected.

IIUD
IIAD
OKAY
YUEP
ISKA
OMFG
DOPE
KOLA
LOPE

Linked Circuit

Last
Inspection

Due Date

Calc. Due
Date

3/29/2008

Circuit3.2
Circuit3.0
Circuit3.0
Circuit3.1
Circuit3.2

Page 5 of 74

Corrosion Equipment Summary


Visions 4

Derewonko
Equipment
Type

Plant ID
NPL-IDO1
NPL-IDO1
NPL-IDO2
NPL-IDO3
NPL-IDO3
NPL-IDO3
NPL-IDO4
NPL-IDO4

Exchanger
Pipeline Segment
Pipeline Segment
Exchanger
Pipe
Pipeline Segment
Pipeline Segment
Pipeline Segment

Print Date: 4/28/2008


Report Criteria: Active = 'Yes'

Equipment
Number
Exchanger1.0
PipeSeg1.0
PipeSeg2.0
Exchanger3.0
Pipe3.0
PipeSeg3.0
PipeSeg4.0
PipeSeg4.2

Equipment Name
OOSD
FIKU
OIDS
DOPE
KOLA
LOPE
POKY
PIKI

Status
In
In
In
In

Service
Service
Service
Service

In Service

Maximum
Short Loss

Maximum
Long Loss

Minimum
Expiry Date

-91.2500

-91.2500

1/5/2008

0.0000

0.0000

4/9/2008

Page 3 of 20

Corrosion Rate Detail


Visions 4

Derewonko
Plant ID: NPL-IDO3
Number: PipeSeg3.0

Type: Pipeline Segment


Name: LOPE

TML Information
TML Id: PSeg1.0TML01
Classification:
Activity Code: AUT
Test Date
4/10/2008
4/7/2008
4/2/2008

TML Description:
IRC: 5
Stream: Internal
Nominal: 2.000 in Minimum: 1.995 in
Minimum Reading
Average Reading
1.000
1.000
2.000
2.000
1.000
1.000

TML Id: PSeg3.0TML02


Classification:
Activity Code: AUT
Test Date

Active:
C.A.: 0.001 in
Min. Short Loss
121.6667
-73.0000

Circuit:
Expiry Date: 4/9/2008
Min. Long Loss
Min Ave Calc
0.0000
System
-73.0000
System

TML Description:
IRC: 5
Nominal:
Row ID

4/10/2008

Minimum Reading: 1.000


1
-243.0900
2
-121.3017
2
0.2433
Minimum Reading: 1.001
1
1
2
2
2
1
1
2
1
1
2

4/7/2008

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Stream: Internal
Active:
Minimum:
C.A.:
Col ID
Short Loss

Circuit:
Expiry Date:
Long Loss

Average Reading: 2.0000


-243.090
-121.302
0.243
Average Reading: 1.0020

Page 9 of 94

Corrosion Rate (Minimum Losses)


Visions 4

Derewonko

IRC
TML
Class.

TML ID
TML Description

Activity Code

Corrosion Rate
Min.
Thick.

Stream

Nominal
Thick.

Due
Date

C.A.

Calc. Next
Date

Last Test
Date

Last Min.
Reading

Expiry Date

Circuit ID
RI
Plant ID:
NPL-IDO1
Equipment Number: Exchanger1.0
EX1.0TML01

Plant ID:
NPL-IDO1
Equipment Number: PipeSeg1.0
PSeg1.0TML01

TEST320

Plant ID:
NPL-IDO2
Equipment Number: PipeSeg2.0
A01
Test

5
108

Active:

4
72

Active:
Internal

4
84

Active:

4
72

Active:

Equipment Type: Pipeline Segment


Equipment Name: FIKU
AUT
2.000 in 1.000 in 1.000 in

0.389 in

0.333 in

Equipment Type: Pipeline Segment


Equipment Name: OIDS
0.269 in

Active:

3/26/2015

3/26/2015

3/26/2008

1.250

182.5000 -91.2500

1/4/2008

1/4/2008

1/3/2008

1.500

/year
/year
61.8762 61.8762

3/25/2014

3/25/2014

3/25/2008

1.500

3/25/2017

3/25/2017

3/25/2008

99.999

4/9/2008

4/9/2008

4/10/2008

1.000

4/10/2017

4/10/2017

4/10/2008

1.000

0.365 in

/year

Plant ID:
NPL-IDO3
Equipment Number: Exchanger3.0
EX3.0TML01
Test Linked Circuit

5
108

Plant ID:
NPL-IDO3
Equipment Number: Pipe3.0
P3.0TML01
Test Linked Circuits 3/25/2008

Plant ID:
NPL-IDO3
Equipment Number: PipeSeg3.0
PSeg1.0TML01

PSeg3.0TML02

Min L

Equipment Type: Exchanger


Equipment Name: OOSD

4
72

A02
Test 2

Min S

Active:
External (Off)

Active:
External (Off)

5
108

Active:
Internal

5
108

Active:
Internal

1/5/2008

/year

Equipment Type: Exchanger


Equipment Name: DOPE
Acces
Circuit3.2

Equipment Type: Pipe


Equipment Name: KOLA
Acces

Equipment Type: Pipeline Segment


Equipment Name: LOPE
AUT
1.995 in 2.000 in 0.001 in 121.6667 0.0000
/year
/year
AUT

4/9/2008

Page 5 of 52
Report Criteria:

No criteria selected.

Corrosion TML Summary


Visions 4

Derewonko

Corrosion Rate
TML ID

TML Description

Class.

IRC RI

Active

Stream

Circuit
ID

Activity
Code

Min.
Thick.

Due Date

Last Test Last Min.


Expiry Date
Date
Read.

2 in
0.389 in

3/26/2015

3/26/2008

1.250

0.269 in 182.5000 -91.2500


61.8762 61.8762

1/4/2008

1/3/2008

1.500

3/25/2014

3/25/2008

1.500

3/25/2017

3/25/2008

99.999

4/9/2008
4/10/2017

4/10/2008
4/10/2008

1.000
1.000

4/15/2008
4/15/2008
4/18/2008

1.000
1.000
1.000

4/25/2008

0.001

Min S
Plant ID:
NPL-IDO1
Equipment Number: Exchanger1.0
EX1.0TML01

Min L

Equipment Type: Exchanger


Equipment Name:OOSD
5

108

Plant ID:
NPL-IDO1
Equipment Number: PipeSeg1.0
PSeg1.0TML01
TEST320

4
4

72
84

Plant ID:
NPL-IDO2
Equipment Number: PipeSeg2.0
A01
Test

72

A02

72

Test 2

Plant ID:
NPL-IDO3
Equipment Number: Exchanger3.0
EX3.0TML01
Test Linked Circuit

Equipment Type: Pipeline Segment


Equipment Name:FIKU
Internal
AUT

Equipment Type: Pipeline Segment


Equipment Name:OIDS

108

Equipment Type: Exchanger


Equipment Name:DOPE
External (Off)
Circuit3.2

Acces

Equipment Type: Pipe


Equipment Name:KOLA
External (Off)

Acces

1/5/2008

Plant ID:
NPL-IDO3
Equipment Number: Pipe3.0
P3.0TML01
Test Linked Circuits 3/25/2008

Plant ID:
NPL-IDO3
Equipment Number: PipeSeg3.0
PSeg1.0TML01
PSeg3.0TML02

5
5

108
108

Plant ID:
NPL-IDO4
Equipment Number: PipeSeg4.0
PSeg4.0TML01
PSeg4.0TML02
PSeg4.0TML03
PSeg4.0TML04
Test Defect #465

Plant ID:
NPL-IDO4
Equipment Number: PipeSeg4.2
PSeg4.2TML01
Demo TML.

Equipment Type: Pipeline Segment


Equipment Name:LOPE
Internal
AUT
Internal
AUT

Equipment Type: Pipeline Segment


Equipment Name:POKY
Internal
Internal
Internal
Internal

1.995 in 121.6667 0.0000

AUT
AUT
AUT
AUT

Equipment Type: Pipeline Segment


Equipment Name:PIKI
External (On)

12

4/19/2008

4/9/2008

4/24/2008

2 in

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Page 4 of 34

Equipment Overall Metal Loss


Visions 4

Derewonko

Plant ID
NPL-IDO1
NPL-IDO1
NPL-IDO2
NPL-IDO3
NPL-IDO3
NPL-IDO3
NPL-IDO4
NPL-IDO4

Equipment Type
Exchanger
Pipeline Segment
Pipeline Segment
Exchanger
Pipe
Pipeline Segment
Pipeline Segment
Pipeline Segment

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Equipment Number
Exchanger1.0
PipeSeg1.0
PipeSeg2.0
Exchanger3.0
Pipe3.0
PipeSeg3.0
PipeSeg4.0
PipeSeg4.2

Equipment Name
OOSD
FIKU
OIDS
DOPE
KOLA
LOPE
POKY
PIKI

Overall Average
Short Loss
-12.0052
-11.0048
3.8802
3.6031
3.3629
10.7569
10.1241
9.5617

Overall Average
Long Loss
-12.0052
-11.0048
-17.1775
-15.9505
-14.8871
-13.9567
-13.1357
-12.4059

Page 3 of 20

Thickness Data Projected Readings

Visions 4

Derewonko
TML ID

TML
Class.

TML Description

Plant ID:
NPL-IDO1
Equipment Number: Exchanger1.0
EX1.0TML01

IRC

RI

Activity
Code

Min.
Thick.

Last Test
Date

Last Min.
Reading

Projected Rdg
Due Date

Expiry Date
Short

108

72

TEST320

84

Plant ID:
NPL-IDO2
Equipment Number: PipeSeg2.0
A01
Test

72

A02

72

Plant ID:
NPL-IDO3
Equipment Number: Exchanger3.0
EX3.0TML01
Test Linked Circuit

Circuit ID

Long

Equipment Type: Exchanger


Equipment Name: OOSD

Plant ID:
NPL-IDO1
Equipment Number: PipeSeg1.0
PSeg1.0TML01

Test 2

Stream

Equipment Type: Pipeline Segment


Equipment Name: FIKU
Internal
AUT

2 in
0.389 in

3/26/2008

1.250

3/26/2015

0.0000

0.0000

0.0000

0.0000

1.2500

1.2500

Equipment Type: Pipeline Segment


Equipment Name: OIDS

108

Plant ID:
NPL-IDO3
Equipment Number: Pipe3.0
P3.0TML01
Test Linked Circuits 3/25/2008

0.269 in

Equipment Type: Exchanger


Equipment Name: DOPE
External (Off) Circuit3.2

Acces

Equipment Type: Pipe


Equipment Name: KOLA
External (Off)

Acces

Plant ID:
NPL-IDO3
Equipment Number: PipeSeg3.0
PSeg1.0TML01

108

Equipment Type: Pipeline Segment


Equipment Name: LOPE
Internal
AUT

PSeg3.0TML02

108

Internal

1/3/2008

1.500

1/4/2008

3/25/2008

1.500

3/25/2014

1/5/2008

-1,093.5000
-546.0000
-369.7572-369.7572

3/25/2008

99.999

3/25/2017

99.9990 99.9990

0.0000

1.995 in

AUT

4/10/2008

1.000

4/9/2008

4/10/2008

1.000

4/10/2017

4/9/2008

0.0000

-1,094.0003
1.0000
1.0000

1.0000

Plant ID:
NPL-IDO4
Equipment Number: PipeSeg4.0
PSeg4.0TML01

Equipment Type: Pipeline Segment


Equipment Name: POKY
Internal
AUT

0.0000

0.0000

PSeg4.0TML02

Internal

AUT

4/15/2008

1.000

1.0000

1.0000

PSeg4.0TML03

Internal

AUT

4/15/2008

1.000

1.0000

1.0000

Internal

AUT

4/18/2008

1.000

1.0000

1.0000

4/25/2008

0.001

4/24/2008 0.0010

0.0010

PSeg4.0TML04

Test Defect #465

Plant ID:
NPL-IDO4
Equipment Number: PipeSeg4.2
PSeg4.2TML01
Demo TML.

Print Date: 4/28/2008


Report Criteria: No criteria selected.

12

Equipment Type: Pipeline Segment


Equipment Name: PIKI
External (On)

2 in

4/19/2008

Page 4 of 39

Thickness Data Reading Detail

Visions 4

Derewonko

Plant ID:NPL-IDO3
Name: LOPE

Type: Pipeline Segment

Number: PipeSeg3.0

TML Id: PSeg1.0TML01

TML Type:

Year Installed:
Nominal:
2.000 in

Activity Code: AUT


1.995 in
Min.:

Test Date
4/10/2008
4/7/2008
4/2/2008

B Min. Read. Ave. Read.





1.000
2.000
1.000

1.000
2.000
1.000

Drawing No.:
0.001 in
C.A.:

Act. Code
AUT
AUT
AUT

Temp.
58

Min S
121.667
-73.000

Min L
0.000
-73.000

ISO No.:
Active: 
Ave S
121.667
-73.000

Ave L
0.000
-73.000

IRC: 5

Min Ave Calc

TML Type:

B Min. Read. Ave. Read.




1.000
1.001

2.000
1.002

Drawing No.:
C.A.:

Act. Code

Temp.

CKLST
AUT

Plant ID:NPL-IDO4
Name: POKY

ISO No.:
Active: 

Short Loss

Long Loss

0.243

0.243

Type: Pipeline Segment

IRC: 5

TML Type:

Test Date
4/15/2008

Activity Code: AUT


Min.:
B Min. Read. Ave. Read.

Drawing No.:
C.A.:

Act. Code
Temp.
AUT
56

Min S

ISO No.:
Active: 
Min L

Ave S

Ave L

IRC:

TML Type:
Activity Code: AUT
Min.:

Test Date
4/15/2008

B Min. Read. Ave. Read.

1.000

3.500

Drawing No.:
C.A.:

Act. Code
AUT

Temp.

Min S

ISO No.:
Active: 
Min L

Ave S

Ave L

IRC:

Test Date
4/15/2008

B Min. Read. Ave. Read.

Print Date: 4/28/2008


Report Criteria: No criteria selected.

1.000

13.500

Drawing No.:
C.A.:

Act. Code
AUT

Temp.
3

Point: 15 Readings

TML Information

Next Insp.:
Expiry Date:

Point: 6 Readings

TML Information

Next Insp.:
Expiry Date:

Min Ave Calc

TML Type:
Activity Code: AUT
Min.:

Next Insp.: 4/10/2017


Expiry Date:

System

55

TML Id: PSeg4.0TML03


Year Installed:
Nominal:

TML Information

Min Ave Calc


System

TML Id: PSeg4.0TML02


Year Installed:
Nominal:

Grid: 2 x 2

Number: PipeSeg4.0

TML Id: PSeg4.0TML01


Year Installed:
Nominal:

Next Insp.: 4/9/2008


Expiry Date: 4/9/2008

System

Activity Code: AUT


Min.:

Test Date
4/10/2008
4/7/2008

TML Information

System

TML Id: PSeg3.0TML02


Year Installed:
Nominal:

Point: 1 Readings

Min S

ISO No.:
Active: 
Min L

Ave S

Ave L

IRC:

Point: 26 Readings

TML Information

Next Insp.:
Expiry Date:

Min Ave Calc


System

Page 4 of 45

Thickness Data Schedule Detail

Visions 4

Derewonko
Plant ID: NPL-IDO3
Number: Exchanger3.0
TML ID:
EX3.0TML01
TML Description: Test Linked Circuit

Type: Exchanger
Name:DOPE
Stream: External (Off) Active:

Scaffold Required:  Manlift:



Ladder Required:  Insulation Removal: 
Circuit:
Circuit3.2
TML Type:
Point

Inspec. Risk Code: 5


Activity Code: Acces

Plant ID: NPL-IDO3


Number: Pipe3.0

Thickness and Test Dates


Nominal Thickness:
Minimum Thickness:
Last Reading Min. Thickness: 99.999
Last Reading Date:
3/25/2008
Next Inspection Date:
3/25/2017
Next Inspection Date (Calc): 3/25/2017
Expiration Date:

Type: Pipe
Name:KOLA

TML ID:
P3.0TML01
Stream: External (Off) Active:
TML Description: Test Linked Circuits 3/25/2008
Scaffold Required:  Manlift:

Ladder Required:  Insulation Removal: 
Circuit:
TML Type:
Point

Inspec. Risk Code:


Activity Code: Acces

Plant ID: NPL-IDO3


Number: PipeSeg3.0
TML ID:
PSeg1.0TML01
TML Description:

Thickness and Test Dates


Nominal Thickness:
Minimum Thickness:
Last Reading Min. Thickness:
Last Reading Date:
Next Inspection Date:
Next Inspection Date (Calc):
Expiration Date:

Type: Pipeline Segment


Name:LOPE
Stream: Internal

Scaffold Required:  Manlift:



Ladder Required:  Insulation Removal: 
Circuit:
TML Type:
Point

Active:

Inspec. Risk Code: 5


Activity Code: AUT

Thickness and Test Dates


Nominal Thickness:
2.000 in
Minimum Thickness:
1.995 in
Last Reading Min. Thickness: 1.000
Last Reading Date:
4/10/2008
Next Inspection Date:
4/9/2008
Next Inspection Date (Calc): 4/9/2008
Expiration Date:
4/9/2008
Thickness and Test Dates

TML ID:
PSeg3.0TML02
TML Description:

Stream: Internal

Scaffold Required:  Manlift:



Ladder Required:  Insulation Removal: 
Circuit:
TML Type:
Grid

Active:

Inspec. Risk Code: 5


Activity Code: AUT

Plant ID: NPL-IDO4


Number: PipeSeg4.0

Nominal Thickness:
Minimum Thickness:
Last Reading Min. Thickness:
Last Reading Date:
Next Inspection Date:
Next Inspection Date (Calc):
Expiration Date:

1.000
4/10/2008
4/10/2017
4/10/2017

Type: Pipeline Segment


Name:POKY
Thickness and Test Dates

TML ID:
PSeg4.0TML01
TML Description:

Stream: Internal

Scaffold Required:  Manlift:



Ladder Required:  Insulation Removal: 
Circuit:
TML Type:
Point
TML ID:
PSeg4.0TML02
TML Description:

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Inspec. Risk Code:


Activity Code: AUT

Stream: Internal

Scaffold Required:  Manlift:



Ladder Required:  Insulation Removal: 
Circuit:
TML Type:
Point

Active:

Active:

Inspec. Risk Code:


Activity Code: AUT

Nominal Thickness:
Minimum Thickness:
Last Reading Min. Thickness:
Last Reading Date:
Next Inspection Date:
Next Inspection Date (Calc):
Expiration Date:
Thickness and Test Dates
Nominal Thickness:
Minimum Thickness:
Last Reading Min. Thickness: 1.000
Last Reading Date:
4/15/2008
Next Inspection Date:
Next Inspection Date (Calc):
Expiration Date:

Page 8 of 90

Thickness Data Schedule Summary

Visions 4

Derewonko
TML ID
Plant ID:
Equipment Number:

TML
Class.

TML Description

RI

108

72

TEST320

84

Test

72

Test 2

72

Plant ID:
Equipment Number:

108

Test Linked Circuits 3/25/2008

108

108









PSeg4.0TML01
PSeg4.0TML02
PSeg4.0TML03
Test Defect #465

Demo TML.

12

Next TML Insp


Calc

Expiry Date

Last Test
Date

Last Min.
Reading

3/26/2014
3/26/2014

3/26/2015

3/26/2008

1.25

Pipeline Segment
OIDS
1/4/2008

1/4/2008

1/3/2008

1.5

1/4/2008

3/25/2014

1/5/2008

3/25/2008

1.5

3/25/2017

3/25/2008

99.999

Exchanger
DOPE

External (Off) Acces

3/25/2017
Pipe
KOLA

External (Off) Acces


Pipeline Segment
LOPE

Internal

AUT

4/9/2008

4/9/2008

Internal

AUT

4/9/2008

4/10/2017

4/9/2008

4/10/2008

4/10/2008

Pipeline Segment
POKY

Internal

AUT

Internal

AUT

4/15/2008

Internal

AUT

4/15/2008

Internal

AUT

4/18/2008

4/25/2008

0.001

Equipment Type:
Equipment Name:

NPL-IDO4
PipeSeg4.2

Print Date: 4/28/2008


Report Criteria: No criteria selected.

AUT

Equipment Type:
Equipment Name:

NPL-IDO4
PipeSeg4.0

PSeg4.2TML01

Internal

Equipment Type:
Equipment Name:

NPL-IDO3
PipeSeg3.0

PSeg4.0TML04

Pipeline Segment
FIKU

Equipment Type:
Equipment Name:

PSeg3.0TML02

Plant ID:
Equipment Number:

NPL-IDO3
Pipe3.0

PSeg1.0TML01

Plant ID:
Equipment Number:

Equipment Type:
Equipment Name:

Equipment Type:
Equipment Name:
Test Linked Circuit

P3.0TML01

Exchanger
OOSD




NPL-IDO3
Exchanger3.0

EX3.0TML01

Equipment Type:
Equipment Name:

Equipment Type:
Equipment Name:

A02

Plant ID:
Equipment Number:




NPL-IDO2
PipeSeg2.0

A01

Plant ID:
Equipment Number:

Stream

TML Next
Inspection Due

NPL-IDO1
PipeSeg1.0

PSeg1.0TML01

Plant ID:
Equipment Number:

Active

NPL-IDO1
Exchanger1.0

EX1.0TML01
Plant ID:
Equipment Number:

IRC

Activity
Code

External (On)

Pipeline Segment
PIKI
4/24/2008

4/24/2008

4/24/2008

Page 4 of 35

Thickness Data TML Detail

Visions 4

Derewonko
TML ID

TML
Class.

TML Description

Plant ID:
NPL-IDO1
Equipment Number: Exchanger1.0

Activity
Code

Plant ID:
NPL-IDO1
Equipment Number: PipeSeg1.0

AUT

TEST320

Plant ID:
NPL-IDO2
Equipment Number: PipeSeg2.0
Test

A02

Test 2

Plant ID:
NPL-IDO3
Equipment Number: Exchanger3.0




Test Linked Circuit

Acces

Test Linked Circuits 3/25/2008

Acces

PSeg1.0TML01

AUT

PSeg3.0TML02

AUT

Plant ID:
NPL-IDO4
Equipment Number: PipeSeg4.0

72

72

PSeg4.0TML01

AUT

PSeg4.0TML02

AUT

PSeg4.0TML03

AUT

Test Defect #465

Plant ID:
NPL-IDO4
Equipment Number: PipeSeg4.2

AUT

Material

Min Co 2.000 in

0.333 in

0.389 in

25%

2.500 in
0.389 in

0.269 in

0.269 in

in Visi

1%

in Visi

1%

Pipe
KOLA

Pipeline Segment
LOPE
108

Internal

108

Internal

Critical
Thickness

1.000 in

108 External (Off)

2.000 in

No

1.995 in

25%

Min Co

25%

Internal

Min Co

25%

Internal

Min Co

25%

Internal

Min Co

25%

Internal

Min Co

25%

Min Co 2.000 in

5%

3 in

3.750 in

3 in

3.150 in

Pipeline Segment
POKY







Arbitrary
Minimum

Exchanger
DOPE

Equipment Type:
Equipment Name:
Demo TML.

Internal

External (Off)

Equipment Type:
Equipment Name:

Crit
Buff.

Pipeline Segment
OIDS





Minimum
Thickness

Pipeline Segment
FIKU
84

Equipment Type:
Equipment Name:

Min.
Type

108

72

Nominal
Thickness

Exchanger
OOSD

Equipment Type:
Equipment Name:

Plant ID:
NPL-IDO3
Equipment Number: PipeSeg3.0

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Stream

RI

Equipment Type:
Equipment Name:

Plant ID:
NPL-IDO3
Equipment Number: Pipe3.0

PSeg4.2TML01




Equipment Type:
Equipment Name:

A01

PSeg4.0TML04

Equipment Type:
Equipment Name:

PSeg1.0TML01

P3.0TML01

IRC

Equipment Type:
Equipment Name:

EX1.0TML01

EX3.0TML01

Active

Pipeline Segment
PIKI
12

External (On) 2.000 in

Page 4 of 34

TML Go Log

Visions 4

AD- Bu April
Plant ID

TML Id

Equipment Number

Equipment Type Associated Major


Equipment Number
Boiler 1

TML-1

Boiler

Major Test

Test for the Point

AD_ Plant1
April

Boiler 1

TML-2

Boiler

Major Test

test

AD-Dashboard

Boiler1

Test1

321231231

ADPlant1

Year
Installed

C.A.

Section Id

Nominal

Min Thick

TML Description

AD_ Plant1
April

Boiler

TML
Classification

BT

2323




CHC

test TML Export

1 in

BT

2000

BT

2000

TML-Test4

BT

2000

IMP

2001

TML-test for 7 readings


Bundle -1

LastLastCol12

Externa

test for the 12


valuesin column
Bundle -1


Bundle -1

Bundle
ADPlant1
Bundle

Bundle -1



(Off)



Externa (Off)


test tml

Bundle
ADPlant1

AUT

TMl Test for 12


readings
TML-Boiler




1 in

Test for the TML 30


readings
TML-test3

AUT

TML-Test2

TML-Boiler












2222

TML-Boiler

Bundle
ADPlant1

Acces

-8.541

-69.35

-8.541

Expiration
Date

TML
Type

Last Read
Avg Thick

Cirtical
Thick

Classifica

Point

1.5
4/9/2008

Minor

1.6125

Point

1.2
4/9/2008

3/31/2008 3/26/2008

1.4167

Minor

2.5

Point

2.5

Equipment
Point


AUT

1/31/2008 1/10/2008


Acces

3/3/2008

0.4

Point

0.4

Equipment

1.5

Point

1.5

Equipment
Grid


AE

Equipment
Point


AE

Equipment


ECA

3/3/2008

1.47

Point

1.47

Equipment

Point

Acces

Equipment

Point

Acces

Equipment

3 in

Externa (Off)


test

3 in

3 in

Acces

TML - 12 readin

CHN

3333

3 in

test - for 12 readings

3 in

3 in


(Off)



Print Date: 4/28/2008


Report Criteria: No criteria selected.

-132.057

-69.35

RL Factor Next Insp Last Reading


Date Due
Date

Last Read
Min Thick

Equipment

-146

Next Insp
Date Calc

Acces

BT

-132.057

RI

TestLast chance

Externa

-146

IRC

Externa (Off)


TML-1

Boiler
ADPlant1

Avg Long
Loss

Externa (Off)


TML-Boiler

Boiler
ADPlant1

Min Long
Loss

23232

Boiler
ADPlant1

Scaffold Activity
Required Code

Active


Boiler -1

Boiler
ADPlant1

Avg Short

Interna

test TML's Description

Boiler
ADPlant1

Min Short

Interna

Boiler
ADPlant1

Stream Insulation Manlift


Removal

Point
3.018 in

Point


Acces

Equipment

3.018 in

Equipment

Page 1 of 35

TML Last Reading to Critical Summary

Visions 4

Derewonko
Corrosion Allowance Remaining: 100 %
TML ID
Plant ID:
Equipment Number:

TML
Class.

TML Description

Stream

NPL-IDO1
Exchanger1.0

Equipment Type: Exchanger


Equipment Name: OOSD

NPL-IDO1
PipeSeg1.0

Equipment Type: Pipeline Segment


Equipment Name: FIKU

Plant ID:
Equipment Number:

NPL-IDO2
PipeSeg2.0

Equipment Type: Pipeline Segment


Equipment Name: OIDS

Plant ID:
Equipment Number:

NPL-IDO3
Exchanger3.0

Equipment Type: Exchanger


Equipment Name: DOPE

Plant ID:
Equipment Number:

NPL-IDO3
Pipe3.0

Equipment Type: Pipe


Equipment Name: KOLA

Nominal
Thickness

Critical
Thickness

Last Test Date

Last Min.
Reading

Due
Date

1.000 in

2.500 in

2.000 in

3.750 in

4/10/2008

1.000

4/9/2008

2.000 in

3.150 in

4/25/2008

0.001

4/19/2008

EX1.0TML01
Plant ID:
Equipment Number:
PSeg1.0TML01

Internal

P3.0TML01
Plant ID:
Equipment Number:

Test Linked Circuits 3/25/2008

Equipment Type: Pipeline Segment


Equipment Name: LOPE

NPL-IDO3
PipeSeg3.0

PSeg1.0TML01
Plant ID:
Equipment Number:

Internal
NPL-IDO4
PipeSeg4.0

Equipment Type: Pipeline Segment


Equipment Name: POKY

NPL-IDO4
PipeSeg4.2

Equipment Type: Pipeline Segment


Equipment Name: PIKI

PSeg4.0TML01
Plant ID:
Equipment Number:

External (Off)

Internal

PSeg4.2TML01

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Demo TML.

External (On)

Page 4 of 33

TML Trending Graph

Visions 4

Plant ID:
Equipment Number:

NPL-IDO3
PipeSeg3.0

Equipment Type:
Equipment Name:

Pipeline Segment
LOPE

Readings
TML ID:
Test Date

4/10/2008
4/7/2008
4/2/2008

PSeg1.0TML01
Base. Arb. Min.





Temperature

3 in
3 in
3 in

58

Average Reading

Minimum Reading Critical Thickness Nominal Thickness Minimum Thickness

3.75 in

2 in

1.995 in

3.75 in

2 in

1.995 in

3.75 in

2 in

1.995 in

Readings
3.8
3.6
3.4
3.2
3

2.6
2.4

58

2.2
2

Temperature

Readings

2.8

1.8
1.6
1.4
1.2
1
4/2/2008

4/7/2008

4/10/2008

Test Date
Average Reading
Nominal Thickness
Average Reading Trend

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Minimum Reading
Minimum Thickness
Minimum Reading Trend

Temperature
Average Reading Best Fit

Critical Thickness
Minimum Reading Best Fit

Page 12 of 191

TML Trending Graph

Visions 4

Plant ID:
Equipment Number:

NPL-IDO3
PipeSeg3.0

Equipment Type:
Equipment Name:

Pipeline Segment
LOPE

Readings
TML ID:
PSeg3.0TML02
Description:
Test Date: 4/7/2008

Baseline:

Grid Readings
3

Row

Row Number

1.001

1.002

Col

Reading

1.002

1.003

1.001

1.002

1.002

1.003

1
1

2
Column Number

Test Date: 4/10/2008 Baseline:

Grid Readings
3

Row

Row Number

Col

Reading

1
1

Print Date: 4/28/2008


Report Criteria: No criteria selected.

2
Column Number

Page 13 of 191

Batch Inhibitor Application Summary

Visions 4

HWBusinessUnit

Plant ID:
HWPlant
Equipment Number: PS_TEST
Location:
Status: In Service

Equipment Type: Pipeline Segment


Equipment Name:

Application Date
2/7/2008

Chemical Type
CT2

Plant ID:
HWPlant
Equipment Number: PS1
Location: JOFFRE ETHYLENE UNIT I
Status: Operating

Volume Rate
60 ft

Equipment Type: Pipeline Segment


Equipment Name: Pipeline Segment1

Application Date

Chemical Type

Volume Rate

3/11/2008

CT2

55 ft

3/10/2008

CT2

60 ft

Plant ID:
HWPlant
Equipment Number: PS2
Location: Location 1
Status: Removed

Equipment Type: Pipeline Segment


Equipment Name: Pipeline Segment2

Application Date
2/7/2008

Chemical Type
CT2

Plant ID:
HWPlant
Equipment Number: PS3
Location: Location 3
Status: Shut-in

Volume Rate
90 ft

Equipment Type: Pipeline Segment


Equipment Name: Pipeline Segment3

Application Date

Chemical Type

Volume Rate

2/8/2008

CT2

90 ft

2/7/2008

CT2

60 ft

Plant ID:
HWPlant
Equipment Number: PS4
Location: Location 1
Status: Suspended

Equipment Type: Pipeline Segment


Equipment Name: Pipeline Segment4

Application Date

Chemical Type

Volume Rate

12/28/2007

CT3

60 ft

12/27/2007

CT2

90 ft

Plant ID:
T-34
Equipment Number: PS1
Location: Location 2
Status: Discontinued

Equipment Type: Pipeline Segment


Equipment Name: Pipeline Segement1

Application Date
2/8/2008

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Chemical Type
CT2

Volume Rate
90 ft

Page 1 of 3

Cathodic Protection Graphs

Visions 4

Derewonko
Plant ID: NPL-IDO3

Equipment Type:

Minimum Voltage (mV): -860.5


Maximum Voltage (mV): 900.1

Minimum Resistance (Ohm): 23.36


Maximum Resistance (Ohm): 3000

Pipeline Segment

Equipment Number: PipeSeg3.0


Minimum Current (mA): 253
Maximum Current (mA): 257

Readings
Test Date
4/2/2008

Voltage (mV)

Resistance (Ohm)

Current (mA)

Performed By

853.11

1236

2/23/2008

-789

1236

255

2/9/2008

466

1225

278

MD

2/8/2008

-458

1211

256

MD

2/7/2008

455

1256

254

MD

2/6/2008

405

1228

245

MD

1/25/2008

-845

1256

222

MD

1/24/2008

867

1225

254

MD

1/23/2008

869

1223

256

MD

1/22/2008

852

1223

255

MD

Print Date: 4/28/2008


Report Criteria: No criteria selected.

MD

Page 7 of 26

Cathodic Protection Graphs

Visions 4

Derewonko
Plant ID: NPL-IDO3

Equipment Type:

Equipment Number: PipeSeg3.0

Pipeline Segment

Readings Graph

200
100
0
-100
-200
-300
-400
-500
-600
-700
-800

2,400
2,200

350

260

250
150
50
-50
-150
-250

255
250

2,000
1,800
1,600
1,400

245

1,200

240

1,000

-350

800
235

-450
-550

230

-650
225

-750

600
400
200
0

-850

220
1/22/2008

-900

2,600

Resistance (Ohm)

Voltage (mV)

300

265

450

Current (mA)

400

270

550

2,800

4/2/2008

500

650

2/23/2008

600

750

2/8/2008

700

3,000
275

2/6/2008

800

280
850

1/24/2008

900

Test Date
Voltage
Max Current

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Min Voltage

Max Voltage

Resistance

Min Resistance

Max Resistance

Current

Min Current

Page 8 of 26

Cathodic Protection Scheduling Summary

Visions 4

Derewonko
Plant ID:
NPL-IDO3
Equipment Number: Exchanger3.0
Location:
Status: In Service
Last CP Test Date

Equipment Type: Exchanger


Equipment Name: DOPE

Next CP Due Date

Next CP Date (Calculated)

CP Test Interval

1/30/2008
Plant ID:
NPL-IDO3
Equipment Number: PipeSeg3.0
Location:
Status: In Service
Last CP Test Date

Equipment Type: Pipeline Segment


Equipment Name: LOPE

Next CP Due Date

Next CP Date (Calculated)

CP Test Interval

4/2/2008
Plant ID:
NPL-IDO4
Equipment Number: PipeSeg4.0
Location:
Status:
Last CP Test Date

Equipment Type: Pipeline Segment


Equipment Name: POKY

Next CP Due Date

Next CP Date (Calculated)

CP Test Interval

4/14/2008
Plant ID:
NPL-IDO4
Equipment Number: PipeSeg4.1
Location:
Status:
Last CP Test Date

Equipment Type: Pipeline Segment


Equipment Name: INDY

Next CP Due Date

Next CP Date (Calculated)

CP Test Interval

4/8/2008

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Page 2 of 11

Continuous Inhibitor Injection Summary

Visions 4

Derewonko
Plant ID:
NPL-IDO4
Equipment Number: InjectionPt4.0
Location:
Status:
Start Date
4/21/2008

Equipment Type: Injection Point


Equipment Name: HOPE

Chemical Type
Chem 1

Actual Injection Rate


24 ft/day

Required Injection Rate


2 ft/day

4/10/2008

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Page 1 of 1

General Trending Go Log

Visions 4

Derewonko
Classification

Associated Major
Equipment Number
Equipment
Equipment
Equipment
Equipment
Equipment
Minor

Plant ID

Equipment Type

Equipment Number

Trend Point

Trend Type

NPL-IDO1
NPL-IDO2
NPL-IDO4
NPL-IDO4
NPL-IDO4
NPL-IDO3

Pipeline
Pipeline
Pipeline
Pipeline
Pipeline
Pipeline

Segment
Segment
Segment
Segment
Segment
Segment

PipeSeg1.0
PipeSeg2.0
PipeSeg4.0
PipeSeg4.1
PipeSeg4.2
PipeSeg3.0

1
2
TP1
TP1
TP2
2D

Trending
Trending
Trending
Trending
Trending
Trending

Type
Type
Type
Type
Type
Type

1
1
1
1
1
1

NPL-IDO3

Pipeline Segment

PipeSeg3.0

3S

Trending Type 2

NPL-IDO3

Pipeline Segment

PipeSeg3.0

56

Water Level

Last Date

Next Date (Calc)

Next Date

1/22/2008

1/22/2008

4/15/2008
4/7/2008
4/11/2008
4/9/2008

4/14/2008

Interval

Circuit3.0
Minor

3/14/2008

Circuit3.0
Minor

Circuit3.0

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Page 2 of 10

General Trending (Reading Type)

Visions 4

Derewonko
Plant ID: NPL-IDO4

Equipment Type:

Pipeline Segment

Equipment Number: PipeSeg4.0

Reading Type: Dimension


Test Date
4/15/2008
4/1/2008

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Trend Test Point


TP1
TP1

Reading
12
23

Page 18 of 86

General Trending (Reading Type)

Visions 4

Derewonko
Plant ID: NPL-IDO4

Equipment Type:

Pipeline Segment

Equipment Number: PipeSeg4.0

Reading Type: Dimension


Reading Types Graph
23
22.5
22
21.5
21
20.5
20
19.5
19

Reading

18.5
18

17.5
17

16.5
16
15.5
15
14.5
14
13.5
13
12.5
12
4/1/2008

4/15/2008
Test Date

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Page 19 of 86

General Trending (Test Date)

Visions 4

Derewonko
Plant ID: NPL-IDO1

Equipment Type:

Pipeline Segment

Equipment Number: PipeSeg1.0

Test Date: 1/22/2008


Reading Type
After Vent
Before Vent

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Trend Test Point


1
1

Reading
1 in
1.2 in

Page 3 of 56

General Trending (Test Date)

Visions 4

Derewonko
Plant ID: NPL-IDO1

Equipment Type:

Pipeline Segment

Equipment Number: PipeSeg1.0

Test Date: 1/22/2008


Test Dates Graph
1.15
1.1
1.05
1
0.95
0.9
0.85
0.8
0.75

Reading

0.7
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
After Vent

Before Vent
Test Date

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Page 4 of 56

General Trending Summary

Visions 4

Derewonko

Plant ID:
NPL-IDO1
Equipment Number: PipeSeg1.0
Equipment Name: FIKU
Trend Type
Trend Point
Trending Type 1
1
Plant ID:
NPL-IDO2
Equipment Number: PipeSeg2.0
Equipment Name: OIDS
Trend Type
Trend Point
Trending Type 1
2
Plant ID:
NPL-IDO3
Equipment Number: PipeSeg3.0
Equipment Name: LOPE
Trend Type
Trend Point
Trending Type 1
2D

Trending Type 2
Water Level

Equipment Type:
Equipment Classification:
TP Description

Tested By

Date
1/22/2008

Equipment Type:
Equipment Classification:
TP Description

TP Description

Reading Type

Reading

Before Vent
After Vent

1.2
1

Date

Reading Type

Tested By

Date
4/9/2008

MD

4/8/2008

MD

1/24/2008

MD

1/23/2008

MD

1/22/2008

in
in

Reading

Reading Unit

Status:
In Service
Location:

Pipeline Segment
Minor

MD

Reading Unit

Status:
In Service
Location:

Pipeline Segment
Equipment

Tested By

Equipment Type:
Equipment Classification:

Status:
In Service
Location:

Pipeline Segment
Equipment

Reading Type

Reading

After Vent
Before Vent
Dimension
Geoff Entry
Before Vent
After Vent
Weight
Before Vent
After Vent
Dimension
Geoff Entry
Weight
After Vent
Before Vent
Before Vent
After Vent

1
1
100
1000
10
1
10000
2.123
2.69
55
2.369
2
97
2.011
2
2.423

Reading Unit
in

in
in
lbs
in
mi
lbs
lbs
lbs
mi
in
in
mi

3S
56

Plant ID:
NPL-IDO4
Equipment Number: PipeSeg4.0
Equipment Name: POKY
Trend Type
Trend Point
Trending Type 1
TP1

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Equipment Type:
Equipment Classification:
TP Description

Tested By
Marcin

Status:
Location:

Pipeline Segment
Equipment
Date
4/15/2008

Reading Type

Reading

Before Vent
Dimension
Weight

0.236
12
3.63

Reading Unit

Page 2 of 12

Glycol Addition Summary

Visions 4

HWBusinessUnit
METEGRITY
Plant ID HWPlant
Train/Unit
2

Equipment Type
Exchanger

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Equipment Number
E1

Equipment Name
Exchanger1

In Service

Classification
Equipment

Lastest Sample Date


12/8/2007

Freeze Point
-280 F

Page 2 of 3

Glycol Samples

Visions 4

Derewonko

Plant ID:
NPL-IDO3
Equipment Classification: Minor
Equipment Name:
DOPE
Sample ID
1
2
3

Equipment Type:
Equipment Number:
In Service:

Sample Date
1/22/2008
1/23/2008
1/24/2008

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Water
Percentage
1
1
1.5

Reserve
Alkalinity
2
2
7

pH Level
4.2
4
8

Glycol
Percentage
2
2
5

Exchanger
Exchanger3.0


Freezing
Point
3 F
3 F
1 F

Chloride
Concentration
5
5
9

Comments

Page 1 of 3

Product Content Testing Go Log

Visions 4

Derewonko
Plant ID

Equipment Type

Classification

Equipment Number

NPL-IDO3

Pipeline Segment

Minor

PipeSeg3.0

NPL-IDO3

Pipeline Segment

Minor

PipeSeg3.0

NPL-IDO3

Pipeline Segment

Minor

PipeSeg3.0

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Associated Major
Equipment Number
Circuit3.0

Test Date
1/23/2008

Static Pressure

Temperature

Differential Pressure
2.3

77

2
Circuit3.0

1/24/2008

76.5

2
Circuit3.0

1/22/2008

78

2.3

Page 2 of 9

Product Content Testing Graph

Visions 4

Plant ID:
NPL-IDO3
Equipment Number: PipeSeg3.0

Derewonko
Equipment Type: Pipeline Segment
Equipment Name: LOPE

Analysis Type
Analysis Type
GAS

2.45
2.45
2.44
2.43
2.42

Reading

2.41
2.4
2.39
2.38
2.37

2.36

2.36
2.35
2.34

2.33

2.33
1/22/2008

1/23/2008
Reading Date

1/24/2008

Reading

Analysis Type
LIQUID

2.69

2.69

1/22/2008
Reading Date

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Page 4 of 20

Product Content Testing Summary

Visions 4

ADBusinessUnit- Dec7
Plant ID:
ADPlant1
Equipment Number: Boiler-2
Location:
JOFFRE ETHYLENE UNIT III
Test Date
3/5/2008

Static Pressure

Equipment Type: Boiler


Equipment Name: Boiler- Export To Excel
Status:
In Service

Differential Pressure

33 psig

43 psig

Plant ID:
ADPlant1
Equipment Number: TD-07122007
Location:
Test Date
12/14/2007

Static Pressure

Test Date

432 F

Comments
test for Excel

Equipment Type: Cooling Tower


Equipment Name: Exchanger-1
Status:
In Service

Differential Pressure

Temperature

Comments

1 psig

Plant ID:
ADPlant1
Equipment Number: test297
Location:

3/17/2008
3/12/2008

Temperature

Static Pressure
1 psig
2 psig

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Equipment Type: Tank


Equipment Name: test
Status:
Differential Pressure
2 psig
3 psig

Temperature
3 F
4 F

Comments
2
3434

Page 1 of 9

Production Test GO Log

Visions 4

Plant ID

Derewonko
Equipment Type

Equipment Number

NPL-IDO3

Boiler

Boiler3.0

NPL-IDO3

Pipeline Segment

PipeSeg3.0

NPL-IDO3

Pipeline Segment

NPL-IDO3

Associated Major
Equipment Number

Test Date

Performed By

4/17/2008

MD

Circuit3.0

1/22/2008

MD

PipeSeg3.0

Circuit3.0

1/24/2008

MD

Pipeline Segment

PipeSeg3.0

Circuit3.0

1/23/2008

MD

NPL-IDO4

Pipeline Segment

PipeSeg4.0

4/17/2008

Marcin

NPL-IDO4

Pipeline Segment

PipeSeg4.0

4/15/2008

Marcin

NPL-IDO4

Pipeline Segment

PipeSeg4.0

4/16/2008

Marcin

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Page 2 of 8

Production Test Summary

Visions 4

ADBusinessUnit- Dec7
Plant ID:
ADPlant1
Equipment Number: Boiler-2

Equipment Type:
Name:

Test Date

Boiler
Boiler- Export To Excel

Fluid

Flow Rate

3/3/2008

Liquids

4P

3/3/2008

Condensate

3A
ADBusinessUnit- Dec7

Plant ID:
ADPlant1
Equipment Number: TD-07122007

Equipment Type:
Name:

Test Date
1/8/2008

Cooling Tower
Exchanger-1

Fluid

Flow Rate

Liquids
ADBusinessUnit- Dec7

Plant ID:
ADPlant1
Equipment Number: test297

Equipment Type:
Name:

Test Date
3/17/2008

Tank
test

Fluid

Flow Rate

Condensate
Derewonko

Plant ID:
NPL-IDO3
Equipment Number: Boiler3.0

Equipment Type:
Name:

Test Date

Boiler
OKAY

Fluid

Flow Rate

4/17/2008

Gas

2A

4/17/2008

Condensate

1A
Derewonko

Plant ID:
NPL-IDO3
Equipment Number: PipeSeg3.0

Equipment Type:
Name:

Test Date

Pipeline Segment
LOPE

Fluid

Flow Rate

1/24/2008

Condensate

22 G

1/23/2008

Gas

3F

1/22/2008

Gas

2A
Derewonko

Plant ID:
NPL-IDO4
Equipment Number: PipeSeg4.0

Equipment Type:
Name:

Test Date

Pipeline Segment
POKY

Fluid

Flow Rate

4/17/2008

Gas

0.265 G

4/16/2008

Condensate

1.235 A

4/15/2008

Liquids

1.456 G

4/15/2008

Condensate

1.236 A
HWBusinessUnit3

Plant ID:
HWPlant2
Equipment Number: B1

Equipment Type:
Name:

Test Date

Bundle
Bundle1

Fluid

Flow Rate

3/7/2008

Water

10 S

3/7/2008

Oil

10 P

3/7/2008

Liquids

10 G

3/7/2008

Gas

10 F

3/7/2008

Condensate

10 A

3/6/2008

Water

20 S

3/6/2008

Oil

20 P

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Page 1 of 2

Sodium Samples

Visions 4

Plant ID:
Equipment Name:
Sample ID
1
2
3

Derewonko
Equipment Type: Exchanger

NPL-IDO3
DOPE

Sample Date
1/22/2008
1/23/2008
1/24/2008

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Type of Sodium
Nitrate
Nitrate
Nitrate

Sodium Level
23
21
22

pH Level
12
11.3
12

Equipment Number:
Exchanger3.0
Equipment Classification: Minor

In Service:

Comments

Page 3 of 10

Sodium Sampling Level Graph

Visions 4

HWBusinessUnit4

Plant ID:
HWPlant4
Equipment Classification: Equipment

Equipment Type: Exchanger


Equipment Name: Exchanger1

Sample ID
1
2
3

Sodium Level
80
60
90

Sample Date
4/13/2008
4/14/2008
4/15/2008

Type of Sodium
Nitrate
Nitrate
Nitrate

pH Level
7
8
9

Equipment Number:

E1
In Service:

Comments
Comments
Comments
Comments

4/13/2008

9
8.8
8.6
8.4
8.2
8

pH

Sodium Level

Sodium Sam ples


90
88
86
84
82
80
78
76
74
72
70
68
66
64
62
60

7.8
7.6
7.4
7.2
7
4/13/2008

4/13/2008

4/13/2008

4/14/2008
Sample Date
Sodium

Print Date: 4/28/2008


Report Criteria: No criteria selected.

4/14/2008

4/14/2008

4/14/2008

4/15/2008

pH

Page 5 of 10

Tank Volume Trending Summary

Visions 4

Derewonko
Plant ID: NPL-IDO1
Equipment Type
Tank

Equipment Number
Tank1.0

Design Liquid
Level
30 ft

Flow Rate
(Calculated)

Last Test Date


4/11/2008

15

Used Volume
(Calculated)
15

Projected Life
(Calculated)
4/13/2008

Plant ID: NPL-IDO4


Equipment Type
Tank

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Equipment Number
Tank4.0

Design Liquid
Level

Flow Rate
(Calculated)

Last Test Date


4/27/2008

50

Used Volume
(Calculated)
50

Projected Life
(Calculated)
4/27/2008

Page 2 of 6

MM Unit12
Metegrity
Edmonton

Inspection Task Projected Planning


Print Date: 4/28/2008 10:08:29 AM
Years Projected: 5
Plant/Area:
Type:
Number:
Name:

MM Plant 170
Exchanger
EX-1111

AE
2008

2009

2010

2011

2012

2013

2011

2012

2013

2011

2012

2013

2011

2012

2013

Regulatory Summary Reort T


est

Plant/Area:
Type:
Number:
Name:

MM Plant 170
Exchanger
EX-0020
Attachment Number Test: M
ar 11, 2008

Plant/Area:
Type:
Number:
Name:

MM Plant 170
Pipe
PP-0010
Main Test: Mar 11, 2008

Plant/Area:
Type:
Number:
Name:

MM Plant 170
Exchanger
EX-0020

N/A
2008

2009

2010

AE
2008

2009

2010

N/A
2008

2009

2010

Attachment Number Test: M


ar 11, 2008

Report Criteria:
AE

Plant ID = 'MM Plant 170', Type = 'IT'


N/A

Page 1

Work Log Go Log

Visions 4

Derewonko
Plant ID
Equipment Type
NPL-IDO1

Equipment Number

Classification

Memo No

Status

Extent

Associated Major
Equipment Number

Type

Date Created

Stream

Activity
Code

Equipment

3487

WR

3/3/2008

Equipment

3504

IT

4/17/2008

Equipment

3148

IT

12/27/2007

PipeSeg1.0

Equipment

3307

WR

12/27/2007

PipeSeg4.2

Equipment

3528

IT

4/25/2008

Equipment

3744

WR

4/25/2008

Equipment

3526

IT

4/25/2008

Equipment

3743

WR

4/25/2008

Pipe1.0

Pipe
NPL-IDO1

PipeSeg1.0

Pipeline Segment
NPL-IDO1

PipeSeg1.0

Pipeline Segment
NPL-IDO1
Pipeline Segment
NPL-IDO4
Pipeline Segment
NPL-IDO4

PipeSeg4.2

Pipeline Segment
NPL-IDO4

PSV4.0

PSV
NPL-IDO4

PSV4.0

PSV

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Open

Problem Code

Due Date

Work Order
Number

Job File
Date
Completed/Closed Number

Notification
Type

Full

Work Event

Title

3/3/2008

Open
Completed

Partial
AE

Completed

Partial

Open

Partial-Recu

22222
4/17/2008
TEST1-Atta
chments
3/18/2008
4/25/2008

AUT
Open

Partial-Recu

4/25/2008

Acces
Completed

Partial
AE

Completed

5/2/2008
4/25/2008

Partial
AUT

4/26/2008
4/25/2008

Page 7 of 30

Work Log Memo Summary

Visions 4

Derewonko
Plant ID: NPL-IDO1
Number: Pipe1.0

Equipment Type: Pipe


Name: IJAJ

Status:
Mfg Serial No.:

Registration No.: 10034A

Circuits
Circuit1.0

3487 Work Request


No:

3487

Title:

Activity Code:
AE
Department:
Operations
Extent: Full
Date Created:
Job File No.:
3/3/2008
Stream:
Work Order Number:
Status:
Open
Estimated Labour Cost:
Estimated Material Cost:
Due Date:
3/3/2008
Date Completed/Closed:
Priority Code:
High
Estimated Hours:
Inspection Risk Code:
Problem Code:
Problem Description:
Discover and Download: XM brings the magic of XM+Napster to XM Radio Online. Whenever the song you're listening to matches
with an artist, album or track within Napster's library, you can "Discover & Download" with the click of a button.
Work Description:
Proposed Disposition:
Channel Presets: Add up to eight channels to your presets list. See what's playing on your favorites from the "My Presets" tab.
What's On: See what's playing across all of XM's online channels in real time.
Distribution List
Name

Title

Ivan Raikov

A character in metal gear - subsistence

James Bond

007

Print Date: 4/28/2008


Report Criteria: Unit Id = 'Derewonko', Plant/Area = 'NPL-IDO1', Equipment Type = 'Pipe', Equipment Number between 'Pipe1.0 AND Pipe1.0',
Type = 'WR', Activity Code = 'AE', Priority Code = 'High', Status = 'Open'

Page 1 of 1

Work Log Summary

Visions 4

Derewonko
Memo Number

Title

Plant ID:
NPL-IDO1
Equipment Number: Pipe1.0
Status:
3487

Equipment Type:
Equipment Name:
Location:

Plant ID:
NPL-IDO1
Equipment Number: PipeSeg1.0
Status:
In Service
3504
3148
3307

Equipment Type:
Equipment Name:
Location:

Plant ID:
NPL-IDO4
Equipment Number: PipeSeg4.2
Status:
3528
3744

Equipment Type:
Equipment Name:
Location:

Plant ID:
NPL-IDO4
Equipment Number: PSV4.0
Status:
3526
3743

Equipment Type:
Equipment Name:
Location:

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Type

Date
Created

Status

Pipe
IJAJ
JOFFRE ETHYLENE UNIT I
WR

3/3/2008

Open

IT
IT
WR

4/17/2008
12/27/2007
12/27/2007

Open
Completed
Completed

IT
WR

4/25/2008
4/25/2008

Open
Open

IT
WR

4/25/2008
4/25/2008

Completed
Completed

Pipeline Segment
FIKU

Pipeline Segment
PIKI

PSV
JOKE

Page 6 of 31

Work Template

Visions 4

Plant ID:
Equipment Number:

Equipment Type:
Equipment Name:

NPL-IDO1
Pipe1.1

Pipe
DSAS

Work Template
Work Template No: 179

31

Title: NCR-Pipe1.1

Date Created:
4/25/2008
Modification Reason:

Prepared By:
Extent:

Partial
Inspection Tasks

Memo Title: WR-Pipe1.1


Memo Type:
Priority Code:
Activity Code:
Problem Code:
Access Required:
Lighting Required:
Reason for Work:
RFW Cause:
Work Description:

WR
2
Acces

1
Cleaning Code:
Insulation Removal:
Estimated Hours:
Notification Type:
Surface Preparation:

Paint Code:
Sentry:
Permit:
Task Order:
Component Code:
Stream:

Demo WR.
Problem Description:

Demo WR.
Proposed Disposition:

Demo WR.
Work Template
Work Template No: 106
Date Created:
3/11/2008
Modification Reason:

32

Title:
Prepared By:
Extent:
Work Template Description
Access Details
Inspection Details

Work Template
Work Template No: 144
Date Created:
3/20/2008
Modification Reason: MRL1

33

Title: Work Template [144]


Prepared By:
Extent:

HW
Full
Work Template Description

Work Template Description


Access Details
Access Details
Inspection Details
Inspection Details
Inspection Tasks

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Page 12 of 31

Work Template Go Log

Visions 4

Work Template Number


179
178
175
176
173
174
172
171
170
168
169
166
167
140
141
143
144
145
146
147
148
149
150
151
153
154
161
162
163
164
165
138
139
135
136
137
133
134
Print Date: 4/28/2008
Report Criteria: No criteria selected.

Date Created
4/25/2008
4/24/2008
4/15/2008
4/15/2008
4/10/2008
4/10/2008
4/7/2008
4/2/2008
4/1/2008
3/26/2008
3/26/2008
3/25/2008
3/25/2008
3/20/2008
3/20/2008
3/20/2008
3/20/2008
3/20/2008
3/20/2008
3/20/2008
3/20/2008
3/20/2008
3/20/2008
3/20/2008
3/20/2008
3/20/2008
3/20/2008
3/20/2008
3/20/2008
3/20/2008
3/20/2008
3/19/2008
3/19/2008
3/18/2008
3/18/2008
3/18/2008
3/17/2008
3/17/2008

Title

Prepared By

NCR-Pipe1.1

Extent

Modification Reason

Partial

test

test

Full

MRL1

Test Work Template


SV_TEST Templater

Test
Sveto

Partial
Partial

MRL3

test

Partial

MRL2

test
rtet

Full
Partial

Work Template [144]

HW

test
test
test

test
Full
Full
Full
Full
Full
Full
Full
Full
5

asdf
test

MRL1

Partial

test
asdf
test
test
ds
asdf
adsf
53

Full

Partial

Full
Partial
Partial
Partial

MRL2

MRL2

Page 1 of 4

Work Template Memo

Visions 4

Work Template No: 144

Title: Work Template [144]

Date Created:
3/20/2008
Modification Reason: MRL1

Prepared By:
Extent:

HW
Full

Work Template Description


Work Template Description

Access Details
Access Details

Inspection Details
Inspection Details

Inspection Tasks
1

Memo Title: Inspection Task


Memo Type:
Priority Code:
Activity Code:
Problem Code:
Access Required:
Lighting Required:
Reason for Work:
RFW Cause:
Work Description:

IT
Med
COMM
FAIL2
Ladder

Cleaning Code:
Insulation Removal:
Estimated Hours:
Notification Type:
Surface Preparation:

DBLST


90
N1
NACE 2

Scheduled
Required Maintenance

Paint Code:
Sentry:
Permit:
Task Order:
Component Code:
Stream:

PC1


Hot Work
2
Code1
External (On)

Work Description
Problem Description:
Problem Description
Proposed Disposition:
Propose Disposition

Work Requests
1

Memo Title: Work Request


Memo Type:
Priority Code:
Activity Code:
Problem Code:
Access Required:
Lighting Required:
Reason for Work:
RFW Cause:
Work Description:

WR
Low
AE
FAIL1
Internal

Scheduled
Available Time

Cleaning Code:
Insulation Removal:
Estimated Hours:
Notification Type:
Surface Preparation:

CHEMC


90
N1
NACE 2

Paint Code:
Sentry:
Permit:
Task Order:
Component Code:
Stream:

PC2


Cold Work
1
Code1
External (On)

Work Description
Problem Description:
Problem Description
Proposed Disposition:
Proposed Disposition

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Page 10 of 31

Work Template Summary

Visions 4

WT No. 108
Extent:
Prepared By:

Title: Worm Template Memo


Full
MM

Date Created:
3/11/2008
Modification Reason: MRL1

Work Template Description


Access Details
Inspection Details
Memos
Memo Type
WR

Priority
Code
2

Memo Title
WR from WT

Activity
Code
Acces

Est.
Hours
3432

Stream
External (Off)

Equipment Link
Plant ID
MM Plant 170

Print Date: 4/28/2008


Report Criteria: No criteria selected.

Equipment Type
Exchanger

Equipment Number
EX-00010

Equipment Name
Main Test: Mar 10, 2008

Page 10 of 120

You might also like