You are on page 1of 2

Federal Register / Vol. 72, No.

247 / Thursday, December 27, 2007 / Notices 73341

12 p.m. Lunch Break. Opportunities for public participation Issued at Washington, DC on December 20,
1 p.m. Administrative Committee will be held from 1 p.m. to 1:15 p.m. 2007.
Report. and 4 p.m. to 4:15 p.m. Rachel Samuel,
1:45 p.m. Strategic and Legacy These times are subject to change; Deputy Advisory Committee Management
Management Committee Report. please contact the Federal Coordinator Officer.
3:15 p.m. Waste Management (below) for confirmation of times prior [FR Doc. E7–25031 Filed 12–26–07; 8:45 am]
Committee Report. to the meeting. BILLING CODE 6450–01–P
3:45 p.m. Public Comment Session.
4 p.m. Adjourn. ADDRESSES: AmeriTel Inn, 645 Lindsey
Boulevard, Idaho Falls, Idaho 83402. DEPARTMENT OF ENERGY
If needed, time will be allotted after
public comments for items added to the FOR FURTHER INFORMATION CONTACT:
Robert L. Pence, Federal Coordinator, Federal Energy Regulatory
agenda and administrative details. A
Department of Energy, Idaho Operations Commission
final agenda will be available at the
meeting Monday, January 28, 2008. Office, 1955 Fremont Avenue, MS– [Docket Nos. ER07–1386–000; ER07–1386–
Public Participation: The meeting is 1203, Idaho Falls, ID 83415. Phone (208) 001; ER07–1386–002]
open to the public. Written statements 526–6518; Fax (208) 526–8789 or e-mail:
may be filed with the Board either pencerl@id.doe.gov or visit the Board’s Tatanka Wind Power, LLC; Notice of
before or after the meeting. Individuals Internet home page at: http:// Issuance of Order
who wish to make oral statements www.inlemcab.org.
December 17, 2007.
pertaining to agenda items should SUPPLEMENTARY INFORMATION: Purpose of Tatanka Wind Power, LLC (Tatanka)
contact Gerri Flemming’s office at the the Board: The purpose of the Board is filed an application for market-based
address or telephone listed above. to make recommendations to DOE in the rate authority, with an accompanying
Requests must be received five days areas of environmental restoration, market-based rate tariff. The proposed
prior to the meeting and reasonable waste management, and related market-based rate tariff provides for the
provision will be made to include the activities. sale of energy and capacity at market-
presentation in the agenda. The Deputy based rates. Tatanka also requested
Designated Federal Officer is Tentative Topics (agenda topics may
change up to the day of the meeting; waivers of various Commission
empowered to conduct the meeting in a regulations. In particular, Tatanka
fashion that will facilitate the orderly please contact Robert L. Pence for the
most current agenda): requested that the Commission grant
conduct of business. Individuals blanket approval under 18 CFR part 34
wishing to make public comment will • Accelerated Retrieval Project (ARP)
of all future issuances of securities and
be provided a maximum of five minutes III Engineering Evaluation/Cost Analysis
assumptions of liability by Tatanka.
to present their comments. (EE/CA) & Waste Area Group 7 Public On December 10, 2007, pursuant to
Minutes: Minutes will be available by Comment Discussion. delegated authority, the Director,
writing or calling Gerri Flemming at the • Chemical Processing Plant (CPP)– Division of Tariffs and Market
address or phone number listed above. 601 EE/CA. Development-West, granted the requests
Minutes will also be available at the • Special Nuclear Material. for blanket approval under part 34
following Web site http://www.srs.gov/ • Workforce Restructuring Plan (Director’s Order). The Director’s Order
general/outreach/srs-cab/srs-cab.html. Briefing. also stated that the Commission would
Issued at Washington, DC on December 19, • Life-Cycle Baseline. publish a separate notice in the Federal
2007. Register establishing a period of time for
• Operable Unit 10–08 Briefing.
Rachel Samuel, the filing of protests. Accordingly, any
Public Participation: The meeting is person desiring to be heard concerning
Deputy Advisory Committee Management
Officer.
open to the public. Written statements the blanket approvals of issuances of
may be filed with the Board either securities or assumptions of liability by
[FR Doc. E7–25030 Filed 12–26–07; 8:45 am]
before or after the meeting. Individuals Tatanka, should file a protest with the
BILLING CODE 6450–01–P
who wish to make oral presentations Federal Energy Regulatory Commission,
pertaining to agenda items should 888 First Street, NE., Washington, DC
contact Robert L. Pence at the address 20426, in accordance with Rules 211
DEPARTMENT OF ENERGY
or telephone number listed above. The and 214 of the Commission’s Rules of
Environmental Management Site- request must be received five days prior Practice and Procedure. 18 CFR 385.211,
Specific Advisory Board, Idaho to the meeting and reasonable provision 385.214 (2007).
National Laboratory will be made to include the presentation Notice is hereby given that the
in the agenda. The Deputy Designated deadline for filing protests is January 9,
AGENCY: Department of Energy. Federal Officer is empowered to 2008.
ACTION: Notice of Open Meeting. conduct the meeting in a fashion that Absent a request to be heard in
will facilitate the orderly conduct of opposition to such blanket approvals by
SUMMARY: This notice announces a business. Individuals wishing to make the deadline above, Tatanka is
meeting of the Environmental public comment will be provided a authorized to issue securities and
Management Site-Specific Advisory maximum of five minutes to present assume obligations or liabilities as a
Board (EM SSAB), Idaho National their comments. guarantor, indorser, surety, or otherwise
Laboratory. The Federal Advisory Minutes: Minutes will be available by in respect of any security of another
Committee Act (Pub. L. 92–463, 86 Stat.
mstockstill on PROD1PC66 with NOTICES

writing or calling Robert L. Pence, person; provided that such issuance or


770) requires that public notice of this Federal Coordinator, at the address and assumption is for some lawful object
meeting be announced in the Federal phone number listed above. Minutes within the corporate purposes of
Register. will also be available at the following Tatanka compatible with the public
DATES: Tuesday, January 15, 2008, 8 Web site http://www.inlemcab.org/ interest, and is reasonably necessary or
a.m.–5:30 p.m. meetings.html. appropriate for such purposes.

VerDate Aug<31>2005 18:00 Dec 26, 2007 Jkt 214001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\27DEN1.SGM 27DEN1
73342 Federal Register / Vol. 72, No. 247 / Thursday, December 27, 2007 / Notices

The Commission reserves the right to free at (866) 208–3676, or for TTY, federal authorizations within 90 days of
require a further showing that neither contact (202) 502–8659. the date of issuance of the Commission
public nor private interests will be Transco proposes to construct the staff’s FEIS or EA.
adversely affected by continued expansion facilities, referred to as the Any person desiring to intervene or to
approvals of Tatanka’s issuance of Sentinel Expansion Project, in two protest this filing must file in
securities or assumptions of liability. phases. Phase 1 would consist of accordance with Rules 211 and 214 of
Copies of the full text of the Director’s approximately four miles of 42-inch the Commission’s Rules of Practice and
Order are available from the pipeline looping in Pennsylvania as Procedure (18 CFR 385.211 and
Commission’s Public Reference Room, well as modifications to Compressor 385.214). Protests will be considered by
888 First Street, NE., Washington, DC Station No. 195 and modifications to the Commission in determining the
20426. The Director’s Order may also be various other existing valve settings and appropriate action to be taken, but will
viewed on the Commission’s Web site at meter stations in Pennsylvania. The not serve to make protestants parties to
http://www.ferc.gov using the eLibrary phase 1 facilities would provide 40,000 the proceeding. Any person wishing to
link. Enter the docket number, dekatherms per day for a proposed in- become a party must file a notice of
excluding the last three digits in the service date of November 1, 2008. The intervention or motion to intervene, as
docket number filed, to access the Phase 2 facilities would consist of about appropriate. Such notices, motions, or
document. Comments, protests, and seven miles of 42-inch pipeline protests must be file on or before the
interventions may be filed electronically replacement in Pennsylvania and a total comment date. Anyone filing a motion
via the internet in lieu of paper. See 18 of about 7 miles of 42-inch pipeline to intervene or protest must serve a copy
CFR 385.2001(a)(1)(iii) and the looping in Pennsylvania and New Jersey of that document on the Applicant. On
instructions on the Commission’s Web as well as modifications to Compressor or before the comment date, it is not
site under the ‘‘e-Filing’’ link. The Station No. 200 and various existing necessary to serve motions to intervene
Commission strongly encourages meter stations in Pennsylvania and New or protests on persons other than the
electronic filings. Jersey. Phase 2 would provide 102,000 Applicant.
dekatherms per day for a proposed in- However, a person does not have to
Kimberly D. Bose, service date of November 1, 2009. intervene in order to have comments
Secretary. Any questions regarding the considered. The second way to
[FR Doc. E7–25004 Filed 12–26–07; 8:45 am] application are to be directed to Scott participate is by filing with the
BILLING CODE 6717–01–P Turkington, Director, Rates & Secretary of the Commission, as soon as
Regulatory, Transcontinental Gas Pipe possible, an original and two copies of
Line Corporation, Post Office Box 1396, comments in support of or in opposition
DEPARTMENT OF ENERGY Houston, Texas 77251–1396, telephone: to this project. The Commission will
(713) 215–3391 or e-mail: consider these comments in
Federal Energy Regulatory scott.c.turkington@williams.com. determining the appropriate action to be
Commission On August 4, 2006, the Commission taken, but the filing of a comment alone
staff granted Transco’s request to utilize will not serve to make the filer a party
[Docket No. CP08–31–000 and Docket No. the National Environmental Policy Act to the proceeding. The Commission’s
PF06–32–000] (NEPA) Pre-Filing Process and assigned rules require that persons filing
Docket No. PF06–32–000 to staff comments in opposition to the project
Transcontinental Gas Pipe line activities involving the project. Now, as provide copies of their protests only to
Corporation; Notice of Application of the filing of this application on the party or parties directly involved in
December 3, 2007, the NEPA Pre-Filing the protest.
December 17, 2007. Process for this project has ended. From Persons who wish to comment only
Take notice that on December 3, 2007, this time forward, this proceeding will on the environmental review of this
Transcontinental Gas Pipe line be conducted in Docket No. CP08–31– project should submit an original and
Corporation (Transco), 2800 Post Oak 000, as noted in the caption of this two copies of their comments to the
Boulevard, Houston, Texas 77056–6106 notice. Secretary of the Commission.
filed an application pursuant to sections Pursuant to section 157.9 of the Environmental commenters will be
7(b) and 7(c) of the Natural Gas Act Commission’s rules, 18 CFR 157.9, placed on the Commission’s
(NGA) and Part 157 of the Commission’s within 90 days of this Notice the environmental mailing list, will receive
regulations, for a certificate of public Commission staff will either: complete copies of the environmental documents,
convenience and necessity to construct, its environmental assessment (EA) and and will be notified of meetings
operate and abandon facilities in eastern place it into the Commission’s public associated with the Commission’s
Pennsylvania and northern New Jersey record (eLibrary) for this proceeding, or environmental review process.
that would expand its existing system issue a Notice of Schedule for Environmental commenters will not be
by providing an additional 142,000 Environmental Review. If a Notice of required to serve copies of filed
dekatherms per day of firm Schedule for Environmental Review is documents on all other parties.
transportation capacity to the issued, it will indicate, among other However, the non-party commenters
northeastern U.S. market. This filing is milestones, the anticipated date for the will not receive copies of all documents
available for review at the Commission Commission staff’s issuance of the final filed by other parties or issued by the
in the Public Reference Room or may be environmental impact statement (FEIS) Commission (except for the mailing of
viewed on the Commission’s Web site at or EA for this proposal. The filing of the environmental documents issued by the
http://www.ferc.gov using the EA in the Commission’s public record Commission) and will not have the right
mstockstill on PROD1PC66 with NOTICES

‘‘eLibrary’’ link. Enter the docket for this proceeding or the issuance of a to seek court review of the
number excluding the last three digits in Notice of Schedule for Environmental Commission’s final order.
the docket number field to access the Review will serve to notify federal and The Commission encourages
document. For assistance, please contact state agencies of the timing for the electronic submission of protests and
FERC Online Support at completion of all necessary reviews, and interventions in lieu of paper using the
FERCOnlineSupport@ferc.gov or toll the subsequent need to complete all ‘‘eFiling’’ link at http://www.ferc.gov.

VerDate Aug<31>2005 18:00 Dec 26, 2007 Jkt 214001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 E:\FR\FM\27DEN1.SGM 27DEN1

You might also like