You are on page 1of 2

71672 Federal Register / Vol. 72, No.

242 / Tuesday, December 18, 2007 / Notices

capacity of 7.0 Bcf, an injection rate of maintained by the Secretary of the while the PF Docket Number is now
100 MMcf per day and a withdrawal Commission and will receive copies of closed, all of the information contained
rate of 200 MMcf per day. CIG’s all documents filed by the applicant and in the Pre-Filing Process will become
proposal is more fully described as set by all other parties. A party must submit part of the certificate proceeding. From
forth in the application that is on file 14 copies of filings made with the this time forward, CIG’s proceeding will
with the Commission and open to Commission and must mail a copy to be conducted in Docket No. CP07–30–
public inspection. This filing may also the applicant and to every other party in 000, as noted in the caption of this
be viewed on the Commission’s Web the proceeding. Only parties to the Notice. All future correspondence
site at http://www.ferc.gov using the proceeding can ask for court review of should refer to this CP docket number
‘‘eLibrary’’ link. Enter the docket Commission orders in the proceeding. only.
number, excluding the last three digits, However, a person does not have to Comment Date: January 4, 2008.
in the docket number field to access the intervene in order to have comments
considered. The second way to Kimberly D. Bose,
document. There is an ‘‘eSubscription’’
link on the Web site that enables participate is by filing with the Secretary.
subscribers to receive e-mail notification Secretary of the Commission, as soon as [FR Doc. E7–24414 Filed 12–17–07; 8:45 am]
when a document is added to a possible, an original and two copies of BILLING CODE 6717–01–P
subscribed docket(s). For assistance comments in support of or in opposition
with any FERC Online service, please e- to this project. The Commission will
mail FERCOnlineSupport@ferc.gov, or consider these comments in DEPARTMENT OF ENERGY
call (866) 208–3676 (toll free). For TTY, determining the appropriate action to be
call (202) 502–8659. taken, but the filing of a comment alone Federal Energy Regulatory
Any questions regarding this will not serve to make the filer a party Commission
application should be directed to to the proceeding. The Commission’s [Docket No. ER08–107–000]
Richard Derryberry, Director of rules require that persons filing
Regulatory Affairs, Colorado Interstate comments in opposition to the project FirstEnergy Generation Mansfield Unit
Gas Company, P.O. Box 1087, Colorado provide copies of their protests only to 1 Corp.; Notice of Issuance of Order
Springs, Colorado 80944 at (719) 520– the party or parties directly involved in
December 11, 2007.
3782 or by fax at (719) 667–7534. the protest.
Pursuant to § 157.9 of the Persons who wish to comment only FirstEnergy Generation Mansfield
Commission’s rules, 18 CFR 157.9, on the environmental review of this Unit 1 Corp. (FEGM Unit 1) filed an
within 90 days of this Notice the project should submit an original and application for market-based rate
Commission staff will either: Complete two copies of their comments to the authority, with an accompanying rate
its environmental assessment (EA) and Secretary of the Commission. schedule. The proposed market-based
place it into the Commission’s public Environmental commentors will be rate schedule provides for the sale of
record (eLibrary) for this proceeding; or placed on the Commission’s energy and capacity at market-based
issue a Notice of Schedule for environmental mailing list, will receive rates. FEGM Unit 1 also requested
Environmental Review. If a Notice of copies of the environmental documents, waivers of various Commission
Schedule for Environmental Review is and will be notified of meetings regulations. In particular, FEGM Unit 1
issued, it will indicate, among other associated with the Commission’s requested that the Commission grant
milestones, the anticipated date for the environmental review process. blanket approval under 18 CFR Part 34
Commission staff’s issuance of the final Environmental commentors will not be of all future issuances of securities and
environmental impact statement (FEIS) required to serve copies of filed assumptions of liability by FEGM Unit
or EA for this proposal. The filing of the documents on all other parties. 1.
EA in the Commission’s public record However, the non-party commentors On December 10, 2007, pursuant to
for this proceeding or the issuance of a will not receive copies of all documents delegated authority, the Director,
Notice of Schedule for Environmental filed by other parties or issued by the Division of Tariffs and Market
Review will serve to notify federal and Commission (except for the mailing of Development-West, granted the requests
state agencies of the timing for the environmental documents issued by the for blanket approval under Part 34
completion of all necessary reviews, and Commission) and will not have the right (Director’s Order). The Director’s Order
the subsequent need to complete all to seek court review of the also stated that the Commission would
federal authorizations within 90 days of Commission’s final order. publish a separate notice in the Federal
the date of issuance of the Commission The Commission strongly encourages Register establishing a period of time for
staff’s FEIS or EA. electronic filings of comments, protests the filing of protests. Accordingly, any
There are two ways to become and interventions in lieu of paper using person desiring to be heard concerning
involved in the Commission’s review of the ‘‘eFiling’’ link at http:// the blanket approvals of issuances of
this project. First, any person wishing to www.ferc.gov. Persons unable to file securities or assumptions of liability by
obtain legal status by becoming a party electronically should submit an original FEGM Unit 1, should file a protest with
to the proceedings for this project and 14 copies of the protest or the Federal Energy Regulatory
should, on or before the comment date intervention to the Federal Energy Commission, 888 First Street, NE.,
stated below, file with the Federal Regulatory Commission, 888 First Washington, DC 20426, in accordance
Energy Regulatory Commission, 888 Street, NE., Washington, DC 20426. with Rules 211 and 214 of the
First Street, NE., Washington, DC 20426, On March 15, 2007, the Commission Commission’s Rules of Practice and
a motion to intervene in accordance staff granted CIG’s request to utilize the Procedure. 18 CFR 385.211, 385.214
with the requirements of the Pre-Filing Process and assigned Docket (2004).
yshivers on PROD1PC62 with NOTICES

Commission’s Rules of Practice and No. PF07–6–000 to staff activities Notice is hereby given that the
Procedure (18 CFR 385.214 or 385.211) involving CIG’s proposal. Now, as of the deadline for filing protests is January 9,
and the Regulations under the NGA (18 filing of CIG’s application on November 2008.
CFR 157.10). A person obtaining party 29, 2007, the Pre-Filing Process for this Absent a request to be heard in
status will be placed on the service list project has officially concluded. And opposition to such blanket approvals by

VerDate Aug<31>2005 15:19 Dec 17, 2007 Jkt 214001 PO 00000 Frm 00058 Fmt 4703 Sfmt 4703 E:\FR\FM\18DEN1.SGM 18DEN1
Federal Register / Vol. 72, No. 242 / Tuesday, December 18, 2007 / Notices 71673

the deadline above, FEGM Unit 1 is and 385.214). Protests will be (NYISO) proposal for Long-term Firm
authorized to issue securities and considered by the Commission in Transmission Rights (LTTRs), which
assume obligations or liabilities as a determining the appropriate action to be NYISO submitted in compliance with
guarantor, indorser, surety, or otherwise taken, but will not serve to make the Commission’s LTTR Final Rule.1
in respect of any security of another protestants parties to the proceeding. As ‘‘non-decisional’’ staff, Dr. Singh
person; provided that such issuance or Any person wishing to become a party will not participate in an advisory
assumption is for some lawful object must file a notice of intervention or capacity in the Commission’s review of
within the corporate purposes of FEGM motion to intervene, as appropriate. any offer of settlement or settlement
Unit 1, compatible with the public Such notices, motions, or protests must agreement or in deliberations
interest, and is reasonably necessary or be filed on or before the date as concerning the disposition of the NYISO
appropriate for such purposes. indicated below. Anyone filing an proposal or the order ruling on that
The Commission reserves the right to intervention or protest must serve a proposal.
require a further showing that neither copy of that document on the Applicant.
Kimberly D. Bose,
public nor private interests will be Anyone filing an intervention or protest
adversely affected by continued on or before the intervention or protest Secretary.
approvals of FEGM Unit 1’s issuance of date need not serve motions to intervene [FR Doc. E7–24417 Filed 12–17–07; 8:45 am]
securities or assumptions of liability. or protests on persons other than the BILLING CODE 6717–01–P
Copies of the full text of the Director’s Applicant.
Order are available from the The Commission encourages
Commission’s Public Reference Room, electronic submission of protests and DEPARTMENT OF ENERGY
888 First Street, NE., Washington, DC interventions in lieu of paper using the
Federal Energy Regulatory
20426. The Order may also be viewed ‘‘eFiling’’ link at http://www.ferc.gov.
Commission
on the Commission’s Web site at Persons unable to file electronically
http://www.ferc.gov, using the eLibrary should submit an original and 14 copies
[Docket Nos. ER08–38–000, ER08–38–001,
link. Enter the docket number excluding of the protest or intervention to the
ER08–38–002]
the last three digits in the docket Federal Energy Regulatory Commission,
number filed to access the document. 888 First Street, NE., Washington, DC Northern Renewable Energy (USA) Ltd;
Comments, protests, and interventions 20426. Notice of Issuance of Order
may be filed electronically via the This filing is accessible on-line at
internet in lieu of paper. See, 18 CFR http://www.ferc.gov, using the December 11, 2007.
385.2001(a)(1)(iii) and the instructions ‘‘eLibrary’’ link and is available for Northern Renewable Energy (USA)
on the Commission’s Web site under the review in the Commission’s Public Ltd. (NREL USA) filed an application
‘‘e-Filing’’ link. The Commission Reference Room in Washington, DC. for market-based rate authority, with an
strongly encourages electronic filings. There is an ‘‘eSubscription’’ link on the accompanying rate schedule. The
Web site that enables subscribers to proposed market-based rate schedule
Kimberly D. Bose,
receive e-mail notification when a provides for the sale of energy, capacity
Secretary. document is added to a subscribed and ancillary services at market-based
[FR Doc. E7–24418 Filed 12–17–07; 8:45 am] docket(s). For assistance with any FERC rates. NREL USA so requested waivers
BILLING CODE 6717–01–P Online service, please e-mail of various Commission regulations. In
FERCOnlineSupport@ferc.gov, or call particular, NREL USA requested that the
(866) 208–3676 (toll free). For TTY, call Commission grant blanket approval
DEPARTMENT OF ENERGY (202) 502–8659. under 18 CFR part 34 of all future
Comment Date: 5 p.m. Eastern Time issuances of securities and assumptions
Federal Energy Regulatory
December 27, 2007. of liability by NREL USA.
Commission
On December 10, 2007, pursuant to
Kimberly D. Bose,
[Docket No. PR08–8–000] delegated authority, the Director,
Secretary.
Division of Tariffs and Market
Magic Valley Pipeline, L.P.; Notice of [FR Doc. E7–24412 Filed 12–17–07; 8:45 am] Development—West, granted the
Petition for Rate Approval BILLING CODE 6717–01–P requests for blanket approval under Part
December 11, 2007. 34 (Director’s Order). The Director’s
Take notice that on November 30, Order also stated that the Commission
DEPARTMENT OF ENERGY would publish a separate notice in the
2007, Magic Valley Pipeline, L.P. (Magic
Valley) filed a petition for approval of Federal Energy Regulatory Federal Register establishing a period of
rates for transportation services, Commission time for the filing of protests.
pursuant to section 284.123(b)(2) of the Accordingly, any person desiring to be
[Docket No. ER07–521–000] heard concerning the blanket approvals
Commission’s regulations. Magic Valley
requests that the Commission approve a of issuances of securities or assumptions
New York Independent System of liability by NREL USA, should file a
maximum monthly reservation charge of Operator, Inc.; Notice of Designation of
$1.1669 per Dth, with a maximum firm protest with the Federal Energy
Certain Commission Personnel as Regulatory Commission, 888 First
commodity charge of $0.00 per Dth, and Non-Decisional
the equivalent interruptible Street, NE., Washington, DC 20426, in
transportation rate of $0.0384 per Dth. December 11, 2007. accordance with Rules 211 and 214 of
Any person desiring to participate in Commission staff member Dr. Harry the Commission’s Rules of Practice and
yshivers on PROD1PC62 with NOTICES

this rate proceeding must file a motion Singh (Office of Energy Markets
1 Long-Term Firm Transmission Rights in
to intervene or to protest this filing must Regulation; 202–502–6341;
Organized Electricity Markets, Order No. 681, FERC
file in accordance with Rules 211 and harry.singh@ferc.gov) is assigned to help Stats. & Regs. ¶31,226 (August 1, 2006), order on
214 of the Commission’s Rules of resolve issues concerning the New York reh’g and clarification, Order No. 681–A, 117 FERC
Practice and Procedure (18 CFR 385.211 Independent System Operator, Inc.’s ¶61,201 (November 16, 2006) (together, LTTR Rule).

VerDate Aug<31>2005 15:19 Dec 17, 2007 Jkt 214001 PO 00000 Frm 00059 Fmt 4703 Sfmt 4703 E:\FR\FM\18DEN1.SGM 18DEN1