You are on page 1of 2

71124 Federal Register / Vol. 72, No.

240 / Friday, December 14, 2007 / Notices

request for a modification to a particular an order, as well as any relevant SUPPLEMENTARY INFORMATION: The Board
rule of origin based on a change in the information regarding past production. is a discretionary federal advisory
availability in North America of a CITA will protect any business committee established by the Secretary
particular fiber, yarn or fabric and that confidential information that is marked of Defense to provide the Department of
the requesting party would bear the business confidential from disclosure to Defense independent advice concerning
burden of demonstrating that a change the full extent permitted by law. CITA matters arising from the military service
is warranted. NAFTA Implementation will make available to the public non- obligations of members of the National
Act, SAA, H. Doc. 103-159, Vol. 1, at confidential versions of the request and Guard and Reserve members and the
491 (1993). The SAA provides that CITA non-confidential versions of any public impact on their civilian employment.
may make a recommendation to the comments received with respect to a Pursuant to DoD policy, the Assistant
President regarding a change to a rule of request in room 3001 in the Herbert Secretary of Defense (Reserve Affairs)
origin for a textile or apparel good. SAA Hoover Building, 14th and Constitution may act upon the advice of the Board.
at 491. The NAFTA Implementation Act Avenue, N.W., Washington, DC 20230. The Board shall be composed of no
provides the President with the Persons submitting comments on a more than fifteen members appointed by
authority to proclaim modifications to request are encouraged to include a non- the Secretary of Defense for three-year
the NAFTA rules of origin as are confidential version and a non- terms, and their appointments will be
necessary to implement an agreement confidential summary. renewed on an annual basis. Those
with one or more NAFTA country on members, who are not full-time federal
R. Matthew Priest, officers or employees, shall serve as
such a modification. See section 202(q)
of the NAFTA Implementation Act. Chairman, Committee for the Implementation Special Government Employees under
of Textile Agreements. the authority of 5 U.S.C. 3109.
On October 16, 2007, the Chairman of
CITA received a request from the
[FR Doc. E7–24281 Filed 12–13–07; 8:45 am] Board members, with the exception of
National Textile Association (NTA), BILLING CODE 3510–DS travel and per diem for official travel,
alleging that certain rayon fibers (other shall serve without compensation. The
than ‘‘lyocell’’) cannot be supplied by Assistant Secretary of Defense (Reserve
Affairs) shall select the Board’s
the domestic industry in commercial DEPARTMENT OF DEFENSE
Chairperson from the Board
quantities in a timely manner and
Office of the Secretary membership at large.
requesting that CITA consider whether The Board shall meet at the call of the
the North American Free Trade Board’s Designated Federal Officer, in
Agreement (NAFTA) rule of origin for Amendment to Department of Defense
Federal Advisory Committees consultation with the Chairperson. The
textile filaments, staple yarns, and Designated Federal Officer, pursuant to
woven fabrics, classified under chapters AGENCY: DoD. DoD policy, shall be a full-time or
52, 54 and 55 of the Harmonized Tariff ACTION:Amendment to Federal permanent part-time DoD employee,
Schedule of the United States (HTSUS) Advisory Committee. and shall be appointed in accordance
and nonwoven and other textile articles with established DoD policies and
of chapter 56, should be modified to SUMMARY: Under the provisions of the procedures. The Designated Federal
allow the use of non-North American Federal Advisory Committee Act of Officer or duly appointed Alternate
rayon fibers (other than ‘‘lyocell’’). CITA 1972, (5 U.S.C. Appendix, as amended), Designated Federal Officer shall attend
is also considering a broad change in the the Sunshine in the Government Act of all committee meetings and
rule of origin for all other textile 1976 (5 U.S.C. 552b, as amended), and subcommittee meetings.
products to allow the use of non-North 41 CFR 102–3.85, the Department of Pursuant to 41 CFR 102–3.105(j) and
American rayon fibers (other than Defense gives notice that it is amending 102–3.140, the public or interested
‘‘lyocell’’). the charter for the Defense Advisory organizations may submit written
CITA is soliciting public comments Board for Employer Support of the statements to the Defense Advisory
regarding this request, particularly with Guard and Reserve (hereafter referred to Board for Employer Support of the
respect to whether the rayon fiber as the Board). Guard and Reserve membership about
described above can be supplied by the The Department of Defense hereby the Board’s mission and functions.
domestic industry in commercial authorizes the Board to establish and Written statements may be submitted at
quantities in a timely manner. use subcommittees as necessary and any time or in response to the stated
Comments must be received no later consistent with its mission. These agenda of planned meeting of the
than January 14, 2008. Interested subcommittees or working groups shall Defense Advisory Board for Employer
persons are invited to submit six copies operate under the provisions of the Support of the Guard and Reserve.
of such comments or information to the Federal Advisory Committee Act of All written statements shall be
Chairman, Committee for the 1972, the Sunshine in the Government submitted to the Designated Federal
Implementation of Textile Agreements, Act of 1976, and other appropriate Officer for the Defense Advisory Board
Room 3100, U.S. Department of Federal regulations. for Employer Support of the Guard and
Commerce, 14th and Constitution Such subcommittees or workgroups Reserve, and this individual will ensure
Avenue, N.W., Washington, DC 20230. shall not work independently of the that the written statements are provided
If a comment alleges that these rayon chartered Board, and shall report all to the membership for their
fibers can be supplied by the domestic their recommendations and advice to consideration. Contact information for
industry in commercial quantities in a the Board for full deliberation and the Defense Advisory Board for
timely manner, CITA will closely discussion. Subcommittees or Employer Support of the Guard and
review any supporting documentation, workgroups have no authority to make Reserve’s Designated Federal Officer can
rmajette on PROD1PC64 with NOTICES

such as a signed statement by a decisions on behalf of the chartered be obtained from the GSA’s FACA
manufacturer stating that it produces Board nor can they report directly to the Database—https://www.fido.gov/
fiber that is the subject of the request, Department of Defense or any federal facadatabase/public.asp.
including the quantities that can be officers or employees who are not Board The Designated Federal Officer,
supplied and the time necessary to fill Members. pursuant to 41 CFR 102–3.150, will

VerDate Aug<31>2005 16:23 Dec 13, 2007 Jkt 214001 PO 00000 Frm 00013 Fmt 4703 Sfmt 4703 E:\FR\FM\14DEN1.SGM 14DEN1
Federal Register / Vol. 72, No. 240 / Friday, December 14, 2007 / Notices 71125

announce planned meetings of the would be maintained through a program of numerous tropical storms and
Defense Advisory Board for Employer of periodic beach nourishment events hurricanes during the mid to late 1990’s
Support of the Guard and Reserve. The with the material extracted from the and due to impacts of the uncontrolled
Designated Federal Officer, at that time, New River Inlet; and if necessary, movement of the main ebb channel in
may provide additional guidance on the supplemental materials from the New River Inlet. The Town has stated
submission of written statements that offshore borrow area. All work will be that the shoreline erosion and residual
are in response to the stated agenda for accomplished using a hydraulic dredge. effects of the storms have left North
the planned meeting in question. The proposed project construction will Topsail Beach in an extremely
FOR FURTHER INFORMATION CONTACT: be conducted in a five phase approach vulnerable position with regard to its
Contact Jim Freeman, Deputy to correspond with the Town’s ocean front development and
Committee Management Officer for the anticipated annual generation of funds. infrastructure. They have estimated that
Department of Defense, 703–601–2554, The ocean shoreline of the Town of over $250 million in property tax value
extension 128. North Topsail Beach encompasses as well as roads, water and sewer lines,
approximately 11.1 miles along the and other utilities are at risk. The stated
Dated: December 7, 2007.
northern end of Topsail Island. Of the goals and objectives of the project are
L.M. Bynum, 11.1 miles, approximately 7.25-miles of the following: (1) Stabilize the
Alternate OSD Federal Register Liaison the shoreline in the project area, with
Officer, Department of Defense. oceanfront shoreline located
the exception of two small areas, is immediately south of New River Inlet,
[FR Doc. E7–24224 Filed 12–13–07; 8:45 am] located within the Coastal Barrier (2) Provide short-term protection to the
BILLING CODE 5001–06–P Resource System (CBRS), which 31 imminently threatened residential
prohibits the expenditure of Federal structures over the next zero to five
funds that would encourage years, (3) Provide long-term protection
DEPARTMENT OF DEFENSE development. to Town infrastructure and
Department of the Army; Corps of The channel through New River Inlet approximately 1,200 homes over the
Engineers has been maintained by the COE for next thirty years, (4) Reduce or mitigate
commercial and recreational boating for historic shoreline erosion along 11.1
The Release of the Draft Environmental interest for over 55 years. The COE is miles of oceanfront shoreline, (5)
Impact Statement and the authorized to maintain the channel in Improve recreational opportunities, (6)
Announcement of a Public Hearing for the inlet to a depth of 6 feet mean low Use beach compatible material, (7)
the North Topsail Beach Shoreline water (mlw) over a width of 90 feet. Maintain the Town’s tax base, and (8)
Protection Project, in North Topsail DATES: The Public Hearing will be held Balance the needs of the human
Beach, Onslow County, NC at the North Topsail Beach Town Hall, environment with the protection of
located at 2008 Loggerhead Court, off existing natural resources.
AGENCY: Department of the Army, U.S. NC Hwy 210, on January 9, 2007 at 6:30
Army Corps of Engineers, DoD. The project is divided into three
p.m. Written comments on the Draft EIS sections; North, South, and Central. The
ACTION: Notice. will be received until January 29, 2008. North Section starts from the inlet
SUMMARY: The U.S. Army Corps of ADDRESSES: Copies of comments and shoulder and runs approximately 21,000
Engineers (COE), Wilmington District, questions regarding the Draft EIS may be linear feet along the ocean shoreline.
Wilmington Regulatory Field Office has addressed to: U.S. Army Corps of The Central Section is located both
received a request for Department of the Engineers, Wilmington District, north and south of NC Hwy 210/55
Army authorization, pursuant to Section Regulatory Division. ATTN: File Bridge and is approximately 16,500
404 of the Clean Water Act and Section Number 2005–344–067, P.O. Box 1890, linear feet, while the South Section,
10 of the Rivers and Harbors Act, from Wilmington, NC 28402–1890. Copies of which is outside of the CBRS
the Town of North Topsail Beach to the Draft EIS can be reviewed on the designation, includes approximately
nourish approximately 11.1 miles of Coastal Planning & Engineering 20,320 linear feet of shoreline. The
beachfront to protect residential homes homepage at, http:// Town is proposing to undertake the
and town infrastructures, to reposition www.coastalplanning.net/projects/ nourishment along the 11.1 miles of
the New River Inlet channel, and to temp/ntopsail.html, or contact Ms. oceanfront in a five phase approach
implement an inlet management plan to Gwen Dye, at (910) 251–4494, to receive within a dredging window between
control the positioning of the new inlet written or CD copies of the Draft EIS. November 16 and March 31 of any year.
channel, and to conduct periodic FOR FURTHER INFORMATION CONTACT: The first phase will include the
renourishment events. The new channel Questions about the proposed action relocation of the inlet channel with the
will be centrally located and the and DEIS can be directed to Mr. Mickey dredged inlet material being used to
proposal will be to maintain that Sugg, Wilmington Regulatory Field nourish approximately 14,000 linear
position, which essentially will be Office, telephone: (910) 251–4811. feet of shoreline in the North Section.
located perpendicular to the adjacent SUPPLEMENTARY INFORMATION: 1. Project Construction timeline for Phase One
shorelines of North Topsail Beach and Description. The Town of North Topsail will be within the 2008–2009 dredging
Onslow Beach. The proposed source of Beach, located along the north-northeast window. Phase Two would take place
the material for the nourishment will be 11.1 miles of Topsail Island in North during the 2010–2011 dredging window
dredged from an offshore borrow area Carolina, is proposing to nourish the using the offshore borrow source, and
and from the repositioning of the inlet. oceanfront shoreline and reposition will nourish approximately 5,140 linear
The projected amount of material New River Inlet channel as a means to feet in the North Section. The third
needed to nourish the oceanfront address a severe erosion problem that is phase will place offshore borrow
rmajette on PROD1PC64 with NOTICES

shoreline is approximately 3.21 million threatening development and town material along approximately 11,500
cubic yards. The placement of beach fill infrastructure. The entire stretch of the linear feet within the southern part of
along the Town’s shoreline would result Town’s shoreline has experienced a the Central Section, and is proposed
in the initial widening of the beach by considerable amount of erosion over the during the 2012–2013 dredging
50 to 100 feet. The widened beach last 20 years due primarily to the impact window. For Phase Four, offshore

VerDate Aug<31>2005 15:31 Dec 13, 2007 Jkt 214001 PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 E:\FR\FM\14DEN1.SGM 14DEN1

You might also like