You are on page 1of 1

Federal Register / Vol. 72, No.

232 / Tuesday, December 4, 2007 / Notices 68133

DEPARTMENT OF ENERGY There are two ways to become and interventions via the Internet in lieu
involved in the Commission’s review of of paper. See 18 CFR 385.2001(a)(1)(iii)
Federal Energy Regulatory this project. First, any person wishing to and the instructions on the
Commission obtain legal status by becoming a party Commission’s Web (http://
[Docket Nos. CP08–21–000] to the proceedings for this project www.ferc.gov) site under the ‘‘e-Filing’’
should, on or before the comment date link.
CenterPoint Energy Gas Transmission stated below, file with the Federal Comment Date: December 18, 2007.
Company; Notice of Application Energy Regulatory Commission, 888
Kimberly D. Bose,
First Street, NE., Washington, DC 20426,
November 27, 2007. a motion to intervene in accordance Secretary.
Take notice that on November 13, with the requirements of the [FR Doc. E7–23449 Filed 12–3–07; 8:45 am]
2007, CenterPoint Energy Gas Commission’s Rules of Practice and BILLING CODE 6717–01–P
Transmission Company (CEGT), 1111 Procedure (18 CFR 385.214 or 385.211)
Louisiana Street, Houston, Texas and the Regulations under the NGA (18
77002–5231, filed in Docket No. CP08– CFR 157.10). A person obtaining party DEPARTMENT OF ENERGY
21–000, an application pursuant to status will be placed on the service list
section 7(b) of the Natural Gas Act Federal Energy Regulatory
maintained by the Secretary of the
(NGA), to abandon its Lines ADT–2, Commission and will receive copies of Commission
ADT–6, ADT–8, ADT–10, and ADT–4, all documents filed by the applicant and [Docket Nos. CP08–28–000]
all located in Hemphill County, Texas, by all other parties. A party must submit
by sale to CenterPoint Energy Field 14 copies of filings made with the CenterPoint Energy Gas Transmission
Services, Inc. In conjunction with the Commission and must mail a copy to Company; Notice of Application
abandonment, CEGT seeks a the applicant and to every other party in
determination that the lines are November 27, 2007.
the proceeding. Only parties to the
gathering facilities exempt from the Take notice that on November 15,
proceeding can ask for court review of
Commission’s jurisdiction under NGA 2007, CenterPoint Energy Gas
Commission orders in the proceeding.
section 1(b), all as more fully set forth However, a person does not have to Transmission Company (CEGT), 1111
in the application, which is on file with intervene in order to have comments Louisiana Street, Houston, Texas
the Commission and open to public considered. The second way to 77002–5231, filed in Docket No. CP08–
inspection. This filing may also be participate is by filing with the 21–000, an application pursuant to
viewed on the Commission’s Web site at Secretary of the Commission, as soon as section 7(b) of the Natural Gas Act
http://www.ferc.gov using the possible, an original and two copies of (NGA), to abandon its Lines ADT–17,
‘‘eLibrary’’ link. Enter the docket comments in support of or in opposition AD–107, AD–107–A, AD–107–B, and its
number, excluding the last three digits, to this project. The Commission will Canadian Compressor Station, all
in the docket number field to access the consider these comments in located in Pittsburg County, Oklahoma,
document. For assistance, call (202) determining the appropriate action to be by sale to CenterPoint Energy Field
502–8659 or TTY, (202) 208–3676. taken, but the filing of a comment alone Services, Inc. In conjunction with the
Any questions regarding this will not serve to make the filer a party abandonment, CEGT seeks a
application should be directed to to the proceeding. The Commission’s determination that the facilities are
Lawrence O. Thomas, Director-Rates & rules require that persons filing gathering facilities exempt from the
Regulatory at CenterPoint Energy Gas comments in opposition to the project Commission’s jurisdiction under NGA
Transmission Co., P.O. Box 21734, provide copies of their protests only to section 1(b), all as more fully set forth
Shreveport, Louisiana 71151, or by the party or parties directly involved in in the application which is on file with
calling (318) 429–2804. the protest. the Commission and open to public
Pursuant to section 157.9 of the Persons who wish to comment only inspection. This filing may also be
Commission’s rules, 18 CFR 157.9, on the environmental review of this viewed on the Commission’s Web site at
within 90 days of this Notice the project should submit an original and http://www.ferc.gov using the
Commission staff will either: Complete two copies of their comments to the ‘‘eLibrary’’ link. Enter the docket
its environmental assessment (EA) and Secretary of the Commission. number, excluding the last three digits,
place it into the Commission’s public Environmental commentors will be in the docket number field to access the
record (eLibrary) for this proceeding; or placed on the Commission’s document. For assistance, call (202)
issue a Notice of Schedule for environmental mailing list, will receive 502–8659 or TTY, (202) 208–3676.
Environmental Review. If a Notice of copies of the environmental documents, Any questions regarding this
Schedule for Environmental Review is and will be notified of meetings application should be directed to
issued, it will indicate, among other associated with the Commission’s Lawrence O. Thomas, Director-Rates &
milestones, the anticipated date for the environmental review process. Regulatory at CenterPoint Energy Gas
Commission staff’s issuance of the final Environmental commentors will not be Transmission Co., P.O. Box 21734,
environmental impact statement (FEIS) required to serve copies of filed Shreveport, Louisiana 71151, or by
or EA for this proposal. The filing of the documents on all other parties. calling (318) 429–2804.
EA in the Commission’s public record However, the non-party commentors Pursuant to section 157.9 of the
for this proceeding or the issuance of a will not receive copies of all documents Commission’s rules, 18 CFR 157.9,
Notice of Schedule for Environmental filed by other parties or issued by the within 90 days of this Notice the
Review will serve to notify federal and Commission (except for the mailing of Commission staff will either: complete
mstockstill on PROD1PC66 with NOTICES

State agencies of the timing for the environmental documents issued by the its environmental assessment (EA) and
completion of all necessary reviews, and Commission) and will not have the right place it into the Commission’s public
the subsequent need to complete all to seek court review of the record (eLibrary) for this proceeding; or
federal authorizations within 90 days of Commission’s final order. issue a Notice of Schedule for
the date of issuance of the Commission The Commission strongly encourages Environmental Review. If a Notice of
staff’s FEIS or EA. electronic filings of comments, protests Schedule for Environmental Review is

VerDate Aug<31>2005 17:38 Dec 03, 2007 Jkt 214001 PO 00000 Frm 00012 Fmt 4703 Sfmt 4703 E:\FR\FM\04DEN1.SGM 04DEN1

You might also like