Federal Register / Vol. 72, No.

225 / Friday, November 23, 2007 / Notices 65731

Corps of Engineers’ Allegheny Lock & o. Notice of Intent—A notice of intent s. Agency Comments—Federal, state,
Dam No. 7 and operated in a run-of- must specify the exact name, business and local agencies are invited to file
river mode would consist of: (1) A new address, and telephone number of the comments on the described application.
125-foot long, 160-foot wide, 60-foot prospective applicant, and must include A copy of the application may be
high concrete powerhouse; (2) a new an unequivocal statement of intent to obtained by agencies directly from the
intake channel and tailrace channel on submit, if such an application may be Applicant. If an agency does not file
the eastern side of the river; (3) three filed, either a preliminary permit comments within the time specified for
turbine/generator units with a combined application or a development filing comments, it will be presumed to
installed capacity of 16.5 megawatts; (4) application (specify which type of have no comments. One copy of an
a new 12,000-foot long above ground application). A notice of intent must be agency’s comments must also be sent to
transmission line extending from the served on the applicant(s) named in this the Applicant’s representatives.
switchyard near the powerhouse to a public notice.
connection at a substation located south p. Proposed Scope of Studies Under Kimberly D. Bose,
of the powerhouse on the Kittanning Permit—A preliminary permit, if issued, Secretary.
side of the river; and (5) appurtenant does not authorize construction. The [FR Doc. E7–22838 Filed 11–21–07; 8:45 am]
facilities. The proposed Allegheny Lock term of the proposed preliminary permit BILLING CODE 6717–01–P
& Dam No. 7 Project would have an would be 36 months. The work
average annual generation of 89 proposed under the preliminary permit
gigawatt-hours. would include economic analysis, ENVIRONMENTAL PROTECTION
l. This filing is available for review at preparation of preliminary engineering AGENCY
the Commission in the Public Reference plans, and a study of environmental
Room or may be viewed on the impacts. Based on the results of these [ER–FRL–6693–3]
Commission’s Web site at http:// studies, the Applicant would decide Environmental Impact Statements and
www.ferc.gov using the ‘‘eLibrary’’ link. whether to proceed with the preparation Regulations; Availability of EPA
Enter the docket number excluding the of a development application to Comments
last three digits in the docket number construct and operate the project.
field to access the document. For q. Comments, Protests, or Motions to Availability of EPA comments
assistance, call toll-free Intervene—Anyone may submit prepared pursuant to the Environmental
1–866–208–3676 or e-mail comments, a protest, or a motion to Review Process (ERP), under section
ferconlinesupport@ferc.gov. For TTY, intervene in accordance with the 309 of the Clean Air Act and section
call (202) 502–8659. A copy is also requirements of Rules of Practice and 102(2)(c) of the National Environmental
available for inspection and Procedure, 18 CFR 385.210, .211, .214. Policy Act as amended. Requests for
reproduction at the address in item h In determining the appropriate action to copies of EPA comments can be directed
above. take, the Commission will consider all to the Office of Federal Activities at
m. Competing Preliminary Permit— protests or other comments filed, but 202–564–7167.
Anyone desiring to file a competing only those who file a motion to An explanation of the ratings assigned
application for preliminary permit for a intervene in accordance with the to draft environmental impact
proposed project must submit the Commission’s Rules may become a statements (EISs) was published in FR
competing application itself, or a notice party to the proceeding. Any comments, dated April 6, 2007 (72 FR 17156).
of intent to file such an application, to protests, or motions to intervene must
the Commission on or before the be received on or before the specified Draft EISs
specified comment date for the comment date for the particular EIS No. 20070377, ERP No. D–COE–
particular application (see 18 CFR 4.36). application. E39070–TN, Center Hill Dam and Lake
Submission of a timely notice of intent r. Filing and Service of Responsive Project, Changes to Operational Guide
allows an interested person to file the Documents—Any filings must bear in Curves Pool Elevations, Chancey Fork
competing preliminary permit all capital letters the title River and Cumberland River, Dekalb
application no later than 30 days after ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT County, TN.
the specified comment date for the TO FILE COMPETING APPLICATION’’, Summary: EPA expressed
particular application. A competing ‘‘COMPETING APPLICATION’’, environmental concerns about impacts
preliminary permit application must ‘‘PROTEST’’, and ‘‘MOTION TO to water quantity and impacts related to
conform with 18 CFR 4.30 and 4.36. INTERVENE’’, as applicable, and the dam releases, and also requested
n. Competing Development Project Number of the particular additional dam failure risk assessment
Application—Any qualified application to which the filing refers. information.
development applicant desiring to file a Any of the above-named documents Rating EC2.
competing development application must be filed by providing the original EIS No. 20070396, ERP No. D–AFS–
must submit to the Commission, on or and the number of copies provided by L65542–ID, Cherry Dinner Project,
before a specified comment date for the the Commission’s regulations to: The Management of Vegetation, Hazardous
particular application, either a Secretary, Federal Energy Regulatory Fuels, and Access Plus Watershed
competing development application or a Commission, 888 First Street, NE., Improvements, Amendment to the
notice of intent to file such an Washington, DC 20426. An additional Forest Plan, Palouse Ranger District,
application. Submission of a timely copy must be sent to Director, Division Clearwater National Forest, Latah
notice of intent to file a development of Hydropower Administration and County, ID.
application allows an interested person Compliance, Federal Energy Regulatory Summary: EPA expressed
mstockstill on PROD1PC66 with NOTICES

to file the competing application no Commission, at the above-mentioned environmental concerns about water
later than 120 days after the specified address. A copy of any notice of intent, quality impacts within streams and
comment date for the particular competing application or motion to creeks that are already on the state of
application. A competing license intervene must also be served upon each Idaho’s current 303(d) list due to
application must conform with 18 CFR representative of the Applicant temperature and sediment load
4.30 and 4.36. specified in the particular application. exceedances.

VerDate Aug<31>2005 16:16 Nov 21, 2007 Jkt 214001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\23NON1.SGM 23NON1
65732 Federal Register / Vol. 72, No. 225 / Friday, November 23, 2007 / Notices

Rating EC2. Amendment to Provide Scheduled Air Agency’s draft administrative policies
EIS No. 20070445, ERP No. D–USN– Service, Town of Mammoth Lakes, and procedures for completing the
E11063–00, Shock Trail of the MESA Mono County, CA. Comment Period initial screening and testing under
VERDE (LPD 19), San Antonio (LPD 17) Ends: 01/11/2008. Contact: Chuck EPA’s Endocrine Disruptor Screening
Class Ship designated as the Shock Ship Cox, 425–227–2243. Program (EDSP) and the burden and
for Proposed Shock Trail, Possible EIS No. 20070498, Draft EIS, FHW, UT, cost estimates for the related
Offshore Locations are Naval Station I–15 Corridor Project, Transportation information collection activities. In two
Norfolk, VA; Naval Station Mayport, FL; Improvement from Utah County to forthcoming notices in the Federal
and Naval Air Station Pensacola, FL. Salt Lake County, UT. Comment Register, EPA will announce the
Summary: EPA expressed Period Ends: 01/11/2008. Contact: availability for public review and
environmental concerns about impacts Carlos Machado, 801–963–0182. comment of: (1) The draft policies and
to avian and marine species. EIS No. 20070499, Final EIS, FRC, 00, procedures EPA is considering adopting
Rating EC1. Klamath Hydroelectric Project, for conducting the initial screening and
EIS No. 20070364, ERP No. DS–COE– Continued Operation for Hydropower testing under the EDSP and (2) the draft
E01013–FL, Rock Mining in the Lake License FERC No. 2082–27, Klamath Information Collection Request (ICR) for
Belt Region Plan, Continuance of River, Klamath County, OR and the initial screening and testing. The
Limestone Mining Construction, section Siskiyou County, CA. Wait Period purpose of the public workshop is to
404 Permit, Miami-Dade County, FL. Ends: 12/24/2007. Contact: John allow the public to ask questions and for
Summary: EPA expressed Mudre, 202–502–8902. EPA to provide further explanation
environmental concerns about water about these aspects of the EDSP, which
quality, wetland and mining-related Amended Notices
in turn may facilitate the preparation of
seepage impacts, and requested EIS No. 20070409, Draft EIS, AFS, MT, comments.
additional mitigation and monitoring Beartooth Ranger District Travel DATES: The meeting is on Monday,
measures. Management Planning, Proposing to December 17, 2007, from 9 a.m. to 5
Rating EC2. Designate Routes for Public Motorized p.m.
Dated: November 19, 2007. Use, and Change Management of Pack Special accommodations: For
Robert W. Hargrove, and Saddle Stock on Certain Trail, information on access or services for
Director, NEPA Compliance Division, Office Beartooth Ranger District, Custer individuals with disabilities, and to
of Federal Activities. National Forest, Carbon, Stillwater, request accommodation of a disability,
[FR Doc. E7–22851 Filed 11–21–07; 8:45 am] Sweet Grass, and Park Counties, MT. please contact the person listed under
Comment Period Ends: 12/19/2007. FOR FURTHER INFORMATION CONTACT at
BILLING CODE 6560–50–P
Contact: Doug Epperly, 406–657–6205 least 10 days prior to the meeting to give
Ext 225. Revision for FR Notice EPA as much time as possible to process
ENVIRONMENTAL PROTECTION Published 10/05/2007: Extending your request.
AGENCY Comment Period from 11/19/2007 to ADDRESSES: The meeting will be held at
12/19/2007. the Environmental Protection Agency,
[ER–FRL–6693–2] EIS No. 20070478, Final EIS, AFS, AK, Conference Center—Lobby Level, One
Helicopter Access to Conduct Forest Potomac Yard (South Building), 2777 S.
Environmental Impact Statements;
Inventory and Analysis (FIA) in Crystal Drive, Arlington, VA 22202.
Notice of Availability
Wilderness, in Tongas and Kedgwick FOR FURTHER INFORMATION CONTACT:
Responsible Agency: Office of Federal National Forest, AK. Wait Period William Wooge, Office of Science
Activities, General Information, (202) Ends: 12/24/2007. Contact: Ken Post, Coordination and Policy (OSCP),
564–7167 or http://www.epa.gov/ 907–586–8796. Review to FR Notice Environmental Protection Agency, 1200
compliance/nepa/ Published 11/09/2007: Extending Pennsylvania Ave., NW., Washington,
Weekly receipt of Environmental Impact Wait Period from 12/10/2007 to 12/ DC 20460–0001; telephone number:
Statements 24/2007 and Correction to Title. (202) 546–8476; e-mail address:
Filed 11/12/2007 through 11/16/2007 Dated: November 19, 2007. wooge.william@epa.gov.
Pursuant to 40 CFR 1506.9. Robert W. Hargrove, SUPPLEMENTARY INFORMATION:
EIS No. 20070495, Final Supplement, Director, NEPA Compliance Division, Office
APH, 00, Importation of Solid Wood of Federal Activities. I. Who Should Attend?
Packing Material, To Reevaluate and [FR Doc. E7–22852 Filed 11–21–07; 8:45 am] You may be interested in attending
Refine Estimates of Methyl Bromide BILLING CODE 6560–50–P this workshop if you produce,
Usage in the Treatment, manufacture, use, or import pesticide/
Implementation, United States. Wait agricultural chemicals and other
Period Ends: 12/24/2007. Contact: ENVIRONMENTAL PROTECTION chemical substances; or if you are or
David A. Bergston, 301–734–6103. AGENCY may otherwise be involved in the testing
EIS No. 20070496, Draft EIS, FRC, 00, of chemical substances for potential
Fayetteville/Greenville Expansion [EPA–HQ–OPPT–2007–1080; FRL–8341–3]
endocrine effects. To determine whether
Project, Construction and Operation Endocrine Disruptor Screening you or your business may have an
of the Natural Gas Pipeline Facilities Program; Workshop to Discuss Draft interest in this workshop you should
in Arkansas and Mississippi. Policies and Procedures carefully examine section 408(p) of the
Comment Period Ends: 01/07/2008. Federal, Food, Drug, and Cosmetic Act
mstockstill on PROD1PC66 with NOTICES

Contact: Andy Black, 1–866–208– AGENCY: Environmental Protection (FFDCA). [21 U.S.C. 346a(p)]
3372. Agency (EPA).
EIS No. 20070497, Draft EIS, FAA, CA, II. What is the EDSP?
ACTION: Notice.
Horizon Air Service to Mammoth The EDSP was established in 1998 to
Yosemite Airport Project, Proposed SUMMARY: EPA is convening a 1–day carry out the mandate in section 408(p)
Operations Specifications public workshop to discuss the of FFDCA [21 U.S.C. 346a et. seq.],

VerDate Aug<31>2005 16:16 Nov 21, 2007 Jkt 214001 PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 E:\FR\FM\23NON1.SGM 23NON1