65724 Federal Register / Vol. 72, No.

225 / Friday, November 23, 2007 / Notices

DEPARTMENT OF ENERGY 4100 proposed 20-kilowatt Free Flow prospective applicant, and must include
generating units having a total installed an unequivocal statement of intent to
Federal Energy Regulatory capacity of 82-megawatts, (2) a proposed submit, if such an application may be
Commission transmission line, and (3) appurtenant filed, either a preliminary permit
[Project No. 12940–000] facilities. The project would have an application or a development
average annual generation of 359.16- application (specify which type of
FFP Project 51, LLC; Notice of gigawatt-hours and be sold to a local application). A notice of intent must be
Application Accepted for Filing and utility. served on the applicant(s) named in this
Soliciting Comments, Motions To l. Location of Application: A copy of public notice.
Intervene, and Protests the application is available for q. Proposed Scope of Studies Under
inspection and reproduction at the Permit—A preliminary permit, if issued,
November 14, 2007. Commission in the Public Reference does not authorize construction. The
Take notice that the following Room, located at 888 First Street, NE., term of the proposed preliminary permit
hydroelectric applications have been Room 2A, Washington, DC 20426, or by would be 36 months. The work
filed with the Commission and are calling (202) 502–8371. This filing may proposed under the preliminary permit
available for public inspection: also be viewed on the Commission’s would include economic analysis,
a. Type of Application: Preliminary Web site at http://www.ferc.gov using preparation of preliminary engineering
Permit. the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental
b. Project No.: P–12940–000. number excluding the last three digits in impacts. Based on the results of these
c. Date Filed: August 6, 2007. the docket number field to access the studies, the Applicant would decide
d. Applicant: FFP Project 51 LLC. document. For assistance, call toll-free whether to proceed with the preparation
e. Name of the Project: Greenfield 1–866–208–3676 or e-mail of a development application to
Bend Project. FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project.
f. Location: The project would be call (202) 502–8659. A copy is also r. Comments, Protests, or Motions to
located on the Mississippi River in available for inspection and Intervene—Anyone may submit
Mississippi County, Missouri and reproduction at the address in item h comments, a protest, or a motion to
Alexander County, Illinois. The project above. intervene in accordance with the
uses no dam or impoundment. m. Individuals desiring to be included requirements of Rules of Practice and
g. Filed Pursuant to: Federal Power on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214.
Act, 16 U.S.C. 791a–825r. so indicate by writing to the Secretary In determining the appropriate action to
h. Applicants Contact: Mr. Dan Irvin, of the Commission. take, the Commission will consider all
FFP Project 51, LLC, 69 Bridge Street, n. Competing Preliminary Permit— protests or other comments filed, but
Manchester, MA 01944, phone (978) Anyone desiring to file a competing only those who file a motion to
232–3536. application for preliminary permit for a intervene in accordance with the
i. FERC Contact: Patricia W. Gillis, proposed project must submit the Commission’s Rules may become a
(202) 502–8735. competing application itself, or a notice party to the proceeding. Any comments,
j. Deadline for filing comments, of intent to file such an application, to protests, or motions to intervene must
protests, and motions to intervene: 60 the Commission on or before the be received on or before the specified
days from the issuance date of this specified comment date for the comment date for the particular
notice. particular application (see 18 CFR 4.36). application.
All documents (original and eight Submission of a timely notice of intent Comments, protests and interventions
copies) should be filed with: Kimberly allows an interested person to file the may be filed electronically via the
D. Bose, Secretary, Federal Energy competing preliminary permit Internet in lieu of paper. See 18 CFR
Regulatory Commission, 888 First application no later than 30 days after 385.2001(a)(1)(iii) and the instructions
Street, NE., Washington, DC 20426. the specified comment date for the on the Commission’s Web site at
Comments, protests, and interventions particular application. A competing http://www.ferc.gov under the ‘‘e-
may be filed electronically via the preliminary permit application must Filing’’ link.
Internet in lieu of paper; see 18 CFR conform with 18 CFR 4.30 and 4.36. s. Filing and Service of Responsive
385.2001(a)(1)(iii) and, the instructions o. Competing Development Documents—Any filings must bear in
on the Commission’s Web site under the Application—Any qualified all capital letters the title
‘‘e-Filing’’ link. The Commission development applicant desiring to file a ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT
strongly encourages electronic filings. competing development application TO FILE COMPETING APPLICATION’’,
Please include the project number (P– must submit to the Commission, on or ‘‘COMPETING APPLICATION’’,
12940–000) on any comments or before a specified comment date for the ‘‘PROTEST’’, and ‘‘MOTION TO
motions filed. particular application, either a INTERVENE’’, as applicable, and the
The Commission’s Rules of Practice competing development application or a Project Number of the particular
and Procedure require all intervenors notice of intent to file such an application to which the filing refers.
filing documents with the Commission application. Submission of a timely Any of the above-named documents
to serve a copy of that document on notice of intent to file a development must be filed by providing the original
each person in the official service list application allows an interested person and the number of copies provided by
for the project. Further, if an intervenor to file the competing application no the Commission’s regulations to: The
files comments or documents with the later than 120 days after the specified Secretary, Federal Energy Regulatory
Commission relating to the merits of an comment date for the particular Commission, 888 First Street, NE.,
mstockstill on PROD1PC66 with NOTICES

issue that may affect the responsibilities application. A competing license Washington, DC 20426. An additional
of a particular resource agency, they application must conform with 18 CFR copy must be sent to Director, Division
must also serve a copy of the document 4.30 and 4.36. of Hydropower Administration and
on that resource agency. p. Notice of Intent—A notice of intent Compliance, Federal Energy Regulatory
k. Description of Project: The must specify the exact name, business Commission, at the above-mentioned
proposed project would consist of: (1) address, and telephone number of the address. A copy of any notice of intent,

VerDate Aug<31>2005 16:16 Nov 21, 2007 Jkt 214001 PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 E:\FR\FM\23NON1.SGM 23NON1
Federal Register / Vol. 72, No. 225 / Friday, November 23, 2007 / Notices 65725

competing application or motion to Internet in lieu of paper; see 18 CFR preliminary permit application must
intervene must also be served upon each 385.2001(a)(1)(iii) and the instructions conform with 18 CFR 4.30 and 4.36.
representative of the Applicant on the Commission’s Web site under the o. Competing Development
specified in the particular application. ‘‘e-Filing’’ link. The Commission Application—Any qualified
t. Agency Comments—Federal, state, strongly encourages electronic filings. development applicant desiring to file a
and local agencies are invited to file Please include the project number (P– competing development application
comments on the described application. 12941–000) on any comments or must submit to the Commission, on or
A copy of the application may be motions filed. before a specified comment date for the
obtained by agencies directly from the The Commission’s Rules of Practice particular application, either a
Applicant. If an agency does not file and Procedure require all intervenors competing development application or a
comments within the time specified for filing documents with the Commission notice of intent to file such an
filing comments, it will be presumed to to serve a copy of that document on application. Submission of a timely
have no comments. One copy of an each person in the official service list notice of intent to file a development
agency’s comments must also be sent to for the project. Further, if an intervenor application allows an interested person
the Applicant’s representatives. files comments or documents with the to file the competing application no
Kimberly D. Bose,
Commission relating to the merits of an later than 120 days after the specified
issue that may affect the responsibilities comment date for the particular
Secretary.
of a particular resource agency, they application. A competing license
[FR Doc. E7–22828 Filed 11–21–07; 8:45 am] must also serve a copy of the document application must conform with 18 CFR
BILLING CODE 6717–01–P on that resource agency. 4.30 and 4.36.
k. Description of Project: The p. Notice of Intent—A notice of intent
proposed project would consist of: (1) must specify the exact name, business
DEPARTMENT OF ENERGY
1450 proposed 20-kilowatt Free Flow address, and telephone number of the
Federal Energy Regulatory generating units having a total installed prospective applicant, and must include
Commission capacity of 29-megawatts, (2) a proposed an unequivocal statement of intent to
transmission line, and (3) appurtenant submit, if such an application may be
[Project No. 12941–000] facilities. The project would have an filed, either a preliminary permit
average annual generation of 127.02- application or a development
FFP Project 50, LLC; Notice of gigawatt-hours and be sold to a local application (specify which type of
Application Accepted for Filing and utility. application). A notice of intent must be
Soliciting Comments, Motions To served on the applicant(s) named in this
l. Location of Application: A copy of
Intervene, and Protests public notice.
the application is available for
November 14, 2007. inspection and reproduction at the q. Proposed Scope of Studies Under
Take notice that the following Commission in the Public Reference Permit—A preliminary permit, if issued,
hydroelectric applications have been Room, located at 888 First Street, NE., does not authorize construction. The
filed with the Commission and are Room 2A, Washington, DC 20426, or by term of the proposed preliminary permit
available for public inspection: calling (202) 502–8371. This filing may would be 36 months. The work
a. Type of Application: Preliminary also be viewed on the Commission’s proposed under the preliminary permit
Permit. Web site at http://www.ferc.gov using would include economic analysis,
b. Project No.: P–12941–000. the ‘‘eLibrary’’ link. Enter the docket preparation of preliminary engineering
c. Date Filed: August 6, 2007. number excluding the last three digits in plans, and a study of environmental
d. Applicant: FFP Project 50 LLC. the docket number field to access the impacts. Based on the results of these
e. Name of the Project: Wickliffe document. For assistance, call toll-free studies, the Applicant would decide
Project. 1–866–208–3676 or e-mail whether to proceed with the preparation
f. Location: The project would be FERCOnlineSupport@ferc.gov. For TTY, of a development application to
located on the Mississippi River in call (202) 502–8659. A copy is also construct and operate the project.
Mississippi County, Missouri and available for inspection and r. Comments, Protests, or Motions to
Ballard County, Kentucky. The project reproduction at the address in item h Intervene—Anyone may submit
uses no dam or impoundment. above. comments, a protest, or a motion to
g. Filed Pursuant to: Federal Power m. Individuals desiring to be included intervene in accordance with the
Act, 16 U.S.C. 791a—825r. on the Commission’s mailing list should requirements of Rules of Practice and
h. Applicants Contact: Mr. Dan Irvin, so indicate by writing to the Secretary Procedure, 18 CFR 385.210, .211, .214.
FFP Project 50, LLC, 69 Bridge Street, of the Commission. In determining the appropriate action to
Manchester, MA 01944, phone (978) n. Competing Preliminary Permit— take, the Commission will consider all
232–3536. Anyone desiring to file a competing protests or other comments filed, but
i. FERC Contact: Patricia W. Gillis, application for preliminary permit for a only those who file a motion to
(202) 502–8735. proposed project must submit the intervene in accordance with the
j. Deadline for filing comments, competing application itself, or a notice Commission’s Rules may become a
protests, and motions to intervene: 60 of intent to file such an application, to party to the proceeding. Any comments,
days from the issuance date of this the Commission on or before the protests, or motions to intervene must
notice. specified comment date for the be received on or before the specified
All documents (original and eight particular application (see 18 CFR 4.36). comment date for the particular
mstockstill on PROD1PC66 with NOTICES

copies) should be filed with: Kimberly Submission of a timely notice of intent application.
D. Bose, Secretary, Federal Energy allows an interested person to file the Comments, protests and interventions
Regulatory Commission, 888 First competing preliminary permit may be filed electronically via the
Street, NE., Washington, DC 20426. application no later than 30 days after Internet in lieu of paper. See 18 CFR
Comments, protests, and interventions the specified comment date for the 385.2001(a)(1)(iii) and the instructions
may be filed electronically via the particular application. A competing on the Commission’s Web site at

VerDate Aug<31>2005 16:16 Nov 21, 2007 Jkt 214001 PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 E:\FR\FM\23NON1.SGM 23NON1